Oilfield water injection pipe network monitoring device
By introducing adjustment and sealing devices into the oilfield water injection pipe network monitoring device, the problem of low installation efficiency of intelligent fine injection instruments for oilfield water injection is solved, automatic height adjustment of the equipment and improvement of the sealing effect are achieved, and the convenience of workers' operation and oilfield pipelines are improved. transportation reliability.
Patent Information
- Application Number
- CN202420561050.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-10-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing installation method of intelligent fine injection instruments for oilfield water injection requires workers to hold the equipment and connect the pipelines, which leads to increased labor intensity and reduced installation efficiency. It is especially difficult to install on oilfield pipelines of different heights.
An oilfield water injection pipe network monitoring device is designed, which adopts an adjusting device and a sealing device. The adjusting device includes a servo motor, a two-way screw rod, a slider and a guide rod, which can automatically adjust the height of the equipment. The sealing device passes through sealing rings, limit grooves and Fixing strips enable quick sealing and replacement.
It reduces the labor intensity of workers, improves the installation efficiency of monitoring equipment and the transportation reliability and stability of oil field pipelines, and ensures stable installation and sealing effects of equipment.
Smart Images

Figure CN221839535U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of oilfield water injection monitoring, in particular to an oilfield water injection pipe network monitoring device. Background Art
[0002] In order to ensure the formation pressure, many oil fields adopt water injection development for exploitation. Oil field water injection is usually monitored using oil field water injection intelligent precision injection instrument. Through oil field water injection monitoring, the water injection process can be fully monitored and managed to ensure the stability and efficiency of oil field production, reduce production costs, and increase production capacity and output.
[0003] The above-mentioned and existing related technologies often have the following defects: the intelligent precision injection instrument for oilfield water injection is usually installed on the oilfield pipeline to accurately measure and control the water volume, pressure and other parameters during the water injection process. The current common installation method is that workers are responsible for holding the equipment to connect the pipeline for operation. Due to the different heights of the oilfield pipelines, holding heavy equipment for a long time will increase the labor intensity of the workers, reduce the installation efficiency of the monitoring equipment, and thus affect the overall efficiency of the work.
[0004] Therefore, the utility model provides an oilfield water injection pipe network monitoring device. Utility Model Content
[0005] The utility model aims to solve the problem that the common installation method in the prior art is that workers are responsible for holding the equipment to connect the pipeline to operate. Due to the different heights of oil field pipelines, holding heavy equipment for a long time will increase the labor intensity of workers and reduce the installation efficiency of the monitoring equipment. A monitoring device for oil field water injection pipe network is proposed.
[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an oilfield water injection pipeline monitoring device, comprising a pipeline, an intelligent meter head is installed on the arc surface of the pipeline, a metering assembly is installed on the arc surface of the pipeline, an electric actuator is fixedly connected to the upper surface of the metering assembly, flanges are fixedly connected to both ends of the pipeline, an adjustment device is provided on the arc surface of the pipeline, the adjustment device comprises two adjustment plates, both of which are rotatably connected to the pipeline, a slider is rotatably connected to the surface of the two adjustment plates, a long frame is slidably connected to the lower surface of the slider, a bidirectional lead screw is rotatably connected to the surface of the long frame, the bidirectional lead screw is threadedly connected to the slider, a servo motor is fixedly connected to the surface of the long frame, the output end of the servo motor is fixedly connected to the bidirectional lead screw, two guide rods are fixedly connected to the inner wall of the long frame, and the guide rods are slidably connected to the slider.
[0007] The effects achieved by the above components are: by setting up an adjustment device and utilizing the coordination between the adjustment, slider, long frame, bidirectional screw rod, servo motor and guide rod, the oilfield water injection intelligent precision injection instrument can be height adjusted to avoid the situation where workers need to hold the equipment for installation. The monitoring equipment can be installed according to oilfield pipelines of different heights. By adjusting the height of the monitoring equipment, the monitoring equipment can be stably lifted to the required height, allowing workers to easily dock and install it, thereby reducing the workers' labor intensity and improving the installation efficiency of the monitoring equipment.
[0008] Preferably, a fixed block is fixedly connected to the surface of the elongated frame, a telescopic rod is fixedly connected to the upper surface of the fixed block, an arc plate is fixedly connected to one end of the telescopic rod, and the arc plate is fixedly connected to the pipeline.
