Supporting device for initial construction of tunnel

By designing an adjustable support device and using the support rod group and the guide plate group to adjust the distance between the steel arch frames, the problem that the support structure at the bottom of the steel arch frame cannot be adjusted is solved and the construction efficiency is improved.

CN221838356UActive Publication Date: 2024-10-15CHINA RAILWAY 19TH BUREAU GRP 3RD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420515253.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-10-15
Estimated Expiration
2034-03-18

AI Technical Summary

Technical Problem

During the initial construction of the tunnel, the I-shaped steel bottom of the steel arch frame could not be adjusted according to the actual height, which caused inconvenience in filling the steel pad and affected construction efficiency.

Method used

Design a support device that includes two sets of steel arch frames and a support structure. The upper support plate and lower support plate of the support structure are slidingly connected. The support rod group and the guide plate group are used to adjust the distance between the steel arch frames to achieve height adjustment.

Benefits of technology

It solves the problem that the support structure at the bottom of the steel arch cannot be adjusted, and improves construction efficiency and adaptability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221838356U_ABST
    Figure CN221838356U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of tunnel construction supporting, in particular to a supporting device for tunnel initial construction, which comprises two groups of steel arches and two groups of supporting structures, the two groups of steel arches are fixedly connected through connecting columns, and the two groups of supporting structures are fixedly connected with the bottoms of the two groups of steel arches respectively. The supporting structure comprises two sets of supporting bases and connecting grooves, each supporting base comprises an upper supporting plate and a lower supporting plate, the upper supporting plates and the lower supporting plates are slidably connected through guide plate sets, the upper ends of the upper supporting plates are fixedly connected with the bottom of one side of the steel arch, and multiple sets of supporting rod sets are installed on the lower supporting plates. According to the steel arch support, the problem that in the supporting construction process through an existing steel arch, I-shaped steel used for supporting the bottom of the steel arch is integrally formed and cannot be correspondingly adjusted and matched according to the actual placement height is solved. The steel arch support solves the problem that in the prior art, in the supporting construction process through the steel arch, I-shaped steel used for supporting the bottom of the steel arch is integrally formed and cannot be correspondingly adjusted and matched according to the actual placement height.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel construction support, in particular to a support device for initial tunnel construction. Background Art

[0002] During the initial construction of the tunnel, support devices are needed. When the surrounding rock conditions are poor during construction, steel arch support devices must be used.

[0003] Steel arch support is a support measure for underground projects that is formed by steel. L, U, I-shaped steel and rails, steel pipes and other steel are processed into the required shape, and the support measures for underground projects are reinforced by whole frame installation or rod assembly. It can be combined with anchor rods, shotcrete, and steel mesh to form a composite support. There are two types of rigid steel arches and retractable steel arches, which have immediate strength and rigidity and can control excessive deformation of surrounding rocks, but the cost is high and the requirements for the dimensional accuracy of the excavated section are strict. This method is often used in construction of shallow buried, biased, and extremely short self-stabilizing surrounding rocks, as well as loose, broken, gushing, and expansive rock and soil.

[0004] In the process of using steel arch frames for support construction, if the foot is over-excavated or the arch foot elevation is insufficient, it is necessary to add I-steel to the bottom of the steel arch frame for filling. However, in the actual construction process, since the I-steel is formed in one piece, its height cannot be adjusted. After filling the I-steel, it is often encountered that the I-steel still cannot contact the bottom of the steel arch frame. At this time, steel pads must be filled under the I-steel. Since the I-steel has a certain weight, it is necessary to use tools such as jacks and hammers when filling the steel pads. The filling process is very inconvenient, affecting the construction efficiency. Utility Model Content

[0005] The utility model aims to provide a supporting device for initial construction of a tunnel, which solves the problem that in the existing process of using steel arch frames for supporting construction, the I-shaped steel used for supporting the bottom of the steel arch frame is integrally formed and cannot be adjusted and adapted according to the actual placement height.

[0006] In order to achieve the above-mentioned purpose, the utility model provides a support device for initial construction of a tunnel, comprising:

[0007] Steel arch frames, the number of which is two groups, and the two groups of steel arch frames are fixedly connected by connecting columns;

[0008] The support structure is two groups, which are fixedly connected to the bottom of the two groups of steel arch frames respectively. The support structure includes two groups of support bases and connecting grooves. The support base includes an upper support plate and a lower support plate, and the upper support plate and the lower support plate are slidably connected to each other through a guide plate group. The upper end of the upper support plate is fixedly connected to the bottom of one side of the steel arch frame. The lower support plate is equipped with multiple groups of support rod groups. The support rod group includes a fixing stud and a supporting screw tube. The fixing stud is fixedly installed on the lower support plate, and the supporting screw tube is threadably installed on the fixing stud, and the upper support plate is supported by the supporting screw tube. The connecting groove includes an upper slide groove and a lower slide groove that are slidably connected, and the far ends of the upper slide groove and the lower slide groove are respectively fixedly connected to the two groups of lower support plates, and the upper slide groove and the lower slide groove are fixedly connected by a first fixing member.

