Fabricated road bridge pier column

By using triangular support seats and positioning installation components in prefabricated bridge piers, the problem of steel bars being difficult to quickly enter the positioning slots is solved, the piers are quickly positioned and efficiently connected, the installation efficiency and stability are improved, and the installation is ensured Use security.

CN221855264UActive Publication Date: 2024-10-18ZHEJIANG GUQIAO CONSTRUCTION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323179459.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-24
Publication Date
2024-10-18
Estimated Expiration
2033-11-24

AI Technical Summary

Technical Problem

Due to the large number of steel bars in prefabricated bridges, it is difficult to quickly enter the center of the positioning slot, resulting in low installation efficiency and poor stability, which affects subsequent use.

Method used

Design a prefabricated road bridge pier, which uses a triangular support base and positioning installation components, including positioning grooves, expansion grooves and fixed grooves. The piers and steel bars can be quickly positioned and connected through fixing bolts to improve installation stability.

Benefits of technology

It realizes the rapid positioning and installation of pier columns, improves the installation efficiency and connection strength, and ensures the safety and stability of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855264U_ABST
    Figure CN221855264U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type road bridge pier column which comprises a bearing platform, a pier column body is arranged at the top of the bearing platform, and a plurality of supporting seats are fixedly connected to the top of the bearing platform. A plurality of first prefabricated steel bars are fixedly connected to the top of the pier column body, and a positioning installation assembly is arranged between the pier column body and the bearing platform. According to the utility model, a plurality of parts are arranged, so that the pier stud main body can be quickly positioned and mounted, the mounting working efficiency is improved, the positioning stability is high, the structure is simple, and the use effect is better; by arranging the positioning and mounting assembly, the multiple second prefabricated steel bars can be quickly mounted and positioned, it is guaranteed that the multiple second prefabricated steel bars can conveniently enter the center of a fixing groove during mounting, the second prefabricated steel bars are stably positioned, then locking is conducted through fixing bolts, and after locking, the multiple supporting bases can better support the pier column body; the installation is stable, and the connection strength is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road and bridge construction, in particular to an assembled road and bridge pier. Background Art

[0002] Prefabricated bridges are widely praised for their many advantages such as low carbon, environmental protection, and efficient construction, and are being used more and more widely. Prefabricated bridges are factory-manufactured piers, beams and other structures that are assembled and connected on site, so that the on-site foundation and prefabricated components are constructed simultaneously, thereby achieving the goal of shortening the construction period and improving the quality of the project. The connection form of the piers and abutments of prefabricated bridges determines the construction quality and progress of the prefabricated bridges.

[0003] At present, prefabricated bridges are generally positioned and installed in the form of grouting sleeves. However, due to the large number of steel bars, the steel bars cannot be quickly put into the center of the positioning groove, and the stability after installation is general, which not only reduces the efficiency of installation, but also affects the subsequent use effect.

[0004] Therefore, there is an urgent need to provide a prefabricated road bridge pier to solve the above problems. Utility Model Content

[0005] The technical problem to be solved by the utility model is that the current prefabricated bridges are generally positioned and installed in the form of grouting sleeves, but due to the large number of steel bars, the steel bars cannot be quickly put into the center of the positioning groove, and the stability after installation is general, which not only reduces the efficiency of installation, but also affects the subsequent use effect.

[0006] In order to solve the above technical problems, a technical solution adopted by the utility model is: to provide an assembled road bridge pier, including a cap, a pier body is arranged on the top of the cap, and a plurality of support seats are fixedly connected to the top of the cap;

[0007] A plurality of first prefabricated steel bars are fixedly connected to the top of the pier column body, and a positioning and installation component is arranged between the pier column body and the cap.

[0008] The utility model is further configured as follows: the plurality of support seats are all triangular structures, and the plurality of support seats are all in contact with the outer wall of the pier column body.

[0009] Through the above technical solution, multiple support seats can support and reinforce the pier column body. When the pier column body is tilted, the multiple support seats can provide supporting force to it, ensuring the safety of use.

