Pavement repairing and leveling structure
By arranging support components and a normal-temperature rapid-curing base rubber layer in the pavement repair structure, combined with the mixing and compaction of fillers in the asphalt mixture layer, the problem of insufficient load-bearing capacity of filling materials in the existing technology is solved, and a more stable road surface is achieved. Repair and longer service life.
Patent Information
- Application Number
- CN202420132023.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-19
AI Technical Summary
When the existing pavement repair structure repairs large-area notches, the load-bearing capacity and durability of the filling material are insufficient, and it is easily damaged by vehicle rolling and natural factors, resulting in frequent repairs and replacements.
A pavement repair and smoothing structure is designed, which includes a support component set in the crack hole. The component consists of a first support rod, a second support rod, a round cover, a movable rod, a round block and a base. It is combined with a normal temperature rapid curing primer layer and The asphalt mixture layer is mixed and compacted with fillers to form a stable load-bearing structure.
It improves the load-bearing strength and performance of the road surface, prevents the repair area from forming depressions due to long-term rolling by cars, and extends the service life of the repair material.
Smart Images

Figure CN221855185U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road leveling and repairing, and specifically relates to a road surface repairing and leveling structure. Background Art
[0002] In road planning and construction, asphalt pavement is a commonly used pavement structure. However, asphalt pavement also has many diseases in long-term use. The most common disease of asphalt pavement is cracks. The cracks of asphalt pavement are divided into reflective cracks, construction cracks and fatigue cracks. Generally, the cracks that appear in the early stage of disease are mainly reflective cracks and construction cracks. If the cracks are not repaired in time, the accumulated water will seep along the cracks, which will affect the stability of the road surface and roadbed, causing greater damage to the road surface, and seriously affecting driving comfort and safety.
[0003] The existing patent (application number: CN201820215002.6) proposes a pavement repair structure, especially a new type of asphalt pavement crack filling repair structure that keeps the pavement intact and flat and prevents cracks from occurring again, which mainly includes a crack opening, a sealing rubber layer, an isolation plate and a repair filler layer in sequence, wherein a U-shaped three-dimensional trough is opened at the crack opening, the sealing rubber layer and the repair filler layer are respectively arranged below the trough and inside the trough, and the top surface of the repair filler layer is flush with the pavement; the isolation plate is arranged on the bottom surface of the trough to block the upper and lower spaces of the trough, and the pavement crack filling repair structure is integrated with the original pavement to restore the original pavement surface structure; wherein the sealing rubber layer fills the cracks from the bottom to repair the cracks in the bottom layer, the isolation plate is arranged above the sealing rubber layer, the repair filler layer is repaired from the top, and the original pavement surface structure can also be repaired, and the filling of the repair filler layer makes the cracks and the derived grooves finally flush with the original pavement, and also ensures the comfort and safety of driving.
[0004] In the above device, the gaps are filled with filling materials of various materials, and there is a lack of effective supporting components. However, when the road surface groove to be repaired is large, the road surface filled with the filling material may have insufficient bearing capacity and durability compared to the intact road surface. When cars roll over the road surface for a long time, the road surface may form depressions. The filling material is easily damaged by vehicle rolling and natural factors, and requires frequent repair and replacement.
[0005] In view of this, this application is hereby filed. Utility Model Content
[0006] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a road surface repair and leveling structure to achieve the purpose of preventing the road surface repaired from being easily dented.
[0007] In order to solve the above technical problems, the utility model provides a road surface repair and leveling structure, including a crack hole, on which a load-bearing component for supporting is arranged, the load-bearing component includes a first support rod, the first support rod is arranged inside the crack hole, a second support rod is fixedly installed on the top of the first support rod, the top of the second support rod is threadedly connected with a round cover, a movable rod is arranged inside the first support rod, the bottom end of the movable rod is connected with a round block, and the top thread of the round block is on the inner top wall of the round cover.
[0008] Furthermore, a base is installed at the bottom of the first support rod, and a round head bolt is threadedly connected to the top of the base. The round head bolts are distributed in a circle on the top of the base, and the bottoms of the round head bolts extend to the outside of the base.
[0009] Furthermore, the circumferential outer walls of the first support rod and the second support rod are linearly distributed with a plurality of circular through holes, the circular through holes penetrate into the interior of the first support rod and the second support rod, the interior of the first support rod and the second support rod are configured to be hollow, and the material of the first support rod and the second support rod is steel.
