Shared type double-row pile enclosure system based on foundation pit in deeply-buried water treatment plant station
By adopting a double-row pile enclosure system in a deep-buried water treatment plant station, combined with waste earth improvement and gravity retaining walls, the difficulty in foundation pit support construction and deformation problems have been solved, and shared and efficient support of the foundation pit has been achieved. Reduce cost and construction period.
Patent Information
- Application Number
- CN202420112177.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-16
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-01-16
AI Technical Summary
In deep-buried water treatment plants, the construction of foundation pit support is difficult. The existing technology has problems such as high cost, long construction period, serious environmental pollution and deformation of the foundation pit, especially in soft soil areas.
A shared double-row pile enclosure system for the foundation pit based on the deep-buried water treatment plant station is adopted, including front and rear rows of piles, crown beams, internal support plates, gravity retaining walls and corner diagonal braces. Waste earthwork is used for improvement and backfilling, combined with The versatility of reinforced concrete structures enables the sharing of foundation pits and soil reinforcement.
It reduces material investment and construction period, improves the overall stiffness and deformation resistance of the foundation pit, reduces the cost of earthwork transportation, and achieves safe, economical and environmentally friendly support effects for the foundation pit.
Smart Images

Figure CN221837597U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of deep foundation pit support structures, and in particular relates to a double-row pile enclosure system based on a common foundation pit type in a deep buried water treatment plant. Background Art
[0002] The structures in water treatment plants have gradually changed from above-ground to underground or superimposed, becoming deep-buried water treatment structures, which greatly reduces the floor area, increases land utilization, and saves investment. In the construction process of deep-buried plants in urban areas, the construction area is narrow, the surrounding environmental protection requirements are high, and the foundation pit of the water treatment structure has a large plane area, making it difficult to set up the support system in the foundation pit. At the same time, the soil in large coastal cities in my country is soft and the soil quality is poor. The above comprehensive reasons lead to the difficulty of the construction of the foundation pit support of deep-buried water treatment plants. How to save foundation pit investment and reduce construction period as much as possible under the premise of ensuring the safety of the foundation pit and controlling the deformation of the foundation pit is the core issue of the foundation pit support design of deep-buried water treatment plants. At the same time, there are a large number of deep-buried pipes in deep-buried water treatment plants. The pipes need to be connected from the deep-buried water treatment structures, so the burial depth is equivalent to it. At the same time, the diameter of the pipe is large, generally 1-2m, so the construction period is long. The common practice at present is to construct a pipeline foundation pit and carry out secondary road breaking and excavation construction after the construction of the deep buried structure is completed. However, this method has disadvantages such as high cost, repeated excavation and construction, and long construction period.
[0003] Existing foundation pit support structures can be divided into two types: with internal support and without internal support. The support structure with internal support includes pile rows, underground continuous walls and other forms. Its advantage is that the foundation pit deformation is small, but there are generally problems such as high cost, long construction period, and serious environmental pollution. The support structure without internal support includes double-row piles, gravity retaining walls and other forms. Its advantage is that there is no need to construct internal support, so the cost is low, the construction period is short, and it is green and low-carbon, but there is generally a problem of large foundation pit deformation in soft soil areas. Utility Model Content
[0004] In view of this, the purpose of the utility model is to provide a double-row pile retaining system based on a common foundation pit in a deep-buried water treatment plant to solve the deficiencies in the prior art.
[0005] In order to achieve the above object, the utility model is implemented by the following technical solutions:
[0006] Provided is a double-row pile retaining system based on the shared foundation pit of a deep buried water treatment plant, including:
[0007] At least one side retaining structure, the side retaining structure includes a front row of piles and a rear row of piles arranged parallel to each other, the pipeline is laid between the front row of piles and the rear row of piles along the extension direction of the side retaining structure, the tops of the front row of piles and the rear row of piles are respectively laid with crown beams along the extension direction of the side retaining structure, an inner support plate is erected between the two crown beams and a mounting position is preset for the additional structure, and the waste earth generated by the excavation of the in-situ improved foundation pit is backfilled into the pipeline foundation pit trench in layers by compaction.
[0008] As described in the double-row pile retaining system based on the shared foundation pit of a deep-buried water treatment plant, the middle area of the inner support plate is hollowed out and steel bar connectors are reserved in sequence on the edges of the hollowing out. The additional structure includes a connecting plate, which is connected to the steel bar connector and is arranged on the inner support plate through the steel bars in the plate.
