Novel prefabricated assembled pier joint structure

By supporting the caulking mechanism, the joints of the bridge piers are sealed in heavy rain weather to avoid water erosion, which improves the durability and use effect of the bridge piers and solves the problem that the joints are susceptible to water erosion.

CN221855281UActive Publication Date: 2024-10-18ZHEN JIANG KE RUN KE JI KAI FA YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202322989258.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-06
Publication Date
2024-10-18
Estimated Expiration
2033-11-06

AI Technical Summary

Technical Problem

In heavy rainy weather, the joints of prefabricated assembled bridge piers are easily eroded by water flow, resulting in corrosion of steel bars and reduced bonding force, which reduces the durability and use effect of the bridge piers.

Method used

A support caulking mechanism is used, including a support bottom plate, a fixed frame, a threaded connection, a limit chute and a slider. The fixed frame is dropped downward to fill and block the outer wall of the pier to prevent water from entering, and the support plate and support sleeve are used to provide Inclined support improves the stability of the pouring frame.

Benefits of technology

The joints are sealed, water erosion is avoided, the bonding force between the steel bars and the grouting sleeves is improved, and the service life and construction stability of the piers are extended.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855281U_ABST
    Figure CN221855281U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel prefabricated assembled pier joint structure which comprises a bearing table and a pouring frame arranged above the bearing table and further comprises a supporting joint filling mechanism. The supporting joint filling mechanism comprises a plurality of supporting bottom plates, a fixing frame and a plurality of fixing bolts connected to the outer wall of the fixing frame in a threaded mode. Under the action of the supporting joint filling mechanism, after pouring of the pouring frame is completed, the outer wall of the poured bridge pier is subjected to joint filling and blocking through downward falling of a fixing frame, namely, in strong rainwater weather, a splicing joint is sealed and prevented from being eroded by water flow impact, water flow flows into the splicing joint, and the sealing effect of the splicing joint is improved. Correspondingly, the steel bars in the splicing seams are prevented from being eroded, so that the bonding force between the steel bars and the grouting sleeves is improved, the durability of the pier is improved, and the using effect of the prefabricated spliced pier is improved.