SCR (Selective Catalytic Reduction) denitration device
By designing a convenient catalyst replacement structure in the SCR denitrification device, including through-holes and threaded holes, the problem of inconvenient catalyst replacement is solved, downtime is significantly reduced, and the efficiency of cement production is improved.
Patent Information
- Application Number
- CN202420011499.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-02
AI Technical Summary
The existing SCR denitrification tower is inconvenient to operate when replacing the catalyst, resulting in long production shutdown time and affecting the efficiency of cement production.
An SCR denitrification device is designed, including an SCR denitrification tower, a carrier plate, a catalyst, a front fixed plate, a rear fixed plate and an ammonia gas pipe. The replacement process of the catalyst is simplified by setting up through-ports, placement slots, threaded holes and screws. Improve replacement efficiency.
The rapid replacement of the catalyst in the SCR denitrification tower is achieved, which significantly reduces downtime and improves work efficiency.
Smart Images

Figure CN221846690U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of SCR denitration, in particular to an SCR denitration device. Background Art
[0002] During the calcination of cement clinker, cement kilns will emit a large amount of nitrogen oxide waste gas. Direct emission will cause serious pollution to the atmospheric environment. Therefore, a denitrification device is required to treat the waste gas before it is discharged.
[0003] At present, the SCR denitrification process is usually used to denitrify flue gas in cement production. However, the catalyst in the SCR denitrification process is usually fixed inside the SCR denitrification tower. It is cumbersome to replace the catalyst, and the operation inside the SCR denitrification tower is not convenient, resulting in a long shutdown time of the SCR denitrification tower. For this reason, we propose an SCR denitrification device. Utility Model Content
[0004] The utility model aims to provide an SCR denitration device, which has the advantages of being easy to replace and install the catalyst inside the SCR denitration tower, improving work efficiency, and also greatly reducing the downtime of the SCR denitration tower, thereby solving the problem that the SCR denitration tower currently used in cement production is not convenient enough when replacing the catalyst inside the SCR denitration tower, resulting in a long downtime of the SCR denitration tower.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an SCR denitrification device, comprising an SCR denitrification tower, a supporting plate, a catalyst, a rear fixing plate, a front fixing plate and an ammonia pipe, the front surface of the SCR denitrification tower is provided with a through-hole, the upper surface of the supporting plate is provided with a placement groove, and the catalyst is located inside the placement groove, threaded holes are symmetrically provided at the middle position of the front surface and the rear surface of the supporting plate, bolt holes are provided at the middle position of the front surface of the front fixing plate and the rear surface of the rear fixing plate, and screws are movably inserted in the two bolt holes, the front fixing plate and the supporting plate are symmetrically fixedly connected with plug columns at both sides of the rear surface, and the rear fixing plate and the supporting plate are symmetrically provided with plug holes at both sides of the front surface of the supporting plate.
[0006] Preferably, slide grooves are symmetrically arranged at both sides of the outer surface of the support plate, and fixed slide bars are symmetrically fixedly installed at both sides of the inner wall of the SCR denitration tower, and the two fixed slide bars are respectively located in the two slide grooves.
[0007] Preferably, a flue gas inlet pipe is fixedly connected to the upper surface of the SCR denitrification tower, and a flue gas outlet pipe is fixedly connected to one side of the outer surface of the SCR denitrification tower near the lower surface.
[0008] Preferably, the ends of the smoke inlet pipe and the smoke outlet pipe are both fixedly connected with connecting flanges.
[0009] Preferably, a branch pipe is fixedly connected to the outer surface of the ammonia pipe, and the branch pipe passes through the SCR denitrification tower.
[0010] Preferably, sealing strips are fixedly installed at a position close to the edge of the rear surface of the front fixing plate and a position close to the edge of the front surface of the rear fixing plate.
