Cantilever scaffold for building engineering construction
By using structures such as anchor bolts and adjusting sleeves in the cantilever scaffolding, the problems of unstable installation of the cantilever scaffolding and damage to structural beams by nuts are solved, achieving stable installation and improving safety of the cantilever scaffolding.
Patent Information
- Application Number
- CN202323455799.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-19
AI Technical Summary
The existing cantilever scaffolding is unloaded through steel wire ropes, which makes it impossible to ensure that the bottom surface is flush with the concrete surface during installation, causing warping, affecting stability, and the nuts damage the structural beams, reducing the safety factor.
A cantilever scaffolding is designed, installed with anchor bolts, equipped with a first ring, a second ring, a tie rod, a locking nut and an adjustment sleeve. The length of the wire rope is adjusted through the adjustment sleeve to ensure that the bottom surface is flush, and the pressure block and The stop ring distributes the load on the nut and prevents wear on the structural beam.
It achieves stable installation of the cantilevered scaffolding, avoids head warping, reduces damage to structural beams, and improves the safety factor.
Smart Images

Figure CN221837922U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of scaffolds, in particular to a cantilever scaffold for construction engineering. Background Art
[0002] Cantilever scaffolding refers to a scaffolding whose frame structure unloads on a rigid cantilever beam (frame) attached to the building structure. It is used for the main or decoration work in construction and its safety protection needs. The erection height of each section shall not exceed 24m. The allowed erection height of a cantilever scaffolding (one) is 20M. The building structure to which the cantilever frame is attached should be a reinforced concrete structure or a steel structure, and it shall not be attached to a brick-concrete structure or a stone structure. The supporting structure of the cantilever frame shall be a cantilever beam or cantilever truss made of steel, etc., and steel pipes shall not be used; its nodes shall be bolted or welded, and fasteners shall not be used. The fixing method to the building structure shall be determined by design calculation. It is applicable to reinforced concrete structures, high-rise or super-high-rise steel structures, and the main or decoration work in construction and its safety protection needs.
[0003] The existing cantilever scaffolding is unloaded by wire ropes, and the length of the wire ropes is usually fixed. This method makes it impossible to ensure that the bottom surface of the cantilever scaffolding is flush with the concrete surface during installation, which in turn causes the cantilever scaffolding to warp after installation, affecting the stability of the cantilever scaffolding installation. In addition, the upper end of the wire rope is installed on a pull rod, and the pull rod is inserted into the structural beam and limited by a nut. The nut area is small, so when tightened, it will cause a large degree of damage to the surface of the structural beam. In addition, the nut is subjected to a large load, which reduces the safety factor.
[0004] Based on this, the utility model designs a cantilever scaffold for construction engineering to solve the above problems. Utility Model Content
[0005] The utility model aims to provide a cantilever scaffold for construction engineering, so as to solve the problem that the existing cantilever scaffold proposed in the above background technology is unloading through steel wire rope, and the length of the steel wire rope is usually fixed. This method makes it impossible to ensure that the bottom surface of the cantilever scaffold can be flush with the concrete surface during installation, thereby causing the cantilever scaffold to warp after installation, affecting the stability of the cantilever scaffold installation. In addition, the upper end of the steel wire rope is installed on the pull rod, and the pull rod is inserted into the structural beam and limited by a nut. The nut area is small, so when tightened, it will cause a large degree of damage to the surface of the structural beam. In addition, the load on the nut is large, which reduces the safety factor.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a cantilever scaffold for construction engineering, comprising a cantilever scaffold installed on a concrete structure through anchor bolts, a first ring installed on the cantilever scaffold, a steel wire rope connected to the first ring, an end of the steel wire rope away from the first ring is connected to a second ring, a pull rod is fixed to the second ring, the pull rod penetrates the structural beam, and a locking nut is threadedly sleeved on one end of the pull rod passing through the structural beam, a pressure block is sleeved on the end of the pull rod passing through the structural beam, and a pressure block is opened A through hole is provided for the pull rod to pass freely, the steel wire rope is divided into two parts, and are respectively defined as a first steel wire rope and a second steel wire rope, the first steel wire rope and the second steel wire rope are respectively connected to the second ring and the first ring, the first steel wire rope is connected to the first screw at one end away from the second ring, and the second steel wire rope is connected to the second screw at one end away from the first ring, the first screw and the second screw are commonly connected with an adjusting sleeve, and the threads of the two are in opposite directions, and the adjusting sleeves are respectively provided with threaded holes for the first screw and the second screw to be threaded together.
