Bridge construction drilling device

By adopting the design of screw, support frame and motor in the bridge construction drilling device, the drill bit position and speed can be adjusted quickly, which solves the problem of low drilling efficiency during construction, improves construction efficiency and accuracy, and is suitable for Drilling construction for steel structure bridges.

CN221848703UActive Publication Date: 2024-10-18QINGDAO ROAD & BRIDGE CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420231194.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-31
Publication Date
2024-10-18
Estimated Expiration
2034-01-31

AI Technical Summary

Technical Problem

Drilling operations during bridge construction are inefficient and require frequent adjustments to the position of the steel, resulting in high consumption of manpower and material resources and slowing down the construction progress.

Method used

A drilling device for bridge construction is designed, which uses the matching structure of the screw and the support frame to realize the vertical and horizontal position adjustment of the drill bit. The position and speed of the drill bit are quickly adjusted through the drive motor and three-phase motor, combined with thrust ball bearings and belt transmission. Enhance device stability and accuracy.

Benefits of technology

Continuous drilling operations are realized without the need to adjust the position of the section steel on site, saving manpower and material resources, improving construction efficiency and accuracy, reducing energy consumption, and ensuring construction progress and engineering standards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221848703U_ABST
    Figure CN221848703U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of bridge construction technical equipment, in particular to a drilling device for bridge construction, which comprises a base, a rotatable lead screw mounted on the base, a first support frame sleeved on the lead screw, a rotating shaft mounted in the first support frame, a second support frame fixedly connected with the rotating shaft, and a clamping column mounted at the outer end of the second support frame. A shell is fixedly connected to the outer wall of the clamping column, a rotatable rotating rod is installed in the shell, and the bottom end of the rotating rod extends out of the shell and is fixedly provided with a drill bit used for bridge construction drilling. The height of the vertical position of the drill bit can be adjusted, and the horizontal position of the drill bit can be properly adjusted through the rotating shaft and the second supporting frame, so that continuous drilling construction operation can be achieved, operators do not need to adjust the position of profile steel in the operation process, the problem that the construction operation efficiency is too low is solved, and the construction efficiency is improved. Manpower and material resources are saved, working hours consumed by drilling construction operation are greatly reduced, and the overall construction progress is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge construction technical equipment, and specifically discloses a bridge construction drilling device. Background Art

[0002] Steel structure bridges have the advantages of light weight, high strength, simple construction, large span, excellent earthquake resistance and impact resistance, etc., and are currently widely used in bridge construction projects. Drilling construction is one of the important links in bridge construction. Drilling holes in the steel used in steel structure bridges can effectively enhance the bearing capacity of the bridge. At the same time, drilling construction can be used to strengthen the structure at key positions of the bridge, improve the bridge's earthquake resistance and deformation resistance, and ensure that the bridge can remain normal under the influence of natural disasters or other external forces. When conducting bridge foundation drilling construction, site surveys and explorations are required to determine the location and depth of the drilling holes, and the bridge is drilled using a drilling rig and related tools and equipment.

[0003] The utility model patent with authorization announcement number: CN220028748U discloses a new type of highway bridge construction drilling equipment, including a base, two guide rods are fixedly arranged on the base, the two guide rods are slidably arranged with the same mounting frame, a mounting block is slidably arranged in the mounting frame, a mounting frame is fixedly arranged on the outer wall of the mounting block, a mounting plate and a motor are fixedly arranged on the mounting frame, a drive sleeve is rotatably arranged on the mounting plate, a transmission rod is slidably arranged between the drive sleeve and the motor output shaft, a cylinder for driving the transmission rod to move axially is arranged on the mounting plate, and a plurality of drilling plates are evenly arranged on the outer periphery of the drive sleeve, and the plurality of drilling plates are radially slidably connected to the drive sleeve.

[0004] In the disclosed patent technology, the steel section of the steel structure bridge is placed on the base, and the mounting block can be moved up and down along the threaded rod to adjust the height of the drilling plate, so as to perform drilling operations on the steel section; in the actual construction process, there are a large number of hole structures on the steel section. If the drilling equipment in the above patent technology is used for drilling operations, after completing the drilling operation of the first hole structure, the on-site workers are required to adjust the position of the steel section and perform drilling operations on the second hole structure; each drilling operation requires the position of the steel section to be adjusted, the construction efficiency is too low, and a large amount of manpower and material resources are required, so that the construction work intensity is large, time-consuming and labor-intensive, which greatly slows down the overall construction progress. Utility Model Content

[0005] Aiming at the problem of low construction efficiency in the current bridge construction drilling operation process, the utility model provides a bridge construction drilling device.

