Steel tower construction adjusting device

By using the steel tower construction adjustment device in bridge construction and using components such as tower cranes and jacks to accurately adjust the position of the tower sections, the deflection problem of the concrete tower limbs caused by thermal expansion and contraction was solved, ensuring the pouring quality and shortening the construction period.

CN221855290UActive Publication Date: 2024-10-18CCCC SECOND HARBOR ENGINEERING CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420212119.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-29
Publication Date
2024-10-18
Estimated Expiration
2034-01-29

AI Technical Summary

Technical Problem

During bridge construction, the concrete tower limbs deflect due to thermal expansion and contraction, causing the relative position deviation between tower sections to be too large, affecting the pouring quality.

Method used

Design a steel tower construction adjustment device, including concrete tower limbs, tower sections, connecting devices, tower cranes and support devices. It accurately adjusts tower sections through multiple horizontal rods, diagonal rods, joints, corbels, jacks and pads and other components. The relative position ensures that the positioning bolts are aligned and limits the deflection of the tower limbs.

Benefits of technology

It effectively avoids the problem of unqualified quality caused by excessive deflection angle after the concrete tower limbs are poured, ensures that the installation error of the Helong section meets the requirements, shortens the construction period, and has great promotion value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855290U_ABST
    Figure CN221855290U_ABST
Patent Text Reader

Abstract

The utility model provides a steel tower construction adjusting device which comprises two concrete tower limbs, tower sections are arranged on the concrete tower limbs, a connecting device is arranged between the two tower sections, a tower crane is arranged on one side of one tower section, and a supporting device is arranged on the concrete tower limbs. After the multiple positioning bolts at one end of the connecting device are detached, the two tower sections are poured, so that after the two tower sections deform after being poured, the relative displacement of the two tower sections can be judged through the relative positions of the through holes in one end of the connecting device and the second through holes in the tower sections, and meanwhile the connecting device cannot be damaged due to deformation. And the tower crane is driven to enable the tower sections to rotate, so that the through holes in the connecting devices are aligned with the through holes in the second through holes of the tower sections, and the relative positions of the two tower sections are aligned. And the phenomenon that after concrete is poured and solidified, the tower section deflects, and consequently the pouring quality of the concrete tower limb is unqualified is avoided, and the method has high popularization value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of bridge construction, in particular to a steel tower construction adjustment device. Background Art

[0002] With the changes in bridge engineering requirements and the improvement of design level, new structures have emerged in the design of bridge towers for long-span bridges. New tower column structures that are different from traditional concrete tower columns have emerged. The emergence of steel-concrete combined structure bridge towers has put forward new requirements for bridge tower construction technology. Most of the traditional and commonly used steel-concrete combined bridge towers use concrete abutments and all-steel steel towers, or steel shells filled with concrete. The present application involves a bridge tower form in which the lower tower limb adopts a concrete structure, and the joint section and above the joint section adopt an all-steel structure. Since the steel towers of the two tower limbs are hoisted and placed on the concrete tower limbs respectively, the relative positions of the two steel tower limbs must be limited to ensure that the installation error of the upper joint section meets the requirements. After the tower sections of each layer of the existing two steel tower limbs are poured, due to thermal expansion and contraction, the tower sections will deflect after the concrete pouring and solidification. If no adjustment is made, after the tower sections of each layer are slowly poured and installed layer by layer, the deflection angle of the concrete tower limb will be too large, and the relative position offset of the two concrete tower limbs will be too large, resulting in unqualified casting quality of the concrete tower limb. For this reason, we propose a steel tower construction adjustment device to solve the above problem. Utility Model Content

[0003] The utility model provides a steel tower construction adjustment device, which solves the problem that after each layer of tower sections of two steel tower limbs are poured and concrete is poured and solidified, the tower sections will deflect. If no adjustment is performed, after each layer of tower sections is slowly poured and installed layer by layer, the deflection angle of the concrete tower limb is too large, and the relative position deviation of the two concrete tower limbs is too large, resulting in unqualified pouring quality of the concrete tower limb.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is: a steel tower construction adjustment device, including two concrete tower limbs, tower sections are arranged on the concrete tower limbs, a connecting device is arranged between the two tower sections, a tower crane is arranged on one side of one tower section, and a supporting device is arranged on the concrete tower limb.

[0005] In a preferred solution, the connecting device includes a plurality of horizontal rods, a plurality of diagonal rods are arranged between two horizontal rods, a plurality of joints are arranged at both ends of the connecting device, and a plurality of corbels are arranged on one side of the tower section.