[0007] Preferably, a mounting tube is passed through the structural beam, and the pull rod is passed through the mounting tube and can slide freely.
[0008] Preferably, the outer diameter of the pressing block decreases gradually in a direction away from the second ring.
[0009] Preferably, a stop ring is sleeved on the pull rod, the stop ring is located between the pressure block and the locking nut, and is provided with a protrusion extending toward the pressure block, and the pressure block is provided with a stop groove for the protrusion to engage.
[0010] Preferably, one end of the pull rod connected to the second ring is sleeved with a limiting ring, and the limiting ring is used to limit the movement of the pull rod toward the locking nut.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows: by setting the first screw rod, the second screw rod and the adjusting sleeve, when the adjusting sleeve rotates, the first screw rod and the second screw rod move relatively, so that the total length of the line connecting the first ring and the second ring can be adjusted, so that the bottom surface of the cantilever scaffolding can be flush with the surface of the concrete structure layer, thereby ensuring the stability of the cantilever scaffolding after installation and avoiding the occurrence of warping phenomenon. By setting the pressure block, the load of the locking nut can be unloaded. By setting the stop ring, the locking nut can be prevented from rotating with the pressure block when the thread of the locking nut is screwed on the pull rod. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0013] Figure 1 It is a schematic diagram of the general assembly structure of the utility model;
[0014] Figure 2 for Figure 1 A schematic diagram of the enlarged local structure in the middle.
[0015] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0016] 1-structural beam, 2-pull rod, 3-second circular ring, 4-first steel wire rope, 5-first screw, 6-adjusting sleeve, 7-second screw, 8-second steel wire rope, 9-first circular ring, 10-cantilever scaffolding, 11-anchor bolt, 12-concrete structure, 13-pressing block, 14-installing pipe, 15-stop groove, 16-protrusion, 17-stop ring, 18-locking nut. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figure 1-2The utility model provides a technical solution: a cantilever scaffold for construction engineering, comprising a cantilever scaffold 10 installed on a concrete structure 12 through an anchor bolt 11, a first ring 9 installed on the cantilever scaffold 10, a steel wire rope connected to the first ring 9, a second ring 3 connected to the end of the steel wire rope away from the first ring 9, a pull rod 2 fixed to the second ring 3, the pull rod 2 penetrates the structural beam 1, further, a mounting tube 14 is penetrated on the structural beam 1, the pull rod 2 is penetrated in the mounting tube 14 and can slide freely, by providing the mounting tube 14, it is avoided that the pull rod 2 will cause wear on the inside of the structural beam 1 when it moves in the structural beam 1, and it can also make the pull rod 2 smoothly penetrate into the structural beam 1, so as to be installed more quickly. In the structural beam 1, one end of the tie rod 2 passing through the structural beam 1 is threadedly sleeved with a locking nut 18, and one end of the tie rod 2 passing through the structural beam 1 is sleeved with a pressure block 13. A through hole is provided on the pressure block 13 for the tie rod 2 to pass freely. A stop ring 17 is sleeved on the tie rod 2. The stop ring 17 is located between the pressure block 13 and the locking nut 18, and a protrusion 16 extending toward the pressure block 13 is provided thereon. A stop groove 15 for the protrusion 16 to engage with is provided on the pressure block 13. By providing the stop ring 17 and engaging the protrusion 16 in the stop groove 15, the circumferential rotation resistance of the pressure block 13 is large, so that the pressure block 13 and the locking nut 18 are prevented from rotating. The outer diameter of the pressure block 13 decreases successively in the direction away from the second ring 3. The pressure of the locking nut 18 on the pressure block 13 will be evenly dispersed to avoid extrusion and wear on the outer surface of the structural beam 1. In addition, one end of the pull rod 2 connected to the second ring 3 is sleeved with a limiting ring, and the limiting ring is used to limit the movement of the pull rod 2 toward the locking nut 18. In this way, the pull rod 2 is jointly limited by the pressure block 13 and the limiting ring to avoid lateral movement of the pull rod 2. The wire rope is divided into two