Pile foundation casing

By arranging structures such as lashing fixing components and levels on the pile foundation casing, the problems of loss of pile protection and construction accuracy are solved, efficient and convenient pile foundation construction is achieved, and costs are reduced.

CN221855509UActive Publication Date: 2024-10-18CHINA RAILWAY 19TH BUREAU GRP FIFTH ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420026353.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-04
Publication Date
2024-10-18
Estimated Expiration
2034-01-04

AI Technical Summary

Technical Problem

In the traditional pile foundation construction method, the hole formation method of mud wall protection leads to the loss of pile protection, which affects the drilling accuracy and the convenience of review.

Method used

Design a hollow cylindrical casing with multiple sets of lashing and fixing components and levels on the top, including lashing and fixing devices, installation grooves, support rods, levels, and scales to ensure drilling accuracy and construction quality.

Benefits of technology

Through the design of lashing and fixing devices, the loss of guard piles is avoided, ensuring drilling accuracy and construction quality; the level detects verticality in real time, and the scale directly measures height and mud water level, improving construction convenience and cost-effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855509U_ABST
    Figure CN221855509U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and provides a pile foundation casing. The pile foundation pile casing comprises a pile casing body, the pile casing body is of a hollow cylindrical structure, at least two binding and fixing assemblies are arranged on the top of the pile casing body in the circumferential direction at intervals, each binding and fixing assembly comprises two oppositely-arranged binding and fixing devices, and the connecting line of the two binding and fixing devices of each set passes through the center of the top face of the pile casing body. According to the pile foundation pile casing, the binding and fixing device is directly formed on the pile casing body, in the drilling process, the binding and fixing device cannot be lost, the drilling construction and rechecking precision can be guaranteed, the construction quality is guaranteed, the construction convenience is improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction, and in particular to a pile foundation casing. Background Art

[0002] As a relatively mature construction method, pile foundation construction has continuously updated its technology and processes with the development of science and technology, which has effectively promoted the faster development of pile foundation construction technology while ensuring construction safety.

[0003] The traditional pile foundation construction method is to set up a casing at the pile position, put a steel skeleton into the hole through mechanical drilling or manual digging, and pour concrete to form it. Before the pile foundation construction, it is necessary to measure and lay out and protect the pile position by setting four guard piles around the casing. At the same time, the intersection of the connecting lines between the guard piles can also be used as the centering point for the drill to rotate in for drilling.

[0004] The drilling process usually uses mud wall protection method, which is a mechanical drilling method that uses mud to protect and stabilize the hole wall. The mud and stone chips are suspended in the mud and then discharged out of the hole. When the mud and stone chips are discharged out of the hole, they are easy to cover the guard piles and cause the loss of the guard piles. The guard piles are difficult to protect, which affects the subsequent drilling accuracy and causes inconvenience during review. Utility Model Content

[0005] In order to solve the above technical problem or at least partially solve the above technical problem, the present disclosure provides a pile foundation casing.

[0006] The present invention provides a pile foundation casing, including a casing body, the casing body is a hollow cylindrical structure, at least two groups of binding and fixing components are arranged at intervals along the circumferential direction on the top of the casing body, the binding and fixing components include two relatively arranged binding and fixing devices, and the connection line of the two binding and fixing devices in each group passes through the center of the top surface of the casing body.

[0007] Optionally, there are four binding and fixing devices, and two adjacent binding and fixing devices are spaced 90 degrees apart in the circumferential direction.

[0008] Optionally, the top of the casing body is recessed to form a plurality of installation grooves, and the binding and fixing devices are arranged in the installation grooves one by one.

[0009] Optionally, the binding and fixing device includes a fixing portion and a supporting portion, and a binding space for accommodating a binding line is formed between the fixing portion and the supporting portion.

[0010] Optionally, the supporting part includes a plurality of supporting rods, the bottoms of the plurality of supporting rods abut against the side walls of the mounting groove, the tops of the plurality of supporting rods jointly support the fixing part, and the binding space is formed between the fixing part and the tops of the plurality of supporting rods.

[0011] Optionally, a level is further included, which is arranged on the top of the casing body and is used to detect the verticality of the casing body.