[0006] In the preferred scheme, the joint includes an end rod, which is connected to the horizontal rod, and a second base plate is provided at one end of the end rod, and a through hole is provided on the second base plate. The corbel includes a bottom box body, an upper box body and a plurality of arc plates are provided on the bottom box body, and a second through hole is provided on the upper box body. The end rod rests on the arc plate, and the positioning bolt passes through the second through hole and the through hole.

[0007] In the preferred solution, a plurality of three-way jacks and a plurality of pads are arranged on the top of the supporting device, a bottom plate is arranged at the bottom of the tower section, the bottom plate rests on the plurality of pads, steel frames are arranged on both sides of the concrete tower limbs, and a top plate is arranged on the steel frames.

[0008] In a preferred solution, the supporting device includes a truss support and a plurality of columns, the truss support is provided with a plurality of limiting corbels, the columns penetrate the plurality of limiting corbels, and the concrete tower limb is provided with a plurality of longitudinal beams.

[0009] In a preferred solution, a plurality of transverse support rods on the truss support are against the longitudinal beams, a plurality of three-way jacks and a plurality of pads are installed on the top of the truss support, and a plurality of oblique supports are provided on the truss support.

[0010] In the preferred solution, the oblique support includes a transverse plate, on which an oblique support rod is provided, one end of the oblique support rod rests on the truss support, a rib plate is provided between the oblique support rod and the transverse plate, and a plurality of steel bars are provided at the bottom of the transverse plate, and the steel bars pass through the truss support.

[0011] In the preferred scheme, the tower crane is provided with multiple layers of guide wheel groups, each layer of guide wheel groups includes multiple guide wheels, and the concrete tower limbs are provided with multiple layers of guide wheel seat groups, the guide wheel seat groups include multiple guide wheel seats, the guide wheel seat groups are consistent in height with the guide wheel groups, and the guide wheel seats and guide wheels are connected by steel cables.

[0012] In a preferred solution, a plurality of brackets are provided on the concrete tower limbs, a plurality of second guide wheel seat groups are provided on the brackets, and the second guide wheel seat groups are connected to the guide wheel seats via steel cables.

[0013] The beneficial effects of the utility model are as follows: most of them adopt concrete caps and all-steel steel towers, or steel shells filled with concrete. The utility model relates to a lower tower limb adopting a concrete structure, a junction section being a steel-concrete combined structure, and an upper tower limb adopting an all-steel structure, which has the advantages of low cost of concrete towers, and also ensures the overall manufacturing of the upper tower limb cable anchoring structure and the steel tower, greatly shortening the construction period.

[0014] Drive the tower crane to hoist the tower section onto the pad so that the concrete tower limb can support the tower section, drive the tower crane again to hoist the connecting device onto the two tower sections, drive multiple three-way jacks to make the two tower sections relatively displaced, accurately adjust the horizontal position of the tower section so that the second through hole is aligned with the through hole, and install the positioning bolts to position the two tower sections. Only by accurately adjusting the relative position of the two tower sections can the installation error of the upper joint section be guaranteed to meet the requirements.

[0015] After removing the multiple positioning bolts at one end of the connecting device, the two tower sections are cast, so that after the two tower sections are deformed during casting, the relative displacement of the two tower sections can be judged through the relative position of the through hole at one end of the connecting device and the second through hole on the tower section, while preventing deformation and damage to the connecting device. The tower crane is driven again to rotate the tower crane, so that the tower section rotates, so that the through hole on the connecting device is aligned with the through hole on the second through hole of the tower section, so that the relative positions of the two tower sections are aligned, thereby limiting the relative position of the concrete tower limbs and ensuring that the installation error of the upper joint section meets the requirements. It is avoided that the tower section will deflect after the concrete casting solidifies, and after each layer of tower sections is slowly cast and installed layer by layer, the deflection angle of the concrete tower limb is too large, resulting in the phenomenon of unqualified casting quality of the concrete tower limb, which has great promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The utility model is further described below in conjunction with the accompanying drawings and embodiments;

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is a schematic diagram of the local structure of the utility model;

[0019] Figure 3 It is a schematic diagram of a single concrete tower limb structure of the utility model;

[0020] Figure 4 It is a top view of the overall structure of the utility model;

[0021] Figure 5 It is a front view of the connecting device of the utility model;

