Fabricated anchor rod steel frame
By using the prefabricated anchor steel frame made of square steel pipes, the problems of long construction period and difficult transportation of traditional anchor frames are solved, achieving fast and safe construction, suitable for emergency rescue and disaster relief scenarios, and reducing the cost of transportation and on-site assembly. Difficulty.
Patent Information
- Application Number
- CN202420156371.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-22
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-01-22
AI Technical Summary
The traditional lattice anchor frame has a long construction period and is difficult to meet the rapid disposal needs of emergency and disaster relief projects. Moreover, the precast concrete components are heavy and difficult to transport and handle.
It adopts a prefabricated anchor steel frame made of square steel pipes, which are connected by anchor rods and anchor heads to achieve rapid installation and hoisting, reducing high-altitude working time. The bolt-type fixation method is used to reduce bolts and welding operations and increase the amount of concrete at the intersection. layers to increase stiffness.
It achieves fast and safe construction, is suitable for mountain slopes, reduces artificial height working time and safety hazards, is suitable for rapid rescue and disaster relief scenarios, and reduces the difficulty of transportation and on-site assembly.
Smart Images

Figure CN221855512U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to an assembled anchor steel frame and belongs to the field of slope protection. Background Art
[0002] Lattice anchor frame or lattice anchor cable frame is a commonly used support method in slope support. Traditional lattice anchor frame or lattice anchor cable frame is generally composed of concrete steel frame beam, anchor rods or anchor cables. The anchor rods or anchor cables are set at the nodes of the frame beam. This method has a long construction period. The concrete steel frame beam is composed of the steps of erecting frame formwork, tying steel bars, pouring concrete, and curing concrete. It takes at least 28 days to complete these steps alone, and the construction process is cumbersome.
[0003] Especially for emergency rescue and disaster relief projects, quick disposal is often required. In this case, this support method is often difficult to meet the construction period requirements. At present, prefabricated components are used in advance, and the prefabricated concrete components are transported to the site for temporary assembly. However, the transportation of finished concrete products is time-consuming and labor-intensive, and difficult to carry. In emergency rescue and disaster relief projects, the soil around the mountain is loose, and the prefabricated concrete components are very heavy, making manual operation difficult.
[0004] Therefore, the utility model provides an assembled anchor steel frame which can be hoisted and quickly installed. Utility Model Content
[0005] In view of this, the purpose of the utility model is to provide an assembled anchor steel frame that can be hoisted and quickly installed.
[0006] The utility model is achieved in this way:
[0007] An assembled anchor steel frame comprises a plurality of first frame beams and second frame beams, wherein the first frame beams and the second frame beams intersect each other perpendicularly;
[0008] An anchor rod is provided at the intersection of the first frame beam and the second frame beam;
[0009] The anchor head is located at the intersection of the first frame beam and the second frame beam, and the anchor head is connected to the anchor rod.
[0010] As a further improvement, the first frame beam and the second frame beam are both formed by connecting a plurality of square steel pipes end to end.
[0011] As a further improvement, bolts are used at the joints between two adjacent square steel pipes.
[0012] As a further improvement, a through hole for the second frame beam or the first frame beam to pass through is opened at the intersection of the first frame beam or the second frame beam, so that the first frame beam and the second frame beam can cross each other perpendicularly.
[0013] As a further improvement, a concrete layer is provided inside the connection of the square steel pipe near the intersection of the first frame beam and the second frame beam.
[0014] As a further improvement, the anchor rod comprises an anchoring section and a free section, and the anchoring section and the free section are integrated.
[0015] As a further improvement, the anchoring section includes an anchor rod tip, a fixing sleeve, and a ring frame. Several fixing sleeves with hollow interiors are vertically welded to the top of the anchor rod tip. The fixing sleeves are distributed in a circular shape with equal distances around the center line of the anchor rod tip. A ring frame is fixed to the top of the fixing sleeve.
[0016] As a further improvement, the anchor rod tip is a hollow cone, and a plurality of openings are provided near the top of the cone.
[0017] As a further improvement, the free section comprises a plurality of steel bars fixed above the ring frame, and a second concrete layer wrapping the steel bars.
[0018] As a further improvement, the number of the steel bars is equal to the number of the fixing sleeves.
[0019] The beneficial effects of the utility model are:
[0020] ① The utility model replaces the frame beams made of concrete by adopting the first frame beam and the second frame beam made of square steel tubes, and anchor rods are arranged at the intersection of the first frame beam and the second frame beam, and are closed with anchor heads. The construction is convenient and can be hoisted or carried manually, which reduces the time of manual high-altitude work. The utility model is suitable for mountain slopes and other places where long-term manual high-altitude work is required and the danger is high. The construction speed is fast, and the equipment can be prefabricated in the factory and assembled on site without maintenance. The utility model is particularly suitable for rapid emergency rescue.
