Material injection fixing device for highway bridge construction

By designing a flexible installation mechanism and a pouring mechanism that improves the fullness of the material body, the problem of steel bar displacement and formwork size limitations caused by the injection fixing device in the existing technology is solved, and more efficient concrete pouring and construction intensity are achieved.

CN221855292UActive Publication Date: 2024-10-18王一力
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420273526.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-03
Publication Date
2024-10-18
Estimated Expiration
2034-02-03

AI Technical Summary

Technical Problem

Existing injection fixing devices for highway and bridge construction can easily cause the internal steel structure of the formwork to shift or dislocate during the injection process, and are inconvenient to use on formwork of different sizes, affecting the fullness of concrete and construction strength.

Method used

An injection fixing device is designed that includes an installation mechanism and a pouring mechanism. The installation mechanism achieves flexible erection of the formwork through base plates, grooved rods, and adjusting snap components; the pouring mechanism reduces impact through guide components, potential reduction disks, and elastic components. force, and improve the fullness of the material body through the discharge port and the rotating potential reduction plate.

Benefits of technology

It effectively prevents the displacement and dislocation of the steel structure, improves the fullness of the concrete, and the device can be flexibly erected on formwork of different sizes, improving the strength and efficiency of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855292U_ABST
    Figure CN221855292U_ABST
Patent Text Reader

Abstract

The utility model discloses a material injection fixing device for highway bridge construction, which relates to the technical field of construction equipment, and comprises a mounting mechanism comprising a base plate and two groove rods symmetrically and fixedly arranged on the lower wall of the base plate; the pouring mechanism comprises a pouring tank fixedly arranged on the upper wall of the base plate, a discharging opening in the lower portion of the pouring tank and the material hole are located on the same axis, and a material guiding assembly is arranged on one side of the outer wall of the pouring tank. According to the material injection fixing device for highway bridge construction, when pouring materials fall on the potential reducing disc block, the discharging opening is formed in the upper wall of the potential reducing disc block, then the pouring materials fall into a formwork through the discharging opening, the impact force generated when the materials fall is reduced, and when the materials with certain weight are accumulated on the potential reducing disc block, the springs are compressed, and the pouring materials are fixed through the springs. A worker can hold the auxiliary handle lug to further press the vertical shaft rod, so that the potential reduction disc block is placed into the template, the potential reduction disc block is driven to rotate by rotating the vertical shaft rod, falling materials are conveniently filled, and the filling degree of the materials is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to a material injection fixing device for highway bridge construction. Background Art

[0002] During the construction of highway bridges, concrete pouring is often required. Before pouring concrete, a steel bar structure needs to be placed inside the formwork to enhance the strength of the concrete structure. However, during the pouring process, the existing material injection and fixing device usually pours the concrete directly into the formwork. During the pouring process, impact force is generated, causing the steel bar structure arranged inside the formwork to shift or misalign, affecting the strength of the pouring.

[0003] After searching, a Chinese patent with publication number CN 213867416 U mentioned a material injection fixing device for highway bridge construction, including a material injection tank, a connecting sleeve, a fixing plate, a slide, a stabilizing mechanism and a locking mechanism. The upper end of the material injection tank is fixedly connected with a connecting sleeve, the lower end of the material injection tank is fixedly connected with a fixing plate, and the middle parts of the two sides of the material injection tank corresponding to each other are horizontally opened with slides. The stabilizing mechanism includes a pressure plate, a return spring, a support rod, a rod sleeve and a support foot, and the locking mechanism includes a fastening ring, a rotating shaft, a fastening block, a fastening handle, a fastening nut and a fastening screw. The utility model is convenient to fix the steel bars by adding a stabilizing mechanism, preventing the arranged steel bar structure from shifting or misaligning, and ensuring the strength of the casting; by adding a locking mechanism, the friction between the connecting sleeve and the material injection pipe is used to effectively prevent the device from falling off, which not only ensures the safety of the workers but also avoids waste.

[0004] The above-mentioned device has disadvantages in its specific use. When the pressure block in the above-mentioned device is subjected to force, it will drive the pressure plate to move downward, and then drive the support rod to move downward. The support foot at the lower end of the support rod will fit into the ground at the edge of the foundation pit, and the elasticity of the return spring itself will absorb part of the impact force, further reducing the impact force of the concrete. However, in actual use, the concrete inside the lower formwork is unevenly distributed, further resulting in insufficient concrete filling. In addition, the above-mentioned device is not convenient for use on formworks of different sizes, and has high limitations. Utility Model Content

[0005] The utility model aims to provide a material injection fixing device for highway bridge construction to solve the problems raised in the above-mentioned background technology.