[0022] Figure 6 It is a front view of the corbel of the utility model;

[0023] Figure 7 This is a front view of the connection between the corbel and the joint of the utility model;

[0024] Figure 8 It is the left view and the right view of the corbel of the utility model;

[0025] Fig. 9 It is a front view of the connector of the utility model;

[0026] Fig.10 It is a front view of the oblique support of the utility model;

[0027] Fig.11 It is a front view of the concrete tower limb and the tower crane of the utility model;

[0028] Fig.12 It is a cross-sectional view of a single concrete tower limb and a tower crane of the utility model;

[0029] Fig.13 It is a cross-sectional view of a single concrete tower limb and a tower crane when the bracket is installed in the utility model;

[0030] In the figure: concrete tower limb 1; steel frame 101; tower section 2; bottom plate 201; supporting device 3; truss support 301; column 302; limiting corbel 303; longitudinal beam 304; oblique support 305; rib plate 3051; cross plate 3052; oblique support rod 3053; reinforcement bar 3054; connecting device 4; horizontal rod 401; oblique rod 402; joint 5; end rod 501; second bottom plate 502; through hole 503; corbel 6; bottom box body 601; upper box body 602; second through hole 603; curved plate 604; three-way jack 7; pad 8; tower crane 9; guide wheel group 901; bracket 10; second guide wheel seat group 1001; steel cable 11; guide wheel seat group 12; positioning bolt 13. DETAILED DESCRIPTION

[0031] Embodiment 1:

[0032] like Figure 1-13 In the invention, a steel tower construction adjustment device includes two concrete tower limbs 1, tower sections 2 are arranged on the concrete tower limbs 1, a connecting device 4 is arranged between the two tower sections 2, a tower crane 9 is arranged on one side of one of the tower sections 2, and a supporting device 3 is arranged on the concrete tower limb 1. According to this structure, the connecting device 4 is manufactured together with the tower sections 2, and the connecting device 4 and the joint 5 are vertically assembled in the factory. After the vertical assembly is completed, they need to be dismantled and the connecting device 4 and the joint 5 are transported to the site. The specific dimensions can be adjusted according to the vertical assembly conditions on site. The purpose of vertical assembly is to ensure that the connecting device 4 can effectively ensure the limit of the two tower sections 2, so that the joint section can be assembled and constructed according to the design requirements.

[0033] Most of them adopt concrete caps and all-steel steel towers, or steel shells filled with concrete. The utility model relates to a lower tower limb adopting a concrete structure, a junction section being a steel-concrete combined structure, and an upper tower limb adopting an all-steel structure, which has the advantages of low cost of concrete towers, and also ensures the upper tower limb cable anchoring structure and the steel tower are manufactured as a whole, greatly shortening the construction period.

[0034] The tower crane 9 is driven to hoist the tower section 2 onto the pad 8 so that the concrete tower limb 1 can support the tower section 2. The tower crane 9 is driven again to hoist the connecting device 4 onto the two tower sections 2. The two tower sections 2 are relatively displaced by driving a plurality of three-way jacks 7. The horizontal position of the tower section 2 is precisely adjusted so that the second through hole 603 is aligned with the through hole 503. The positioning bolts 13 are installed so that the two tower sections 2 can be positioned. The relative position of the two tower sections 2 is precisely adjusted to ensure that the installation error of the upper joint section meets the requirements.

[0035] After removing the multiple positioning bolts 13 at one end of the connecting device 4, the two tower sections 2 are cast, so that after the two tower sections 2 are deformed during casting, the relative displacement of the two tower sections 2 can be determined by the relative position of the through hole 503 at one end of the connecting device 4 and the second through hole 603 on the tower section 2, while the connecting device 4 is not deformed and damaged. The tower crane 9 is driven again to rotate the tower crane 9 to rotate the tower section 2 so that the through hole 503 on the connecting device 4 is aligned with the through hole on the second through hole 603 of the tower section 2, so that the relative positions of the two tower sections 2 are aligned, thereby limiting the relative position of the concrete tower limb 1 and ensuring that the installation error of the upper joint section meets the requirements. It is avoided that the tower section 2 will deflect after the concrete casting solidifies, and after each layer of the tower sections is slowly cast and installed layer by layer, the deflection angle of the concrete tower limb 1 is too large, resulting in the phenomenon of unqualified casting quality of the concrete tower limb.