[0021] ② The utility model has a through hole for the second frame beam or the first frame beam to pass through at the intersection of the first frame beam or the second frame beam, so that the first frame beam and the second frame beam can cross each other vertically, and the latch-type mutual fixing method does not require bolts, welding, etc., which greatly reduces the time of high-altitude operations and reduces safety hazards to personnel.
[0022] ③ The utility model also provides a concrete layer inside the square steel pipe connection near the intersection of the first frame beam and the second frame beam to strengthen the rigidity of the intersection of the first frame beam and the second frame beam to avoid node damage or other problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 The utility model is a cross-sectional schematic diagram of an assembled anchor steel frame in use according to an embodiment of the utility model.
[0025] Figure 2 It is a partial plan view of an assembled anchor steel frame in a top view according to an embodiment of the utility model.
[0026] Figure 3 The utility model provides a schematic plan view of a square steel tube structure at a cross node of an assembled anchor steel frame according to an embodiment of the utility model.
[0027] Figure 4 The utility model provides a schematic diagram of the anchor rod structure of an assembled anchor rod steel frame.
[0028] Figure 5 The utility model provides a schematic diagram of the local structure of the anchor rod of an assembled anchor rod steel frame according to an embodiment of the present invention.
[0029] Figure 6 The utility model provides a schematic plan view of a square steel tube at a cross node of an assembled anchor steel frame according to an embodiment of the present invention. DETAILED DESCRIPTION
[0030] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the utility model. Therefore, the following detailed description of the embodiments of the utility model provided in the drawings is not intended to limit the scope of the utility model for which protection is sought, but merely represents the selected embodiments of the utility model. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the utility model.
[0031] In the description of the present invention, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0032] Reference Figure 1-Figure 6 As shown, this embodiment provides a specific implementation method for an assembled anchor steel frame, comprising a plurality of first frame beams 10 and second frame beams 20, wherein the first frame beams 10 and the second frame beams 20 intersect each other perpendicularly to form a cross node;
[0033] An anchor rod 30 is provided at the intersection of the first frame beam 10 and the second frame beam 20;
[0034] The anchor head 40 is located at the intersection of the first frame beam 10 and the second frame beam 20 , and the anchor head 40 is connected to the anchor rod 30 .
[0035] The utility model replaces the frame beams made of concrete by adopting the first frame beam 10 and the second frame beam 20 made of square steel tubes, and an anchor rod 30 is arranged at the intersection of the first frame beam 10 and the second frame beam 20, and is closed by an anchor head 40. The construction is convenient and can be hoisted or carried manually, which reduces the time of manual high-altitude work. The utility model is suitable for mountain slopes and other places where manual high-altitude work for a long time is required and the danger is high.
[0036] Moreover, the construction speed is fast, it can be prefabricated in the factory and assembled on site, and no maintenance is required, which makes it particularly suitable for rapid emergency rescue and disaster relief.
[0037] As a possible specific implementation of the present invention, the first frame beam 10 and the second frame beam 20 are both formed by connecting a plurality of square steel pipes 50 end to end.
[0038] Furthermore, the connection between two adjacent square steel pipes 50 is connected by bolts.
[0039] In a specific use environment, it is convenient for maintenance and replacement. The local rectangular square steel pipe can be replaced by removing the bolts to achieve maintenance and care of the first frame beam 10 or the second frame beam 20.
[0040] As a possible specific implementation manner of the utility model, a through hole 70 for the second frame beam 20 or the first frame beam 10 to pass through is opened at the intersection position of the first frame beam 10 or the second frame beam 20, so that the first frame beam 10 and the second frame beam 20 can cross each other vertically, and the latch-type mutual fixing method does not require bolts, welding, etc., which greatly reduces the time of high-altitude operations and reduces safety hazards to personnel.
[0041] As a possible specific implementation of the utility model, a concrete layer 60 is also provided inside the connection of the square steel pipe 50 near the intersection of the first frame beam 10 and the second frame beam 20 to strengthen the rigidity of the intersection of the first frame beam 10 and the second frame beam 20 to avoid node damage or other problems.
[0042] As a possible specific implementation of the present invention, the anchor rod 30 includes an anchoring section 301 and a free section 302, and the anchoring section 301 and the free section 302 are integrated.
[0043] Furthermore, the anchoring section 301 includes an anchor tip 311, a fixing sleeve 312, and a ring frame 313. A plurality of fixing sleeves 312 with hollow interiors are vertically welded to the top of the anchor tip 311. The fixing sleeves 312 are distributed in a circular shape with equal distances around the center line of the anchor tip 311. The ring frame 313 is fixed to the top of the fixing sleeve 312.
[0044] The design of the anchoring section 301 makes it convenient to put the anchoring section 301 directly into the hole drilled in the mountain, and it is also more convenient to be fixed after pouring concrete later, and it is not easy to fall off the mountain.