[0006] To solve the above problems, the utility model provides the following technical solutions:

[0007] A bridge construction drilling device comprises a base, a rotatable screw is installed on the base, a first support frame is mounted on the screw, a rotating shaft is installed in the first support frame, a second support frame is fixedly connected to the rotating shaft, a clamping column is installed at the outer end of the second support frame, a shell is fixedly connected to the outer wall of the clamping column, a rotatable rotating rod is installed in the shell, the bottom end of the rotating rod protrudes out of the shell and a drill bit for bridge construction drilling is fixedly installed.

[0008] Preferably, a support rod is fixedly mounted on the base, and there are at least two support rods arranged on the outside of the lead screw, and the support rod is slidably matched with the first support frame.

[0009] Preferably, the top end of the support rod is fixedly connected to a top plate, a first drive motor is mounted on the top plate, and the first drive motor is connected to the lead screw.

[0010] Preferably, a second driving motor is mounted on the first supporting frame, a transmission gear is mounted on the outer wall of the rotating shaft, and the transmission gear is connected to the second driving motor via a synchronous belt.

[0011] Preferably, a thrust ball bearing is fixedly installed between the first support frame and the second support frame.

[0012] Preferably, a three-phase motor fixedly connected to the second support frame is arranged on the outside of the shell, a first turntable and a second turntable are fixedly installed on the outer wall of the rotating rod, a support plate is fixedly installed on the outer wall of the clamping column, and the three-phase motor, the first turntable, the second turntable and the support plate are connected by a belt.

[0013] Preferably, the first turntable is arranged on the upper part of the second turntable, and the outer diameter of the second turntable is larger than the outer diameter of the first turntable.

[0014] Preferably, the first rotating disk and the second rotating disk are both provided with protrusions, the protrusions and the rotating rod are both provided with threaded holes, and bolts are installed in the threaded holes.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] 1. The utility model can adjust the height of the vertical position of the drill bit by setting the matching structure of the lead screw and the first support frame, and can appropriately adjust the horizontal position of the drill bit through the rotating shaft and the second support frame, so as to realize continuous drilling construction operation, without the need for operators to adjust the position of the steel section during the operation, thus solving the problem of low construction efficiency, saving manpower and material resources, greatly reducing the working hours consumed by the drilling construction operation, and ensuring the progress of the overall construction;

[0017] 2. The utility model can quickly adjust the horizontal and vertical positions of the drill bit by setting the first drive motor and the second drive motor, and the rotation speed of the drill bit can be controlled and adjusted under the action of the three-phase motor. Different rotation speeds are suitable for steel sections of different materials, which can not only reduce the energy consumption of the overall device, but also effectively improve the drilling efficiency, and has practical value;

[0018] 3. The utility model can effectively enhance the stability of the connection structure between the first support frame and the second support frame by arranging a thrust ball bearing, and under the coordination of the support plate, make the transmission force of the belt more stable, enhance the stability of the overall device, ensure the drilling accuracy of the drill bit, and ensure that the drilling accuracy of bridge construction meets engineering standards, so it has a very broad application prospect. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solution of the utility model, the following will briefly introduce the drawings required for the description. Obviously, the drawings described below are only some embodiments of the utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0020] Figure 1 This is a schematic diagram of the overall device structure of the utility model;

[0021] Figure 2 This is a schematic diagram of the installation of the first drive motor of the utility model;

[0022] Figure 3 This is a schematic diagram of the installation structure of the first support frame and the second support frame of the utility model;

[0023] Figure 4 This is a schematic diagram of the synchronous belt installation structure of the utility model;

[0024] Figure 5 This is a schematic diagram of the external structure of the housing of the utility model;

[0025] Figure 6 This is a schematic diagram of the internal structure of the shell of the utility model;

[0026] Figure 7 This is a schematic diagram of the installation structure of the first turntable and the second turntable of the utility model;

[0027] Figure 8 This is a schematic diagram of the threaded hole structure of the utility model;