[0036] The supporting device 3, the connecting device 4, the three-way jack 7 and the pad 8 can all be disassembled from the overall structure and can be reused many times. The structure is novel and the design is strong.

[0037] In the preferred solution, the connecting device 4 includes a plurality of horizontal rods 401, a plurality of oblique rods 402 are arranged between two horizontal rods 401, a plurality of joints 5 are arranged at both ends of the connecting device 4, and a plurality of brackets 6 are arranged on one side of the tower section 2. With this structure, the connecting device 4 is manufactured together with the tower section 2, and the connecting device 4 and the joints 5 are vertically assembled in the factory. After the vertical assembly is completed, they need to be dismantled and transported to the site. The specific dimensions can be adjusted according to the vertical assembly conditions on site. The purpose of vertical assembly is to ensure that the connecting device 4 can effectively ensure the limit of the two tower sections 2, so that the joint section can be assembled and constructed according to the design requirements.

[0038] In the preferred solution, the joint 5 includes an end rod 501, which is connected to the horizontal rod 401, and a second bottom plate 502 is provided at one end of the end rod 501, and a through hole 503 is provided on the second bottom plate 502. The corbel 6 includes a bottom box 601, and an upper box 602 and a plurality of arc-shaped plates 604 are provided on the bottom box 601. The upper box 602 is provided with a second through hole 603, and the end rod 501 abuts against the arc-shaped plate 604, and the positioning bolt 13 passes through the second through hole 603 and the through hole 503. With this structure, the arc-shaped plate 604 can support the end rod 501, and the joint 5 and the corbel 6 can be quickly installed and disassembled, which is convenient for the overall structure construction. The second bottom plate 502 is against the upper box body 602, and after removing the multiple positioning bolts 13 at one end of the connecting device 4, the two tower sections 2 are cast, so that after the two tower sections 2 are deformed during casting, the relative displacement of the two tower sections 2 can be determined by the relative position of the through hole 503 at one end of the connecting device 4 and the second through hole 603 on the tower section 2, while the connecting device 4 is not deformed and damaged. The tower crane 9 is driven again to rotate the tower crane 9 to rotate the tower section 2, so that the through hole 503 on the connecting device 4 is aligned with the through hole on the second through hole 603 of the tower section 2, so that the relative positions of the two tower sections 2 are aligned, thereby limiting the relative position of the concrete tower limb 1 and ensuring that the installation error of the upper joint section meets the requirements.

[0039] In the preferred solution, a plurality of three-way jacks 7 and a plurality of pads 8 are provided on the top of the support device 3, a bottom plate 201 is provided at the bottom of the tower section 2, the bottom plate 201 is against the plurality of pads 8, a steel frame 101 is provided on both sides of the concrete tower limb 1, and a top plate is provided on the steel frame 101. With this structure, the support device 3, the connecting device 4, the three-way jacks 7 and the pads 8 can all be disassembled from the overall structure and can be reused many times, with a novel structure and strong design. The tower crane 9 is driven to hoist the tower section 2 onto the pads 8 so that the concrete tower limb 1 can support the tower section 2, and the tower crane 9 is driven again to hoist the connecting device 4 onto the two tower sections 2, and by driving the plurality of three-way jacks 7, the two tower sections 2 are relatively displaced, and the horizontal position of the tower section 2 is accurately adjusted so that the second through hole 603 is aligned with the through hole 503, and the positioning bolts 13 are installed so that the two tower sections 2 can be positioned.

[0040] In a preferred solution, the support device 3 includes a truss support 301 and a plurality of columns 302. The truss support 301 is provided with a plurality of limiting brackets 303. The columns 302 penetrate the plurality of limiting brackets 303. The concrete tower limb 1 is provided with a plurality of longitudinal beams 304. With this structure, the limiting brackets 303 limit the truss support 301, and the columns 302 penetrate the limiting holes of the limiting brackets 303.

[0041] In the preferred solution, multiple horizontal support rods on the truss support 301 are against the longitudinal beam 304, multiple three-way jacks 7 and multiple pads 8 are installed on the top of the truss support 301, and multiple oblique supports 305 are provided on the truss support 301. With this structure, the horizontal support rods are against the longitudinal beam 304, so that the truss support 301 can be installed on the concrete tower limb 1. The tower crane 9 is driven to hoist the tower section 2 onto the pads 8, so that the concrete tower limb 1 can support the tower section 2, and the tower crane 9 is driven again to hoist the connecting device 4 onto the two tower sections 2. By driving multiple three-way jacks 7, the two tower sections 2 are relatively displaced, and the horizontal position of the tower section 2 is accurately adjusted. When the tower section 2 needs to be poured, the three-way jack 7 is driven to lift the two tower sections 2, and the steel frame 101 is erected on the concrete tower limb 1. After the top plate on the steel frame 101 is erected, multiple three-way jacks 7 are driven to make the tower section 2 lean against the steel frame 101, so that the supporting device 3, the three-way jack 7 and the pad 8 can be disassembled.