[0011] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0012] The utility model achieves the effect of facilitating the replacement and installation of the catalyst inside the SCR denitration tower, improving work efficiency, and greatly reducing the downtime of the SCR denitration tower by arranging an SCR denitration tower, a through-hole, a bearing plate, a placement groove, a catalyst, a front fixing plate, a rear fixing plate, a plugging column, a plugging hole, a threaded hole and a screw rod. When the catalyst inside the SCR denitration tower is replaced, the screw rod on the front fixing plate is twisted to separate the screw rod and the threaded hole, the front fixing plate is disassembled, and a new catalyst is placed inside a new bearing plate and located inside the placement groove. Two plugging columns on the rear surface of the new bearing plate are inserted into the two plugging holes on the front surface of the original bearing plate, and the new bearing plate is pushed into the through-hole to replace the original catalyst inside the SCR denitration tower. The two plugging columns on the rear surface of the new bearing plate are inserted into the two plugging holes on the new rear fixing plate. The screw rods on the front fixing plate and the rear fixing plate on the new bearing plate are twisted to fix the new bearing plate. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a three-dimensional diagram of the utility model;
[0014] Figure 2 It is a partial three-dimensional diagram of the load-bearing plate of the utility model;
[0015] Figure 3 It is a partial three-dimensional diagram of the front fixing plate of the utility model;
[0016] Figure 4 It is a partial three-dimensional diagram of the rear fixing plate of the utility model;
[0017] Figure 5 It is a partial stereogram of the catalyst and the supporting plate of the utility model;
[0018] Figure 6 It is a schematic diagram of the main cross-sectional structure of the utility model.
[0019] Figure numerals: 1. Flue gas exhaust pipe; 2. SCR denitrification tower; 3. Fixed slide bar; 4. Flue gas inlet pipe; 5. Connecting flange; 6. Load-bearing plate; 7. Placement groove; 8. Catalyst; 9. Slide groove; 10. Through-hole; 11. Rear fixing plate; 12. Front fixing plate; 13. Sealing strip; 14. Bolt hole; 15. Screw; 16. Plug column; 17. Socket; 18. Threaded hole; 19. Branch pipe; 20. Ammonia pipe. DETAILED DESCRIPTION
[0020] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
[0021] like Figure 1-Figure 6As shown, the utility model proposes an SCR denitration device, including an SCR denitration tower 2, a supporting plate 6, a catalyst 8, a rear fixed plate 11, a front fixed plate 12 and an ammonia pipe 20. The upper surface of the SCR denitration tower 2 is fixedly connected with a flue gas inlet pipe 4. The nitrogen and oxygen-containing waste flue gas generated in the cement production process enters the SCR denitration tower 2 from the flue gas inlet pipe 4. A flue gas exhaust pipe 1 is fixedly connected to one side of the outer surface of the SCR denitration tower 2 near the lower surface. The flue gas purified by denitration is discharged from the flue gas exhaust pipe 1. The ends of the flue gas inlet pipe 4 and the flue gas exhaust pipe 1 are fixedly connected with a connecting flange 5. A through hole 10 is provided on the front surface of the SCR denitration tower 2, and the through hole 10 penetrates from the front surface of the SCR denitration tower 2 to the rear surface of the SCR denitration tower 2. The bearing plate 6 is inserted into the SCR denitration tower 2 from the through hole 10. Slide grooves 9 are symmetrically arranged at both sides of the outer surface of the bearing plate 6. Fixed slide bars 3 are symmetrically fixedly installed at both sides of the inner wall of the SCR denitration tower 2. The two fixed slide bars 3 are respectively located in the two slide grooves 9, so that the bearing plate 6 can be inserted into the SCR denitration tower 2 from the through hole 10. At the same time, the cooperation of the fixed slide bar 3 and the slide groove 9 can support the bearing plate 6. The bearing plate 6 The upper surface is provided with a placement groove 7, and the catalyst 8 is located inside the placement groove 7. The bearing plate 6 is used for fixing and carrying the catalyst 8. The middle positions of the front and rear surfaces of the bearing plate 6 are symmetrically provided with threaded holes 18. The front surface of the front fixing plate 12 and the middle position of the rear surface of the rear fixing plate 11 are provided with bolt holes 14, and the two bolt holes 14 are movably plugged with screws 15. The front fixing plate 12 and the two sides of the rear surface of the bearing plate 6 are symmetrically fixedly connected with plug posts 16. The rear fixing plate 11 and the two sides of the front surface of the bearing plate 6 are symmetrically provided with plug holes 17. The rear surface of the front fixing plate 12 is close to the edge. Sealing strips 13 are fixedly installed at the position and at the front surface of the rear fixed plate 11 near the edge. The front fixed plate 12 and the rear fixed plate 11 are of the same size, but the size of the front fixed plate 12 and the rear fixed plate 11 is larger than the through-opening 10. After the front fixed plate 12 and the rear fixed plate 11 are in contact with the SCR denitrification tower 2, the sealing strip 13 plays a sealing role. A branch pipe 19 is fixedly connected to the outer surface of the ammonia pipe 20, and the branch pipe 19 passes through the SCR denitrification tower 2. The ammonia in the ammonia pipe 20 is transmitted to the inside of the SCR denitrification tower 2 through the branch pipe 19, and cooperates with the catalyst 8 to complete the denitrification of the nitrogen and oxygen-containing waste gas.
