Ecological revetment for port navigation channel engineering
By designing structures such as soil layers, gravel layers, and concrete layers on the port channel revetment, the problem of difficulty in planting green plants in concrete structures has been solved, the greening and stability of the ecological revetment has been achieved, and the long-term growth and ornamental effects of plants have been ensured. And improve the stability and safety of the bank protection.
Patent Information
- Application Number
- CN202323550764.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-26
AI Technical Summary
The concrete structure of the existing port channel revetment makes it difficult to plant green plants, resulting in inconvenience in greening the ecological revetment. Moreover, the plants are easily affected by the water during high and low tides, making it difficult to survive for a long time and affecting the aesthetic effect.
An ecological bank protection for port channel engineering is designed, including a soil layer, a gravel layer, a concrete layer, a green groove, a planting seat, a lifting seat, a weight plate, a limiting mechanism, a reinforcing mechanism, a drainage hole and a protective mechanism. Through these structures The greening and reinforcement of the concrete layer are achieved to ensure the stable growth and safety of plants when water levels change.
It improves the greening convenience and sturdiness of the ecological revetment, ensures the long-term growth and ornamental effects of plants, and at the same time enhances the stability and safety of the revetment.
Smart Images

Figure CN221837480U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of ecological revetment, in particular to an ecological revetment for a port and waterway project. Background Art
[0002] With the rapid development of the domestic shipping industry, more and more coasts are being developed into port and waterway revetments. Some existing port and waterway revetments are constructed using ecological revetments to increase the ecological effect of the revetment and ensure a green and leisurely ecological environment. However, most of the plants planted on the existing ecological revetments are planted on the top of the revetment, or planted using some fixed planting racks, which causes water impacts on the planted plants during high and low tides, resulting in the water submerging or exposing the plants. As time goes by, it becomes difficult for plants to survive on the ecological revetment for a long time, which in turn affects the aesthetic effect of the ecological revetment, making it difficult to achieve the expected effect of the ecological revetment.
[0003] In the existing technology, such as the Chinese patent number: CN 219753133 U "A kind of ecological revetment for port and waterway engineering", which includes a main body mechanism, a mobile floating mechanism is arranged on one side of the main body mechanism, a fixing mechanism is arranged on the bottom end of the mobile floating mechanism, and the mobile floating mechanism includes a slide rail 1, and a slide rail 2 is arranged on one side of the slide rail 1; the utility model, through the installed mobile floating mechanism, the plants inside the planting box can be raised as the water body rises, so that the planting box is always parallel to the water surface, which is more convenient for pedestrians to watch, greatly increases the viewing effect of the revetment, and keeps the planting box always with moisture for the plants to absorb, and the installed fixing mechanism can better connect the mobile floating mechanism with the concrete layer, thereby increasing the fixing effect of the mobile floating mechanism and increasing the stability of the device.
[0004] When constructing ecological revetments using existing technologies, since most ecological revetments are concrete structures, it is difficult to plant green plants on the top of the ecological revetments, which leads to the problem of inconvenience in greening the ecological revetments.
[0005] Therefore, it is necessary to provide an ecological revetment for port channel engineering to solve the above technical problems. Utility Model Content
[0006] The utility model provides an ecological revetment for a port and waterway project, which solves the problem that since most ecological revetments are concrete structures, it is difficult to plant green plants on the top of the ecological revetment, which leads to inconvenience in greening the ecological revetment.
[0007] In order to solve the above technical problems, the utility model provides an ecological revetment for a port and waterway engineering, comprising a soil layer, a gravel layer is arranged on the top of the soil layer, a concrete layer is arranged on the top of the gravel layer, a greening trough is opened on the top of the concrete layer, a planting seat is movably sleeved inside the greening trough, a No. 1 drainage hole is opened at the bottom of the planting seat, a lifting seat is movably sleeved on the side of the concrete layer, a floating plate is fixedly connected to the side of the lifting seat, a counterweight plate is fixedly connected to the bottom of the lifting seat, a limiting mechanism is arranged on the side of the concrete layer, a No. 2 drainage hole is opened on the side of the lifting seat, a reinforcing mechanism is arranged inside the concrete layer, a fixing mechanism is arranged inside the greening trough, a protective mechanism is arranged on the top of the concrete layer, and an auxiliary mechanism is arranged on the top of the concrete layer.
