Lightweight lifting climbing frame for high pier construction

By designing a lifting lightweight climbing frame for high pier construction, the staggered connection of fixed rods and moving rods and hydraulic cylinders are used to realize the rapid lifting and lowering of the load-bearing platform, which solves the complex and time-consuming problems of traditional construction methods in high-rise buildings. Improved construction efficiency and reduced costs.

CN221837926UInactive Publication Date: 2024-10-15JIANGSU YANING CONSTRUCTION CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202322900067.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-10-27
Publication Date
2024-10-15
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional construction method of building scaffolding in high-rise buildings is complex, time-consuming and labor-intensive. Especially in the concrete pouring construction of elevator shafts, shear walls, columns and beams, the construction space is limited and the cost is high, making it difficult to efficiently construct high piers.

Method used

Design a lifting lightweight climbing frame for high pier construction. A load-bearing platform is formed through the staggered connection of fixed rods and movable rods. The load-bearing holes and hydraulic cylinders are preset. The lifting cylinder is used to realize the rapid lifting and lowering of the load-bearing platform, simplifying operation and movement.

Benefits of technology

It realizes rapid movement and simplified operation of high pier construction, improves construction efficiency, reduces costs, and simplifies the construction difficulty and use of consumables of high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221837926U_ABST
    Figure CN221837926U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of high pier construction, in particular to a lifting light climbing frame for high pier construction, which comprises a fixed rod I, a movable rod I, a fixed rod II and a movable rod II, the fixed rod I, the movable rod I, the fixed rod II and the movable rod II are connected in a staggered manner to form two groups of bearing platforms, a high pier is arranged on the inner side of the bearing platform, and a plurality of bearing holes are evenly formed in the side walls of the front end and the rear end of the high pier. A stress plate is fixedly mounted on the side wall of the fixing rod I through a mounting sleeve, a stress block is inserted into the stress plate, and one end of the stress block is inserted into the bearing hole; when the position of one bearing platform needs to be moved, the stress block on the bearing platform is taken out of the bearing hole, the bearing platform can be jacked up and moved to a proper position by starting the jacking oil cylinder, and then the bearing platform is fixed through the stress block, operation is easy, the lifting speed is high, construction efficiency is improved, and cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of high pier construction, in particular to a lifting light climbing frame for high pier construction. Background Art

[0002] In recent years, my country has not only built a large number of high-rise buildings, but also set off a wave of building super-high-rise landmark buildings. The construction of super-high floors means that the height of construction is also constantly increasing. The traditional construction method is mainly to build scaffolding on the exterior walls, interior decoration or places where the floor height is too high to be directly constructed, and the construction workers carry out construction on the scaffolding.

[0003] However, the erection of scaffolding is relatively complicated and requires a lot of manpower, material resources and time. The higher the height, the more difficult it is to erect. Moreover, for concrete pouring construction such as elevator shafts, shear walls, columns and beams, a large number of formworks need to be installed, and the construction space is limited. As the number of floors increases, the scaffolding consumables increase, and the difficulty and construction cost of erection are also high. Utility Model Content

[0004] The utility model aims to provide a lifting light climbing frame for high pier construction to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a lifting light climbing frame for high pier construction, comprising: a fixed rod 1, a moving rod 1, a fixed rod 2 and a moving rod 2, wherein the fixed rod 1, the moving rod 1, the fixed rod 2 and the moving rod 2 are staggered and connected to form a load-bearing platform, wherein the load-bearing platform is provided with two groups, a high pier is provided on the inner side of the load-bearing platform, and a plurality of load-bearing holes are evenly opened on the side walls of the front and rear ends of the high pier;

[0006] A force-bearing plate is fixedly mounted on the side wall of the fixing rod 1 through a mounting sleeve, a force-bearing block is plugged into the force-bearing plate, and one end of the force-bearing block is inserted into the load-bearing hole;

[0007] A lifting cylinder is installed between the upper and lower load-bearing platforms.

[0008] Preferably, the intersection of the fixed rod 1 and the fixed rod 2 is fixedly connected by a fixed sleeve, the intersection of the fixed rod 1 and the movable rod 2 is slidably connected by a sliding sleeve, and the intersection of the fixed rod 2 and the movable rod 1 is slidably connected by a sliding sleeve.

[0009] Preferably, hydraulic cylinders are fixedly mounted on the side walls at both left and right ends of the fixed rod 1 and the fixed rod 2, and the other ends of the hydraulic cylinders are respectively connected to the moving rod 1 and the moving rod 2.