[0009] As described in the double-row pile retaining system based on the shared foundation pit in the deep-buried water treatment plant, a gravity retaining wall is provided on the top of the rear row of piles, and the back of the gravity retaining wall is backfilled with soil to the design elevation of the foundation pit site, and the backfill soil is the waste soil generated by the foundation pit excavation.
[0010] As described in the double-row pile retaining system based on the shared foundation pit of a deep-buried water treatment plant, the front row piles and the rear row piles are both method piles and the inner inserted steel is higher than the crown beam, a protective cap is set on the top of the inner inserted steel of the rear row piles, expansion bolts are set on both sides of the protective cap and anchored in the crown beam, and the gravity retaining wall is constructed on the top of the crown beam of the rear row piles.
[0011] As described in the double-row pile retaining system for shared foundation pits in deep-buried water treatment plants, corner diagonal braces are provided between the front-row piles on the adjacent two sides that form a certain angle with each other.
[0012] The beneficial effects of the technical solution of the utility model are:
[0013] 1. The double-row piles adopted in the utility model are construction piles, and the inserted steel is higher than the pile crown beam. When the steel is recovered, the crown beam can be used as a pile pulling platform, which is convenient for pulling out and recycling. At the same time, the pile body does not need to use reinforced concrete, which saves material input and concrete curing waiting time;
[0014] 2. In the first stage, the waste earthwork generated by excavating the pipeline foundation pit can be improved on-site by adding lime powder, and then compacted and backfilled into the pipeline foundation pit in layers. No earthwork needs to be transported or purchased from outside, and the balance of earthwork and the reinforcement of the soil between the double-row piles can be achieved at the lowest cost, thereby improving the bearing capacity of the double-row piles and preparing for their use in the second stage.
[0015] 3. The foundation pit retaining structures such as pile rows, concrete crown beams and supports in the first phase do not need to be dismantled and can be directly put into use in the second phase to achieve shared foundation pit;
[0016] 4. Taking full advantage of the fact that concrete structures can bear both compression and tension, the reinforced concrete crown beam and internal support that were under compression in the first stage will transform into a tensile connecting beam in the second stage, and together with the connecting plate implemented in the second stage, form a beam-slab structure at the top of the double-row piles, greatly improving the overall stiffness of the double-row piles and reducing their deformation;
[0017] 5. The beneficial effects of the gravity retaining wall set on the top of the rear piles in the second stage include the following:
[0018] ① Since the rear row of piles in the double row of piles serves as the anchor piles in the front row, their deformation tendency is to produce upward pull-out deformation, and the friction between the piles and the soil produces deformation resistance. Therefore, the gravity retaining wall set on the top of the rear row of piles can use the additional bending moment generated by the deadweight of the retaining wall and the horizontal soil pressure behind the wall to limit the pull-out deformation tendency of the rear row of piles, thereby achieving the effect of reducing the overall deformation of the double row of piles;
[0019] ② The gravity retaining wall set on the top of the pile can lower the top elevation of the double-row piles, allowing the load-bearing section of the pile body to enter the deep soil with better soil properties and stronger deformation resistance, thereby reducing the deformation of the double-row piles without increasing the length of the piles;
[0020] ③ The gravity retaining wall and the backfill behind it can be used as a foundation pit construction road to expand the construction site when the site is limited, making construction easier;
[0021] 6. A stainless steel protective cap is installed on the top of the steel section of the rear row piles to separate the steel section from the gravity retaining wall, making it easy to pull out the steel section for recycling after the gravity retaining wall is dismantled. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] To further illustrate the above-mentioned purpose, structural features and effects of the present invention, the present invention will be described in detail below with reference to the accompanying drawings.