[0008] Preferably, the planting seat is compatible with the greening trough, and the height of the planting seat is the same as the height of the concrete layer.
[0009] Preferably, the thickness of the crushed stone layer is smaller than the thickness of the concrete layer, and the crushed stone layer and the concrete layer are parallel to each other.
[0010] Preferably, the counterweight plate is made of metal lead material, and the counterweight plate is located directly below the lifting seat.
[0011] Preferably, the limiting mechanism comprises a limiting rod, the limiting rod is fixedly connected to the side of the concrete layer, the outer movably sleeve of the limiting rod is connected with a sliding sleeve, the outer part of the sliding sleeve is fixedly connected with a support frame, and the support frame is fixedly connected to the bottom of the lifting seat.
[0012] Preferably, there are a plurality of No. 2 drainage holes, and the plurality of No. 2 drainage holes are evenly distributed on the side of the lifting seat.
[0013] Preferably, the reinforcing mechanism comprises a No. 1 threaded steel bar, the No. 1 threaded steel bar is fixedly sleeved inside the concrete layer, and the outside of the No. 1 threaded steel bar is fixedly connected with a No. 2 threaded steel bar.
[0014] Preferably, the fixing mechanism comprises a clamping block, the clamping block is movably sleeved inside the planting seat, and a pull ring is fixedly connected to the top of the clamping block.
[0015] Preferably, the protection mechanism comprises a hanging rod, the hanging rod is fixedly connected to the top of the concrete layer, and a life buoy is movably sleeved on the outside of the hanging rod.
[0016] Preferably, the auxiliary mechanism comprises a fixing rod, the fixing rod is fixedly connected to the top of the concrete layer, and a pull rope is fixedly connected to the outside of the fixing rod.
[0017] Compared with the related technologies, the ecological revetment of a port and waterway engineering provided by the utility model has the following beneficial effects:
[0018] The utility model provides an ecological revetment for a port and waterway project. By setting a planting seat, when the construction of the ecological revetment is completed, green plants are planted inside the planting seat, so that a plurality of planting seats can accommodate a plurality of green plants, thereby achieving a greening effect on the top of the concrete layer, that is, achieving a greening effect of the ecological revetment, avoiding the problem that the concrete layer is relatively hard and difficult to plant green plants, thereby improving the convenience of greening the ecological revetment.
[0019] By setting up a reinforcing mechanism, when the ecological revetment is being constructed, the No. 1 rebar and the No. 2 rebar can reinforce the concrete layer, so as to avoid the problem of the concrete layer breaking when impacted by water waves, thereby improving the firmness of the concrete layer, that is, improving the firmness of the ecological revetment. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A structural schematic diagram of a preferred embodiment of an ecological revetment for a port and waterway project provided by the utility model;
[0021] Figure 2 for Figure 1 The enlarged schematic diagram of point A in the ecological revetment of a port channel project is shown;
[0022] Figure 3 for Figure 1 A front view of a fixing mechanism in an ecological revetment of a port channel project is shown;
[0023] Figure 4 for Figure 1 A front view of a planting seat in an ecological revetment of a port and waterway project is shown.
[0024] Numbers in the figure: 1. Soil layer; 2. Gravel layer; 3. Concrete layer; 4. Greening trough; 5. Planting seat; 6. Drainage hole No. 1; 7. Lifting seat; 8. Floating plate; 9. Counterweight plate; 10. Limiting mechanism; 101. Limiting rod; 102. Sliding sleeve; 103. Support frame; 11. Drainage hole No. 2; 12. Strengthening mechanism; 121. Threaded steel bar No. 1; 122. Threaded steel bar No. 2; 13. Fixing mechanism; 131. Block; 132. Pull ring; 14. Protective mechanism; 141. Hanging rod; 142. Lifebuoy; 15. Auxiliary mechanism; 151. Fixing rod; 152. Pull rope. DETAILED DESCRIPTION
[0025] The utility model is further described below in conjunction with the accompanying drawings and implementation modes.