[0012] Optionally, the level instrument comprises a shell, a cavity structure is formed inside the shell, the cavity structure is filled with liquid, and a bubble structure floats on the liquid;

[0013] The cavity structure includes a first channel and a second channel arranged horizontally, the first channel and the second channel intersect at a midpoint and are perpendicular, and the bubble structure is configured to be located at the intersection of the first channel and the second channel when horizontal and can move in the first channel and the second channel.

[0014] Optionally, a first scale is provided on the outer wall surface of the casing body extending along the vertical direction thereof, for detecting the height of the top of the casing body from the ground.

[0015] Optionally, in the direction from the top end to the bottom end of the casing body, the scale marking values ​​of the first scale gradually increase.

[0016] Optionally, a second scale is provided on the inner wall surface of the casing body and extends along the vertical direction thereof, so as to detect the water level of the mud in the casing body.

[0017] Compared with the prior art, the technical solution provided by the embodiments of the present disclosure has the following advantages:

[0018] The pile foundation casing provided by the present disclosure includes a casing body, the casing body is a hollow cylindrical structure, the hollow cylindrical structure can be used as a guide device for the drilling rig to rotate in, at least two groups of binding and fixing components are arranged at intervals along the circumferential direction on the top of the casing body, the binding and fixing components include two binding and fixing devices arranged opposite to each other, that is, there are at least four binding and fixing devices, and the connecting line of the two binding and fixing devices in each group passes through the center of the top surface of the casing body. Among them, the top surface of the casing body is circular, the center of the circle is the center of the top surface, the connecting line of the binding and fixing devices in each group passes through the center of the top surface, that is, the connecting line of at least two groups of binding and fixing devices can intersect at the center, and the center can be used as the centering point for the drilling rig to rotate in for drilling. The binding and fixing device is directly formed on the casing body. During the drilling process, compared with the method of placing pile guards around the casing, the binding and fixing device will not be lost, which can ensure the construction and verification accuracy of the drilling, ensure the construction quality, improve the convenience of construction, and reduce the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0021] Figure 1 This is a schematic diagram of the structure of a pile foundation casing according to an embodiment of the utility model;

[0022] Figure 2 This is a structural schematic diagram of a binding and fixing device according to an embodiment of the utility model;

[0023] Figure 3 A top view of a binding and fixing device according to an embodiment of the utility model;

[0024] Figure 4 A schematic diagram of the structure of a level meter according to an embodiment of the utility model;

[0025] Figure 5 A side view of a level according to an embodiment of the present invention;

[0026] Figure 6 This is a schematic structural diagram of the outer wall of a pile foundation casing according to an embodiment of the utility model;

[0027] Figure 7 A schematic diagram of scale marking values ​​of a first scale ruler according to an embodiment of the utility model;

[0028] Figure 8 The figure is a schematic structural diagram of the inner wall surface of a pile foundation casing according to an embodiment of the utility model.

[0029] In the figure: 10, casing body; 11, mounting groove;

[0030] 20. Binding and fixing device; 21. Fixing part; 22. Support rod; 23. Binding space;

[0031] 30. Level; 31. Shell; 32. Bubble structure; 33. First channel; 34. Second channel;

[0032] 40. The first scale;

[0033] 50. Second scale. DETAILED DESCRIPTION

[0034] In order to more clearly understand the above-mentioned objectives, features and advantages of the present disclosure, the scheme of the present disclosure will be further described below. It should be noted that the embodiments of the present disclosure and the features in the embodiments can be combined with each other without conflict.

[0035] In the following description, many specific details are set forth to facilitate a full understanding of the present disclosure, but the present disclosure may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present disclosure, rather than all of the embodiments.

[0036] The pile foundation casing is described in detail below through specific embodiments:

[0037] Reference Figures 1 to 8 As shown, some embodiments of the utility model provide a pile foundation casing, including a casing body 10, the casing body 10 is a hollow cylindrical structure, the hollow cylindrical structure can be used as a guide device for the drilling rig to rotate in, and at least two groups of binding and fixing components are arranged at intervals along the circumferential direction on the top of the casing body 10. The binding and fixing components include two relatively arranged binding and fixing devices 20, that is, there are at least four binding and fixing devices 20, and the connecting line of the two binding and fixing devices 20 of each group passes through the center of the top surface of the casing body 10.