[0028] In the figure: 1. base, 2. screw, 3. first support frame, 4. rotating shaft, 5. second support frame, 6. clamping column, 7. housing, 8. rotating rod, 9. drill bit, 10. supporting rod, 11. top plate, 12. first drive motor, 13. second drive motor, 14. transmission gear, 15. synchronous belt, 16. thrust ball bearing, 17. three-phase motor, 18. first turntable, 19. second turntable, 20. supporting plate, 21. belt, 22. protrusion, 23. threaded hole, 24. bolt. DETAILED DESCRIPTION

[0029] In order to make the purpose, features and advantages of the utility model more obvious and easy to understand, the technical scheme of the utility model will be clearly and completely described below in conjunction with the drawings in the specific embodiment. Obviously, the embodiments described below are only part of the embodiments of the utility model, not all of them. Based on the embodiments in this patent, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this patent.

[0030] This specific embodiment provides a bridge construction drilling device, such as Figure 1-Figure 8 As shown, it includes a base 1, on which a rotatable screw 2 is installed, and the bottom of the screw 2 is fixedly installed on the table top of the base 1 through a bearing; a support rod 10 is also fixedly installed on the base 4, and the number of the support rods 10 is set to three, and the three support rods 10 are distributed in a triangular shape on the outside of the screw 2, and a first support frame 3 is commonly mounted on the screw 2 and the three support rods 10, and the first support frame 3 is equipped with a plurality of sleeves for facilitating the passage of the screw 2 and the support rod 10; the top end of the support rod 10 is fixedly connected with a top plate 11, and the top plate 11 and the support rod 10 can be fixedly connected by bolts, and a first drive motor 12 is fixedly installed on the upper surface of the top plate 11, and the output shaft of the first drive motor 12 passes through the top plate 11 and is connected to the top end of the screw 2, and the output shaft of the first drive motor 12 can be fastened to the screw 2 through a coupling. By arranging a lead screw 2 and a support rod 10 on the base 1, and under the driving action of the first drive motor 12, when the lead screw 2 rotates, the first support frame 3 can be vertically linearly moved along the outer wall of the lead screw 2 and the support rod 10, so as to adjust the vertical height position of the first support frame 3; and the lead screw 2 can effectively improve the stability of the first support frame 3, and can ensure that the first support frame 3 can remain stably placed at any height.

[0031] A rotating shaft 4 is installed inside the left end of the first support frame 3, and the upper and lower parts of the rotating shaft 4 are both installed with bearings for connecting with the first support frame 3. Under the action of the bearings, the rotating shaft 4 can rotate in the first support frame 3; a transmission gear 14 is mounted on the outer wall of the rotating shaft 4, and the inner peripheral wall of the transmission gear 14 is fixedly connected to the outer wall of the rotating shaft 4. A load-bearing plate is fixedly installed on the right end of the first support frame 3, one side of the load-bearing plate is fixedly connected to the first support frame 3, and the other side of the load-bearing plate protrudes out of the first support frame 3. A second drive motor 13 is fixedly installed on the load-bearing plate on this side, and the output shaft of the second drive motor 13 passes through the load-bearing plate downward, and the output shaft of the second drive motor 13 and the transmission gear 14 are jointly mounted with a synchronous belt 15. By setting the transmission gear 14 and the second drive motor 13, and connecting them together through the synchronous belt 15, the second drive motor 13 can provide rotational power to the rotating shaft 4, so that the rotating shaft 4 can rotate inside the first support frame 3.

[0032] A second support frame 5 is fixedly connected to the outer wall of the rotating shaft 4, and the upper right end of the second support frame 5 is fixedly connected to the top of the rotating shaft 4, and the lower right end of the second support frame 5 is arranged on the lower side of the transmission gear 14 and fixedly connected to the outer wall of the rotating shaft 4; the rotation of the rotating shaft 4 can drive the second support frame 5 to rotate together. A clamping column 6 is installed at the outer left end of the second support frame 5, and the clamping column 6 passes through the second support frame 5 from bottom to top and protrudes upward; a stabilizing block is fixedly installed inside the second support frame 5, and the stabilizing block can be fixedly connected to the upper surface and the lower surface of the second support frame 5 by bolts; the stability of the second support frame 5 can be enhanced by setting the stabilizing block to avoid structural deformation caused by stress concentration.