[0009] The effect achieved by the above components is that the intelligent precision injection instrument for oilfield water injection will drive the telescopic rod to extend and retract and the arc plate to move during the lifting process. The telescopic rod and the arc plate can further fix the intelligent precision injection instrument for oilfield water injection, thereby improving the stability of the intelligent precision injection instrument for oilfield water injection when docking with the oilfield pipeline.
[0010] Preferably, the arc surface of the bidirectional screw rod is slidably connected with a sponge ring, and the surface of the sponge ring is glued with double-sided tape.
[0011] The effect achieved by the above components is: the slider will drive the sponge ring to slide along the arc surface of the bidirectional screw rod. The sponge ring can wipe the dust on the arc surface of the bidirectional screw rod, reduce the friction between the bidirectional screw rod and the slider, extend the service life of the bidirectional screw rod, and thus improve the transmission accuracy of the bidirectional screw rod.
[0012] Preferably, two sharp spikes are fixedly connected to the surfaces of the two sliding blocks, and the sharp spikes are located inside the sponge ring.
[0013] The effect achieved by the above components is: when the sponge ring is slid toward the direction close to the spikes, the spikes will be inserted into the sponge ring, and the spikes can limit the position of the sponge ring to prevent the sponge ring from moving when the bidirectional screw rotates.
[0014] Preferably, a sealing device is provided on the surface of the flange, and the sealing device includes a pointed cone, which is fixedly connected to the flange. A sealing ring is installed on the surface of the flange, and the sealing ring is made of rubber. The pointed cone is located inside the sealing ring. A limiting groove is provided on the surface of the flange, and a guide plate is slidably connected to the inner wall of the limiting groove, and a fixing strip is fixedly connected to the surface of the guide plate.
[0015] The effects achieved by the above components are: by setting up the sealing device and utilizing the cooperation between the sealing ring, the guide, the limit groove and the fixing strip, the rapid sealing of the pipeline joint can be achieved, and it is convenient for the staff to replace the sealing ring in time when needed, which helps to avoid reducing the sealing effect of the sealing ring during long-term water injection, thereby ensuring the normal transportation of the oil field pipeline and improving the reliability and stability of oil field pipeline transportation.
[0016] Preferably, a screw is threadedly connected to the surface of the fixing bar, the screw rests on the surface of the flange, one end of the screw is fixedly connected to a rope, and the other end of the rope is fixedly connected to the flange.
[0017] The effects achieved by the above components are: the rotation of the screw will drive the rope to move, and the rope can prevent the screw from being lost due to loss of contact with the fixing bar. One end of the screw rests on the surface of the flange, and the screw limits the position of the fixing bar, thereby limiting the position of the guide plate.
[0018] Preferably, two thorns are fixedly connected to the surface of the pointed cone, and the thorns are located inside the sealing ring.
[0019] The effect achieved by the above components is that the spurs can further fix the sealing ring and improve the stability of the sealing ring installed on the flange.
[0020] In summary:
[0021] 1. In the utility model, by setting an adjustment device and utilizing the cooperation among the adjustment, slider, long frame, bidirectional screw, servo motor and guide rod, the height of the intelligent precision injection instrument for oil field water injection can be adjusted, avoiding the situation where workers need to hold the equipment for installation. The monitoring equipment can be installed according to oil field pipelines of different heights. By adjusting the height of the monitoring equipment, the monitoring equipment can be stably lifted to the required height, so that workers can easily dock and install it, reducing the labor intensity of the workers and improving the installation efficiency of the monitoring equipment.
[0022] 2. In the utility model, by setting up a sealing device and utilizing the cooperation between the sealing ring, the guide, the limit groove and the fixing strip, rapid sealing of the pipe joint can be achieved, and it is convenient for the staff to replace the sealing ring in time when needed, which helps to avoid reducing the sealing effect of the sealing ring during long-term water injection, thereby ensuring the normal transportation work of the oil field pipeline and improving the reliability and stability of oil field pipeline transportation. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0024] Figure 2 It is a structural schematic diagram of the arc plate of the utility model;
[0025] Figure 3 It is a schematic diagram of the structure of the spike of the utility model;
[0026] Figure 4 For the utility model Figure 1 Schematic diagram of the local structure;
[0027] Figure 5 It is a schematic diagram of the disassembled structure of the sealing ring of the utility model.
