Concrete pile foundation structure for seaport wharf
By setting up intelligent monitoring ribs in the concrete pile foundation structure of the seaport terminal, the stress changes of the pile foundation can be monitored in real time, which solves the problem of short life of traditional sensors, realizes health monitoring and stability assessment of the whole life of the structure, and extends the sensing time. system longevity and improved safety.
Patent Information
- Application Number
- CN202323211739.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-11-27
AI Technical Summary
Existing traditional sensors have a short lifespan in concrete pile structures in marine environments, and cannot achieve health monitoring throughout the life of the structure. As a result, damage cannot be detected in a timely manner and reinforcement measures cannot be taken, which affects the safety and economy of the project.
A concrete pile foundation structure for seaport terminals is designed. By setting up intelligent monitoring bars inside the pile foundation, including intelligent optical fibers, spacer tubes and basalt fiber bars, and connecting them to an external monitoring system, the stress changes of the structure can be monitored in real time. and temperature changes to achieve life-long health monitoring.
It achieves long-term real-time monitoring of the pile foundation structure, extends the service life of the sensing system, improves the stability and safety of the structure, detects potential problems in a timely manner and performs maintenance, and avoids collapse and economic losses.
Smart Images

Figure CN221837634U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of marine engineering, in particular to a concrete pile foundation structure used for a seaport wharf. Background Art
[0002] Pile foundation is an important bearing structure of engineering structure, which directly affects the overall stability and safety of the structure. In particular, concrete pile column structure in marine environment is easily damaged and cracked due to the impact of ocean current, chloride ion corrosion, ultraviolet radiation and aging. If reinforcement technical measures are not taken in time, it may even collapse and cause huge economic losses to the project.
[0003] Nowadays, structural health monitoring technology is gradually being widely used in the engineering field. However, traditional sensors have a short lifespan and often fail after being buried in the structure for 3 to 5 years. They are unable to monitor the long life stage of the structure and the intelligent effect is not obvious. Therefore, it is urgent to study a new type of intelligent sensing technology to achieve full life health monitoring of the structure.
[0004] Therefore, how to provide a new type of pile foundation structure to facilitate real-time monitoring of the stress of the internal structure of the pile foundation is a technical problem that the utility model urgently needs to solve. Utility Model Content
[0005] In view of the above-mentioned shortcomings or deficiencies of the prior art, the technical problem to be solved by the present invention is how to provide a concrete pile foundation structure for a seaport wharf to facilitate real-time monitoring of the stress of the internal structure of the pile foundation.
[0006] In order to solve the above technical problems, the utility model provides a concrete pile foundation structure for a seaport wharf, comprising:
[0007] A pile base constructed of concrete;
[0008] A plurality of steel bars are arranged inside the pile basic body and along its circumference;
[0009] A plurality of stirrups are arranged inside the pile basic body and arranged along the axial direction thereof and used for restraining the steel bars;
[0010] A plurality of intelligent monitoring ribs provided inside the pile basic body and arranged along the circumference thereof and having intelligent sensors;
[0011] Among them, each intelligent monitoring rib is arranged between two adjacent steel bars and is used for communication connection with an external monitoring system.
[0012] Further preferably, the intelligent monitoring ribs include: intelligent optical fibers, spacer sleeves, and basalt fiber ribs sequentially arranged from the inside to the outside; wherein the axial direction of the intelligent monitoring ribs is parallel to the axial direction of the pile base body and the steel bar; and the basalt fiber ribs are connected to the stirrups by binding or shuttling.
[0013] Further preferably, the intelligent monitoring rib also includes: a filling material for immersing the basalt fiber rib and filling the gap between the basalt fiber rib and the outer wall of the spacer sleeve to adhere the basalt fiber rib and the spacer sleeve.
[0014] Further preferably, the filling material is a thermoplastic resin, a thermosetting resin or a viscose.
[0015] Further preferably, the cross-sectional shape of the pile basic body is circular or rectangular.
[0016] Further preferably, the diameter of the intelligent monitoring rib is 8 to 12 mm.
[0017] Further preferably, the number of the intelligent monitoring ribs is 2 to 4, and they are arranged equidistantly along the circumferential direction.
[0018] Further preferably, the diameter of the stirrup is set to 6-8 mm; the distance between the stirrup and the outer surface of the concrete pile foundation is 40 mm-60 mm.
[0019] Further preferably, the diameter of the steel bar is set to 16 mm to 25 mm; and the spacing between the steel bars is 100 mm to 200 mm.
[0020] Further preferably, the spacer tube is made of any one of aluminum, copper or rubber. The spacer tube is a flexible hollow tube having a hollow cavity for accommodating the smart optical fiber and maintaining a preset interval with the smart optical fiber.
[0021] Further preferably, the exterior of the basalt fiber tendons is provided with ribs.