[0042] In a preferred solution, the oblique support 305 includes a horizontal plate 3052, on which an oblique support rod 3053 is provided, one end of the oblique support rod 3053 is against the truss support 301, a rib plate 3051 is provided between the oblique support rod 3053 and the horizontal plate 3052, and a plurality of steel bars 3054 are provided at the bottom of the horizontal plate 3052, and the steel bars 3054 pass through the truss support 301. With this structure, the oblique support 305 is located between two horizontal bars of the oblique support 305, thereby increasing the stability of the overall structure.

[0043] In the preferred solution, the tower crane 9 is provided with a multi-layer guide wheel group 901, each layer of the guide wheel group 901 includes a plurality of guide wheels, and the concrete tower limb 1 is provided with a multi-layer guide wheel seat group 12, the guide wheel seat group 12 includes a plurality of guide wheel seats, the guide wheel seat group 12 is in the same height as the guide wheel group 901, and the guide wheel seats are connected to the guide wheels by a steel cable 11. With this structure, when the tower section 2 is cast and the offset displacement is small, the tower crane 9 is directly connected to the guide wheel seat group 12 through the guide wheel group 901. When the offset displacement of the tower section 2 is large after casting, it is necessary to install a bracket 10 on the concrete tower limb 1 so that the tower crane 9 can contact the tower section 2. At the same time, when the offset displacement is large, the fulcrum extended by the bracket 10 can facilitate the adjustment of the angle of the tower section 2.

[0044] In the preferred solution, a plurality of brackets 10 are provided on the concrete tower limb 1, and a plurality of second guide wheel seat groups 1001 are provided on the brackets 10, and the second guide wheel seat groups 1001 are connected to the guide wheel seat through steel cables 11. An adjustment method for a steel tower construction adjustment device, characterized in that: S1, a connecting device 4 is manufactured together with a tower section 2, and the connecting device 4 and the joint 5 are vertically assembled in the factory, and after the vertical assembly is completed, they need to be dismantled, and the connecting device 4 and the joint 5 are transported to the site;

[0045] S2. After the concrete tower limb 1 is constructed to a certain height, the support device 3 is assembled on the concrete tower limb 1, a plurality of three-way jacks 7 and pads 8 are installed on the support device 3, a plurality of brackets 6 are installed on one side of the tower section 2, and the connection device 4 and the joint 5 are assembled on site;

[0046] S3, hoisting two tower sections 2 to the top of the supporting device 3 by the tower crane 9, so that the two tower sections 2 are respectively against the multiple pads 8 of the respective concrete tower limbs 1, and hoisting the connecting device 4 against the bracket 6 by the tower crane 9, at this time, the second through hole 603 of the connecting device 4 is not necessarily aligned with the through hole 503;

[0047] S3, driving a plurality of three-way jacks 7, and accurately adjusting the horizontal position of the tower section 2 by means of the plurality of three-way jacks 7, so that the second through holes 603 on the two tower sections 2 are aligned with the through holes 503, and inserting positioning bolts 13 into the second through holes 603 and the through holes 503, so as to fix the two tower sections 2 and the connecting device 4;

[0048] S4, removing the multiple positioning bolts 13 at one end of the connecting device 4, and the multiple positioning bolts 13 at the other end of the connecting device 4 remain in the same insertion position;

[0049] S5, driving the three jacks 7 on the two concrete tower limbs 1 at the same time to lift the two concrete tower limbs 1 and the connecting device 4, setting up the steel frame 101 on both sides of the concrete tower limb 1, and lowering the three jacks 7 on the two concrete tower limbs 1 at the same time, so that the top plate on the top of the steel frame 101 supports the bottom plate 201;

[0050] S6, dismantle the supporting device 3, three-way jack 7 and pad 8 on the two concrete tower limbs 1 so as to reuse them later, and pour concrete on the two tower sections 2;

