Pile foundation construction auxiliary table for foundation engineering
By introducing the connecting mechanism, fixing mechanism and calibration mechanism into the pile foundation construction auxiliary platform, the problems of unstable installation and difficulty in observing verticality are solved, and stable support and precise construction of the pile foundation are achieved.
Patent Information
- Application Number
- CN202420220560.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-30
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-30
AI Technical Summary
The existing pile foundation construction auxiliary platform for foundation engineering is unstable during installation, cannot visually observe the verticality of the pile foundation, and is difficult to disassemble.
A pile foundation construction auxiliary platform including a connecting mechanism, a fixing mechanism and a calibration mechanism is designed to achieve stable installation and disassembly through a two-half design and hinged rod structure, and the verticality of the pile foundation is observed through the calibration rope and calibration line.
The stability and construction accuracy of the pile foundation are improved, and the installation and disassembly operations of the pile foundation are facilitated.
Smart Images

Figure CN221855511U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of foundation engineering, and in particular relates to a pile foundation construction auxiliary platform for foundation engineering. Background Art
[0002] The pile foundation is a deep foundation consisting of a column and a pile-steel staggered composite cap connected to the top of the pile, or a single column foundation connected by a column and a pile foundation. If the pile body is completely buried in the soil and the bottom surface of the steel staggered composite cap is in contact with the soil, it is called a low steel staggered composite cap column foundation; if the upper part of the pile body is exposed to the ground and the bottom of the steel staggered composite cap is located above the ground, it is called a high steel staggered composite cap pile foundation.
[0003] The prior art discloses a pile foundation construction auxiliary platform for foundation engineering with patent announcement number CN216515700U. The above patent includes an auxiliary platform body, three support plates are fixedly connected to the periphery of the upper end of the auxiliary platform body, and a fixing rod is commonly fixedly connected between two adjacent support plates, and a fixing mechanism is movably connected through the middle of the outer surfaces of the three support plates, three reinforcement mechanisms are movably connected through the periphery of the upper end of the auxiliary platform body, and the three reinforcement mechanisms and the three support plates are staggered with each other, a number of support columns are fixedly connected to the periphery of the lower end of the auxiliary platform body, and the lower ends of the several support columns are fixedly connected to support seats, and a through opening is opened in the middle of the upper end of the auxiliary platform body. The utility model describes a pile foundation construction auxiliary platform for foundation engineering, which is convenient for fixing pile foundations of different specifications by setting a fixing mechanism, and improves the stability of the device and strengthens the supporting effect on the pile foundation by setting a reinforcement mechanism and a supporting mechanism. However, the following deficiencies still exist in actual use: from a practical point of view, when the device in the patent assists in positioning the pile foundation, the device itself cannot be stably installed on the ground, resulting in poor stability in assisting the positioning of the pile foundation, and at the same time, it is impossible to intuitively see whether the pile foundation is vertical, and it is difficult to remove it from the pile foundation after the pile foundation construction is completed.
[0004] Therefore, there is a need for an auxiliary platform for pile foundation construction for foundation engineering to solve the problems in the prior art that the auxiliary platform itself has poor stability, cannot visually observe whether the pile foundation is vertical, and is inconvenient to disassemble. Utility Model Content
[0005] The purpose of the utility model is to provide a pile foundation construction auxiliary platform for foundation engineering to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pile foundation construction auxiliary platform for foundation engineering, comprising an auxiliary platform body, a connecting mechanism is arranged in the middle of the auxiliary platform body, a fixing plate is fixedly connected to the inner surface of the auxiliary platform body, a fixing mechanism is fixedly connected to the outer surface of the auxiliary platform body, and a calibration mechanism is arranged on the outer surface of the fixing plate.
[0007] It should be noted in the scheme that the auxiliary platform body is divided into two halves by a connecting mechanism, two fixing plates are provided, which are respectively provided on the two halves of the auxiliary platform body, four fixing mechanisms are provided, and two groups of the four fixing mechanisms are provided in pairs, and the two groups of the fixing mechanisms are respectively provided on the two halves of the auxiliary platform body, and two calibration mechanisms are provided, and the two calibration mechanisms are respectively provided on two fixing plates.