[0010] The utility model is further configured as follows: the positioning and installation assembly includes a positioning groove opened on the top of the pedestal, the pier body is located at the center of the positioning groove, a first expanding groove is opened on the inner wall of the positioning groove, a plurality of fixing grooves are opened in the center of the positioning groove, a second expanding groove is opened on the inner walls of the plurality of fixing grooves, a plurality of second prefabricated steel bars are fixedly connected to the bottom of the pier body, two mounting seats are fixedly connected to the outer wall of the pier body, and fixing bolts are installed between the pedestal and the two mounting seats.

[0011] Through the above technical solution, the pier body is hoisted at the center of the positioning groove, and the first expansion groove is used to make it more convenient to enter the installation position. While positioning the pier body, multiple second prefabricated steel bars are located at the center of the range of the second expansion groove. Subsequently, the multiple second prefabricated steel bars can be quickly positioned and installed, and then the two mounting seats are fixed with fixing bolts to achieve connection and installation.

[0012] The utility model is further configured as follows: the pier column body and the plurality of second prefabricated steel bars and the first prefabricated steel bars are all integrated structures.

[0013] Through the above technical solution, the connection stability between the pier column body and the plurality of second prefabricated steel bars and the first prefabricated steel bars is relatively strong, thereby improving the connection strength after positioning and installation, and improving the safety of use.

[0014] The utility model is further configured as follows: a plurality of the second prefabricated steel bars are all located at the center of the fixing groove.

[0015] Through the above technical solution, the second prefabricated steel bar can be quickly positioned and installed through the fixing groove and the second expanding groove. When the second prefabricated steel bar is located at the center of the second expanding groove, it can enter the center of the fixing groove due to the inclined inner wall of the second expanding groove.

[0016] The utility model is further configured as follows: mounting holes are provided on the support platform and the two mounting seats, and the two fixing bolts are located at the centers of the mounting holes.

[0017] Through the above technical solution, the base and the two mounting seats can be installed and fixed by two fixing bolts, thereby improving the stability of the installation and fixation.

[0018] The beneficial effects of the utility model are as follows:

[0019] 1. The utility model provides a plurality of parts, so that the main body of the pier column can be quickly positioned and installed, which not only improves the work efficiency of the installation, but also has high positioning stability, simple structure and good use effect;

[0020] 2. The utility model provides a positioning and installation component, which enables the rapid installation and positioning of multiple second prefabricated steel bars, ensuring that multiple second prefabricated steel bars can easily enter the center of the fixing groove during installation, so that their positioning is stable, and then they are locked by fixing bolts. After locking, multiple support seats can also better support the pier column body, so that their installation is stable and the connection strength is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is the appearance diagram of the utility model;

[0022] Figure 2 It is a top view of the utility model;

[0023] Figure 3 It is a schematic diagram of the structure of some parts of the utility model;

[0024] Figure 4 for Figure 2 Sectional view along AA direction.

[0025] In the figure: 1. abutment; 2. pier body; 3. support seat; 4. first prefabricated steel bar; 5. positioning and installation assembly; 501. positioning groove; 502. first flaring groove; 503. fixing groove; 504. second flaring groove; 505. second prefabricated steel bar; 506. mounting seat; 507. fixing bolt. DETAILED DESCRIPTION

[0026] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.

[0027] See also Figure 1-Figure 4 A prefabricated road bridge pier comprises a cap 1, a pier body 2 is arranged on the top of the cap 1, and a plurality of support seats 3 are fixedly connected to the top of the cap 1; the plurality of support seats 3 are all triangular structures, and the plurality of support seats 3 are all in contact with the outer wall of the pier body 2; so that the plurality of support seats 3 can play a supporting and reinforcing role for the pier body 2, and when the pier body 2 is tilted, the plurality of support seats 3 can provide supporting force to it, thereby ensuring the safety of use; a plurality of first prefabricated steel bars 4 are fixedly connected to the top of the pier body 2, and a positioning and installation assembly 5 is arranged between the pier body 2 and the cap 1;