[0010] Preferably, the side walls at both ends of the fixing rod 1 are slidably connected with mounting sleeves, and the mounting sleeves are fixed to the side walls of the fixing rod 1 by bolts.

[0011] Preferably, the inner end side wall of the mounting sleeve is fixedly connected to one end of the force-bearing plate, and through holes are provided at the upper and lower ends of the force-bearing plate.

[0012] Preferably, a baffle is fixedly mounted on one end of the force-bearing block, the other end of the force-bearing block passes through the through hole and is inserted into the load-bearing hole, and the baffle is fixed to the side wall of the force-bearing plate by bolts.

[0013] Preferably, one end of the jacking cylinder is fixedly connected to the side wall of the fixing rod 1 on one of the load-bearing platforms, and the other end is fixedly connected to the side wall of the fixing rod 1 on the other load-bearing platform.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] A number of load-bearing holes are evenly preset on the side wall of the high pier. One end of the load-bearing block is passed through the through hole and inserted into the load-bearing hole, and the baffle is fixed to the side wall of the load-bearing plate by bolts. Two load-bearing platforms are installed on the outside of the high pier, and then a jacking cylinder is fixed between the two load-bearing platforms. When it is necessary to move the position of one of the load-bearing platforms, the load-bearing block on the load-bearing platform is taken out of the load-bearing hole, and the jacking cylinder is started to lift the load-bearing platform. After moving to a suitable position, it can be fixed by the load-bearing block. The operation is simple and the lifting speed is fast, which improves the construction efficiency and saves costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure of the load-bearing platform of the utility model;

[0018] Figure 3 It is a schematic diagram of the connection between the load-bearing plate and the load-bearing block of the utility model.

[0019] In the figure: 1. high pier; 2. load-bearing hole; 3. fixed rod 1; 4. movable rod 1; 5. fixed rod 2; 6. movable rod 2; 7. fixed sleeve; 8. sliding sleeve; 9. lifting cylinder; 10. hydraulic cylinder; 11. mounting sleeve; 12. force plate; 13. through hole; 14. force block; 15. baffle. DETAILED DESCRIPTION

[0020] In order to make the purpose and technical solution of the utility model clearly and completely described, and the advantages more clearly understood, the embodiments of the utility model are further described in detail in conjunction with the accompanying drawings. It should be understood that the specific embodiments described here are part of the embodiments of the utility model, not all of the embodiments, and are only used to explain the embodiments of the utility model, and are not used to limit the embodiments of the utility model. All other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] In the description of the present utility model, it should be noted that the terms "center", "middle", "upper", "lower", "left", "right", "inner", "outer", "top", "bottom", "side", "vertical", "horizontal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "one", "first", "second", "third", "fourth", "fifth", "sixth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0022] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0023] For the purpose of simplicity and illustration, the principles of the embodiments are mainly described by reference to examples. In the following description, many specific details are proposed to provide a thorough understanding of the embodiments. However, it is obvious that for those of ordinary skill in the art, these embodiments may not be limited to these specific details in practice. In some instances, known methods and structures are not described in detail to avoid making these embodiments unnecessarily difficult to understand. In addition, all embodiments can be used in combination with each other.

[0024] See also Figures 1 to 3The utility model provides a technical solution: a lifting light climbing frame for high pier construction, comprising: a fixed rod 1 3, a moving rod 1 4, a fixed rod 2 5 and a moving rod 2 6, the fixed rod 1 3, the moving rod 1 4, the fixed rod 2 5 and the moving rod 2 6 are staggered and connected to form a load-bearing platform, the load-bearing platform is provided with two groups, a high pier 1 is provided on the inner side of the load-bearing platform, and a plurality of load-bearing holes 2 are evenly opened on the side walls of the front and rear ends of the high pier 1;

[0025] The intersection of the fixed rod 1 3 and the fixed rod 2 5 is fixedly connected by a fixed sleeve 7, the intersection of the fixed rod 1 3 and the movable rod 2 6 is slidably connected by a sliding sleeve 8, the intersection of the fixed rod 2 5 and the movable rod 1 4 is slidably connected by a sliding sleeve 8, and the side walls of the left and right ends of the fixed rod 1 3 and the fixed rod 2 5 are fixedly installed with hydraulic cylinders 10, and the other ends of the hydraulic cylinders 10 are respectively connected to the movable rod 1 4 and the movable rod 2 6;

