Independent pier base type equipment foundation long foundation bolt positioning template

By designing a long anchor bolt positioning template for independent pier-type equipment foundations that includes a central connecting steel plate, positioning brackets and long anchor bolts, the problem of difficulty in controlling the positioning and installation accuracy of independent pier-type equipment foundation bolts has been solved, and a better solution has been achieved. High positioning accuracy and construction quality.

CN221837621UActive Publication Date: 2024-10-15BEIJING BODA JINGKAI CONSTR ENG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420004997.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-02
Publication Date
2024-10-15
Estimated Expiration
2034-01-02

AI Technical Summary

Technical Problem

During the construction of the Air Liquide production plant, it was difficult to control the positioning and installation accuracy of bolts on independent pier-type equipment foundations, resulting in vertical deviations of embedded bolts and affecting the quality of equipment installation and pipe interface effects.

Method used

An independent pier-type equipment foundation long anchor bolt positioning template including a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate and a long anchor bolt positioning plate is designed. The bracket bolts are used to fix and adjust the fixing nuts. Achieve precise positioning of bolts and form an integrated positioning formwork to ensure relative position accuracy between bolts.

Benefits of technology

The positioning accuracy of the long anchor bolts of the independent pier foundation is improved, the construction quality and efficiency are ensured, the bolt installation errors are reduced, and the effect of the pipe interface is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837621U_ABST
    Figure CN221837621U_ABST
Patent Text Reader

Abstract

The utility model discloses an independent pier base type equipment foundation long foundation bolt positioning template, which relates to the technical field of equipment installation, and comprises a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long foundation bolt positioning plate and a long foundation bolt positioning hole, the first positioning support and the second positioning support are perpendicular to each other, the center position of the first positioning support and the center position of the second positioning support are fixed to the center connecting steel plate through support bolts, positioning steel plates are arranged at the two ends of the first positioning support and the two ends of the second positioning support correspondingly, and long foundation bolt positioning holes are formed in the positioning steel plates. The long foundation bolt penetrates through the long foundation bolt positioning hole, one end of the long foundation bolt is fixed to the positioning steel plate through the long foundation bolt adjusting and fixing nut, the other end of the long foundation bolt is welded to the long foundation bolt positioning plate, and the technical problem that the installation precision of the embedded bolt of the independent pier base type equipment foundation is not high is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of equipment installation, in particular to a long anchor bolt positioning template for an independent pier type equipment foundation. Background Art

[0002] Chips are called the "foundation" of the information age. They are the core and most important component of the information industry. They are one of the important indicators of a country's high-end manufacturing capabilities and comprehensive national strength. The Air Liquide production plant is a building that provides compressed gas supply for the production and storage of electronic chips. It is extremely important for the production of electronic chips. The foundation of large tank equipment is the top priority of the construction of the Air Liquide production plant. Its construction accuracy will directly affect the installation quality of large equipment, especially the bolts are arranged on the foundation of each independent pier-type equipment. The bolt positioning and installation accuracy is particularly difficult to control. Bulk gas tanks have strict requirements on the installation accuracy of embedded bolts. According to calculations, for every 1mm deviation of the verticality of the embedded bolts exceeding the allowable error, the top of the tank will have a 10mm deviation, and the pipes attached to the tank will also have a 10mm counterpart deviation, affecting the pipe interface effect. The reasons for the low installation accuracy of embedded bolts. Utility Model Content

[0003] The purpose of the present utility model is to provide a method for solving at least one of the above-mentioned technical problems.

[0004] In the first aspect, an embodiment of the utility model provides a long anchor bolt positioning template for an independent pier-type equipment foundation, comprising: a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long anchor bolt positioning plate and a long anchor bolt positioning hole, wherein the first positioning bracket and the second positioning bracket are arranged perpendicular to each other, and the center positions of the first positioning bracket and the second positioning bracket are fixed to the central connecting steel plate by bracket bolts, the first fixed bracket and the second positioning bracket are both ends of the positioning steel plate, the long anchor bolt positioning hole is opened on the positioning steel plate, the long anchor bolt passes through the long anchor bolt positioning hole, and one end of the long anchor bolt is fixed to the positioning steel plate by a long anchor bolt adjusting and fixing nut, and the other end of the long anchor bolt is arranged and welded to the long anchor bolt positioning plate.