[0010] Furthermore, a mesh plate is sleeved on the outside of the second support rod, the mesh plate is installed on the top of the first support rod, and the material of the mesh plate is iron.
[0011] Furthermore, the crack hole is distributed with a first adhesive layer, a crushed stone layer, a base adhesive layer that quickly solidifies at room temperature, a mixed material layer, and an asphalt mixture layer from low to high.
[0012] Furthermore, the grid plate is installed inside the base glue layer that is quickly cured at room temperature.
[0013] After adopting the above technical solution, the utility model has the following beneficial effects compared with the prior art:
[0014] 1. In the utility model, the filler is poured into the first support rod, the two are fully mixed, and the first support rod and the second support rod are changed from hollow to solid. The whole load-bearing assembly will be more stable when supporting the road surface, and the bearing strength of the road surface can be improved, thereby ensuring better road performance and preventing the formation of depressions at the gap repair after the road surface has been rolled over by cars for a long time.
[0015] 2. In the utility model, the crack hole is distributed with a first adhesive layer, a crushed stone layer, a room temperature fast curing base adhesive layer, a mixed material layer, and an asphalt mixture layer from low to high. The road filling material is filled into the gap. The mixed material layer is mortar. The staff ensures that the thickness of various filling materials is uniform when filling, which can avoid voids or unevenness. After placing them in sequence, the filling materials are compacted with equipment such as rollers or flat vibrators to ensure that the filling materials are tightly combined with the road surface and make the crack repair area smooth. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings are part of the present invention and are used to provide a further understanding of the present invention. The schematic embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute an improper limitation on the present invention. Obviously, the accompanying drawings described below are only some embodiments. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work. In the accompanying drawings:
[0017] Figure 1 This is a schematic diagram of the internal structure of a load-bearing component of a road surface repair and leveling structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the internal structure of a road surface repair and leveling structure of the utility model;
[0019] Figure 3 for Figure 1 Enlarged view of point A in the middle.
[0020] Numbers in the figure:
[0021] 1. Crack hole;
[0022] 2. load-bearing assembly; 201. first support rod; 202. second support rod; 203. round cover; 204. movable rod; 205. round block;
[0023] 3. Base; 4. Round head bolts; 5. Round through holes; 6. First adhesive layer; 7. Gravel layer; 8. Normal temperature rapid curing base adhesive layer; 9. Mixing layer; 10. Asphalt mixture layer; 11. Grid plate.
[0024] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but rather to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solutions and advantages of the embodiments of the utility model clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. The following embodiments are used to illustrate the utility model but are not used to limit the scope of the utility model.
[0026] In the description of the present invention, it should be noted that the terms "upper", "lower", "front", "back", "left", "right", "vertical", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention.
[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0028] In the above device, the bearing capacity and durability of the filling material for the filled road surface may be insufficient. If cars roll over the road surface for a long time, the road surface may form depressions. The filling material is easily damaged by vehicle rolling and natural factors, and requires frequent repair and replacement.
[0029] like Figures 1 to 3 The utility model provides a road surface repair and leveling structure.
[0030] Specifically, by Figure 1-3 A road surface repair and leveling structure is provided, including a crack hole 1, on which a load-bearing component 2 for supporting is arranged, the load-bearing component 2 includes a first support rod 201, the first support rod 201 is arranged inside the crack hole 1, a second support rod 202 is fixedly installed on the top of the first support rod 201, a round cover 203 is threadedly connected to the top of the second support rod 202, a movable rod 204 is arranged inside the first support rod 201, a round block 205 is connected to the bottom end of the movable rod 204, and the top of the round block 205 is threaded on the inner top wall of the round cover 203.
[0031] In the utility model, the four sides of the crack are leveled and the debris in the crack is cleaned, the base 3 is placed inside the crack, the round head bolt 4 is fixed to the inner bottom wall of the crack hole 1, and when various fillers are filled into the crack, the round cover 203 can be turned open, and the first glue layer 6 or the room temperature fast curing bottom glue layer 8 can be poured into the second support rod 202 from the top opening of the second support rod 202. The first glue layer 6 and the room temperature fast curing bottom glue layer 8 will seep out from the circular through hole 5 to the surrounding fillers, so that the surrounding fillers are more tightly bonded, and the load-bearing component 2 can also be closely adhered to the surrounding fillers, and the load-bearing capacity of the load-bearing component 2 is stronger.
