Traction substation spare power automatic switching tester suitable for electrified railway unified device

By designing an automatic switching tester for traction substations, using soft pressure plate configuration to simulate faults and automatically verifying the automatic switching device, the problem of complex operation of the existing system is solved, and the verification efficiency and reliability of the power supply system are improved.

CN221841192UActive Publication Date: 2024-10-15CHENGDU JIAODA YUNDA ELECTRICAL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420321295.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-15
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

The existing automatic switching test verification system is complex to operate and requires manual confirmation and frequent communication, resulting in long time and low efficiency, which affects the transportation efficiency and power supply reliability of the electrified railway transportation system.

Method used

An automatic switching tester for traction substations including a device panel, power module, switching input and output module, data measurement module, communication module, control module and remote signaling module is designed to quickly simulate line faults through soft pressure plate configuration. It eliminates the need for upper-level power switch opening and closing and additional manual operations to achieve automated verification.

Benefits of technology

It greatly improves the efficiency of automatic switching test verification, reduces manual operations, shortens verification time, and improves the overall reliability and transportation efficiency of the electrified railway power supply system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221841192U_ABST
    Figure CN221841192U_ABST
Patent Text Reader

Abstract

A spare power automatic switching tester suitable for a traction substation of an electrified railway unified device is characterized by comprising a device panel, a power supply module, a switching value input and output module, a data measurement module, a communication module, a control module and a remote signaling module, the device panel, the power supply module, the switching value input and output module, the data measurement module, the communication module, the control module and the remote signaling module are installed in the electric cabinet and are electrically connected. Under the combined action of the device panel, the power supply module, the switching value input and output module, the data measurement module, the communication module, the control module and the remote signaling module, and under the combined action of related mechanisms, line fault conditions can be quickly simulated by using different soft pressing plate configurations, physical operations such as switching on and switching off of a superior power supply switch are omitted, and the working efficiency is improved. And additional manual operation is omitted, rapid verification of the functions of the spare power automatic switching device is realized, and the verification efficiency of the spare power automatic switching test is greatly improved. On the basis, the device has a good application prospect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of traction power supply engineering testing, in particular to a traction substation automatic switching tester suitable for a unified device of an electrified railway. Background Art

[0002] With the development of electrified railways, the requirements for intelligent power supply and power consumption in railways are becoming higher and higher. In order to ensure the reliability of the power supply end and ensure that the backup equipment can be put into use as soon as possible when the transmission line and / or transformer fails and needs maintenance, the configuration, testing, and application of the backup automatic device in the application are becoming increasingly important. The backup automatic device, that is, the automatic backup power supply device, means that when the traction substation has dual power supplies, when one side of the power supply line fails and trips and cuts off the power, the backup automatic device will automatically connect the power supply on the other side to the line and restore the overall power supply, thereby greatly shortening the power supply suspension time, meeting the needs of the power user, and improving the overall stability and reliability of the power supply system.

[0003] From the definition of the backup automatic switch device, it is not difficult to see that it should remain on standby when the power supply system is in normal working conditions, and once a fault condition occurs in the system, it needs to be put into operation quickly to ensure fast and accurate access to the corresponding backup power supply. Therefore, in order to ensure the reliability of the backup automatic switch device, it is very important to regularly inspect, test and maintain it. The above whole process is generally called backup automatic switch test verification.

[0004] In the prior art, the automatic standby test verification is mainly carried out under the monitoring system. According to the system wiring form, the automatic standby device is switched to the corresponding mode, and then the upper power supply is opened and closed to simulate line pressure loss, power failure and other faults, and then the automatic standby device is observed to be put into operation and switch the power supply, so as to complete the experimental verification. This operation mode not only involves the opening and closing of the upper power switch, but also requires manual confirmation for each operation, which requires a large amount of operation, and the power supply site personnel and the automatic switch site personnel need to communicate frequently, which wastes manpower and seriously affects work efficiency, resulting in a long time and low efficiency for the entire automatic standby test verification, thereby reducing the transportation efficiency and comprehensive reliability of power supply of the electrified railway transportation system. Summary of the invention

[0005] In order to overcome the technical limitations of the existing automatic switching test and verification systems, the drawbacks as described in the background, the utility model provides a traction substation automatic switching tester suitable for the unified device of electrified railways, which can quickly simulate line fault conditions by using different soft pressure plate configurations under the joint action of a related mechanism, eliminating physical operations such as the opening and closing of the upper power switch, and eliminating additional manual operations, thereby achieving rapid verification of the automatic switching device function, greatly improving the efficiency of the automatic switching test and verification.