[0006] In order to solve the above problems, the technical solutions adopted by the utility model are as follows:

[0007] A material injection fixing device for highway bridge construction, comprising:

[0008] The mounting mechanism comprises a base plate and two slot rods symmetrically fixedly arranged on the lower wall of the base plate, wherein a material hole is opened on the upper wall of the base plate, and an adjusting clamping assembly is arranged under the slot rods;

[0009] The pouring mechanism comprises a pouring tank fixedly arranged on the upper wall of a base plate, wherein a discharge port at the bottom of the pouring tank is coaxial with a material hole, a material guide component is arranged on one side of an outer wall of the pouring tank, a force reducing disk block is arranged inside the pouring tank, a plurality of discharge ports are arranged in a circular array on the outer wall of the force reducing disk block, and an elastic component is arranged above the force reducing disk block.

[0010] Preferably, the adjustment locking assembly includes a sliding rod, an extension rod and a clamping rod, both side walls of the slot rod are provided with a first sliding groove opening, the sliding rod is slidably arranged in the first sliding groove opening, the lower wall of the slot rod is provided with a second sliding groove opening, the second sliding groove opening is connected to the first sliding groove opening, the upper end of the extension rod is fixedly connected to the lower wall of the sliding rod, and the upper end of the extension rod is slidably matched with the second sliding groove opening, and the upper wall of the clamping rod is fixedly connected to the end of the extension rod away from the sliding rod.

[0011] Preferably, the material guide assembly includes a bent rod and a material guide plate, the material guide plate is arranged at the upper end of the feed port above the casting tank, and the two ends of the bent rod are fixedly connected to the outer wall of the casting tank and the lower wall of the material guide plate respectively.

[0012] Preferably, the elastic component includes a vertical shaft rod, a fixed rod, a tube rod and a spring, one end of several of the fixed rods are fixedly connected to the outer wall of the tube rod, the other ends of several of the fixed rods are fixedly connected to the upper wall of the casting tank, the vertical shaft rod is movably connected to the inside of the tube rod, the lower end of the vertical shaft rod is fixedly connected to the upper wall of the force reducing disk block, the spring is arranged above the tube rod, and the spring is sleeved on the outer wall of the vertical shaft rod.

[0013] Preferably, a plurality of force reducing inclined plates are provided between the force reducing disk block and the barrel rod, and one end of two of the force reducing inclined plates are fixedly connected to the outer wall of the vertical shaft rod.

[0014] Preferably, the upper end of the vertical shaft rod is fixedly connected to a handle rod, and the outer wall of the handle rod is fixedly connected to an auxiliary handle ear.

[0015] Compared with the prior art, the utility model has the following beneficial effects:

[0016] The utility model discloses that when casting material falls on the reducing plate block, a discharge port is opened on the upper wall of the reducing plate block, and the material falls into the template through the discharge port, thereby reducing the impact force of the material when it falls. When a certain weight of material is accumulated on the reducing plate block, the spring is compressed, and the staff can hold the auxiliary handle ear and further press the vertical shaft rod to place the reducing plate block into the template, and drive the reducing plate block to rotate by rotating the vertical shaft rod, which is convenient for filling the falling material, further improving the filling degree of the material body, and the structural design is humanized.

[0017] During the process of setting up the installation mechanism on the template, the staff utilizes the characteristic that the slide bar is slidably set in the first slide groove and the characteristic that the upper end of the extension bar is slidably matched with the second slide groove, and then slides to adjust the distance between the two clamping rods, and further respectively clamps the two clamping rods with the two sides of the template, thereby facilitating the installation mechanism to be set up on the template, and by adjusting the distance, it is convenient to set up the device on templates of different widths, and the utility model is highly practical. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the external overall structure of a material injection fixing device for highway bridge construction;

[0019] Figure 2 It is a schematic diagram of the internal structure of a material injection fixing device for highway bridge construction;

[0020] Figure 3 It is a schematic diagram of the installation mechanism structure of a material injection fixing device for highway bridge construction;

[0021] Figure 4 The present invention is a schematic diagram of the structure of a force reducing plate and a discharge port of a material injection fixing device for highway bridge construction.