[0028] like Figure 3 and Figure 4As shown, the positioning and installation component 5 includes a positioning groove 501 opened on the top of the pedestal 1, the pier body 2 is located at the center of the positioning groove 501, a first flaring groove 502 is opened on the inner wall of the positioning groove 501, a plurality of fixing grooves 503 are opened in the center of the positioning groove 501, and a second flaring groove 504 is opened on the inner wall of the plurality of fixing grooves 503, and a plurality of second precast steel bars 505 are fixedly connected to the bottom of the pier body 2, and the pier body 2 and the plurality of second precast steel bars 505 and the first precast steel bars 4 are all an integrated structure; so that the pier body 2 and the plurality of second precast steel bars 505 and the first precast steel bars 4 have a strong connection stability, thereby improving the connection strength after positioning and installation, and improving the safety of use; the plurality of second precast steel bars 505 are all located at the center of the fixing groove 503; so that the second precast steel bars 505 can be quickly positioned and installed through the fixing groove 503 and the second flaring groove 504, when the second precast steel bars 505 are located in the second flaring groove After the center of 504 is reached, the center of the fixing groove 503 can be entered due to the inclined inner wall of the second expanding groove 504; the outer wall of the pier body 2 is fixedly connected to two mounting seats 506, and fixing bolts 507 are installed between the base 1 and the two mounting seats 506; mounting holes are provided on the base 1 and the two mounting seats 506, and the two fixing bolts 507 are located in the center of the mounting holes; so that the base 1 and the two mounting seats 506 can be installed and fixed by the two fixing bolts 507, thereby improving the stability of the installation and fixation; the pier body 2 is hoisted in the center of the positioning groove 501, and the first expanding groove 502 is used to make it more convenient to enter the installation position. While positioning the pier body 2, multiple second prefabricated steel bars 505 are located in the center of the range of the second expanding groove 504, and then the multiple second prefabricated steel bars 505 can be quickly positioned and installed, and then the two mounting seats 506 are fixed with fixing bolts 507 to achieve connection and installation.

[0029] When the utility model is in use, the pier body 2 is first hoisted at the center of the positioning groove 501, and the first expansion groove 502 is used to make it more convenient to enter the installation position. While positioning the pier body 2, the multiple second prefabricated steel bars 505 are located at the center of the range of the second expansion groove 504. Subsequently, the multiple second prefabricated steel bars 505 can be quickly positioned and installed, and then the two mounting seats 506 are fixed with fixing bolts 507 to achieve connection and installation. Finally, the cap beam and the multiple first prefabricated steel bars 4 can be positioned and installed.

[0030] The above description is only an embodiment of the present invention, and does not limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the specification and drawings of the present invention, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An assembled road bridge pier, comprising a cap (1), Features: A pier column body (2) is arranged on the top of the pedestal (1), and a plurality of support seats (3) are fixedly connected to the top of the pedestal (1); A plurality of first prefabricated steel bars (4) are fixedly connected to the top of the pier column body (2), and a positioning and installation assembly (5) is provided between the pier column body (2) and the cap (1); The positioning and installation assembly (5) comprises a positioning groove (501) provided at the top of the pedestal (1); the pier column body (2) is located at the center of the positioning groove (501); a first expanding groove (502) is provided on the inner wall of the positioning groove (501); a plurality of fixing grooves (503) are provided at the center of the positioning groove (501); a second expanding groove (504) is provided on the inner walls of the plurality of fixing grooves (503); a plurality of second prefabricated steel bars (505) are fixedly connected to the bottom of the pier column body (2); two mounting seats (506) are fixedly connected to the outer wall of the pier column body (2); and fixing bolts (507) are installed between the pedestal (1) and the two mounting seats (506).

2. The assembled road bridge pier according to claim 1, Features: The plurality of support seats (3) are all triangular structures, and the plurality of support seats (3) are all in contact with the outer wall of the pier column body (2).

3. The assembled road bridge pier according to claim 1, Features: The pier column body (2), the plurality of second prefabricated steel bars (505), and the first prefabricated steel bars (4) are all integral structures.

4. The assembled road bridge pier according to claim 1, Features: The plurality of second prefabricated steel bars (505) are all located at the center of the fixing groove (503).

5. The assembled road bridge pier according to claim 1, Features: The support platform (1) and the two mounting seats (506) are both provided with mounting holes, and the two fixing bolts (507) are both located at the center of the mounting holes.