[0038] It can be understood that the top surface of the casing body 10 is circular, and the center of the circle is the center of the top surface. The connecting lines of each group of the binding and fixing devices 20 pass through the center of the top surface, that is, the connecting lines of at least two groups of the binding and fixing devices 20 can intersect at the center, and the center can be used as the centering point for the drill rig to screw in for drilling. The binding and fixing devices 20 are directly formed on the casing body 10. During the drilling process, compared with the method of placing guard piles around the casing, the binding and fixing devices 20 will not be lost, which can ensure the construction and review accuracy of the drilling, ensure the construction quality, improve the convenience of construction, and reduce the construction cost.

[0039] In specific implementation, there are four tying and fixing devices 20, that is, there are two groups of tying and fixing components, and two adjacent tying and fixing devices 20 are spaced 90 degrees apart in the circumferential direction, that is, the connecting lines of the two groups of tying and fixing devices 20 are perpendicular to each other.

[0040] Of course, the number of the binding and fixing devices 20 can also be six, eight, etc., and the angles between two adjacent binding and fixing devices 20 can also be other angles. The present disclosure does not limit this, as long as the connecting lines of the binding and fixing devices 20 in each group can intersect at the center position of the top surface of the casing body 10 to align the drilling rig through the center position.

[0041] In some embodiments, the top of the casing body 10 is recessed to form a plurality of mounting grooves 11, and the binding and fixing devices 20 are arranged one by one in the mounting grooves 11. It can be understood that the top of the binding and fixing device 20 does not exceed the top surface of the casing body 10, so as to prevent the mud and slag chips from being damaged by the binding and fixing device 20 during the process of being discharged out of the hole during the drilling construction, thereby improving the service life of the binding and fixing device 20 and enabling the pile foundation casing to be recycled.

[0042] In a specific implementation, the connecting lines between the relative installation grooves 11 all pass through the center of the top surface of the casing body 10. In this way, when the binding and fixing devices 20 are set in the installation grooves 11, the intersection of the connecting lines between each group of binding and fixing devices 20 can be used as the centering point for the drilling rig to rotate in.

[0043] Reference Figure 2 and Figure 3 As shown, the tying and fixing device 20 includes a fixing portion 21 and a supporting portion, and a tying space 23 for accommodating tying wires is formed between the fixing portion 21 and the supporting portion. That is, the tying wires used for centering the drilling rig are tied in the tying space 23, that is, the tying wires are tied between the fixing portion 21 and the supporting portion, and the tying wires can be limited in the tying space 23 by the limiting between the fixing portion 21 and the supporting portion to prevent the tying wires from moving up and down, thereby ensuring the centering accuracy and the construction quality.

[0044] In a specific implementation, the support portion includes a plurality of support rods 22 , the bottoms of the plurality of support rods 22 abut against the side walls of the mounting groove 11 , the tops of the plurality of support rods 22 jointly support the fixing portion 21 , and a binding space 23 is formed between the fixing portion 21 and the tops of the plurality of support rods 22 .

[0045] Reference Figure 3 As shown, there are four support rods 22, and the bottom ends of the four support rods 22 are respectively abutted against the four corners of the bottom of the installation groove 11, and the top ends of the four support rods 22 converge toward the center of the installation groove 11 and are jointly supported at the bottom of the fixing portion 21, so that a binding space 23 can be formed between the fixing portion 21 and the support rods 22. It can be understood that the support rods 22 gradually spread in the direction from top to bottom, and when the binding wire is bound in the binding space 23, the support rods 22 can prevent the binding wire from sliding down, thereby ensuring the binding position of the binding wire, thereby ensuring the centering accuracy, and ensuring the construction quality.

[0046] Of course, the number of support rods 22 can be set according to actual needs, or the fixing portion 21 can be directly set at the bottom of the mounting groove 11, and a binding space 23 is formed between the fixing portion 21 and the bottom of the mounting groove 11. The present disclosure does not limit this, as long as the binding line can be tied to the fixing portion 21 and a centering point for screwing in can be provided to the drilling rig.