[0009] As a further solution of the utility model, the steel arch frame includes a plurality of groups of arc-shaped steel frames connected in sequence.

[0010] As a further solution of the utility model, the first fixing member includes a first fastening bolt, and the upper slide groove and the lower slide groove are correspondingly provided with a plurality of mounting holes for installing the first fastening bolt.

[0011] As a further solution of the utility model, the guide plate group includes a guide plate, a guide groove and a second fixing member. The guide plate and the guide groove are respectively fixedly mounted on the close sides of the upper support plate and the lower support plate and are fixedly connected by the second fixing member.

[0012] As a further solution of the utility model, the second fixing member is a fixing bolt, and multiple groups of the fixing bolts are fixedly installed on the inner side of the guide groove. The guide plate is provided with a connecting groove for the fixing bolts to pass through, and the fixing bolt is installed with a fixing nut for clamping the guide plate and the guide groove.

[0013] Compared with the prior art, the utility model designs two groups of steel arch frames and a supporting structure, wherein the two groups of supporting structures are fixedly connected to the bottoms of the two groups of steel arch frames, and the upper supporting plate and the lower supporting plate in the supporting structure can adjust the distance between the two accordingly according to the requirements of the actual placement area, and are supported by a support rod group and a guide plate group, thereby solving the problem that in the existing process of using steel arch frames for support construction, the I-shaped steel used for supporting the bottom of the steel arch frames is one-piece and cannot be adjusted and adapted according to the actual placement height. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 The utility model provides a structural schematic diagram of a supporting device for initial tunnel construction.

[0015] Figure 2 This is a structural schematic diagram of the support structure provided by the utility model.

[0016] Figure 3 This is a disassembly schematic diagram of the support structure provided by the utility model.

[0017] In the attached drawings: 1, steel arch frame; 21, upper support plate; 22, guide plate; 23, lower support plate; 24, guide groove; 25, connecting groove; 31, first fastening bolt; 32, upper slide groove; 33, lower slide groove; 34, mounting hole; 41, fixing stud; 42, supporting screw tube; 51, fixing bolt; 52, fixing nut. DETAILED DESCRIPTION

[0018] The technical solution of the utility model is further described in detail below in conjunction with specific implementation methods.

[0019] like Figure 1 and Figure 2 As shown, in an embodiment of the utility model, a support device for initial construction of a tunnel includes two groups of steel arch frames 1, and the two groups of steel arch frames 1 are fixedly connected by connecting columns; a support structure, which is in two groups and is fixedly connected to the bottom of the two groups of steel arch frames 1 respectively, and the support structure includes two groups of support bases and connecting grooves, and the support base includes an upper support plate 21 and a lower support plate 23, and the upper support plate 21 and the lower support plate 23 are slidably connected by a guide plate group, and the upper end of the upper support plate 21 is fixedly connected to the bottom of one side of the steel arch frame 1, and the lower support plate 23 is slidably connected by a guide plate group. A plurality of support rod groups are installed on the support plate 23, and the support rod groups include a fixing stud 41 and a supporting screw 42. The fixing stud 41 is fixedly installed on the lower support plate 23, and the supporting screw 42 is threadedly rotatably installed on the fixing stud 41, and the upper support plate 21 is supported by the supporting screw 42. The connecting groove includes an upper slide groove 32 and a lower slide groove 33 that are slidably connected, and the distal ends of the upper slide groove 32 and the lower slide groove 33 are respectively fixedly connected to the two groups of lower support plates 23, and the upper slide groove 32 and the lower slide groove 33 are fixedly connected by a first fixing member;

[0020] Specifically, when the utility model adjusts the spacing between the upper support plate 21 and the lower support plate 23, the jack is placed between the upper support plate 21 and the lower support plate 23, and then the upper support plate 21 is lifted to the supporting position by the jack, and then multiple groups of support nuts are rotated forward in sequence so that their tops contact the bottom of the upper support plate 21. At this time, the jack can be withdrawn, and the support rod group replaces the jack to support the upper support plate 21. At the same time, the guide plate group linearly guides the upper support plate 21 when it slides. At the same time, after the upper support plate 21 moves to the preset position, the guide plate group is locked, and the auxiliary support rod group supports and positions the upper support plate 21.