[0033] A thrust ball bearing 16 is fixedly installed between the first support frame 3 and the second support frame 5. The inner ring diameter of the thrust ball bearing 16 is larger than the diameter of the rotating shaft 4. The thrust ball bearing 16 is arranged inside the first support frame 3 and at the lower part of the second support frame 5. The upper surface of the thrust ball bearing 16 is fixedly connected to the lower surface of the second support frame 5, and the lower surface of the thrust ball bearing 16 is fixedly connected to the inner surface of the first support frame 3. By setting the thrust ball bearing 16, the smoothness of the rotation of the second support frame 5 is further improved, and the corresponding supporting capacity is provided, thereby enhancing the stability of the connection structure between the first support frame 3 and the second support frame 5.

[0034] A shell 7 is fixedly connected to the outer wall of the clamping column 6, and the shell 7 is arranged on the upper left side of the second support frame 5. The interior of the shell 7 is a hollow structure. A rotatable rotating rod 8 is installed in the shell 7. The bottom end of the rotating rod 8 protrudes out of the shell 7 and a drill bit 9 for drilling holes in bridge construction is fixedly installed. The rotating rod 8 is arranged on the left side of the shell 7. The upper part of the rotating rod 8 is installed in the shell 7, and the lower part of the rotating rod 8 protrudes out of the shell 7; a first rotating disk 18 and a second rotating disk 19 are fixedly installed on the outer wall of the rotating rod 8. The first rotating disk 18 and the second rotating disk 19 are fixedly installed. 19 is arranged from top to bottom inside the shell 7, and the circumferential surfaces of the first turntable 18 and the second turntable 19 are both provided with inner grooves; a three-phase motor 17 is fixedly installed on the upper surface of the second support frame 5, and the three-phase motor 17 is arranged on the right side of the shell 7, and a support plate 20 is fixedly installed on the outer wall of the clamping column 6, and the support plate 20 is fixedly connected to the clamping column 6 through a connecting rod, and an inner groove is provided on the circumferential surface of the support plate 20; the output shaft of the three-phase motor 17, the first turntable 18, the second turntable 19, and the support plate 20 are connected by a belt 21. Through the connecting action of the belt 21, the driving force of the three-phase motor 17 can be transmitted to the first turntable 18 and the second turntable 19. The first turntable 18 and the second turntable 19 can drive the rotating rod 8 to rotate. When the rotating rod 8 rotates, the drill bit 9 can rotate, thereby drilling holes in the steel sections used in the steel structure bridge; by setting the support plate 20, a support structure can be provided for the end of the belt 21, thereby smoothly transmitting the first turntable 18 and the second turntable 19, so that the rotating rod 8 can maintain high-speed and stable rotation.

[0035] The outer diameter of the second rotating disk 19 is larger than the outer diameter of the first rotating disk 18. The second rotating disk 19 with a larger outer diameter is arranged at the bottom, which can effectively improve the force balance of the rotating rod 8 and avoid stress concentration.

[0036] In addition, the first turntable 18 and the second turntable 19 are both provided with protrusions 22. The protrusions 22 of the first turntable 18 are arranged at the upper part, and the protrusions 22 of the second turntable 19 are arranged at the lower part. Threaded holes 23 are opened on the circumferential surfaces of the protrusions 22 and the circumferential surfaces of the rotating rod 8. Threaded bolts 24 are installed in the threaded holes 23. The bolts 24 can firmly connect the first turntable 18 and the rotating rod 8, and the second turntable 19 and the rotating rod 8, to ensure smooth transmission of the belt 21.

[0037] The working principle of the utility model is:

[0038] When drilling the steel of the steel structure bridge, the steel can be placed on the left side of the base 1, and the three-phase motor 17 is started. Under the drive of the belt 21, the first turntable 18 and the second turntable 19 are rotated, thereby driving the rotating rod 8 and the drill bit 9 to rotate; the first drive motor 12 is started to rotate the screw 2 on the base 1, and the first support frame 3 is vertically linearly moved on the support rod 10, so that the drill bit 9 is close to the surface of the steel and performs drilling operations on it. When the hole structure at this position completes the drilling operation, the vertical height of the drill bit 9 is raised, and the second drive motor 13 is started to drive the transmission gear 15 to rotate, so that the shaft 4 drives the second support frame 5 to rotate, so as to adjust the horizontal position of the drill bit 9, so that the drill bit 9 is aligned with the next hole that needs to be drilled, and the vertical height of the drill bit 9 is lowered, thereby completing the drilling operation at this position.