[0022] Compared with related technologies, this application can monitor the stress changes of the pile-column structure in real time, thereby effectively providing long-term protection for the pile foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Other features, objects and advantages of the present application will become more apparent by reading the detailed description of non-limiting embodiments made with reference to the following drawings:
[0024] Figure 1: A schematic diagram of a transverse cross-sectional structure of a concrete pile foundation structure for a seaport terminal in the first embodiment of the utility model;
[0025] Figure 2 : A schematic cross-sectional structure diagram of the intelligent monitoring rib in the first embodiment of the utility model;
[0026] Figure 3 : A schematic diagram of the structure of the intelligent monitoring ribs and the steel bars in the first embodiment of the utility model being shuttled and connected before being poured with concrete;
[0027] Figure 4 : A schematic diagram of the transverse cross-sectional structure of a concrete pile foundation structure for a seaport terminal in the second embodiment of the present invention.
[0028] Figure numerals: 1. steel bar; 2. intelligent monitoring rib; 3. pile basic body; 5. intelligent optical fiber; 6. stirrups; 7. basalt fiber rib; 8. spacer sleeve; 81. cavity. DETAILED DESCRIPTION
[0029] The concept, specific structure and technical effects of the present invention will be further described below in conjunction with the accompanying drawings to fully understand the purpose, characteristics and effects of the present invention.
[0030] Embodiment 1
[0031] like Figure 1 and Figure 2 As shown, the first embodiment of the utility model provides a concrete pile foundation structure for a seaport terminal, which is mainly composed of a pile basic body 3 constructed of concrete, a plurality of steel bars 1 arranged inside the pile basic body 3 and arranged along its circumference, a plurality of stirrups 6 arranged inside the pile basic body 3 and arranged along its axial direction and used to constrain the steel bars 1, and a plurality of intelligent monitoring ribs 2 arranged inside the pile basic body 3 and arranged along its circumference and having intelligent sensors.
[0032] Among them, each intelligent monitoring rib 2 is arranged between two adjacent steel bars 1, and is used to communicate with an external monitoring system, for example, through the connecting wires exposed at both ends of the intelligent monitoring rib 2 for connecting optical fibers and a monitoring system, such as a demodulator, for wired or wireless connection.
[0033] From the above content, it can be known that: by setting a plurality of intelligent monitoring ribs 2 along the circumference of the pile basic body 3, and communicating and connecting with the external monitoring system through each intelligent monitoring rib 2, for example, by connecting the sensing optical fiber in the intelligent monitoring rib 2 to the demodulator for data recording and analysis, the internal stress strain and temperature change of the concrete pile foundation structure can be monitored in real time, and the whole life cycle monitoring and diagnosis of the concrete pile foundation structure can be realized, so as to facilitate maintenance according to the real-time conditions in the later stage, thereby improving the service life of the intelligent monitoring ribs, for example, to five years or more than ten years. In addition, the steel bars 1 and the stirrups 6 can be connected as a whole by welding or binding, and the above-mentioned constraints are formed to improve the toughness of the overall structure and the accuracy of the detection of the intelligent monitoring ribs 2, and to ensure the thickness of the concrete protective layer.
[0034] Specifically, if Figure 2 As shown, the intelligent monitoring ribs 2 in this embodiment include: intelligent optical fibers 5, spacer tubes 8, and basalt fiber ribs 7, etc., which are sequentially sleeved from the inside to the outside. The axial direction of the intelligent monitoring ribs 2 is parallel to the axial direction of the pile basic body 3 and the axial direction of the steel bar 1. This structure not only facilitates the installation and monitoring of the intelligent optical fiber 5, but also provides good protection for the intelligent optical fiber 5, thereby ensuring the service life and monitoring accuracy of optical fiber transmission. In addition, by surrounding the intelligent monitoring ribs 2, the various force changes of the pile column can be monitored, which is conducive to the diagnosis and evaluation of the overall structural stability of the pile column.
[0035] In detail, the basalt fiber reinforcement 7 in this embodiment is preferably connected to the stirrup 6 by binding.
[0036] Obviously, it needs to be explained that Figure 3 As shown, the basalt fiber reinforcement 7 in this embodiment can also be connected to the stirrup 6 by shuttling without binding, which not only facilitates installation and disassembly, but also allows accurate detection of the area where the basalt fiber reinforcement 7 and the stirrup 6 are connected.
[0037] As a further preferred embodiment, the intelligent monitoring rib 2 further comprises: a filling material for immersing the basalt fiber rib 7 and filling the gap between the basalt fiber rib 7 and the outer wall of the spacer tube 8 to adhere the basalt fiber rib 7 and the spacer tube 8. With this structure, it is possible to avoid the basalt fiber rib and the spacer tube 8 being unreliably adhered and directly exposed to the concrete, which may lead to corrosion or damage, thereby affecting the detection accuracy of the intelligent optical fiber 5.
[0038] As a further preferred embodiment, the filling material is a thermoplastic resin, a thermosetting resin or a viscose. The use of such a material can not only play a role in filling and consolidation, but also play a role in enhancing the overall structural toughness and strength of the intelligent monitoring rib 2.
[0039] Further preferably, the cross-sectional shape of the pile basic body in this embodiment is circular.