[0008] It is further worth explaining that the fixing mechanism includes a mounting block, the mounting block is fixedly connected to the outer surface of the auxiliary platform body, the bottom of the mounting block is fixedly connected to a positioning rod, the inner thread of the mounting block is connected to a threaded rod, the top of the threaded rod is fixedly connected to a nut, the bottom end of the mounting block is fixedly connected to an extrusion block, the positioning rod is fixedly connected to a fixing frame and is arranged close to the bottom end, a movable block is slidably arranged in the fixing frame, the outer surface of the movable block is fixedly connected to a clamping block, the bottom of the movable block is fixedly connected to a connecting block and is arranged in the fixing frame, and a spring telescopic rod is fixedly installed on the outside of the connecting block in the fixing frame.
[0009] It should be further explained that the threaded rod is arranged in the positioning rod through the mounting block, the extrusion block is arranged as an arc surface, the upper part of the movable block near one end of the extrusion block is arranged as an arc surface, and four fixed frames are arranged, and the four fixed frames are evenly arranged on the positioning rod.
[0010] As a preferred embodiment, the calibration mechanism includes a mounting plate, the mounting plate is fixedly connected to the top outer side of the fixed plate, a calibration rope is fixedly connected to the bottom of the mounting plate, a counterweight is fixedly connected to the bottom end of the calibration rope, and the calibration rope projects a calibration line on the outer surface of the fixed plate.
[0011] As a preferred embodiment, the connecting mechanism includes a hinge rod, which is arranged on the middle rear side of the two halves of the auxiliary platform body and is hinged and rotated by the hinge rod. A positioning block is fixedly connected to the left half of the front side of the auxiliary platform body on the opposite side of the hinge rod, and a threaded hole is opened on the positioning block. The positioning block is fixedly connected to a connecting plate corresponding to the right half of the auxiliary platform body, and the connecting plate is threadedly connected with bolts matching the threaded holes.
[0012] Compared with the prior art, the utility model provides a pile foundation construction auxiliary platform for foundation engineering, which has at least the following beneficial effects:
[0013] (1) The fixing mechanism is provided to facilitate the stable installation of the auxiliary platform, so that it can provide stable support for the auxiliary pile foundation, thereby ensuring the stability of the pile foundation.
[0014] (2) Through the calibration mechanism, it is easy to visually observe whether the auxiliary pile foundation maintains vertical construction, so as to facilitate construction. At the same time, through the connection mechanism, it is easy to disassemble the device on the pile foundation, so as to facilitate later construction work. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the first state structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the second state structure of the utility model;
[0017] Figure 3 This is a schematic diagram of the internal structure of the fixing mechanism of the utility model;
[0018] Figure 4 for Figure 3 The enlarged structural diagram at A in the middle;
[0019] Figure 5 for Figure 2 Schematic diagram of the enlarged structure at point B.
[0020] In the figure: 1. auxiliary platform body; 2. fixing plate; 3. fixing mechanism; 301. mounting block; 302. positioning rod; 303. threaded rod; 304. nut; 305. extrusion block; 306. fixing frame; 307. movable block; 308. clamping block; 309. spring telescopic rod; 3110. connecting block; 4. calibration mechanism; 401. mounting plate; 402. calibration rope; 403. counterweight block; 404. calibration line; 5. connecting mechanism; 501. positioning block; 502. threaded hole; 503. connecting plate; 504. bolt; 505. hinged rod. DETAILED DESCRIPTION
[0021] The present invention will be further described below in conjunction with the embodiments.
[0022] See also Figure 1-5 The utility model provides a pile foundation construction auxiliary platform for foundation engineering, including an auxiliary platform body 1, a connecting mechanism 5 is arranged in the middle of the auxiliary platform body 1, a fixing plate 2 is fixedly connected to the inner surface of the auxiliary platform body 1, a fixing mechanism 3 is fixedly connected to the outer surface of the auxiliary platform body 1, and a calibration mechanism 4 is arranged on the outer surface of the fixing plate 2.
[0023] Further Figure 1 and Figure 2As shown, it is worth explaining in detail that the auxiliary platform body 1 is divided into two halves by a connecting mechanism 5, two fixing plates 2 are provided, which are respectively provided on the two halves of the auxiliary platform body 1, four fixing mechanisms 3 are provided, and the four fixing mechanisms 3 are provided in two groups of two, and the two groups of fixing mechanisms 3 are respectively provided on the two halves of the auxiliary platform body 1, and two calibration mechanisms 4 are provided, and the two calibration mechanisms 4 are respectively provided on the two fixing plates 2.