[0006] The technical solution used by the utility model to solve the technical problem is:

[0007] The invention discloses a traction substation automatic switching tester suitable for a unified device of an electrified railway, characterized in that it comprises a device panel, a power module, a switch input and output module, a data measurement module, a communication module, a control module and a telemetering module. The device panel, the power module, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module are installed in an electric control box, and a power output end of the power module is electrically connected to a power input end of the device panel, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module; and signal ends of the device panel, the switch input and output module, the data measurement module, the communication module and the telemetering module are electrically connected to a multi-channel signal interaction end of the control module.

[0008] Furthermore, the device panel is composed of buttons, indicator lights and input and output ports, wherein the input and output ports are connected to the standby automatic switching device.

[0009] Furthermore, the control module model is JDA-215B-C-B0A.

[0010] Furthermore, the communication module model is JDA-215B-C-B0B, which consists of 3 Ethernet communication interfaces, can support dual-star and fiber-optic redundant self-healing dual-ring network structures, and can meet the communication network requirements of different types of substations.

[0011] Furthermore, the remote signal module model is JDA-215B-C-B0D, which is composed of a 6-channel remote signal data acquisition card.

[0012] Furthermore, the data measurement module model is JDA-215B-C-B0C; the power module model is JDA-215B-C-B0F.

[0013] Furthermore, the switch input and output module is JDA-215B-C-B0E.

[0014] Compared with the prior art, the utility model has the following beneficial effects: the utility model can quickly simulate line fault conditions by using different soft pressure plate configurations under the joint action of the device panel, power module, switch input and output module, data measurement module, communication module, control module and remote signal module, and under the joint action of relevant mechanisms, eliminating the need for physical operations such as upper power switch separation and combination, and eliminating additional manual operations, thereby realizing rapid verification of the function of the standby automatic switching device, and greatly improving the efficiency of the standby automatic switching test verification. Based on the above, the utility model has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1This is the system structure diagram of the utility model tester;

[0016] Figure 2 This is a panel diagram of the tester device of the utility model;

[0017] Figure 3 This is the first part of the physical diagram of the control module of the utility model;

[0018] Figure 4 This is a physical picture of the switch quantity input and output module and the data measurement module of the utility model;

[0019] Figure 5 This is the self-reset logic diagram of the utility model;

[0020] Figure 6 This is the logic diagram of the automatic action of the utility model;

[0021] Figure 7 This is a panel diagram of the data measurement module and remote signaling module of the utility model;

[0022] Figure 8 It is a principle block diagram of the incoming line pressure loss alarm of the utility model. DETAILED DESCRIPTION

[0023] The invention discloses a traction substation automatic switching tester suitable for a unified device of an electrified railway, comprising a device panel, a power module, a switch input and output module, a data measurement module, a communication module, a control module and a telemetering module. The device panel, the power module, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module are installed on a circuit board in an electric control box. The power output end of the power module is electrically connected to the power input end of the device panel, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module; the signal ends of the device panel, the switch input and output module, the data measurement module, the communication module and the telemetering module and the multi-channel signal interaction end of the control module are electrically connected respectively.