[0026] Please refer to Figure 1 , Figure 2 , Figure 3 , Figure 4 ,in, Figure 1 A structural schematic diagram of a preferred embodiment of an ecological revetment for a port and waterway project provided by the utility model; Figure 2 for Figure 1 The enlarged schematic diagram of point A in the ecological revetment of a port channel project is shown; Figure 3 for Figure 1 A front view of a fixing mechanism in an ecological revetment of a port channel project is shown; Figure 4 for Figure 1 A front view of a planting seat in an ecological revetment for a port and waterway project is shown. An ecological revetment for a port and waterway project comprises a soil layer 1, a gravel layer 2 is arranged on the top of the soil layer 1, a concrete layer 3 is arranged on the top of the gravel layer 2, a greening trough 4 is provided on the top of the concrete layer 3, a planting seat 5 is movably sleeved inside the greening trough 4, a No. 1 drainage hole 6 is provided at the bottom of the planting seat 5, a lifting seat 7 is movably sleeved on the side of the concrete layer 3, a floating plate 8 is fixedly connected to the side of the lifting seat 7, a counterweight plate 9 is fixedly connected to the bottom of the lifting seat 7, a limiting mechanism 10 is arranged on the side of the concrete layer 3, a No. 2 drainage hole 11 is provided on the side of the lifting seat 7, a reinforcing mechanism 12 is arranged inside the concrete layer 3, a fixing mechanism 13 is arranged inside the greening trough 4, a protective mechanism 14 is arranged on the top of the concrete layer 3, and an auxiliary mechanism 15 is arranged on the top of the concrete layer 3.
[0027] The planting seat 5 is compatible with the greening trough 4, and the height value of the planting seat 5 is the same as the height value of the concrete layer 3; by setting the planting seat 5, when the ecological revetment construction is completed, the green plants are planted inside the planting seat 5, so that multiple planting seats 5 can accommodate multiple green plants, thereby achieving the greening effect on the top of the concrete layer 3, that is, achieving the greening effect of the ecological revetment, avoiding the problem that the concrete layer 3 is relatively hard and difficult to plant green plants, thereby improving the convenience of ecological revetment greening.
[0028] The thickness of the gravel layer 2 is less than the thickness of the concrete layer 3, and the gravel layer 2 and the concrete layer 3 are parallel to each other; by setting the gravel layer 2, when the ecological revetment construction is carried out, the gravel layer 2 can greatly improve the firmness of the bottom of the concrete layer 3, thereby avoiding the problem of cracks in the concrete layer 3 caused by the settlement of the soil layer 1, thereby improving the stability of the concrete layer 3.
[0029] The material of the counterweight plate 9 is metal lead material, and the counterweight plate 9 is located directly below the lifting seat 7; by setting the counterweight plate 9, when the lifting seat 7 moves up and down, the counterweight plate 9 can stretch the lifting seat 7 downward, thereby avoiding the problem of up and down fluctuations of the lifting seat 7 when impacted by water waves, thereby improving the stability of the lifting seat 7.
[0030] The limiting mechanism 10 includes a limiting rod 101, which is fixedly connected to the side of the concrete layer 3. The outer movably sleeve of the limiting rod 101 is connected to a sliding sleeve 102, and the outer part of the sliding sleeve 102 is fixedly connected to a support frame 103, and the support frame 103 is fixedly connected to the bottom of the lifting seat 7. By setting the limiting mechanism 10, when the ecological bank protection construction is carried out, green plants are planted inside the lifting seat 7. At this time, the lifting seat 7 can drive the green plants to move up and down through the sliding sleeve 102 and the limiting rod 101, so that the green plants can move up and down with the water level, thereby improving the ornamental effect of the green plants.
[0031] There are several No. 2 drainage holes 11, and the several No. 2 drainage holes 11 are evenly distributed on the side of the lifting seat 7. By setting the No. 2 drainage holes 11, when water flows into the interior of the lifting seat 7, the No. 2 drainage holes 11 can discharge the water inside the lifting seat 7, thereby avoiding the problem of green plants rotting due to water accumulation inside the lifting seat 7, thereby improving the protection effect of green plants.