[0023] Figure 1 This is a schematic overall plan view of the first stage enclosure structure of a preferred embodiment of the utility model;
[0024] Figure 2 for Figure 1 Schematic diagram of the cross section along AA direction;
[0025] Figure 3 This is a partial plan view of the first stage enclosure structure of a preferred embodiment of the utility model;
[0026] Figure 4 for Figure 3 Schematic diagram of the cross section along BB direction;
[0027] Figure 5 This is a schematic overall plan view of the second stage enclosure structure of a preferred embodiment of the utility model;
[0028] Figure 6 for Figure 5 Schematic diagram of the cross section along AA direction;
[0029] Figure 7 This is a schematic diagram of a stainless steel protective cap on the top of the rear pile in a preferred embodiment of the utility model;
[0030] In the figure: 0, pipeline; 0', temporary plugging; 1, front row piles; 2, rear row piles; 3, crown beam; 4, inner support plate; 5, improved backfill; 6, steel bar connector; 7, connecting plate; 8, connecting plate steel bars; 9, front row method piles inserted in steel; 10, rear row method piles inserted in steel; 11, corner braces; 12, protective caps; 13, expansion bolts; 14, retaining wall; 15, backfill behind the wall; 16, deeply buried structures. DETAILED DESCRIPTION
[0031] The terms "utility model" and "the present utility model" used in this specification are intended to refer broadly to all subject matter of this specification and any patent claims below. Statements containing these terms should not be understood to limit the subject matter described herein or to limit the meaning or scope of any patent claim below. In addition, this specification does not attempt to describe or limit the subject matter covered by any claim of any specific component, paragraph, statement or figure of this application. The subject matter should be understood with reference to the entire specification, all drawings and any claims below. The present utility model may have other embodiments and be practiced or implemented in other ways. Moreover, it should be understood that the wording and terminology used herein are for illustrative purposes and should not be considered as limiting.
[0032] The details of the present invention will now be discussed with reference to the accompanying drawings which illustrate the present invention by way of example only. In the accompanying drawings, similar features or components may be marked with the same reference numerals.
[0033] The use of "including", "having" and "comprising" and variations thereof herein is meant to include the items listed thereafter and their equivalents and additional items. Although reference may be made to directions such as above, below, upward, downward, backward, bottom, top, front, back, etc. in describing the drawings, for convenience, reference is made relative to the drawings. These directions are not intended to literally accept or limit the present invention in any form. In addition, terms such as "first", "second", "third", etc. are used herein for illustrative purposes and are not intended to indicate or imply importance or significance.
[0034] See also Figure 1 , Figure 2As shown, the utility model includes at least one side enclosure structure, the side enclosure structure includes a front row of piles 1 and a rear row of piles 2 arranged in parallel with each other, the pipeline 0 is laid between the front row of piles 1 and the rear row of piles 2 along the extension direction of the side enclosure structure, and the tops of the front row of piles 1 and the rear row of piles 2 are respectively laid with crown beams 3 along the extension direction of the side enclosure structure, and an inner support plate 4 is erected between the two crown beams 3 and a mounting position is preset for the additional structure. The waste earthwork generated by the excavation of the foundation pit after the in-situ improvement, that is, the improved backfill soil 5, is backfilled into the pipeline foundation pit trench in layers and compacted. The front row of piles 1 and the rear row of piles 2 are preferably construction method piles.
[0035] Furthermore, the middle area of the inner support plate 4 is hollowed out and steel bar connectors 6 are reserved in sequence at the hollowed-out edges. The additional structure includes a connecting plate 7, which is connected to the steel bar connector 6 and is arranged on the inner support plate 4 through the steel bars in the plate.
[0036] Specifically, in the first stage of the embodiment of the utility model, the construction piles on both sides of the pipeline 0, the crown beam 3 and the concrete inner support plate 4 between the crown beam 3 are first constructed, and the crown beam 3 and the inner support plate 4 are pressed according to the method. Figure 3 , Figure 4 The specifications and spacing of the embedded steel bar connector 6 and the connecting plate steel bar 8, the front row construction method pile internal plug-in steel 9 and the rear row construction method pile internal plug-in steel 10 are determined by calculation according to the soil quality and the excavation depth of the foundation pit. In order to ensure that in the second stage, the internal support plate 4 can increase the overall stiffness of the double-row piles after being converted into a connecting beam, the support spacing is small. At the same time, in order to facilitate the material discharge during the pipeline construction, some supports are cancelled at the left and right corners of the foundation pit where the force is small, forming a larger material discharge hole. In order to reinforce the missing connecting beam function of the cancelled support in the second stage, a corner diagonal brace 11 is set between the front row piles 1 that form a certain angle between the adjacent two sides. The angle here is generally 90°, which has the beneficial effect of facilitating the pipeline construction while further improving the overall stiffness of the double-row piles to reduce deformation. At the same time, at the place where the pipeline 0 leads out of the pipeline foundation pit, the pipeline 0 adopts a temporary plugging 0', which has the beneficial effect of preventing the backfill soil between the double-row piles from entering the pipeline. After the construction of the proposed deep buried structure is completed, another pipe connection operation is carried out. The first stage is a pile row + internal support structure. The inserted steel of the front and rear piles is 3 higher than the crown beam for subsequent extraction and recovery. The top of the crown beam is connected to the design elevation of the foundation pit site by slope, so that a gravity retaining wall can be set up on the top of the crown beam in the second stage. The length of the front and rear piles is determined by the deformation calculation of the double-row piles in the second stage. At the same time, considering the weight effect of the gravity retaining wall on the top of the rear row of piles in the second stage, the length of the rear row of piles can be reduced to 60%-80% of the length of the front row of piles. The beneficial effect is that the pile length can be further shortened and the economic benefits can be improved. The earthwork generated by the excavation of the pipeline foundation pit is improved in situ and then backfilled into the trench in layers by compaction. The improvement method is to add a certain proportion of lime powder. The specific proportion of lime powder is determined by the proportion test according to the local soil properties.