[0028] Legend: 1. Smart meter head; 2. Pipeline; 3. Metering component; 4. Electric actuator; 5. Flange; 6. Adjustment device; 601. Adjustment plate; 602. Slider; 603. Long frame; 604. Bidirectional lead screw; 605. Servo motor; 606. Guide rod; 607. Fixed block; 608. Telescopic rod; 609. Arc plate; 610. Sponge ring; 611. Double-sided tape; 612. Spike; 7. Sealing device; 71. Sealing ring; 72. Guide plate; 73. Limiting groove; 74. Fixing strip; 75. Screw; 76. Rope; 77. Cone; 78. Spike. DETAILED DESCRIPTION
[0029] Reference Figure 1 As shown, the utility model provides a technical solution: an oilfield water injection pipe network monitoring device, comprising a pipeline 2, an intelligent meter head 1 is installed on the arc surface of the pipeline 2, a metering component 3 is installed on the arc surface of the pipeline 2, an electric actuator 4 is fixedly connected to the upper surface of the metering component 3, both ends of the pipeline 2 are fixedly connected to flanges 5, an adjusting device 6 is provided on the arc surface of the pipeline 2, and a sealing device 7 is provided on the surface of the flange 5.
[0030] The specific arrangement and function of the adjusting device 6 and the sealing device 7 will be described in detail below.
[0031] Reference Figure 2 and Figure 3As shown, in this embodiment: the adjusting device 6 includes two adjusting plates 601, both adjusting plates 601 are rotatably connected to the pipeline 2, the surfaces of the two adjusting plates 601 are rotatably connected to the slider 602, the lower surface of the slider 602 is slidably connected to the elongated frame 603, the surface of the elongated frame 603 is rotatably connected to the bidirectional lead screw 604, the bidirectional lead screw 604 is threadedly connected to the slider 602, the surface of the elongated frame 603 is fixedly connected to the servo motor 605, the output end of the servo motor 605 is fixedly connected to the bidirectional lead screw 604, the inner wall of the elongated frame 603 is fixedly connected to two guide rods 606, the guide rods 606 are slidably connected to the slider 602 Then, by setting the adjustment device 6, the adjustment, slider 602, the elongated frame 603, the bidirectional screw 604, the servo motor 605 and the guide rod 606 are used to cooperate with each other, so that the oil field water injection intelligent precision injection instrument can be adjusted in height, so as to avoid the situation where workers need to hold the equipment for installation. The monitoring equipment can be installed according to the oil field pipelines 2 of different heights. The height of the monitoring equipment can be adjusted to stably lift the monitoring equipment to the required height, so that the workers can easily dock and install it, reduce the labor intensity of the workers, and improve the installation efficiency of the monitoring equipment. The surface of the elongated frame 603 is fixedly connected with a fixed block 607, and the upper surface of the fixed block 607 The surface is fixedly connected with a telescopic rod 608, one end of the telescopic rod 608 is fixedly connected with an arc plate 609, and the arc plate 609 is fixedly connected to the pipeline 2. The oilfield water injection intelligent precision injection instrument will drive the telescopic rod 608 to extend and retract and the arc plate 609 to move during the lifting process. The telescopic rod 608 and the arc plate 609 can further fix the oilfield water injection intelligent precision injection instrument, thereby improving the stability of the oilfield water injection intelligent precision injection instrument when docking the oilfield pipeline 2. The circular arc surface of the bidirectional screw rod 604 is slidably connected with a sponge ring 610, and the surface of the sponge ring 610 is glued with a double-sided tape 611. The slider 602 will drive the sponge ring 610 along the circular arc surface of the bidirectional screw rod 604. Sliding, the sponge ring 610 can wipe the dust on the arc surface of the two-way screw rod 604, reduce the friction between the two-way screw rod 604 and the slider 602, and extend the service life of the two-way screw rod 604, thereby improving the transmission accuracy of the two-way screw rod 604. The surfaces of the two sliders 602 are fixedly connected with two spikes 612, and the spikes 612 are located in the sponge ring 610. Slide the sponge ring 610 in the direction close to the spikes 612. At this time, the spikes 612 will be inserted into the sponge ring 610. The spikes 612 limit the position of the sponge ring 610 to prevent the sponge ring 610 from moving when the two-way screw rod 604 rotates.