sections, which are defined as the first steel wire rope 4 and the second steel wire rope 8. The first steel wire rope 4 and the second steel wire rope 8 are respectively connected to the second ring 3 and the first ring 9. The end of the first steel wire rope 4 away from the second ring 3 is connected to the first screw 5, and the end of the second steel wire rope 8 away from the first ring 9 is connected to the second screw 7. The first screw 5, the second steel wire rope 8 and the second screw 7 are connected to the first screw 5. The two screw rods 7 are commonly connected with an adjusting sleeve 6, and the threads of the two screw rods are in opposite directions. The adjusting sleeve 6 is respectively provided with threaded holes for the first screw rod 5 and the second screw rod 7 to be threadedly engaged. When adjusting the length of the wire rope so that the bottom surface of the cantilever scaffolding 10 is flush with the surface of the concrete structure 12, the adjusting sleeve 6 is firstly rotated by an external tool, and the first screw rod 5 and the second screw rod 7 are respectively threadedly engaged with the two threaded holes on the adjusting sleeve 6. At the same time, since the threads of the first screw rod 5 and the second screw rod 7 are in opposite directions, the first screw rod 5 and the second screw rod 7 are relatively moved, and then the total length of the line connecting the first ring and the second ring is adjusted, so that the bottom surface of the cantilever scaffolding is flush with the top surface of the concrete structure 12, thereby ensuring the stability of the cantilever scaffolding after installation.
[0019] In the description of this specification, the description of reference terms such as "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0020] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.
Claims
1. A cantilever scaffold for construction engineering, comprising a cantilever scaffold (10) installed on a concrete structure (12) through an anchor bolt (11), a first ring (9) installed on the cantilever scaffold (10), a steel wire rope connected to the first ring (9), an end of the steel wire rope away from the first ring (9) connected to a second ring (3), a pull rod (2) fixed to the second ring (3), the pull rod (2) penetrates a structural beam (1), and a locking nut (18) is threadedly sleeved on one end of the pull rod (2) passing through the structural beam (1), characterized in that: One end of the pull rod (2) passing through the structural beam (1) is sleeved with a pressure block (13), and the pressure block (13) is provided with a through hole for the pull rod (2) to pass freely. The steel wire rope is divided into two parts, which are respectively defined as a first steel wire rope (4) and a second steel wire rope (8). The first steel wire rope (4) and the second steel wire rope (8) are respectively connected to the second circular ring (3) and the first circular ring (9). The end of the first steel wire rope (4) away from the second circular ring (3) is connected to the first screw rod (5), and the end of the second steel wire rope (8) away from the first circular ring (9) is connected to the second screw rod (7). The first screw rod (5) and the second screw rod (7) are commonly connected with an adjustment sleeve (6), and the thread rotation directions of the two are opposite. The adjustment sleeve (6) is respectively provided with a threaded hole for the first screw rod (5) and the second screw rod (7) to be threadedly engaged.
2. A cantilever scaffold for construction engineering according to claim 1, characterized in that: A mounting tube (14) is passed through the structural beam (1), and the pull rod (2) is passed through the mounting tube (14) and can slide freely.
3. A cantilever scaffold for construction engineering according to claim 1, characterized in that: The outer diameter of the pressing block (13) decreases gradually in a direction away from the second ring (3).
4. The cantilever scaffold for construction engineering according to claim 1, characterized in that: The pull rod (2) is provided with a stop ring (17), the stop ring (17) is located between the pressure block (13) and the locking nut (18), and is provided with a protrusion (16) extending toward the pressure block (13), and the pressure block (13) is provided with a stop groove (15) for the protrusion (16) to engage.
5. The cantilever scaffold for construction engineering according to claim 1, characterized in that: One end of the pull rod (2) connected to the second ring (3) is sleeved with a limit ring, and the limit ring is used to limit the movement of the pull rod (2) towards the locking nut (18).