[0026] A force-bearing plate 12 is fixedly installed on the side wall of the fixing rod 3 through a mounting sleeve 11, a force-bearing block 14 is inserted on the force-bearing plate 12, one end of the force-bearing block 14 is inserted into the load-bearing hole 2, the side walls at both ends of the fixing rod 3 are slidably connected with mounting sleeves 11, the mounting sleeve 11 is fixed to the side wall of the fixing rod 3 by bolts, the inner end side wall of the mounting sleeve 11 is fixedly connected to one end of the force-bearing plate 12, the upper and lower ends of the force-bearing plate 12 are provided with through holes 13, one end of the force-bearing block 14 is fixedly installed with a baffle 15, the other end of the force-bearing block 14 passes through the through hole 13 and is inserted into the load-bearing hole 2, and the baffle 15 is fixed to the side wall of the force-bearing plate 12 by bolts;

[0027] A lifting cylinder 9 is installed between the upper and lower load-bearing platforms, one end of the lifting cylinder 9 is fixedly connected to the side wall of the fixing rod 3 on one of the load-bearing platforms, and the other end is fixedly connected to the side wall of the fixing rod 3 on the other load-bearing platform.

[0028] When the device is working, a number of load-bearing holes 2 are evenly preset on the side wall of the high pier 1. By passing one end of the force block 14 through the through hole 13 and inserting it into the load-bearing hole 2, the baffle 15 is fixed to the side wall of the force plate 12 by bolts, and two load-bearing platforms are installed on the outside of the high pier 1. Then, the jacking cylinder 9 is fixed between the two load-bearing platforms. When it is necessary to move the position of one of the load-bearing platforms, the force block 14 on the load-bearing platform is taken out of the load-bearing hole 2, and the jacking cylinder 9 is started to lift the load-bearing platform. After moving it to a suitable position, it can be fixed by the force block 14.

[0029] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A lifting light climbing frame for high pier construction, comprising: A fixed rod (3), a movable rod (4), a fixed rod (5) and a movable rod (6), the fixed rod (3), the movable rod (4), the fixed rod (5) and the movable rod (6) are interlaced and connected to form a load-bearing platform, characterized in that: the load-bearing platform is provided with two groups, a high pier (1) is provided on the inner side of the load-bearing platform, and a plurality of load-bearing holes (2) are evenly opened on the side walls of the front and rear ends of the high pier (1); A force-bearing plate (12) is fixedly mounted on the side wall of the fixing rod (3) via a mounting sleeve (11), a force-bearing block (14) is plugged into the force-bearing plate (12), and one end of the force-bearing block (14) is inserted into the load-bearing hole (2); A lifting cylinder (9) is installed between the upper and lower load-bearing platforms; The intersection of the fixing rod 1 (3) and the fixing rod 2 (5) is fixedly connected via a fixing sleeve (7); a baffle (15) is fixedly mounted on one end of the force-bearing block (14); the other end of the force-bearing block (14) passes through the through hole (13) and is inserted into the load-bearing hole (2); and the baffle (15) is fixed to the side wall of the force-bearing plate (12) via bolts.

2. The lifting light climbing frame for high pier construction according to claim 1 is characterized by: The intersection of the fixed rod 1 (3) and the movable rod 2 (6) is slidably connected via a sliding sleeve (8), and the intersection of the fixed rod 2 (5) and the movable rod 1 (4) is slidably connected via a sliding sleeve (8).

3. A lifting light climbing frame for high pier construction according to claim 2, characterized in that: A hydraulic cylinder (10) is fixedly mounted on the side walls at both left and right ends of the fixed rod 1 (3) and the fixed rod 2 (5), and the other end of the hydraulic cylinder (10) is connected to the moving rod 1 (4) and the moving rod 2 (6) respectively.

4. The light-weight climbing frame for high pier construction according to claim 1 is characterized by: The side walls at both left and right ends of the fixing rod 1 (3) are slidably connected with mounting sleeves (11), and the mounting sleeves (11) are fixed to the side walls of the fixing rod 1 (3) by bolts.

5. The lifting light climbing frame for high pier construction according to claim 4 is characterized by: The inner end side wall of the installation sleeve (11) is fixedly connected to one end of the force-bearing plate (12), and through holes (13) are provided at the upper and lower ends of the force-bearing plate (12).

6. The light-weight climbing frame for high pier construction according to claim 1 is characterized by: One end of the lifting cylinder (9) is fixedly connected to the side wall of the fixing rod (3) on one of the load-bearing platforms, and the other end is fixedly connected to the side wall of the fixing rod (3) on the other load-bearing platform.

Citation Information

Cited By

  • Lifting climbing frame for high pier operation construction

    CN223410470U