[0005] Furthermore, the central connecting steel plate, the first positioning bracket and the second positioning bracket are all provided with mounting holes for the bracket bolts, and the first positioning bracket and the second positioning bracket are all provided with positioning holes for the bracket bolts.

[0006] Furthermore, one long anchor bolt corresponds to two long anchor bolt adjusting and fixing nuts, and the two long anchor bolt adjusting and fixing nuts are arranged on the long anchor bolt and are respectively arranged on both sides of the positioning steel plate.

[0007] The utility model provides a long anchor bolt positioning template for an independent pier type equipment foundation, comprising: a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long anchor bolt positioning plate and a long anchor bolt positioning hole, wherein the first positioning bracket and the second positioning bracket are arranged perpendicular to each other, and the center positions of the first positioning bracket and the second positioning bracket are fixed to the central connecting steel plate by bracket bolts, the first fixed bracket and the second positioning bracket are both provided with the positioning steel plate, the positioning steel plate is provided with the long anchor bolt positioning hole, the long anchor bolt passes through the long anchor bolt positioning hole, and one end of the long anchor bolt is fixed to the positioning steel plate by a long anchor bolt adjusting fixing nut, and the other end of the long anchor bolt is arranged and welded to the long anchor bolt positioning plate. In the embodiment of the utility model, by forming the central connecting steel plate, the positioning bracket, the positioning steel plate and the long anchor bolt into a unified whole, the technical effect of enhancing the positioning accuracy of the long anchor bolts of the independent pier foundation is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0008] In order to more clearly illustrate the implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0009] Figure 1 A schematic structural diagram of a long anchor bolt positioning template for an independent pier-type equipment foundation provided by an embodiment of the utility model;

[0010] Figure 2 A top view of a long anchor bolt positioning template for an independent pier-type equipment foundation provided in an embodiment of the utility model.

[0011] In the figure: 1. center connecting steel plate, 2. first positioning bracket, 3. second positioning bracket, 4. positioning steel plate, 5. bracket bolt positioning hole, 6. bracket bolt mounting hole, 7. long anchor bolt positioning hole, 8. long anchor bolt adjustment fixing nut, 9. long anchor bolt, 10. long anchor bolt positioning plate. DETAILED DESCRIPTION

[0012] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0013] Embodiment 1

[0014] According to the embodiment of the utility model, an embodiment of a long anchor bolt positioning template for an independent pier type equipment foundation is provided. Figure 1 and Figure 2 The embodiments of the utility model are described in detail.

[0015] The long anchor bolt positioning template of the independent pier type equipment foundation includes: a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long anchor bolt positioning plate and a long anchor bolt positioning hole, wherein the first positioning bracket and the second positioning bracket are arranged perpendicular to each other, and the center positions of the first positioning bracket and the second positioning bracket are fixed to the central connecting steel plate by bracket bolts, the first fixed bracket and the second positioning bracket are both provided with the positioning steel plates at both ends, the positioning steel plates are provided with the long anchor bolt positioning holes, the long anchor bolts pass through the long anchor bolt positioning holes, and one end of the long anchor bolt is fixed to the positioning steel plate by a long anchor bolt adjusting and fixing nut, and the other end of the long anchor bolt is arranged and welded to the long anchor bolt positioning plate.

[0016] The utility model provides a long anchor bolt positioning template for an independent pier type equipment foundation, comprising: a central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long anchor bolt positioning plate and a long anchor bolt positioning hole, wherein the first positioning bracket and the second positioning bracket are arranged perpendicular to each other, and the center positions of the first positioning bracket and the second positioning bracket are fixed to the central connecting steel plate by bracket bolts, the first fixed bracket and the second positioning bracket are both provided with the positioning steel plate, the positioning steel plate is provided with the long anchor bolt positioning hole, the long anchor bolt passes through the long anchor bolt positioning hole, and one end of the long anchor bolt is fixed to the positioning steel plate by a long anchor bolt adjusting fixing nut, and the other end of the long anchor bolt is arranged and welded to the long anchor bolt positioning plate. In the embodiment of the utility model, by forming the central connecting steel plate, the positioning bracket, the positioning steel plate and the long anchor bolt into a unified whole, the technical effect of enhancing the positioning accuracy of the long anchor bolts of the independent pier foundation is achieved.