[0021] like Figure 1As shown, in an embodiment of the utility model, the steel arch frame 1 includes a plurality of groups of arc-shaped steel frames connected in sequence, and a mounting plate is fixed at the lower end of the bottom arc-shaped steel frames on both sides, and the mounting plate is fixedly connected to the upper support plate 21 by a plurality of groups of fixing bolts 51.

[0022] like Figure 2 and Figure 3 As shown, in the embodiment of the utility model, the first fixing member includes a first fastening bolt 31, and the upper slide groove 32 and the lower slide groove 33 are correspondingly provided with a plurality of mounting holes 34 for installing the first fastening bolt 31. When the upper slide groove 32 is slidably installed in the lower slide groove 33, the mounting holes 34 on the upper slide groove 32 and the lower slide groove 33 are aligned with each other. In the utility model, the number of the first fastening bolts 31 can preferably be a plurality of groups to improve the fixed connection stability of the upper slide groove 32 and the lower slide groove 33.

[0023] like Figure 2 and Figure 3 As shown, in the embodiment of the utility model, the guide plate group includes a guide plate 22, a guide groove 24 and a second fixing member, and the guide plate 22 and the guide groove 24 are respectively fixedly mounted on the close side of the upper support plate 21 and the lower support plate 23, and are fixedly connected by the second fixing member;

[0024] Furthermore, the second fixing member is a fixing bolt 51, and a plurality of groups of the fixing bolts 51 are fixedly installed on the inner side of the guide groove 24. The guide plate 22 is provided with a connecting groove 25 for the fixing bolts 51 to pass through. The fixing bolt 51 is provided with a fixing nut 52 for pressing the guide plate 22 and the guide groove 24. When the support rod group is extended to a preset stroke, the fixing nut 52 can be rotated to fix the guide plate 22 and the guide groove 24. Three groups of fixing bolts 51 are installed on the guide groove 24, and three groups of connecting grooves 25 are correspondingly provided on the guide plate 22. Of course, the actual number of the fixing bolts 51 can also be selected accordingly according to actual conditions.

[0025] In summary, the utility model designs two groups of steel arch frames 1 and a supporting structure, wherein the two groups of supporting structures are fixedly connected to the bottoms of the two groups of steel arch frames 1, and the upper support plate 21 and the lower support plate 23 in the supporting structure can adjust the distance between the two accordingly according to the requirements of the actual placement area, and are supported by a support rod group and a guide plate group, thereby solving the problem that in the existing support construction process using the steel arch frame 1, the I-shaped steel used for supporting the bottom of the steel arch frame 1 is one-piece and cannot be adjusted and adapted according to the actual placement height.

[0026] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.

Claims

1. A support device for initial tunnel construction, characterized in that: include: Steel arch frames, the number of which is two groups, and the two groups of steel arch frames are fixedly connected by connecting columns; The support structure is two groups, which are fixedly connected to the bottom of the two groups of steel arch frames respectively. The support structure includes two groups of support bases and connecting grooves. The support base includes an upper support plate and a lower support plate, and the upper support plate and the lower support plate are slidably connected to each other through a guide plate group. The upper end of the upper support plate is fixedly connected to the bottom of one side of the steel arch frame. The lower support plate is equipped with multiple groups of support rod groups. The support rod group includes a fixing stud and a supporting screw tube. The fixing stud is fixedly installed on the lower support plate, and the supporting screw tube is threadably installed on the fixing stud, and the upper support plate is supported by the supporting screw tube. The connecting groove includes an upper slide groove and a lower slide groove that are slidably connected, and the far ends of the upper slide groove and the lower slide groove are respectively fixedly connected to the two groups of lower support plates, and the upper slide groove and the lower slide groove are fixedly connected by a first fixing member.

2. A tunnel initial construction support device according to claim 1, characterized in that: The steel arch frame comprises a plurality of groups of arc-shaped steel frames connected in sequence.

3. A tunnel initial construction support device according to claim 1, characterized in that: The first fixing member includes a first fastening bolt, and the upper slide groove and the lower slide groove are correspondingly provided with a plurality of mounting holes for mounting the first fastening bolt.

4. A tunnel initial construction support device according to claim 1, characterized in that: The guide plate group includes a guide plate, a guide groove and a second fixing member. The guide plate and the guide groove are respectively fixedly mounted on the close sides of the upper support plate and the lower support plate and are fixedly connected by the second fixing member.

5. A tunnel initial construction support device according to claim 4, characterized in that: The second fixing member is a fixing bolt, and a plurality of groups of the fixing bolts are fixedly installed on the inner side of the guide groove. The guide plate is provided with a connecting groove for the fixing bolts to pass through, and the fixing bolts are provided with fixing nuts for clamping the guide plate and the guide groove.