[0039] In the above-mentioned drilling construction operation, the rotation speed of the three-phase motor 17 can be adjusted to adapt to steel sections of different materials, thereby speeding up the construction progress; and the drill bit 9 can be disassembled and assembled to adapt to drilling construction operations with different hole structures, thereby improving the wide applicability of the device.

[0040] Compared with the prior art, the utility model can adjust the height of the vertical position of the drill bit 9 by setting the matching structure of the lead screw 2 and the first support frame 3, and can appropriately adjust the horizontal position of the drill bit 9 through the rotating shaft 4 and the second support frame 5, so as to realize continuous drilling construction operation, without the need for operators to adjust the position of the steel section during the operation, solving the problem of low construction efficiency, saving manpower and material resources, greatly reducing the working hours consumed by the drilling construction operation, and ensuring the progress of the overall construction; and by setting the first drive motor 12 and the second drive motor 13, the horizontal and vertical positions of the drill bit 9 can be quickly adjusted position, and under the action of the three-phase motor 17, the rotation speed of the drill bit 9 can be controlled and adjusted. Different rotation speeds are suitable for steel sections of different materials, which can not only reduce the energy consumption of the overall device, but also effectively improve the drilling efficiency, and has practical value; at the same time, the thrust ball bearing 16 can effectively enhance the stability of the connection structure between the first support frame 3 and the second support frame 5, and under the coordination of the support plate 20, the transmission force of the belt 21 is more stable, thereby enhancing the stability of the overall device, ensuring the drilling accuracy of the drill bit 9, and ensuring that the drilling accuracy of bridge construction meets engineering standards; in summary, the utility model has a very broad application prospect.

[0041] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A drilling device for bridge construction, comprising a base (1), It is characterized in that A rotatable screw (2) is mounted on the base (1), a first support frame (3) is mounted on the screw (2), a rotating shaft (4) is mounted inside the first support frame (3), a second support frame (5) is fixedly connected to the rotating shaft (4), a clamping column (6) is mounted on the outer end of the second support frame (5), a shell (7) is fixedly connected to the outer wall of the clamping column (6), a rotatable rotating rod (8) is mounted inside the shell (7), the bottom end of the rotating rod (8) protrudes out of the shell (7) and a drill bit (9) for drilling holes in bridge construction is fixedly mounted thereon.

2. A bridge construction drilling device according to claim 1, It is characterized in that A support rod (10) is fixedly mounted on the base, and at least two support rods (10) are provided and arranged outside the lead screw (2). The support rod (10) is slidably matched with the first support frame (3).

3. A bridge construction drilling device according to claim 2, It is characterized in that The top end of the support rod (10) is fixedly connected to a top plate (11), a first drive motor (12) is mounted on the top plate (11), and the first drive motor (12) is connected to the lead screw (2).

4. A bridge construction drilling device according to claim 1, It is characterized in that A second drive motor (13) is mounted on the first support frame (3), a transmission gear (14) is mounted on the outer wall of the rotating shaft (4), and the transmission gear (14) is connected to the second drive motor (13) via a synchronous belt (15).

5. A bridge construction drilling device according to claim 1, It is characterized in that A thrust ball bearing (16) is fixedly installed between the first support frame (3) and the second support frame (5).

6. A bridge construction drilling device according to claim 1, It is characterized in that A three-phase motor (17) fixedly connected to the second support frame (5) is arranged on the outer side of the housing (7); a first rotating disk (18) and a second rotating disk (19) are fixedly mounted on the outer wall of the rotating rod (8); a supporting disk (20) is fixedly mounted on the outer wall of the clamping column (6); and the three-phase motor (17), the first rotating disk (18), the second rotating disk (19) and the supporting disk (20) are connected via a belt (21).

7. A bridge construction drilling device according to claim 6, It is characterized in that The first rotating disk (18) is arranged on the upper part of the second rotating disk (19), and the outer diameter of the second rotating disk (19) is larger than the outer diameter of the first rotating disk (18).

8. A bridge construction drilling device according to claim 6, It is characterized in that The first rotating disk (18) and the second rotating disk (19) are both provided with protrusions (22), the protrusions (22) and the rotating rod (8) are both provided with threaded holes (23), and bolts (24) are installed in the threaded holes (23).