[0032] If you want to make the first glue layer 6 or the room temperature fast curing bottom glue layer 8 quickly flow from the circular through hole 5 to the pores of the surrounding fillers, you can remove the movable rod 204 from the round cover 203 to facilitate pouring. You only need to hold the round cover 203 and move it up and down. The movable rod 204 and the round block 205 can squeeze the first glue layer 6 or the room temperature fast curing bottom glue layer 8 out from the inside of the first support rod 201. When the first glue layer 6 or the room temperature fast curing bottom glue layer 8 is cooled and solidified, the first support rod 201 and the second support rod 202 are fixedly connected with the surrounding fillers through the first glue layer 6 or the room temperature fast curing bottom glue layer 8. If the first glue layer 6 and the room temperature fast curing bottom glue layer 8 in the surrounding filler pores are already After saturation, the first support rod 201 still contains the first adhesive layer 6 or the room temperature fast curing base adhesive layer 8. Then pour the filler into the first support rod 201 to mix the two fully, and change the hollow first support rod 201 and the second support rod 202 into solid ones. The entire load-bearing component 2 will be more stable when supporting the road surface, and can improve the bearing strength of the road surface, thereby ensuring better road performance. Because the round cover 203 is level with the road surface, when the car rolls over the repaired area, the round cover 203 is in direct contact with the car wheel and can bear most of the weight of the car, and a small part of the weight is dispersed on the filler. The load-bearing component 2 can play a better load-bearing and protective role, preventing the road surface from forming a depression at the gap repair after long-term rolling of the car.
[0033] The radius of the round block 205 is smaller than the inner diameter of the first support rod 201. The materials of the asphalt mixture layer 10 are asphalt, aggregate, filler, and asphalt mixture. The first adhesive layer 6 usually refers to a cold patch asphalt mixture. This material adopts a cold mixing process, does not need to be heated, is convenient and fast, and has good adhesion and stability. The normal temperature rapid curing base adhesive layer 8 is a base adhesive material that cures quickly at room temperature, and is mainly used for road repair and reinforcement. This material has the characteristics of rapid curing, high strength, and good weather resistance. It can be quickly cured at room temperature to improve the bearing capacity and service life of the road surface. In addition, the normal temperature rapid curing base adhesive layer 8 also has good adhesion and stability, can effectively bond with the road surface material to form a solid repair layer, and improve the flatness and durability of the road surface.
[0034] The staff can adjust the number of the load-bearing components 2 according to the size of the crack.
[0035] Furthermore, as a specific implementation of the utility model, the utility model provides a road surface repair and leveling structure.
[0036] Specifically, Figure 1It is given, including a crack hole 1, on which a load-bearing component 2 for supporting is arranged, the load-bearing component 2 includes a first support rod 201, the first support rod 201 is arranged inside the crack hole 1, a second support rod 202 is fixedly installed on the top of the first support rod 201, the top of the second support rod 202 is threadedly connected with a round cover 203, a movable rod 204 is arranged inside the first support rod 201, the bottom end of the movable rod 204 is connected with a round block 205, and the top of the round block 205 is threaded on the inner top wall of the round cover 203.
[0037] In the utility model, the base 3 has a certain weight, and the load-bearing component 2 can be erected at the inner bottom of the gap. The base 3 and the load-bearing component 2 are fixed to the bottom of the crack hole 1 by round head bolts 4. When filling, it will not tilt and collapse due to the impact of the filling material. At the same time, it can play a good supporting role and prevent tilting due to the rolling of a heavy car.
[0038] Furthermore, as another specific implementation of the utility model, the utility model provides a road surface repair and leveling structure.
[0039] Specifically, Figure 1 It is shown that a plurality of circular through holes 5 are linearly distributed on the circumferential outer walls of the first support rod 201 and the second support rod 202, and the circular through holes 5 penetrate into the interior of the first support rod 201 and the second support rod 202. The interior of the first support rod 201 and the second support rod 202 is set to be hollow, and the material of the first support rod 201 and the second support rod 202 is steel.
[0040] In the utility model, the first adhesive layer 6 or the room temperature fast curing base adhesive layer 8 is poured from the top of the second support rod 202 into the inside of the first support rod 201 and the second support rod 202. The first adhesive layer 6 and the room temperature fast curing base adhesive layer 8 can penetrate from the circular through hole 5 into the pores on the side of the filler. The first adhesive layer 6 can make the filler such as gravel tightly bonded together, which can play a good fixed support role. The main characteristics of steel are high strength, high hardness and good toughness, which can meet the needs of various shapes. The corrosion resistance of steel is good, which can ensure stability for long-term use.