[0024] Specifically, the architecture diagram of the traction substation automatic switching tester applicable to the unified device of the electrified railway and the connection of each module are as shown in the attached Figure 1 As shown, it includes a device panel, a power module JDA-215B-C-B0F, a switch input and output module JDA-215B-C-B0E, a control module JDA-215B-C-B0A, a data measurement module JDA-215B-C-B0C, a communication module JDA-215B-C-B0B, and a remote signal module JDA-215B-C-B0D. The tester device panel is as shown in the attached Figure 2As shown in the figure, the panel consists of buttons, indicator lights and input and output ports, among which the input and output ports are connected to the backup automatic switching device JDA-215B to receive the working status of the backup automatic switching device, the indicator lights indicate the on and off status of the corresponding lines in the system, and the buttons are used to control the manual reset behavior after the automatic switching action. Control module JDA-215B-C-B0A is as shown in the attached Figure 3 As shown, it receives the data measurement module JDA-215B-C-B0E (attached Figure 4 ) input, judge the system wiring form and standby automatic transfer conditions, perform automatic test configuration, and output the results. The detailed logic is: the main transformer automatic transfer is started by the external input signal "1# main transformer fault 1", "1# main transformer fault 2", "2# main transformer fault 1", "2# main transformer fault 2", and the incoming line automatic transfer is started by the external input signal "1# transformer loss of pressure 1", "1# transformer loss of pressure 2", "2# transformer loss of pressure 1", "2# transformer loss of pressure 2". When the device is ready for automatic transfer, it indicates that the device has the conditions for automatic transfer and can be automatically transferred. The automatic transfer ready remote signal is set to the closed position, and the automatic transfer ready panel light is lit. After the automatic transfer action, the device can be manually (reset remote control, panel reset button) or automatically reset. After reset, the device automatic transfer action light goes out. When the "Confirmation after automatic transfer action" setting value is set to "Exit", the device has the automatic reset function. For the standby automatic transfer action caused by transformer fault, it does not have the automatic reset function and must be manually reset before it can act again. The reset logic is as shown in the attached Figure 5 shown.

[0025] It is suitable for the traction substation standby automatic tester of the unified device of the electrified railway. When testing and verifying the standby automatic device, the control module JDA-215B-C-B0A receives the switch quantity input and output module JDA-215B-C-B0E (attached) of the standby automatic device. Figure 4 ) data, then attached Figure 6The logic judgment test mode is then configured in the control mode. The transformer standby automatic switch and the incoming line standby automatic switch-related soft pressure plate and hard pressure plate are then used to test the standby automatic switch device: when the soft pressure plate and the hard pressure plate are both in operation, the automatic switch function takes effect. The tester determines the operation mode according to the switch status, and the standby automatic switch soft pressure plate is in operation state, and switches between the four operation modes of "1# incoming line with 1# transformer", "2# incoming line with 2# transformer", "1# incoming line with 2# transformer", and "2# incoming line with 1# transformer". During the conversion process, the corresponding indicator light on the device panel lights up. During the entire test, if the switch cannot be opened / closed normally, the input signal is wrong, the pressure judgment fails, etc., the standby automatic switch logic will be automatically interrupted and detailed information will be given. The above test process can be remotely controlled by the remote signal module JDA-215B-C-B0D, and the test results and corresponding logs can be remotely transmitted. These results and logs can also be interacted with other devices connected to it by the communication module JDA-215B-C-B0B. The main structure of the communication module JDA-215B-C-B0B is shown in the attached Figure 7 As shown in the figure, it consists of 3 Ethernet communication interfaces, which can support dual star and fiber redundant self-healing dual ring network structures, and can meet the needs of different types of substations for communication networks. The main structure of the remote signal module JDA-215B-C-B0D is shown in the attached figure. Figure 8 As shown in the figure, it consists of 6-channel remote signal data acquisition cards and is connected to the communication module. The remote signal data such as device status and protection status are output through the communication module, thereby realizing the remote signal function. The data measurement module JDA-215B-C-B0C is connected to the input and output module JDA-215B-C-B0E, as shown in the attached figure. Figure 4 As shown in the figure, it can monitor the 8 voltages in the substation in real time, determine the real-time fault type through the control module, and issue a voltage loss alarm. The judgment logic is shown in the attached figure. Figure 2 As shown in the figure, take the 1# incoming line pressure loss alarm as an example. X1 , U AB1 , U BC1 , U CA1 They are respectively the 1# incoming line voltage and the three-line voltage on the high-voltage side of the 1# main transformer, the 2# incoming line voltage loss alarm principle and the attached Figure 2 The power module JDA-215B-C-B0F provides 110V / 220V power to the above modules.