[0032] Reference Figure 4 and Figure 5As shown, specifically, the sealing device 7 includes a pointed cone 77, which is fixedly connected to the flange 5. A sealing ring 71 is installed on the surface of the flange 5. The sealing ring 71 is made of rubber. The pointed cone 77 is located inside the sealing ring 71. A limiting groove 73 is provided on the surface of the flange 5. A guide plate 72 is slidably connected to the inner wall of the limiting groove 73. A fixing strip 74 is fixedly connected to the surface of the guide plate 72. By setting the sealing device 7, the cooperation between the sealing ring 71, the guide, the limiting groove 73 and the fixing strip 74 can be used to achieve rapid sealing of the joint of the pipeline 2, and it is convenient for the staff to replace the sealing ring 71 in time when needed, which helps to avoid reducing the sealing effect of the sealing ring 71 during long-term water injection, thereby ensuring the normal transportation of the oil field pipeline 2 and improving the transportation efficiency of the oil field pipeline 2. The reliability and stability of transmission are improved. The surface of the fixing bar 74 is threadedly connected with a screw 75, and the screw 75 is against the surface of the flange 5. One end of the screw 75 is fixedly connected with a rope 76, and the other end of the rope 76 is fixedly connected to the flange 5. The rotation of the screw 75 will drive the rope 76 to move. The rope 76 can prevent the screw 75 from losing contact with the fixing bar 74 and being lost. One end of the screw 75 is against the surface of the flange 5. The screw 75 has the effect of limiting the position of the fixing bar 74, thereby limiting the position of the guide plate 72. The surface of the pointed cone 77 is fixedly connected with two spurs 78, and the spurs 78 are located in the sealing ring 71. The spurs 78 can further fix the sealing ring 71, thereby improving the stability of the sealing ring 71 installed on the flange 5.
[0033] Working principle: when the intelligent precision injection instrument for oilfield water injection needs to be installed on the oilfield pipeline 2, the adjusting device 6 needs to be used for installation. First, the sponge ring 610 is put on the arc surface of the bidirectional screw rod 604, and then the double-sided adhesive 611 is torn off, and then the sponge ring 610 is slid toward the direction close to the spike 612. At this time, the spike 612 will be inserted into the sponge ring 610, and the spike 612 can limit the position of the sponge ring 610 to prevent the sponge ring 610 from moving when the bidirectional screw rod 604 rotates. Then, the servo motor 60 is started. 5. The output end of the servo motor 605 drives the two adjustment plates 601 to move toward each other. The movement of the adjustment plates 601 drives the slider 602 to slide along the inner wall of the direction frame. The slider 602 slides along the arc surface of the guide rod 606. The slider 602 drives the sponge ring 610 to slide along the arc surface of the bidirectional screw rod 604. The sponge ring 610 can wipe the dust on the arc surface of the bidirectional screw rod 604, reduce the friction between the bidirectional screw rod 604 and the slider 602, and extend the service life of the bidirectional screw rod 604, thereby improving the bidirectional The transmission accuracy of the screw rod 604 can lift the intelligent precision water injection instrument for oilfield water injection. During the lifting process, the intelligent precision water injection instrument for oilfield water injection will drive the telescopic rod 608 to extend and retract and the arc plate 609 to move. The telescopic rod 608 and the arc plate 609 can further fix the intelligent precision water injection instrument for oilfield water injection, thereby improving the stability of the intelligent precision water injection instrument for oilfield water injection when docking with the oilfield pipeline 2, so that the intelligent precision water injection instrument for oilfield water injection and the oilfield pipeline 2 are at the same horizontal position, which makes it convenient for the staff to install the intelligent precision water injection instrument for oilfield water injection on the oilfield pipeline 2. By setting up the adjustment device 6, and utilizing the mutual cooperation among the adjustment, slider 602, elongated frame 603, bidirectional screw 604, servo motor 605 and guide rod 606, the height of the intelligent precision injection instrument for oilfield water injection can be adjusted, thereby avoiding the situation where workers need to hold the equipment for installation. The monitoring equipment can be installed according to the oilfield pipelines 2 of different heights. By adjusting the height of the monitoring equipment, the monitoring equipment can be stably lifted to the required height, so that workers can easily dock and install it, thereby reducing the labor intensity of the workers and improving the installation efficiency of the monitoring equipment.