[0045] Furthermore, the anchor tip 311 is a hollow cone, and a plurality of openings 314 are provided near the top of the cone, so that after pouring the slow-setting soil later, concrete leaks from the openings 314 and contacts the mountain to achieve fixation.
[0046] Furthermore, the free section 302 includes a plurality of steel bars 315 fixed above the ring frame 313 , and a second concrete layer 316 wrapping the steel bars 315 .
[0047] Furthermore, the number of the steel bars 315 is equal to the number of the fixing sleeves 312 , so that the steel bars 315 are conveniently fixed to the fixing sleeves 312 after passing through the ring frame 313 .
[0048] In the specific implementation process, the length of the steel bar 315 changes with the condition of the mountain. For example, if there are many cracks in the mountain, the longer the anchor rod is, the deeper it can penetrate into the relatively solid rock inside the mountain. Conversely, if there are fewer cracks in the mountain, the shorter the anchor rod is.
[0049] The concrete layer 60 in the above description is cast by fine stone concrete, and the second concrete layer 316 is cement slurry.
[0050] The specific construction steps of this utility model are:
[0051] S1, prepare various construction materials, process the square steel pipe 50, and drill holes for accommodating the anchor rods 30 on the mountain that needs to be reinforced;
[0052] S2, placing anchor rods or anchor cables into the drilled holes;
[0053] S3, injecting cement slurry into the drill hole to form a second concrete layer 316;
[0054] S4, installing the first frame beam 10 and the second frame beam 20 in a cross shape at the hole, specifically: a through hole 70 for the second frame beam 20 or the first frame beam 10 to pass through is opened at the intersection of the first frame beam 10 or the second frame beam 20, so that the first frame beam 10 and the second frame beam 20 can cross each other perpendicularly to form a cross shape;
[0055] S5, connecting the remaining flat or vertical square steel pipes of the first frame beam 10 and the second frame beam 20 between two adjacent cross nodes according to the design size; that is, fixing two adjacent square steel pipes by bolts and welding so that the end to end are connected to form the first frame beam 10 or the second frame beam 20;
[0056] S6, pouring fine stone concrete at the intersection of the first frame beam 10 and the second frame beam 20 to form a concrete layer 60 to strengthen the rigidity of the cross node;
[0057] S7, tensioning and locking anchor rod 30; construction anchor head 40, smooth and beautiful appearance.
[0058] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An assembled anchor steel frame, characterized in that: It comprises a plurality of first frame beams (10) and second frame beams (20), wherein the first frame beams (10) and the second frame beams (20) intersect each other perpendicularly; An anchor rod (30), the anchor rod (30) being arranged at a cross position of the first frame beam (10) and the second frame beam (20); An anchor head (40) is located at the intersection of the first frame beam (10) and the second frame beam (20), and the anchor head (40) is connected to the anchor rod (30); The first frame beam (10) and the second frame beam (20) are both formed by connecting a plurality of square steel pipes (50) end to end.
2. The assembled anchor steel frame according to claim 1, characterized in that: The connection between two adjacent square steel pipes (50) is connected by bolts.
3. The assembled anchor steel frame according to claim 2, characterized in that: A through hole (70) for the second frame beam (20) or the first frame beam (10) to pass through is opened at the intersection of the first frame beam (10) or the second frame beam (20), so that the first frame beam (10) and the second frame beam (20) can cross each other perpendicularly.
4. The assembled anchor steel frame according to claim 2, characterized in that: A concrete layer (60) is also provided inside the connection of the square steel pipe (50) near the intersection of the first frame beam (10) and the second frame beam (20).
5. The assembled anchor steel frame according to claim 1, characterized in that: The anchor rod (30) comprises an anchoring section (301) and a free section (302), and the anchoring section (301) and the free section (302) are integrated.
6. The assembled anchor steel frame according to claim 5, characterized in that: The anchoring section (301) comprises an anchor rod tip (311), a fixing sleeve (312), and a ring frame (313); a plurality of fixing sleeves (312) with hollow interiors are vertically welded to the top of the anchor rod tip (311); the fixing sleeves (312) are distributed in a circular shape with equal distances around the center line of the anchor rod tip (311); and the ring frame (313) is fixed to the top of the fixing sleeve (312).
7. The assembled anchor steel frame according to claim 6, characterized in that: The anchor rod tip (311) is a hollow cone, and has a plurality of openings (314) near the top of the cone.
8. The assembled anchor steel frame according to claim 5, characterized in that: The free section (302) includes a plurality of steel bars (315) fixed above a ring frame (313), and a second concrete layer (316) wrapping the steel bars (315).
9. The assembled anchor steel frame according to claim 8, characterized in that: The number of the steel bars (315) is equal to the number of the fixing sleeves (312).