[0037] like Figure 5 , Figure 6 As shown in the figure, the second stage is a double-row pile support structure. The foundation pit crown beam and inner support plate 4 of the first stage become the inter-pile connecting beam in the double-row pile support structure in the second stage. The connecting plate is constructed on the top of the connecting beam and the crown beam, and the steel bars and steel bar connectors 6 reserved in the first stage are used to form a pile top beam plate structure with the connecting beam and the crown beam 3. Figure 7 The protective cap 12 made of stainless steel plate is shown, and expansion bolts 13 are provided on both sides of the protective cap 12 and anchored in the crown beam 3. A gravity retaining wall is constructed on the top of the crown beam 3 of the rear row piles 2, and backfill soil is used behind the retaining wall 14 to the design elevation of the foundation pit site. The backfill soil 15 behind the wall uses the waste earthwork generated by the first stage of foundation pit excavation, which has the beneficial effect of further reducing the transportation of earthwork and improving economic benefits. Finally, under the support of the above double-row pile structure, the foundation pit is excavated and the deep buried structure 16 is constructed.
[0038] Based on the characteristics of deep-buried water treatment plants and stations, combined with the existing foundation pit support structure, this utility model proposes a double-row pile enclosure system that can realize the shared foundation pit in deep-buried water treatment plants and stations. This enclosure system combines the characteristics of row piles + internal support structure, double-row pile structure, gravity retaining wall and other structures. By playing different roles at different stages, it can realize the shared support structure of deep-buried pipeline foundation pits and deep-buried structure foundation pits in water treatment plants and stations. At the same time, it has the characteristics of high safety, high economy, low construction difficulty and short construction period.
[0039] The above are only preferred embodiments of the present invention, and do not limit the implementation mode and protection scope of the present invention. Those skilled in the art should be aware that all solutions obtained by equivalent substitutions and obvious changes made using the description and illustrations of the present invention should be included in the protection scope of the present invention.
Claims
1. A double-row pile enclosure system based on the shared foundation pit type in a deep buried water treatment plant, characterized in that: include: At least one side retaining structure, the side retaining structure includes a front row of piles and a rear row of piles arranged parallel to each other, the pipeline is laid between the front row of piles and the rear row of piles along the extension direction of the side retaining structure, the tops of the front row of piles and the rear row of piles are respectively laid with crown beams along the extension direction of the side retaining structure, an inner support plate is erected between the two crown beams and a mounting position is preset for the additional structure, and the waste earth generated by the excavation of the in-situ improved foundation pit is backfilled into the pipeline foundation pit trench in layers by compaction.
2. The double-row pile enclosure system based on the shared foundation pit type in the deep buried water treatment plant as claimed in claim 1 is characterized in that: The middle area of the inner support plate is hollowed out and steel bar connectors are reserved in sequence at the edges of the hollowing out. The additional structure includes a connecting plate, and the connecting plate is connected to the steel bar connector through the steel bars in the plate and is arranged on the inner support plate.
3. The double-row pile enclosure system based on the shared foundation pit type in the deep buried water treatment plant as claimed in claim 1 or 2 is characterized in that: A gravity retaining wall is arranged on the top of the rear row of piles, and backfill soil is provided behind the gravity retaining wall to the design elevation of the foundation pit site, and the backfill soil is waste soil generated by excavation of the foundation pit.
4. The double-row pile enclosure system based on the shared foundation pit type in the deep buried water treatment plant as claimed in claim 3 is characterized in that: The front row piles and the rear row piles are both method piles and the inserted steel sections are higher than the crown beam. A protective cap is set on the top of the inserted steel sections of the rear row piles. Expansion bolts are set on both sides of the protective cap and anchored in the crown beam. The gravity retaining wall is constructed on the top of the crown beam of the rear row piles.