Precision control device for long foundation bolt of combined foundation of large-scale equipment
Through the combination of the positioning module and the connecting bracket, a double-layer steel truss is formed to fix the long anchor bolts, which solves the problem of low bolt positioning accuracy in the joint foundation of large equipment and achieves high-precision construction and high-quality installation.
Patent Information
- Application Number
- CN202420005052.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The embedded bolts of large equipment are not firmly fixed, and the relative positions of the bolt groups are inaccurate, which affects subsequent processes and leads to poor installation quality of the equipment foundation.
Multiple positioning modules and connecting brackets between modules are used to fix long anchor bolts through nuts and positioning bolt holes to form a double-layer steel truss to ensure the relative position accuracy between bolts.
It improves the positioning accuracy of the long anchor bolts of the joint foundation of large equipment, ensures the relative position accuracy between bolts, improves construction quality and efficiency, reduces costs, and achieves a 100% installation qualification rate.
Smart Images

Figure CN221837622U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of equipment installation, in particular to a precision control device for long anchor bolts of a large-scale equipment combined foundation. Background Art
[0002] Chips are called the "foundation" of the information age. They are the core and most important component of the information industry. They are one of the important indicators of a country's high-end manufacturing capabilities and comprehensive national strength. The Air Liquide production plant is a building that provides compressed gas supply for the production and storage of electronic chips. It is extremely important for the production of electronic chips. The height of large equipment usually reaches more than 20m. The equipment foundation of large equipment is the top priority of the construction of the Air Liquide production plant. Its construction accuracy will directly affect the installation quality of large equipment. Among them, the installation accuracy control of the embedded bolts and the visual quality control of the equipment foundation are the construction difficulties and the key points of the equipment foundation quality control. In conventional processes, the extra-long embedded bolts are not firmly fixed, and the relative position of the bolt group is not accurate, which affects the subsequent processes. Utility Model Content
[0003] The purpose of the present utility model is to provide a method for solving at least one of the above-mentioned technical problems.
[0004] In the first aspect, an embodiment of the utility model provides a precision control device for long anchor bolts of a large equipment joint foundation, comprising: a plurality of positioning modules and an inter-module connecting bracket, wherein the plurality of positioning modules are connected via the inter-module connecting bracket, the positioning module comprises a shaping steel plate, an intra-module connecting bracket and a plurality of groups of long anchor bolts, the shaping steel plate comprises a plurality of upper-layer bolt shaping steel plates and a plurality of lower-layer bolt shaping steel plates, the shaping steel plates are connected via the intra-module connecting bracket, a plurality of positioning bolt holes are arranged on the shaping steel plate, and the plurality of groups of long anchor bolts are fixed to the corresponding upper-layer bolt shaping steel plates and the lower-layer bolt positioning steel plates via nuts and positioning bolt holes.
[0005] Furthermore, the inter-module connecting bracket includes: a first inter-module connecting bracket, a second inter-module connecting bracket and a third inter-module connecting bracket, wherein the first inter-module connecting bracket is used to connect the upper bolt-shaped steel plates between any two positioning modules, the second inter-module connecting bracket is used to connect the lower bolt-shaped steel plates between any two positioning modules, and the third inter-module connecting bracket is used to connect the upper bolt-shaped steel plates and the lower bolt-shaped steel plates between any two positioning modules.
[0006] Furthermore, the positioning bracket within the module includes: a first positioning bracket within the module, a second positioning bracket within the module and a third positioning bracket within the module, wherein the first positioning bracket within the module is used to connect any two upper bolt-shaped steel plates in a positioning module, the second positioning bracket within the module is used to connect any two lower bolt-shaped steel plates in a positioning module, and the third positioning bracket within the module is used to connect any upper bolt-shaped steel plate and any lower bolt-shaped steel plate in a positioning module.
[0007] Furthermore, the positioning steel plate adopts 10mm rear steel plate, and L75*5mm angle steel is used between the connections.
[0008] Furthermore, one long anchor bolt corresponds to two nuts, one nut is arranged above the upper positioning steel plate, and the other nut is arranged below the lower positioning steel plate.