[0024] The fixing mechanism 3 is provided to facilitate the stable installation of the auxiliary platform 1, and the connecting mechanism 5 is used to facilitate its disassembly to improve practicality. In conjunction with the calibration mechanism 4, the accuracy of the pile foundation construction can be intuitively observed to improve the construction accuracy.
[0025] Further Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, it is worth specifically explaining that the fixing mechanism 3 includes a mounting block 301, the mounting block 301 is fixedly connected to the outer surface of the auxiliary platform body 1, a positioning rod 302 is fixedly connected to the bottom of the mounting block 301, a threaded rod 303 is internally threadedly connected to the mounting block 301, a nut 304 is fixedly connected to the top of the threaded rod 303, an extrusion block 305 is fixedly connected to the bottom end of the mounting block 301, a fixing frame 306 is fixedly connected to the positioning rod 302 and is arranged close to the bottom end, a movable block 307 is slidably arranged in the fixed frame 306, and the movable block The outer surface of 307 is fixedly connected with a clamping block 308, the bottom of the movable block 307 is fixedly connected with a connecting block 3110 and is arranged in the fixed frame 306, the outer side of the connecting block 3110 is fixedly installed with a spring telescopic rod 309 in the fixed frame 306, the threaded rod 303 is arranged in the positioning rod 302 through the mounting block 301, the extrusion block 305 is arranged in an arc surface, the upper part of the movable block 307 near one end of the extrusion block 305 is arranged in an arc surface, and four fixed frames 306 are arranged, and the four fixed frames 306 are evenly arranged on the positioning rod 302;
[0026] By rotating the nut 304, the threaded rod 303 moves in the positioning rod 302 through the mounting block 301, and then the extrusion block 305 squeezes the movable block 307, so that the movable block 307 slides in the fixed frame 306, and squeezes the clamping block 308, so that the clamping block 308 passes through the fixed frame 306 and contacts the ground, thereby improving the stability of the insertion of the positioning rod 302, thereby improving the stability of the pile foundation.
[0027] According to the above working process, it can be known that: by setting the fixing mechanism 3, the auxiliary platform body 1 can be stably installed, so that it can provide stable support for the auxiliary pile foundation, thereby ensuring the stability of the pile foundation.
[0028] Further Figure 1 , Figure 2 and Figure 5As shown, it is worth explaining in detail that the calibration mechanism 4 includes a mounting plate 401, which is fixedly connected to the top outer side of the fixed plate 2, a calibration rope 402 is fixedly connected to the bottom of the mounting plate 401, a counterweight block 403 is fixedly connected to the bottom end of the calibration rope 402, and the calibration rope 402 projects a calibration line 404 on the outer surface of the fixed plate 2.
[0029] Further Figure 1 and Figure 2 As shown, it is worth specifically explaining that the connecting mechanism 5 includes a hinge rod 505, which is arranged at the middle rear side of the two halves of the auxiliary platform body 1 and is hinged and rotated through the hinge rod 505. A positioning block 501 is fixedly connected to the left half of the front side of the auxiliary platform body 1 on the opposite side of the hinge rod 505, and a threaded hole 502 is opened on the positioning block 501. The positioning block 501 is correspondingly fixedly connected to the right half of the auxiliary platform body 1 with a connecting plate 503, and a bolt 504 matching the threaded hole 502 is threadedly connected to the connecting plate 503.
[0030] The auxiliary platform body 1 is opened by rotating the bolts 504, and the device is placed on the surface of the pile foundation. At this time, the auxiliary platform body 1 is closed and fixed by the bolts 504, and then the positioning rods 302 are inserted so that the four positioning rods 302 are inserted into the ground. At the same time, the deviation degree between the calibration rope 402 and the calibration line 404 can be used to observe whether the pile foundation is vertical, so as to facilitate corresponding adjustments to improve the accuracy of construction.
[0031] This solution has the following working process: when this device is used, the auxiliary platform body 1 is opened by rotating the bolt 504, and the device is sleeved on the surface of the pile foundation. At this time, the auxiliary platform body 1 is closed and fixed by the bolt 504, and then the positioning rod 302 is inserted so that the four positioning rods 302 are inserted into the ground. At the same time, the deviation degree between the calibration rope 402 and the calibration line 404 can be used to observe whether the pile foundation is vertical, so as to facilitate corresponding adjustment. At the same time, the threaded rod 303 is moved in the positioning rod 302 through the mounting block 301 by rotating the nut 304, so that the extrusion block 305 squeezes the movable block 307, so that the movable block 307 slides in the fixed frame 306, and the clamping block 308 is squeezed so that the clamping block 308 passes through the fixed frame 306 and contacts the ground, thereby improving the stability of the insertion of the positioning rod 302 and improving the stability of the pile foundation.