[0051] S7, install the guide wheel seat group 12 on the concrete tower limb 1 corresponding to the removed positioning bolt 13, and after adjusting the position of the tower section 2, when the tower section 2 is far away from the tower crane 9, install the bracket 10 on the concrete tower limb 1, connect the second guide wheel seat group 1001 with the guide wheel group 901 through the steel cable 11, and connect the guide wheel seat group 12 with the guide wheel group 901 through the steel cable 11;

[0052] S8, drive the tower crane 9 to rotate, so that the concrete tower limb 1 from which the positioning bolts 13 are removed rotates, so that each second through hole 603 on the concrete tower limb 1 from which the positioning bolts 13 are removed is aligned with the corresponding through hole 503, and the connecting device 4 and the joint 5 are removed from the tower section 2;

[0053] S9, repeat S2 to S8, until multiple tower sections 2 are cast on the concrete tower limb 1, and the casting of the entire tower limb is completed.

[0054] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A steel tower construction adjustment device, characterized in that: It comprises two concrete tower limbs (1), tower sections (2) are provided on the concrete tower limbs (1), a connecting device (4) is provided between the two tower sections (2), a tower crane (9) is provided on one side of one of the tower sections (2), and a supporting device (3) is provided on the concrete tower limb (1); The connecting device (4) comprises a plurality of horizontal rods (401), a plurality of oblique rods (402) are arranged between two horizontal rods (401), a plurality of joints (5) are arranged at both ends of the connecting device (4), and a plurality of brackets (6) are arranged on one side of the tower section (2); The support device (3) comprises a truss support (301) and a plurality of columns (302); a plurality of position-limiting brackets (303) are provided on the truss support (301); the columns (302) penetrate the plurality of position-limiting brackets (303); and a plurality of longitudinal beams (304) are provided on the concrete tower limb (1).

2. A steel tower construction adjustment device according to claim 1, characterized in that: The joint (5) comprises an end rod (501), the end rod (501) is connected to the horizontal rod (401), one end of the end rod (501) is provided with a second bottom plate (502), the second bottom plate (502) is provided with a through hole (503), the bracket (6) comprises a bottom box (601), the bottom box (601) is provided with an upper box (602) and a plurality of arc-shaped plates (604), the upper box (602) is provided with a second through hole (603), the end rod (501) abuts against the arc-shaped plate (604), and the positioning bolt (13) passes through the second through hole (603) and the through hole (503).

3. A steel tower construction adjustment device according to claim 1, characterized in that: A plurality of three-way jacks (7) and a plurality of pads (8) are provided on the top of the support device (3); a bottom plate (201) is provided at the bottom of the tower section (2); the bottom plate (201) rests on the plurality of pads (8); steel frames (101) are provided on both sides of the concrete tower limb (1); and a top plate is provided on the steel frames (101).

4. A steel tower construction adjustment device according to claim 1, characterized in that: A plurality of transverse support rods on the truss support (301) are against the longitudinal beam (304), a plurality of three-way jacks (7) and a plurality of pads (8) are installed on the top of the truss support (301), and a plurality of inclined supports (305) are provided on the truss support (301).

5. A steel tower construction adjustment device according to claim 4, characterized in that: The oblique support (305) comprises a transverse plate (3052), an oblique support rod (3053) is provided on the transverse plate (3052), one end of the oblique support rod (3053) is against the truss support (301), a rib plate (3051) is provided between the oblique support rod (3053) and the transverse plate (3052), a plurality of steel bars (3054) are provided at the bottom of the transverse plate (3052), and the steel bars (3054) penetrate the truss support (301).

6. A steel tower construction adjustment device according to claim 1, characterized in that: The tower crane (9) is provided with a plurality of guide wheel assemblies (901), each of which comprises a plurality of guide wheels. The concrete tower limb (1) is provided with a plurality of guide wheel seat assemblies (12), the guide wheel seat assemblies (12) comprising a plurality of guide wheel seats. The guide wheel seat assemblies (12) are at the same height as the guide wheel assemblies (901), and the guide wheel seats are connected to the guide wheels via steel cables (11).

7. A steel tower construction adjustment device according to claim 6, characterized in that: A plurality of brackets (10) are provided on the tower limb (1), a plurality of second guide wheel seat groups (1001) are provided on the brackets (10), and the second guide wheel seat groups (1001) are connected to the guide wheel seats via steel cables (11).

Citation Information

Cited By

  • Steel tower construction adjusting device and adjusting method thereof

    CN117738094A