[0022] When the utility model is in use, the nitrogen-oxygen waste flue gas generated in the cement production process enters the SCR denitration tower 2 from the flue gas inlet pipe 4, and the flue gas after denitration and purification is discharged from the flue gas exhaust pipe 1. When the catalyst 8 inside the SCR denitration tower 2 is replaced, the screw 15 on the front fixing plate 12 is twisted to separate the screw 15 and the threaded hole 18, the front fixing plate 12 is removed, and the new catalyst 8 is placed inside the new carrier plate 6 and located inside the placement groove 7. The two plug posts 16 on the rear surface of the new carrier plate 6 are inserted into the two plug holes 17 on the front surface of the original carrier plate 6, and the new carrier plate 6 is pushed into the through-hole 10, so that the original catalyst 8 inside the SCR denitration tower 2 is replaced, and the two plug posts 16 on the rear surface of the new carrier plate 6 are inserted into the two plug holes 17 on the new rear fixing plate 11. The screws 15 on the front fixing plate 12 and the rear fixing plate 11 on the new carrier plate 6 are twisted to fix the new carrier plate 6, and the catalyst 8 is quickly replaced.
[0023] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.
Claims
1. An SCR denitration device, comprising an SCR denitration tower (2), a carrier plate (6), a catalyst (8), a rear fixing plate (11), a front fixing plate (12) and an ammonia pipe (20), Features: The front surface of the SCR denitration tower (2) is provided with a through opening (10), the upper surface of the support plate (6) is provided with a placement groove (7), and the catalyst (8) is located inside the placement groove (7), threaded holes (18) are symmetrically arranged at the middle position of the front surface and the rear surface of the support plate (6), bolt holes (14) are arranged at the middle position of the front surface of the front fixing plate (12) and the rear surface of the rear fixing plate (11), and screw rods (15) are movably inserted inside the two bolt holes (14), the front fixing plate (12) and the support plate (6) are symmetrically fixedly connected with plug posts (16) at both sides of the rear surface, and the rear fixing plate (11) and the support plate (6) are symmetrically provided with plug holes (17) at both sides of the front surface.
2. The SCR denitration device according to claim 1, Features: Slide grooves (9) are symmetrically arranged at positions on both sides of the outer surface of the support plate (6), and fixed slide bars (3) are symmetrically fixedly installed at positions on both sides of the inner wall of the SCR denitration tower (2), and the two fixed slide bars (3) are respectively located inside the two slide grooves (9).
3. The SCR denitration device according to claim 1, Features: A flue gas inlet pipe (4) is fixedly connected to the upper surface of the SCR denitration tower (2), and a flue gas outlet pipe (1) is fixedly connected to one side of the outer surface of the SCR denitration tower (2) near the lower surface.
4. The SCR denitration device according to claim 3, Features: The ends of the smoke inlet pipe (4) and the smoke outlet pipe (1) are both fixedly connected with connecting flanges (5).
5. The SCR denitration device according to claim 1, Features: The outer surface of the ammonia pipe (20) is fixedly connected to a branch pipe (19), and the branch pipe (19) passes through the SCR denitration tower (2).
6. The SCR denitration device according to claim 1, Features: A sealing strip (13) is fixedly installed at a position close to the edge of the rear surface of the front fixing plate (12) and a position close to the edge of the front surface of the rear fixing plate (11).
Citation Information
Cited By
SCR (Selective Catalytic Reduction) denitration device of thermal power generating unit
CN223366636U
Modularly-designed SCR (Selective Catalytic Reduction) denitration device
CN224009487U