[0032] In summary: through the setting of the fixing mechanism 3, it is convenient to stably install the auxiliary platform 1, so that it can provide stable support for the auxiliary pile foundation, thereby ensuring the stability of the pile foundation. Through the setting of the calibration mechanism 4, it is convenient to intuitively observe whether the auxiliary pile foundation maintains vertical construction, so as to facilitate construction. At the same time, through the connection mechanism 5, it is convenient to disassemble the device on the pile foundation, so as to facilitate later construction work.
Claims
1. A pile foundation construction auxiliary platform for foundation engineering, comprising an auxiliary platform body (1), characterized in that: A connecting mechanism (5) is arranged in the middle of the auxiliary platform body (1); a fixing plate (2) is fixedly connected to the inner surface of the auxiliary platform body (1); a fixing mechanism (3) is fixedly connected to the outer surface of the auxiliary platform body (1); and a calibration mechanism (4) is arranged on the outer surface of the fixing plate (2).
2. The pile foundation construction auxiliary platform for foundation engineering according to claim 1, characterized in that: The auxiliary platform body (1) is divided into two halves by a connecting mechanism (5); two fixing plates (2) are provided, which are respectively provided on the two halves of the auxiliary platform body (1); four fixing mechanisms (3) are provided, and the four fixing mechanisms (3) are provided in two groups, and the two groups of fixing mechanisms (3) are respectively provided on the two halves of the auxiliary platform body (1); two calibration mechanisms (4) are provided, and the two calibration mechanisms (4) are respectively provided on the two fixing plates (2).
3. The pile foundation construction auxiliary platform for foundation engineering according to claim 1, characterized in that: The fixing mechanism (3) comprises a mounting block (301), wherein the mounting block (301) is fixedly connected to the outer surface of the auxiliary platform body (1), a positioning rod (302) is fixedly connected to the bottom of the mounting block (301), a threaded rod (303) is internally threadedly connected to the mounting block (301), a nut (304) is fixedly connected to the top of the threaded rod (303), an extrusion block (305) is fixedly connected to the bottom of the mounting block (301), a fixing frame (306) is fixedly connected to the positioning rod (302) and is arranged close to the bottom, a movable block (307) is slidably arranged in the fixing frame (306), a clamping block (308) is fixedly connected to the outer surface of the movable block (307), a connecting block (3110) is fixedly connected to the bottom of the movable block (307) and is arranged in the fixing frame (306), and a spring telescopic rod (309) is fixedly installed on the outside of the connecting block (3110) in the fixing frame (306).
4. The pile foundation construction auxiliary platform for foundation engineering according to claim 3, characterized in that: The threaded rod (303) is arranged in the positioning rod (302) through the mounting block (301); the extrusion block (305) is arranged in an arc-shaped surface; the upper part of the movable block (307) close to one end of the extrusion block (305) is arranged in an arc-shaped surface; four fixing frames (306) are arranged, and the four fixing frames (306) are evenly arranged on the positioning rod (302).
5. The pile foundation construction auxiliary platform for foundation engineering according to claim 1, characterized in that: The calibration mechanism (4) comprises a mounting plate (401), wherein the mounting plate (401) is fixedly connected to the top of the outer side of the fixing plate (2), a calibration rope (402) is fixedly connected to the bottom of the mounting plate (401), a counterweight (403) is fixedly connected to the bottom end of the calibration rope (402), and the calibration rope (402) projects a calibration line (404) onto the outer surface of the fixing plate (2).
6. The pile foundation construction auxiliary platform for foundation engineering according to claim 1, characterized in that: The connecting mechanism (5) comprises a hinge rod (505), the hinge rod (505) being arranged at the middle rear side of the two halves of the auxiliary platform body (1) and being hinged and rotated through the hinge rod (505), a positioning block (501) being fixedly connected to the left half of the front side of the auxiliary platform body (1) on the opposite side of the hinge rod (505), a threaded hole (502) being provided on the positioning block (501), a connecting plate (503) being fixedly connected to the right half of the auxiliary platform body (1) corresponding to the positioning block (501), a bolt (504) matching the threaded hole (502) being threadedly connected to the connecting plate (503).