[0017] It should be noted that the central connecting steel plate, the first positioning bracket and the second positioning bracket are all provided with mounting holes for the bracket bolts, and the first positioning bracket and the second positioning bracket are all provided with positioning holes for the bracket bolts.

[0018] The bracket bolt locating hole is used for quick positioning of the bracket and the center connecting steel plate during installation, and assists in bolt installation. There is no need to set threads in the bracket bolt installation hole, and a short pin can be used. The bracket bolt installation hole is used for bolt installation of the bracket and the center connecting steel plate.

[0019] The positioning steel plate is provided with a long anchor bolt positioning hole, and the diameter of the long anchor bolt installation hole is one specification larger than the long anchor bolt. The steel plate should have sufficient rigidity and the thickness of the steel plate should meet the rigidity requirements.

[0020] The bottom of the long anchor bolt is welded to the long anchor bolt positioning plate, and the top is fixed to the upper and lower sides of the positioning steel plate with double nuts. The length of the long anchor bolt thread that extends out of the positioning steel plate should be based on the requirements of the equipment manufacturer.

[0021] The anchor bolt positioning plate is installed at the tail of the long anchor bolt. It is used as an integrated positioning device to support the independent pier foundation. It is easy to place and install and not easy to shift. It can also increase the holding force of the concrete on the long anchor bolt.

[0022] The positioning brackets are divided into two types: the first positioning bracket and the second positioning bracket. They are assembled crosswise. Each positioning bracket is fixed to the central connecting plate by two bolts and has two hole pins on both sides of the central connecting steel plate. The second positioning bracket is slightly shorter than the first positioning bracket.

[0023] The long anchor bolt positioning template of the independent pier type equipment foundation in the embodiment of the utility model adopts an integrated positioning mold frame, and the anchor bolts are fixed by an integrated positioning mold, so that the anchor bolts of the separated foundation form a unified whole, ensuring the relative position accuracy between each bolt, and at the same time realizing modular installation of the integrated positioning mold frame and overall hoisting in place, which can not only ensure construction quality but also greatly improve work efficiency.

[0024] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0025] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. An independent pier type equipment foundation long anchor bolt positioning template, It is characterized in that include: A central connecting steel plate, a first positioning bracket, a second positioning bracket, a positioning steel plate, a long anchor bolt positioning plate and a long anchor bolt positioning hole, wherein the first positioning bracket and the second positioning bracket are arranged perpendicular to each other, and the center positions of the first positioning bracket and the second positioning bracket are fixed to the central connecting steel plate by bracket bolts, the first positioning bracket and the second positioning bracket are both ends of the positioning steel plate, the positioning steel plate is provided with the long anchor bolt positioning hole, the long anchor bolt passes through the long anchor bolt positioning hole, and one end of the long anchor bolt is fixed to the positioning steel plate by a long anchor bolt adjusting and fixing nut, and the other end of the long anchor bolt is arranged and welded on the long anchor bolt positioning plate.

2. The long anchor bolt positioning template for independent pier type equipment foundation according to claim 1, It is characterized in that The central connecting steel plate, the first positioning bracket and the second positioning bracket are all provided with mounting holes for the bracket bolts, and the first positioning bracket and the second positioning bracket are all provided with positioning holes for the bracket bolts.

3. The long anchor bolt positioning template for independent pier type equipment foundation according to claim 1, It is characterized in that One long anchor bolt corresponds to two long anchor bolt adjusting and fixing nuts, and the two long anchor bolt adjusting and fixing nuts are arranged on the long anchor bolt and are respectively arranged on both sides of the positioning steel plate.

Citation Information

Cited By

  • A pile foundation pre-buried anchor bolt positioning tool

    CN224834443U