[0047] In some embodiments, the pile foundation casing of the present disclosure further includes a level meter 30, which is arranged at the top of the casing body 10 and is used to detect the verticality of the casing body 10. It is understandable that the pile foundation casing is arranged at the preset pile position, and the casing body 10 is easily placed at an angle due to operational reasons during the embedding process, and the method of weighting, vibration, hammering and soil removal in the tube is generally adopted when sinking. This construction method is also easy to cause the pile foundation casing to tilt during the embedding process, affecting the construction quality. The present disclosure integrates the level meter 30 at the top of the casing body 10, which can timely detect the horizontality of the top surface of the casing body 10, and then judge the verticality of the casing body 10, and can detect in real time during the construction process, which can ensure the quality of the construction and make the construction meet the requirements.

[0048] Reference Figure 4 and Figure 5 As shown, the level 30 includes a shell 31, a cavity structure is formed inside the shell 31, the cavity structure is filled with liquid, a bubble structure 32 floats on the liquid, and the bubble structure 32 can move in the cavity structure to show whether the level 30 is in a horizontal state.

[0049] In a specific implementation, the cavity structure includes a first channel 33 and a second channel 34 arranged horizontally, the first channel 33 and the second channel 34 intersect and are perpendicular at the midpoint, and the bubble structure 32 is configured to be located at the intersection of the first channel 33 and the second channel 34 when horizontal and can move in the first channel 33 and the second channel 34. It can be understood that when the bubble structure 32 is at the intersection of the first channel 33 and the second channel 34, the top surface of the casing body 10 is in a horizontal state, and correspondingly, the casing body 10 is perpendicular to the ground in the vertical direction, meeting the construction requirements.

[0050] At the same time, the first channel 33 is perpendicular to the second channel 34, and the bubble structure 32 can move between the first channel 33 and the second channel 34 to adjust the horizontality of the top surface of the casing body 10 according to the position of the bubble structure 32 in the first channel 33 and the second channel 34. During the construction process, the verticality of the casing body 10 can be detected in real time to ensure the quality of the construction.

[0051] Of course, the cavity structure can also be a circular cavity or other shapes, and the present disclosure does not limit this, as long as the position of the bubble structure 32 can be used to determine whether the top surface of the casing body 10 is horizontal and the embedding angle of the casing body 10 can be adjusted accordingly so that the construction meets the requirements.

[0052] In some embodiments, reference Figure 6As shown, a first scale 40 is provided on the outer wall of the casing body 10 along its vertical direction, which is used to detect the height of the top of the casing body 10 from the ground. Furthermore, in the direction from the top to the bottom of the casing body 10, the scale mark value of the first scale 40 gradually increases. It can be understood that, referring to Figure 7 As shown, the scale marking values ​​of the first scale 40 gradually increase, and the height of the top of the casing body 10 from the ground can be directly read from the first scale 40, that is, the distance from the top of the casing body 10 to the ground can be directly read, which is simple to operate.

[0053] Of course, the scale marking values ​​of the first scale 40 may also gradually decrease in the direction from the top to the bottom of the casing body 10 , and the present disclosure does not limit this, as long as the height of the top of the casing body 10 from the ground can be measured by the first scale 40 .

[0054] Further, refer to Figure 8 As shown, a second scale 50 is provided on the inner wall surface of the casing body 10 extending along its vertical direction, which is used to detect the water level of the mud in the casing body 10. It can be understood that during the drilling construction, the mud is used to protect the stable hole wall, that is, the mud with a relative density greater than 1 is used in the hole to protect the wall, which can prevent the hole from collapsing. After the hole is formed, the mud is replaced by underwater concrete pouring. During the construction process, the mud water level needs to be kept higher than the groundwater level by a certain height to increase the water head height in the hole and increase the hydrostatic pressure on the hole wall. Therefore, it is necessary to constantly detect the mud water level in the hole. By providing the second scale 50 on the inner wall of the casing body 10, the mud water level can be guaranteed to ensure the hole is formed.