[0032] The reinforcing mechanism 12 includes a No. 1 threaded steel bar 121, which is fixedly sleeved inside the concrete layer 3, and the outside of the No. 1 threaded steel bar 121 is fixedly connected with a No. 2 threaded steel bar 122; by setting up the reinforcing mechanism 12, when the ecological revetment construction is carried out, the No. 1 threaded steel bar 121 and the No. 2 threaded steel bar 122 can reinforce the concrete layer 3, so that the problem of the concrete layer 3 being broken when impacted by water waves is avoided, thereby improving the firmness of the concrete layer 3, that is, improving the firmness of the ecological revetment.
[0033] The fixing mechanism 13 includes a clamping block 131, which is movably sleeved inside the planting seat 5, and a pull ring 132 is fixedly connected to the top of the clamping block 131; by setting the fixing mechanism 13, when the ecological bank protection construction is completed and the position of the planting seat 5 needs to be adjusted, the pull ring 132 is pulled so that the pull ring 132 can drive the clamping block 131 to move out from the inside of the planting seat 5. At this time, the planting seat 5 can move horizontally inside the greening trough 4, thereby facilitating the movement of greening plants.
[0034] The protection mechanism 14 includes a hanging rod 141, which is fixedly connected to the top of the concrete layer 3, and a lifebuoy 142 is movably sleeved on the outside of the hanging rod 141. By setting up the protection mechanism 14, when a user falls into the waterway, the lifebuoy 142 is removed from the outside of the hanging rod 141 and thrown into the waterway, so that the construction workers can quickly rescue the fallen person through the lifebuoy 142, thereby improving the safety of the ecological revetment.
[0035] The auxiliary mechanism 15 includes a fixing rod 151, which is fixedly connected to the top of the concrete layer 3, and a pull rope 152 is fixedly connected to the outside of the fixing rod 151. By setting up the auxiliary mechanism 15, when other objects fall into the waterway, the pull rope 152 is dropped into the waterway, so that the staff can use the pull rope 152 to tie and fix the objects inside the waterway, and stretch the objects inside the waterway, thereby facilitating the salvage of objects inside the waterway.
[0036] The working principle of the ecological revetment of a port channel project provided by the utility model is as follows:
[0037] Step 1: First, when the ecological revetment construction is completed, the green plants are planted inside the planting seat 5, so that multiple planting seats 5 can accommodate multiple green plants, thereby achieving the greening effect on the top of the concrete layer 3, that is, achieving the greening effect of the ecological revetment, avoiding the problem that the concrete layer 3 is relatively hard and difficult to plant green plants, thereby improving the convenience of ecological revetment greening. When the ecological revetment construction is carried out, the gravel layer 2 can greatly improve the firmness of the bottom of the concrete layer 3, thereby avoiding the problem of cracks in the concrete layer 3 caused by the settlement of the soil layer 1, thereby improving the stability of the concrete layer 3. When the lifting seat 7 moves up and down, the counterweight plate 9 can stretch the lifting seat 7 downward, thereby avoiding the problem of up and down fluctuations of the lifting seat 7 when it is impacted by water waves, thereby improving the lifting seat 7. Stability. When the ecological revetment is constructed, the green plants are planted inside the lifting seat 7. At this time, the lifting seat 7 can drive the green plants to move up and down through the sliding sleeve 102 and the limit rod 101, so that the green plants can move up and down with the water level, thereby improving the ornamental effect of the green plants. When the water flows into the interior of the lifting seat 7, the No. 2 drainage hole 11 can discharge the water flow inside the lifting seat 7, thereby avoiding the problem of the green plants rotting when the water accumulates inside the lifting seat 7, thereby improving the protection effect of the green plants. When the ecological revetment is constructed, the No. 1 threaded steel bar 121 and the No. 2 threaded steel bar 122 can reinforce the concrete layer 3, so that the concrete layer 3 is prevented from being broken when it is impacted by water waves, thereby improving the firmness of the concrete layer 3, that is, improving the firmness of the ecological revetment;
[0038] Step 2: When the construction of the ecological revetment is completed and the position of the planting seat 5 needs to be adjusted, pull the pull ring 132 so that the pull ring 132 can drive the block 131 to move out from the inside of the planting seat 5. At this time, the planting seat 5 can move horizontally inside the greening trough 4, which facilitates the movement of green plants. When the user falls into the waterway, remove the lifebuoy 142 from the outside of the hanging rod 141 and throw it into the waterway, so that the construction personnel can quickly rescue the fallen personnel through the lifebuoy 142, thereby improving the safety of the ecological revetment. When other objects fall into the waterway, the pull rope 152 is thrown into the waterway, so that the staff can use the pull rope 152 to tie and fix the objects inside the waterway, and stretch the objects inside the waterway, thereby facilitating the salvage of the objects inside the waterway.