[0041] Furthermore, as another specific implementation of the utility model, the utility model provides a road surface repair and leveling structure.
[0042] Specifically, Figure 1 It is shown that a mesh plate 11 is sleeved on the outside of the second support rod 202 , and the mesh plate 11 is installed on the top of the first support rod 201 . The material of the mesh plate 11 is iron.
[0043] In the utility model, the grid plate 11 can mainly enhance the strength and stability of the filling material. The grid plate 11 can provide additional support and fixing to prevent the filling material from being deformed or broken when subjected to external force. At the same time, the grid plate 11 can also help distribute and transfer the load and improve the bearing capacity of the filling material.
[0044] Furthermore, as another specific implementation of the utility model, the utility model provides a road surface repair and leveling structure.
[0045] Specifically, Figure 1 It is shown that the first adhesive layer 6, the crushed stone layer 7, the room temperature rapid curing base adhesive layer 8, the mixture layer 9, and the asphalt mixture layer 10 are distributed in the crack hole 1 from low to high.
[0046] In the utility model, the crack hole 1 is provided with a first adhesive layer 6, a crushed stone layer 7, a room temperature rapid curing base adhesive layer 8, a mixed material layer 9, and an asphalt mixture layer 10 from low to high, and the road surface filling material is filled into the gap, and the mixed material layer 9 is mortar. When filling the filler, the staff ensures that the thickness of various filling materials is uniform, which can avoid the occurrence of voids or unevenness. After placing them in sequence, the filler is compacted with equipment such as a roller or a flat vibrator to ensure that the filler is tightly combined with the road surface and the crack repair is smooth.
[0047] Furthermore, as another specific implementation of the utility model, the utility model provides a road surface repair and leveling structure.
[0048] Specifically, Figure 1 It is shown that the grid plate 11 is installed inside the base glue layer 8 that is quickly cured at room temperature.
[0049] In the utility model, the mesh plate 11 can fix the crushed stone layer 7 and the mixed material layer 9 on both sides of the mesh plate 11 by quickly curing the base glue layer 8 at room temperature. The mesh plate 11 can increase the integrity of the filling material, make it more evenly stressed, and reduce stress concentration and crack generation.
[0050] Working principle: level the surroundings of the crack, clean up the debris in the crack, place the base 3 inside the crack, fix the round head bolt 4 on the inner bottom wall of the crack hole 1, and when filling various fillers into the crack, the round cover 203 can be turned open. At this time, the first glue layer 6 or the room temperature fast curing base glue layer 8 can be poured into the second support rod 202 from the top opening of the second support rod 202. The first glue layer 6 and the room temperature fast curing base glue layer 8 will seep out from the circular through hole 5 into the surrounding fillers, making the surrounding fillers bonded more tightly, and also making the load-bearing component 2 closely adhere to the surrounding fillers, so that the load-bearing capacity of the load-bearing component 2 is stronger.
[0051] If you want to make the first glue layer 6 or the room temperature fast curing bottom glue layer 8 quickly flow from the circular through hole 5 to the pores of the surrounding fillers, you can remove the movable rod 204 from the round cover 203 to facilitate pouring. You only need to hold the round cover 203 and move it up and down. The movable rod 204 and the round block 205 can squeeze the first glue layer 6 or the room temperature fast curing bottom glue layer 8 out from the inside of the first support rod 201. When the first glue layer 6 or the room temperature fast curing bottom glue layer 8 is cooled and solidified, the first support rod 201 and the second support rod 202 are fixedly connected with the surrounding fillers through the first glue layer 6 or the room temperature fast curing bottom glue layer 8. If the first glue layer 6 and the room temperature fast curing bottom glue layer 8 in the surrounding filler pores are already After saturation, the first support rod 201 still contains the first adhesive layer 6 or the room temperature fast curing base adhesive layer 8. Then pour the filler into the first support rod 201 to mix the two fully, and change the hollow first support rod 201 and the second support rod 202 into solid ones. The entire load-bearing component 2 will be more stable when supporting the road surface, and can improve the bearing strength of the road surface, thereby ensuring better road performance. Because the round cover 203 is level with the road surface, when the car rolls over the repaired area, the round cover 203 is in direct contact with the car wheel and can bear most of the weight of the car, and a small part of the weight is dispersed on the filler. The load-bearing component 2 can play a better load-bearing and protective role, preventing the road surface from forming a depression at the gap repair after long-term rolling of the car.