[0034] When installing the intelligent precision injection instrument for oil field water injection, sealing device 7 is required to seal the connection between the oil field pipeline 2 and the intelligent precision injection instrument for oil field water injection. First, screw rod 75 is rotated, and screw rod 75 moves with the help of the thread in fixing strip 74, so that one end of screw rod 75 is out of contact with flange 5. The rotation of screw rod 75 will drive rope 76 to move, and rope 76 can prevent the screw rod 75 from being out of contact with fixing strip 74 and being lost. Then, fixing strip 74 is pushed, and fixing strip 74 slides along the inner wall of limiting groove 73. Then, sealing ring 71 is placed on guide plate 72, and then sealing ring 71 is pushed. Sealing ring 71 slides along the surface of guide plate 72, and then sealing ring 71 is pressed. At this time, sharp cone 77 and spur 78 are inserted into sealing ring 71. The sharp cone 77 and spur 78 can fix the sealing ring 71 to avoid the sealing ring 71 from being offset during use. The spur 78 can The sealing ring 71 further fixes the seal and improves the stability of the sealing ring 71 installed on the flange 5. At the same time, the sealing ring 71 can be torn off to facilitate the regular replacement of the sealing ring 71. Then, the fixing strip 74 is pushed again to make the guide plate 72 disengage from the sealing ring 71. Then, the screw 75 is rotated again to make one end of the screw 75 abut against the surface of the flange 5. The screw 75 has the function of limiting the position of the fixing strip 74, thereby limiting the position of the guide plate 72. By setting the sealing device 7 and utilizing the cooperation among the sealing ring 71, the guide and limiting grooves 73 and the fixing strip 74, the rapid sealing of the joint of the pipeline 2 can be achieved, and it is convenient for the staff to replace the sealing ring 71 in time when needed, which helps to avoid reducing the sealing effect of the sealing ring 71 during long-term water injection, thereby ensuring the normal transportation of the oilfield pipeline 2 and improving the reliability and stability of the transportation of the oilfield pipeline 2.
[0035] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.
Claims
1. An oilfield water injection pipe network monitoring device, comprising a pipe (2), a smart meter head (1) is installed on the arc surface of the pipe (2), a metering component (3) is installed on the arc surface of the pipe (2), an electric actuator (4) is fixedly connected to the upper surface of the metering component (3), flanges (5) are fixedly connected to both ends of the pipe (2), and an adjustment device (6) is provided on the arc surface of the pipe (2), characterized in that: The adjusting device (6) comprises two adjusting plates (601), both of which are rotatably connected to the pipeline (2); the surfaces of the two adjusting plates (601) are rotatably connected to a slider (602); the lower surface of the slider (602) is slidably connected to a long frame (603); the surface of the long frame (603) is rotatably connected to a bidirectional screw rod (604); the bidirectional screw rod (604) is threadedly connected to the slider (602); the surface of the long frame (603) is fixedly connected to a servo motor (605); the output end of the servo motor (605) is fixedly connected to the bidirectional screw rod (604); the inner wall of the long frame (603) is fixedly connected to two guide rods (606); the guide rods (606) are slidably connected to the slider (602).
2. The oilfield water injection pipe network monitoring device according to claim 1, characterized in that: A fixed block (607) is fixedly connected to the surface of the elongated frame (603), a telescopic rod (608) is fixedly connected to the upper surface of the fixed block (607), one end of the telescopic rod (608) is fixedly connected to an arc plate (609), and the arc plate (609) is fixedly connected to the pipeline (2).
3. The oilfield water injection pipe network monitoring device according to claim 1, characterized in that: The circular arc surface of the bidirectional screw rod (604) is slidably connected to a sponge ring (610), and the surface of the sponge ring (610) is glued with a double-sided tape (611).
4. The oilfield water injection pipe network monitoring device according to claim 3 is characterized in that: Two sharp spikes (612) are fixedly connected to the surfaces of the two sliding blocks (602), and the sharp spikes (612) are located inside the sponge ring (610).
5. The oilfield water injection pipe network monitoring device according to claim 1, characterized in that: The surface of the flange (5) is provided with a sealing device (7), the sealing device (7) comprises a pointed cone (77), the pointed cone (77) is fixedly connected to the flange (5), a sealing ring (71) is installed on the surface of the flange (5), the sealing ring (71) is made of rubber, the pointed cone (77) is located inside the sealing ring (71), a limiting groove (73) is provided on the surface of the flange (5), the inner wall of the limiting groove (73) is slidably connected to a guide plate (72), and the surface of the guide plate (72) is fixedly connected to a fixing strip (74).
6. The oilfield water injection pipe network monitoring device according to claim 5, characterized in that: The surface of the fixing strip (74) is threadedly connected with a screw rod (75), the screw rod (75) abuts against the surface of the flange (5), one end of the screw rod (75) is fixedly connected with a rope (76), and the other end of the rope (76) is fixedly connected to the flange (5).
7. The oilfield water injection pipe network monitoring device according to claim 5, characterized in that: Two thorns (78) are fixedly connected to the surface of the pointed cone (77), and the thorns (78) are located inside the sealing ring (71).