[0040] As a further preferred embodiment, the diameter of the intelligent monitoring rib 2 is 8-12 mm.
[0041] Further preferably, in order to enable the intelligent monitoring ribs 2 to better detect the stress conditions of the pile basic body from all directions, the number of the intelligent monitoring ribs 2 is 2 to 4, and they are equidistantly arranged in the circumferential direction.
[0042] Further preferably, the diameter of the stirrup 6 is set to 6-8 mm.
[0043] Further preferably, the distance between the stirrups 6 embedded in the concrete pile foundation and the outer surface of the concrete pile foundation is 40 mm to 60 mm.
[0044] Further preferably, the diameter of the steel bar 1 is set to 16 mm to 25 mm; and the spacing between the steel bars 1 is 100 mm to 200 mm.
[0045] By setting the above-mentioned arrangement parameters, such as the diameter and distribution distance of the steel bar 1 and the stirrup 6, the protection of the line can be strengthened, the force can be evenly distributed, and the line can be made stronger and more durable.
[0046] Further preferably, the material of the spacer tube 8 is any one of aluminum, copper or rubber. The spacer tube 8 is preferably a flexible hollow tube having a hollow cavity 81 for accommodating the smart optical fiber 5 and maintaining a preset interval with the smart optical fiber 5. In addition, this embodiment only takes the spacer tube 8 as an example of an aluminum tube, so as to reduce the chemical reaction between the optical fiber and the environment through its anti-corrosion and anti-oxidation capabilities, and effectively protect the safe transmission of the optical fiber.
[0047] Further preferably, the outside of the basalt fiber reinforcement 7 is provided with ribs to improve the bonding performance between the reinforcement and concrete.
[0048] Embodiment 2
[0049] like Figure 4 As shown, the second embodiment of the utility model provides a concrete pile foundation structure for a seaport wharf. This embodiment is substantially the same as the above-mentioned first embodiment, except that the cross-sectional shape of the pile base body in this embodiment is a rectangle.
[0050] The above embodiments are only used to illustrate the technical solution of the utility model but not to limit it. The utility model is described in detail with reference to the preferred embodiments. It should be understood by those skilled in the art that the technical solution of the utility model can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the utility model, and should be included in the scope of the claims of the utility model.
Claims
1. A concrete pile foundation structure for a seaport wharf, characterized in that: include: A pile base constructed of concrete; A plurality of steel bars are arranged inside the pile basic body and along the circumference thereof; A plurality of stirrups are arranged inside the pile basic body along the axial direction thereof and connected to the steel bars; A plurality of intelligent monitoring ribs provided inside the pile basic body and arranged along the circumference thereof and having intelligent sensors; Among them, each intelligent monitoring rib is arranged between two adjacent steel bars and is used for communication connection with an external monitoring system.
2. A concrete pile foundation structure for a seaport terminal according to claim 1, characterized in that: The intelligent monitoring reinforcement bar comprises: an intelligent optical fiber, a spacer tube, and a basalt fiber reinforcement which are sequentially sleeved from the inside to the outside; wherein the axial direction of the intelligent monitoring reinforcement bar is parallel to the axial direction of the pile basic body and the steel bar; and the basalt fiber reinforcement bar is connected to the stirrup by binding or shuttling.
3. A concrete pile foundation structure for a seaport terminal according to claim 2, characterized in that: The intelligent monitoring rib also includes a filling material used to immerse the basalt fiber rib and fill the gap between the basalt fiber rib and the outer wall of the spacer tube, so as to adhere the basalt fiber rib and the spacer tube.
4. A concrete pile foundation structure for a seaport terminal according to claim 3, characterized in that: The filling material is thermoplastic resin, thermosetting resin or adhesive.
5. The concrete pile foundation structure for a seaport terminal according to claim 1, characterized in that: The cross-sectional shape of the pile basic body is circular or rectangular.
6. The concrete pile foundation structure for a seaport terminal according to claim 1, characterized in that: The diameter of the intelligent monitoring ribs is 8-12 mm; the intelligent monitoring ribs are arranged equidistantly along the circumferential direction.
7. A concrete pile foundation structure for a seaport terminal according to claim 1, characterized in that: The diameter of the stirrup is set to 6-8 mm; the distance between the stirrup and the outer surface of the concrete pile foundation is 40 mm-60 mm.
8. The concrete pile foundation structure for a seaport terminal according to claim 1, characterized in that: The diameter of the steel bars is set to 16 mm to 25 mm; the spacing between the steel bars is 100 mm to 200 mm.
9. A concrete pile foundation structure for a seaport terminal according to claim 2, characterized in that: The material of the spacer tube is any one of aluminum, copper or rubber; wherein the spacer tube is a flexible hollow tube having a hollow cavity for accommodating the smart optical fiber and maintaining a preset interval with the smart optical fiber.
10. A concrete pile foundation structure for a seaport terminal according to claim 2, characterized in that: The exterior of the basalt fiber tendons is provided with ribs.