[0055] In specific implementation, in the direction from the top to the bottom of the casing body 10, the scale marking value of the second scale 50 can gradually increase or decrease, and the present disclosure is not limited to this. Specifically, the mud water level can be calculated by parameters such as the groundwater level, the hole depth and the length of the casing body 10, and then real-time detection can be performed through the second scale 50, and water can be added to the hole in time to ensure construction.

[0056] The pile foundation casing provided by the embodiment of the present disclosure has the following advantages:

[0057] (1) Solve the pile guiding problem, and directly set the binding and fixing device into the installation groove formed on the top of the casing body. During the drilling process, the binding and fixing device will not be lost or damaged, which can ensure the construction and verification accuracy of the drilling and improve the convenience of construction;

[0058] (2) A level is provided on the casing body, which can detect the verticality of the casing body in real time during the construction process and make corresponding adjustments, thus ensuring the quality of construction;

[0059] (3) A first scale is provided on the outer wall surface of the casing body, which can directly measure the height of the top of the casing body from the ground, and the operation is simple;

[0060] (4) A second scale is provided on the inner wall surface of the casing body, which can detect the mud water level in the casing body in real time and add water to the hole in time to ensure hole formation.

[0061] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0062] The above are only specific embodiments of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to these embodiments herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A pile foundation casing, It is characterized in that The invention comprises a casing body (10), wherein the casing body (10) is a hollow cylindrical structure, and at least two groups of binding and fixing components are arranged at intervals along the circumferential direction on the top of the casing body (10), wherein the binding and fixing components include two binding and fixing devices (20) arranged opposite to each other, and the connecting line of the two binding and fixing devices (20) of each group passes through the center of the top surface of the casing body (10).

2. The pile foundation casing according to claim 1, It is characterized in that There are four binding and fixing devices (20), and two adjacent binding and fixing devices (20) are spaced 90 degrees apart in the circumferential direction.

3. The pile foundation casing according to claim 1, It is characterized in that The top of the casing body (10) is recessed to form a plurality of installation grooves (11), and the binding and fixing devices (20) are arranged in the installation grooves (11) in a one-to-one correspondence.

4. The pile foundation casing according to claim 3, It is characterized in that The binding and fixing device (20) comprises a fixing portion (21) and a supporting portion, wherein a binding space (23) for accommodating a binding line is formed between the fixing portion (21) and the supporting portion.

5. The pile foundation casing according to claim 4, It is characterized in that The supporting portion comprises a plurality of supporting rods (22), the bottoms of the plurality of supporting rods (22) abut against the side walls of the mounting groove (11), the tops of the plurality of supporting rods (22) jointly support the fixing portion (21), and the binding space (23) is formed between the fixing portion (21) and the tops of the plurality of supporting rods (22).

6. The pile foundation casing according to any one of claims 1 to 5, It is characterized in that It also comprises a level (30), which is arranged on the top of the casing body (10) and is used to detect the verticality of the casing body (10).

7. The pile foundation casing according to claim 6, It is characterized in that The level (30) comprises a shell (31), a cavity structure is formed inside the shell (31), the cavity structure is filled with liquid, and a bubble structure (32) floats on the liquid; The cavity structure comprises a first channel (33) and a second channel (34) which are arranged horizontally, wherein the first channel (33) and the second channel (34) intersect at a midpoint and are perpendicular to each other, and the bubble structure (32) is configured to be located at the intersection of the first channel (33) and the second channel (34) when horizontal and to be able to move in the first channel (33) and the second channel (34).

8. The pile foundation casing according to any one of claims 1 to 5, It is characterized in that A first scale (40) is provided on the outer wall surface of the casing body (10) extending in the vertical direction thereof, and is used to detect the height of the top of the casing body (10) above the ground.

9. The pile foundation casing according to claim 8, It is characterized in that In the direction from the top end to the bottom end of the casing body (10), the scale marking values ​​of the first scale (40) gradually increase.

10. The pile foundation casing according to any one of claims 1 to 5, It is characterized in that A second scale (50) is provided on the inner wall surface of the casing body (10) and extends in the vertical direction thereof, and is used to detect the water level of the mud in the casing body (10).