[0009] The utility model provides a precision control device for long anchor bolts of a large-scale equipment joint foundation, comprising: a plurality of positioning modules and a double-layer steel truss, wherein the double-layer steel truss comprises an inter-module connecting bracket and an intra-module positioning bracket, the plurality of positioning modules are connected via the inter-module connecting bracket, the positioning module comprises an upper bolt shaping steel plate and a lower bolt shaping steel plate, the bolt shaping steel plates are connected via the intra-module positioning bracket, a plurality of positioning bolt holes are arranged on the shaping steel plate, the long anchor bolts are fixed to the corresponding upper bolt shaping steel plate and the lower bolt positioning steel plate via nuts and the positioning bolt holes, the long anchor bolts in the utility model form a unified whole through the double-layer steel truss composed of a plurality of positioning modules and the inter-module connecting bracket, the technical problem of low positioning accuracy of the long anchor bolts of the large-scale equipment joint foundation is solved, and the technical effect of ensuring the relative position accuracy between the bolts is achieved. BRIEF DESCRIPTION OF THE DRAWINGS
[0010] In order to more clearly illustrate the implementation methods of the present application or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0011] Figure 1 A schematic diagram of a precision control device for long anchor bolts of a large equipment joint foundation provided by an embodiment of the utility model;
[0012] Figure 2 A top view of a precision control device for long anchor bolts of a large equipment joint foundation provided by an embodiment of the utility model.
[0013] In the figure: 1. First positioning module, 2. Second positioning module, 3. Third positioning module, 4. Upper bolt-shaped steel plate, 5. Lower bolt-shaped steel plate, 6. Positioning bolt holes of the shaped steel plate, 7. Positioning bracket within the module, 8. Connecting bracket between modules, 9. Long anchor bolts. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0015] Embodiment 1
[0016] According to the embodiment of the utility model, an embodiment of a device for controlling the precision of long anchor bolts of a large equipment joint foundation is provided. Figure 1 and Figure 2 The embodiments of the utility model are described in detail.
[0017] The large-scale equipment joint foundation long anchor bolt precision control device includes: a plurality of positioning modules and inter-module connecting brackets, wherein the plurality of positioning modules are connected through the inter-module connecting brackets, the positioning modules include a shaping steel plate, an inner-module connecting bracket and a plurality of groups of long anchor bolts, the shaping steel plates include a plurality of upper-layer bolt shaping steel plates and a plurality of lower-layer bolt shaping steel plates, the shaping steel plates are connected through the inner-module connecting brackets, a plurality of positioning bolt holes are arranged on the shaping steel plates, and the plurality of groups of long anchor bolts are fixed to the corresponding upper-layer bolt shaping steel plates and the lower-layer bolt positioning steel plates through nuts and positioning bolt holes.
[0018] The utility model provides a precision control device for long anchor bolts of a large-scale equipment joint foundation, comprising: a plurality of positioning modules and an inter-module connecting bracket, wherein the plurality of positioning modules are connected via the inter-module connecting bracket, the positioning module comprises a shaping steel plate, an inner-module connecting bracket and a plurality of groups of long anchor bolts, the shaping steel plate comprises a plurality of upper-layer bolt shaping steel plates and a plurality of lower-layer bolt shaping steel plates, the shaping steel plates are connected via the inner-module connecting bracket, a plurality of positioning bolt holes are arranged on the shaping steel plate, and the plurality of groups of long anchor bolts are fixed to the corresponding upper-layer bolt shaping steel plates and the lower-layer bolt positioning steel plates via nuts and the positioning bolt holes. The medium-length anchor bolts of the utility model are formed into a unified whole by a double-layer steel truss composed of a plurality of positioning modules and the inter-module connecting bracket, thereby solving the technical problem of low positioning precision of the long anchor bolts of the large-scale equipment joint foundation and achieving the technical effect of ensuring the relative position precision between the bolts.
[0019] It should be noted that the positioning steel plate is made of 10mm thick steel plate, and the specific size can be selected according to the size of the large equipment to be installed.
[0020] Preferably, each long anchor bolt is locked and fixed to the upper and lower positioning steel plates at both ends by nuts, and one long anchor bolt corresponds to two nuts, one nut is arranged above the upper positioning steel plate, and the other nut is arranged below the lower positioning steel plate.