[0022] In the figure: 100, mounting mechanism; 101, base plate; 102, slot rod; 103, material hole; 104, slide rod; 105, extension rod; 106, clamping rod; 200, casting mechanism; 201, casting tank; 202, force reducing plate block; 203, discharge port; 204, bending rod; 205, material guide plate; 206, vertical axis rod; 207, fixing rod; 208, cylinder rod; 209, spring; 210, force reducing inclined plate; 211, handle rod; 212, auxiliary handle ear. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] Embodiment 1:

[0025] See also Figure 1-Figure 4 As shown, the utility model is a material injection fixing device for highway bridge construction, comprising

[0026] The mounting mechanism 100 includes a base plate 101 and two slot rods 102 symmetrically fixedly arranged on the lower wall of the base plate 101. A material hole 103 is opened on the upper wall of the base plate 101, and an adjustment clamping assembly is arranged below the slot rods 102;

[0027] The pouring mechanism 200 includes a pouring tank 201 fixedly arranged on the upper wall of the base plate 101, the discharge port below the pouring tank 201 and the material hole 103 are on the same axis, a material guide component is provided on one side of the outer wall of the pouring tank 201, a force reducing disk block 202 is provided inside the pouring tank 201, a plurality of discharge ports 203 are provided in a circular array on the outer wall of the force reducing disk block 202, and an elastic component is provided above the force reducing disk block 202.

[0028] Depend on Figure 1 and Figure 3 It can be seen that the adjustment locking assembly includes a sliding rod 104, an extension rod 105 and a clamping rod 106. Both side walls of the slot rod 102 are provided with a first sliding groove opening, the sliding rod 104 is slidably set in the first sliding groove opening, the lower wall of the slot rod 102 is provided with a second sliding groove opening, the second sliding groove opening is connected to the first sliding groove opening, the upper end of the extension rod 105 is fixedly connected to the lower wall of the sliding rod 104, and the upper end of the extension rod 105 is slidably matched with the second sliding groove opening, and the upper wall of the clamping rod 106 is fixedly connected to the end of the extension rod 105 away from the sliding rod 104.

[0029] As can be seen from the above, when in use, the staff sets up the installation mechanism 100 on the template, and further pours concrete into the template through the pouring mechanism 200;

[0030] Specifically, in the process of erecting the installation mechanism 100 on the template, the staff uses the characteristics of the slide rod 104 slidingly set in the first slide groove and the characteristics of the upper end of the extension rod 105 slidingly cooperating with the second slide groove, and then slides to adjust the distance between the two clamping rods 106, and further engages the two clamping rods 106 with the two sides of the template respectively, which makes it easier to erect the installation mechanism 100 on the template, and by adjusting the distance, it is convenient to erect the device on templates of different widths, which is highly practical.

[0031] Embodiment 2:

[0032] The mounting mechanism 100 includes a base plate 101 and two slot rods 102 symmetrically fixedly arranged on the lower wall of the base plate 101. A material hole 103 is opened on the upper wall of the base plate 101, and an adjustment clamping assembly is arranged below the slot rods 102;

[0033] The pouring mechanism 200 includes a pouring tank 201 fixedly arranged on the upper wall of the base plate 101, the discharge port below the pouring tank 201 and the material hole 103 are on the same axis, a material guide component is provided on one side of the outer wall of the pouring tank 201, a force reducing disk block 202 is provided inside the pouring tank 201, a plurality of discharge ports 203 are provided in a circular array on the outer wall of the force reducing disk block 202, and an elastic component is provided above the force reducing disk block 202.

[0034] refer to Figure 1 , Figure 2 and Figure 4As shown, the material guide assembly includes a bent rod 204 and a material guide plate 205. The material guide plate 205 is arranged at the upper end of the feed port above the casting tank 201. The two ends of the bent rod 204 are fixedly connected to the outer wall of the casting tank 201 and the lower wall of the material guide plate 205 respectively.

[0035] The elastic component includes a vertical shaft rod 206, a fixed rod 207, a tubular rod 208 and a spring 209. One end of several fixed rods 207 are fixedly connected to the outer wall of the tubular rod 208, and the other ends of several fixed rods 207 are fixedly connected to the upper wall of the casting tank 201. The vertical shaft rod 206 is movably connected to the inside of the tubular rod 208, and the lower end of the vertical shaft rod 206 is fixedly connected to the upper wall of the force reducing disk block 202. The spring 209 is arranged above the tubular rod 208, and the spring 209 is sleeved on the outer wall of the vertical shaft rod 206.