[0052] The radius of the round block 205 is smaller than the inner diameter of the first support rod 201. The materials of the asphalt mixture layer 10 are asphalt, aggregate, filler, and asphalt mixture. The first adhesive layer 6 usually refers to a cold patch asphalt mixture. This material adopts a cold mixing process, does not need to be heated, is convenient and fast, and has good adhesion and stability. The normal temperature rapid curing base adhesive layer 8 is a base adhesive material that cures quickly at room temperature, and is mainly used for road repair and reinforcement. This material has the characteristics of rapid curing, high strength, and good weather resistance. It can be quickly cured at room temperature to improve the bearing capacity and service life of the road surface. In addition, the normal temperature rapid curing base adhesive layer 8 also has good adhesion and stability, can effectively bond with the road surface material to form a solid repair layer, and improve the flatness and durability of the road surface.
[0053] The staff can adjust the number of the load-bearing components 2 according to the size of the crack.
[0054] The crack hole 1 is provided with a first adhesive layer 6, a crushed stone layer 7, a room temperature quick-curing base adhesive layer 8, a mixed material layer 9, and an asphalt mixture layer 10 from low to high. The road filling material is filled into the gap. The mixed material layer 9 is mortar. The staff ensures that the thickness of various filling materials is uniform when filling, which can avoid voids or unevenness. After placing them in sequence, the filling materials are compacted with equipment such as rollers or flat vibrators to ensure that the filling materials are tightly combined with the road surface and make the crack repair area smooth.
[0055] The above is only a preferred embodiment of the present invention, and does not constitute any form of limitation to the present invention. Although the present invention has been disclosed as a preferred embodiment as above, it is not intended to limit the present invention. Any technician familiar with this patent can make some changes or modifications to equivalent embodiments of equivalent changes using the technical content suggested above without departing from the scope of the technical solution of the present invention. The implementation schemes in the above embodiments can also be further combined or replaced. However, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention are still within the scope of the present invention.
Claims
1. A road surface repair and leveling structure, comprising a crack hole (1), characterized in that: The crack hole (1) is provided with a load-bearing component (2) for supporting the crack hole, and the load-bearing component (2) comprises a first support rod (201), the first support rod (201) is arranged inside the crack hole (1), a second support rod (202) is fixedly mounted on the top of the first support rod (201), a round cover (203) is threadedly connected to the top of the second support rod (202), a movable rod (204) is arranged inside the first support rod (201), a round block (205) is connected to the bottom end of the movable rod (204), and the top of the round block (205) is threaded on the inner top wall of the round cover (203).
2. A road surface repair and leveling structure according to claim 1, characterized in that: A base (3) is installed at the bottom of the first support rod (201), and a round head bolt (4) is threadedly connected to the top of the base (3). The round head bolts (4) are distributed in a circular shape on the top of the base (3), and the bottoms of the round head bolts (4) extend to the outside of the base (3).
3. A road surface repair and leveling structure according to claim 1, characterized in that: A plurality of circular through holes (5) are linearly distributed on the circumferential outer walls of the first support rod (201) and the second support rod (202); the circular through holes (5) penetrate into the interior of the first support rod (201) and the second support rod (202); the interior of the first support rod (201) and the second support rod (202) are configured to be hollow; and the material of the first support rod (201) and the second support rod (202) is steel.
4. A road surface repair and leveling structure according to claim 1, characterized in that: A mesh plate (11) is sleeved on the outside of the second support rod (202), the mesh plate (11) is installed on the top of the first support rod (201), and the material of the mesh plate (11) is iron.
5. A road surface repair and leveling structure according to claim 1, characterized in that: The crack hole (1) is provided with a first adhesive layer (6), a crushed stone layer (7), a normal temperature rapid curing base adhesive layer (8), a mixed material layer (9), and an asphalt mixture layer (10) in order from the bottom to the top.
6. A road surface repair and leveling structure according to claim 4, characterized in that: The grid plate (11) is installed inside the room temperature rapid curing primer layer (8).
Citation Information
Cited By
High-stability pavement repairing and leveling structure
CN223660535U