[0021] It should be noted that the number and positions of the above-mentioned multiple positioning modules are generally determined according to the number and positions of large-scale equipment. For example, the number of positioning modules is 3. Figure 1 and Figure 2 As shown, the first positioning module and the third positioning module are divided into one module by a single device, and the second positioning module is composed of two adjacent devices. Dividing each positioning module is convenient for processing, hoisting and installation, which is conducive to speeding up the construction progress and improving the safety of the process.
[0022] Each positioning module is provided with an upper horizontal fixed connection bracket, a lower horizontal fixed connection bracket and an upper and lower staggered fixed connection bracket, and the fixed connection bracket adopts L75*5mm angle steel. An upper horizontal fixed connection bracket, a lower horizontal fixed connection bracket and an upper and lower staggered fixed connection bracket are provided outside the positioning module, and the fixed connection bracket also adopts L75*5mm angle steel.
[0023] The large equipment joint foundation long anchor bolt precision control device provided in the embodiment of the utility model divides the anchor bolts into different positioning modules according to the form of the tank equipment legs, and prefabricates and assembles the different modules to form an integral prefabricated steel frame. The anchor bolts are fixed through the integral prefabricated steel frame to form a unified whole, ensuring the relative position accuracy between the bolts. The installation quality of the tank equipment is improved, and the modular installation of the anchor bolt integral pre-buried steel frame is adopted, and the modules are processed and manufactured and hoisted into place. The construction efficiency is improved, and good economic and social benefits are achieved.
[0024] Furthermore, the large-scale equipment joint foundation long anchor bolt precision control device adopts the modular installation and overall positioning pre-embedded method of double-layer prefabricated combined steel truss steel truss anchor bolts, realizing high-precision construction of super-long anchor bolts, and the control accuracy reaches 0.5mm, which improves the construction quality; modular processing and production, hoisting in place, saving labor, improving construction efficiency, and reducing construction difficulty; the device is easy to obtain materials, easy to assemble, safe and reliable, and greatly saves costs. It realizes high-precision construction of super-long anchor bolts, eliminates the problem of being unable to install after the equipment arrives at the site, and achieves a 100% qualified rate for installation.
[0025] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0026] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A precision control device for long anchor bolts of large equipment joint foundation, characterized in that: include: A plurality of positioning modules and inter-module connecting brackets, wherein the plurality of positioning modules are connected via the inter-module connecting brackets, the positioning modules include a shaped steel plate, an intra-module connecting bracket and a plurality of groups of long anchor bolts, the shaped steel plate includes a plurality of upper-layer bolt shaped steel plates and a plurality of lower-layer bolt shaped steel plates, the shaped steel plates are connected via the intra-module connecting brackets, the shaped steel plates are provided with a plurality of positioning bolt holes, and the plurality of groups of long anchor bolts are fixed to the corresponding upper-layer bolt shaped steel plates and the lower-layer bolt positioning steel plates via nuts and positioning bolt holes.
2. The large equipment joint foundation long anchor bolt precision control device according to claim 1 is characterized in that: The inter-module connecting bracket includes: a first inter-module connecting bracket, a second inter-module connecting bracket and a third inter-module connecting bracket, wherein the first inter-module connecting bracket is used to connect the upper bolt-shaped steel plates between any two positioning modules, the second inter-module connecting bracket is used to connect the lower bolt-shaped steel plates between any two positioning modules, and the third inter-module connecting bracket is used to connect the upper bolt-shaped steel plates and the lower bolt-shaped steel plates between any two positioning modules.
3. The large equipment joint foundation long anchor bolt precision control device according to claim 1 is characterized in that: The module-internal positioning bracket includes: a first module-internal positioning bracket, a second module-internal positioning bracket and a third module-internal positioning bracket, wherein the first module-internal positioning bracket is used to connect any two upper bolt-shaped steel plates in a positioning module, the second module-internal positioning bracket is used to connect any two lower bolt-shaped steel plates in a positioning module, and the third module-internal positioning bracket is used to connect any upper bolt-shaped steel plate and any lower bolt-shaped steel plate in a positioning module.
4. The large equipment joint foundation long anchor bolt precision control device according to claim 1 is characterized in that: The positioning steel plate adopts 10mm rear steel plate, and L75*5mm angle steel is used between the connections.
5. The large equipment joint foundation long anchor bolt precision control device according to claim 1 is characterized in that: One long anchor bolt corresponds to two nuts, one nut is set above the upper positioning steel plate, and the other nut is set below the lower positioning steel plate.