[0036] A plurality of force reducing inclined plates 210 are provided between the force reducing disk block 202 and the cylindrical rod 208 , and one end of two force reducing inclined plates 210 are fixedly connected to the outer wall of the vertical shaft rod 206 .

[0037] A handle rod 211 is fixedly connected to the upper end of the vertical shaft rod 206 , and an auxiliary handle ear 212 is fixedly connected to the outer wall of the handle rod 211 .

[0038] As can be seen from the above, after the staff sets up the installation mechanism 100 on the template, the staff further pours the casting material onto the guide plate 205, and then the casting material enters the casting tank 201 through the guiding action of the guide plate 205, and then the casting material falls on the force reducing plate block 202. The upper wall of the force reducing plate block 202 is provided with a discharge port 203, and then the casting material falls into the template through the discharge port 203, which reduces the impact force of the material when it falls. When a certain weight of material is accumulated on the force reducing plate block 202, at this time, the spring 209 is compressed, and the staff can hold the auxiliary handle ear 212 to further press the vertical shaft rod 206, so that the force reducing plate block 202 is placed in the template, and the force reducing plate block 202 is driven to rotate by rotating the vertical shaft rod 206, which is convenient for filling the falling material, further improving the filling degree of the material body, and the structural design is humanized.

[0039] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0040] In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other.

[0041] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A material injection fixing device for highway bridge construction, characterized in that: include The mounting mechanism (100) comprises a base plate (101) and two slot rods (102) symmetrically fixedly arranged on the lower wall of the base plate (101); a material hole (103) is opened on the upper wall of the base plate (101); and an adjusting clamping assembly is arranged below the slot rods (102); The pouring mechanism (200) comprises a pouring tank (201) fixedly arranged on the upper wall of a base plate (101), a discharge port at the bottom of the pouring tank (201) and a material hole (103) being on the same axis, a material guide component being arranged on one side of the outer wall of the pouring tank (201), a force reducing disk block (202) being arranged inside the pouring tank (201), a plurality of discharge ports (203) being arranged in a circular array on the outer wall of the force reducing disk block (202), and an elastic component being arranged above the force reducing disk block (202).

2. A material injection fixing device for highway bridge construction according to claim 1, characterized in that: The adjusting engaging assembly comprises a sliding rod (104), an extension rod (105) and a clamping rod (106); both side walls of the slot rod (102) are provided with a first sliding groove opening, the sliding rod (104) is slidably arranged in the first sliding groove opening, the lower wall of the slot rod (102) is provided with a second sliding groove opening, the second sliding groove opening is communicated with the first sliding groove opening, the upper end of the extension rod (105) is fixedly connected to the lower wall of the sliding rod (104), and the upper end of the extension rod (105) is slidably matched with the second sliding groove opening, and the upper wall of the clamping rod (106) is fixedly connected to an end of the extension rod (105) away from the sliding rod (104).

3. The material injection fixing device for highway bridge construction according to claim 1 is characterized in that: The material guide assembly comprises a bent rod (204) and a material guide plate (205); the material guide plate (205) is arranged at the upper end of the material feed port above the casting tank (201); and the two ends of the bent rod (204) are respectively fixedly connected to the outer wall of the casting tank (201) and the lower wall of the material guide plate (205).

4. The material injection fixing device for highway bridge construction according to claim 1 is characterized in that: The elastic component comprises a vertical shaft rod (206), a fixed rod (207), a barrel rod (208) and a spring (209); one end of a plurality of the fixed rods (207) is fixedly connected to the outer wall of the barrel rod (208); the other ends of a plurality of the fixed rods (207) are fixedly connected to the upper wall of the casting tank (201); the vertical shaft rod (206) is movably connected to the inside of the barrel rod (208); the lower end of the vertical shaft rod (206) is fixedly connected to the upper wall of the force reducing disk block (202); the spring (209) is arranged above the barrel rod (208), and the spring (209) is sleeved on the outer wall of the vertical shaft rod (206).

5. The material injection fixing device for highway bridge construction according to claim 4 is characterized in that: A plurality of force reducing inclined plates (210) are provided between the force reducing disk block (202) and the cylindrical rod (208), and one end of two of the force reducing inclined plates (210) are fixedly connected to the outer wall of the vertical shaft rod (206).

6. A material injection fixing device for highway bridge construction according to claim 4, characterized in that: The upper end of the vertical shaft rod (206) is fixedly connected to a handle rod (211), and the outer wall of the handle rod (211) is fixedly connected to an auxiliary handle ear (212).