[0039] Compared with the related technologies, the ecological revetment of a port and waterway engineering provided by the utility model has the following beneficial effects:
[0040] By setting up the planting seat 5, when the ecological revetment construction is completed, the green plants are planted inside the planting seat 5, so that multiple planting seats 5 can accommodate multiple green plants, thereby achieving the greening effect on the top of the concrete layer 3, that is, achieving the greening effect of the ecological revetment, avoiding the problem that the concrete layer 3 is relatively hard and difficult to plant green plants, thereby improving the convenience of ecological revetment greening.
[0041] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. An ecological revetment for a port and waterway project, comprising a soil layer (1), characterized in that: A gravel layer (2) is arranged on the top of the soil layer (1), a concrete layer (3) is arranged on the top of the gravel layer (2), a greening trough (4) is provided on the top of the concrete layer (3), a planting seat (5) is movably sleeved inside the greening trough (4), a No. 1 drainage hole (6) is provided at the bottom of the planting seat (5), a lifting seat (7) is movably sleeved on the side of the concrete layer (3), a floating plate (8) is fixedly connected to the side of the lifting seat (7), a counterweight plate (9) is fixedly connected to the bottom of the lifting seat (7), a limiting mechanism (10) is arranged on the side of the concrete layer (3), a No. 2 drainage hole (11) is provided on the side of the lifting seat (7), a reinforcing mechanism (12) is arranged inside the concrete layer (3), a fixing mechanism (13) is arranged inside the greening trough (4), a protective mechanism (14) is arranged on the top of the concrete layer (3), and an auxiliary mechanism (15) is arranged on the top of the concrete layer (3).
2. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The planting seat (5) is compatible with the greening trough (4), and the height of the planting seat (5) is the same as the height of the concrete layer (3).
3. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The thickness of the crushed stone layer (2) is smaller than the thickness of the concrete layer (3), and the crushed stone layer (2) and the concrete layer (3) are parallel to each other.
4. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The material of the counterweight plate (9) is a metal lead material, and the counterweight plate (9) is located directly below the lifting seat (7).
5. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The limiting mechanism (10) comprises a limiting rod (101), the limiting rod (101) is fixedly connected to the side of the concrete layer (3), the outer part of the limiting rod (101) is movably sleeved with a sliding sleeve (102), the outer part of the sliding sleeve (102) is fixedly connected with a support frame (103), and the support frame (103) is fixedly connected to the bottom of the lifting seat (7).
6. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The number of the No. 2 drainage holes (11) is a plurality, and the plurality of No. 2 drainage holes (11) are evenly distributed on the side of the lifting seat (7).
7. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The reinforcing mechanism (12) comprises a No. 1 threaded steel bar (121), the No. 1 threaded steel bar (121) is fixedly sleeved inside the concrete layer (3), and the outside of the No. 1 threaded steel bar (121) is fixedly connected to a No. 2 threaded steel bar (122).
8. The ecological revetment for port and waterway engineering according to claim 1 is characterized in that: The fixing mechanism (13) comprises a clamping block (131), the clamping block (131) is movably sleeved inside the planting seat (5), and a pull ring (132) is fixedly connected to the top of the clamping block (131).
9. The ecological revetment for port and waterway engineering according to claim 1, characterized in that: The protection mechanism (14) comprises a hanging rod (141), the hanging rod (141) is fixedly connected to the top of the concrete layer (3), and a life buoy (142) is movably sleeved on the outside of the hanging rod (141).
10. The ecological revetment for port and waterway engineering according to claim 1, characterized in that: The auxiliary mechanism (15) comprises a fixing rod (151), wherein the fixing rod (151) is fixedly connected to the top of the concrete layer (3), and a pull rope (152) is fixedly connected to the outside of the fixing rod (151).