[0026] The traction substation standby automatic switching tester suitable for the unified device of the electrified railway has the following functions. Automatic configuration function: This part of the function is realized by the control module JDA-215B-C-B0A. The tester can automatically identify the current operation mode, automatic switching permission conditions, the working status of the backup incoming power supply or the main transformer and the main wiring form of the traction substation according to the needs of the user. The automatic switching logic can be flexibly configured for the standby automatic switching device to complete the automatic switching of the backup power supply or the backup main transformer, and the standby automatic switching experimental verification function of various wiring methods and operation modes can be completed. Automatic safety function: This part of the function is realized by the input and output module JDA-215B-C-B0E and the control module JDA-215B-C-B0A. The tester can perform experimental verification and post-test analysis of the standby automatic switching of the incoming line pressure loss and the standby automatic switching of the transformer failure. Remote control function: This part of the function is realized by the communication module JDA-215B-C-B0B and the control module JDA-215B-C-B0A. The tester can remotely control the automatic switching test verification in a total of 6 aspects, including device reset, maintenance soft pressure plate, secondary value display soft pressure plate, transformer automatic switching soft pressure plate, incoming line automatic switching soft pressure plate, inline priority soft pressure plate, etc. Data measurement function: This part of the function is realized by the input and output module JDA-215B-C-B0E and the data measurement module JDA-215B-C-B0C. The tester can collect and monitor the 8-way voltage and current in the substation in real time, and can transmit the data to the control module JDA-215B-C-B0A in real time to realize the subsequent control function. Remote signaling function: This part of the function is realized by the remote signaling module JDA-215B-C-B0D and the communication module JDA-215B-C-B0B. The tester can provide corresponding remote signaling functions by collecting 6 remote signaling signals, including external hard-input remote signaling, internal soft remote signaling, device status remote signaling, protection status remote signaling, dual-point remote signaling and protection action remote signaling. And the above remote signals can be recorded and stored, and can be actively transmitted remotely. Communication function: This part of the function is realized by the communication module JDA-215B-C-B0B. The tester provides 3 Ethernet communication interfaces, which support dual star and fiber redundant self-healing dual ring network structure, can meet the needs of different types of substations for communication networks, and support IEC 60870-5-103, IEC60870-5-104, IEC 61850 and other communication protocols. The device supports up to 12 TCP connections using IEC60870-5-103 protocol or IEC61850 at the same time.

[0027] The utility model can quickly simulate line fault conditions by using different soft pressure plate configurations under the joint action of the device panel, power module, switch input and output module, data measurement module, communication module, control module and remote signal module, and under the joint action of relevant mechanisms, eliminating physical operations such as the separation and combination of the upper power switch and eliminating additional manual operations, thereby realizing rapid verification of the function of the standby automatic start device and greatly improving the efficiency of the standby automatic start test verification.

[0028] It should be understood that although the present specification is described according to the implementation mode, the implementation mode does not only include an independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in the embodiments can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. Applicable to the traction substation automatic tester of the unified device of the electrified railway. It is characterized in that The device comprises a device panel, a power module, a switch input and output module, a data measurement module, a communication module, a control module and a telemetering module. The device panel, the power module, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module are installed in an electric control box. The power output end of the power module is electrically connected to the power input end of the device panel, the switch input and output module, the data measurement module, the communication module, the control module and the telemetering module; the signal ends of the device panel, the switch input and output module, the data measurement module, the communication module and the telemetering module are electrically connected to the multi-channel signal interaction end of the control module.

2. The traction substation automatic switching tester suitable for the unified device of the electrified railway according to claim 1, It is characterized in that The device panel consists of buttons, indicator lights and input and output ports, among which the input and output ports are connected to the standby automatic transfer device.

3. The traction substation automatic switching tester suitable for the unified device of the electrified railway according to claim 1, It is characterized in that The control module model is JDA-215B-C-B0A.

4. The traction substation automatic switching tester suitable for the unified device of the electrified railway according to claim 1, It is characterized in that The communication module model is JDA-215B-C-B0B, which consists of 3 Ethernet communication interfaces, can support dual-star and fiber-optic redundant self-healing dual-ring network structures, and can meet the communication network requirements of different types of substations.

5. The traction substation automatic switching tester suitable for the unified device of the electrified railway according to claim 1, It is characterized in that The model of the remote signal module is JDA-215B-C-B0D, which consists of a 6-channel remote signal data acquisition card.

6. The traction substation automatic switching tester applicable to the unified device of the electrified railway according to claim 1, It is characterized in that The data measurement module model is JDA-215B-C-B0C; the power module model is JDA-215B-C-B0F.

7. The traction substation automatic switching tester suitable for the unified device of the electrified railway according to claim 1, It is characterized in that Switching input and output module JDA-215B-C-B0E.