Pile foundation reinforcement cage positioning platform

By designing the pile foundation steel cage positioning platform and using positioning pins and push-pull positioning clamps to accurately determine the center of the steel cage, the problems of large human errors and construction safety hazards in the existing technology have been solved, and an efficient and safe pile foundation steel cage has been realized. Installation, suitable for complex structures and environments.

CN221855516UActive Publication Date: 2024-10-18NO 4 ENG CO LTD OF CHINA RAILWAY NO 9 GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323458198.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-10-18
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

The existing pile foundation steel cage positioning method has problems such as large human errors, many construction safety hazards, tight construction schedules, and poor adaptability. It is especially difficult to ensure construction quality and efficiency in the complex environment of cross-river and sea-crossing bridges.

Method used

A pile foundation steel cage positioning platform is designed, which includes positioning pins, a steel plate platform with a round hole in the center, back ribs, legs, horizontally slidingly connected positioning clamps and elastic reset parts. The center of the pile foundation is determined through four positioning holes. , using push-pull positioning clamps to accurately determine the center of the steel cage, reducing manual errors and providing a safe and reliable construction platform.

Benefits of technology

It effectively avoids rework caused by pile foundation deviation, improves construction efficiency, shortens the reinforcement cage alignment time, reduces hidden dangers for construction workers, is suitable for pile foundations of different sizes, and improves construction safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855516U_ABST
    Figure CN221855516U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of pile foundation reinforcement cage construction, and particularly relates to a pile foundation reinforcement cage positioning platform which comprises positioning plug pins, a steel plate platform with a round hole formed in the center, back ribs arranged on the lower side of the peripheral edge of the steel plate platform, a plurality of supporting legs arranged on the lower sides of the back ribs and positioning clamping plates horizontally connected to the back ribs in a sliding mode. A plurality of insertion holes are vertically formed in the positioning clamping plate; a fixing hole upwards penetrating through the steel plate platform is vertically formed in the middle of the back rib, the positioning plug pin can be inserted into the fixing hole and the different inserting holes to lock the position of the positioning clamping plate, and the positioning clamping plate can be locked after extending towards the circle center direction of the round hole by different lengths; the pile foundation center can be rapidly and accurately determined according to the pile diameter after the reinforcement cage is lowered, reworking caused by deviation of the pile foundation in the later period is avoided, it is guaranteed that the pile foundation construction progress is not affected, and meanwhile a safe and reliable construction platform is provided in the whole process from reinforcement cage hoisting to pile foundation pouring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pile foundation steel cage construction, and in particular relates to a pile foundation steel cage positioning platform. Background Art

[0002] Faced with cross-river and cross-sea bridges with complex construction technology and wading construction, engineering construction technology and processes are constantly innovating to continuously achieve a win-win situation of quality and efficiency. The pile foundation is the foundation of the entire bridge structure, and its construction quality is one of the key control points of the project. The accuracy of the steel cage installation is an important factor affecting the quality of pile foundation construction. At present, the positioning of the steel cage of bored piles and manually excavated piles is mainly carried out by manually pulling a cross line, which has a large human-caused error. When backfilling at the pile foundation construction site, it is easy to cause damage to the pile guard and affect the deviation of the pile foundation center. At the same time, due to frequent leakage backfilling and hole collapse, there are many safety hazards at the construction site. In addition, the project schedule is tight and the number of pile foundation construction is large. Ordinary installation technology can no longer adapt to the current bridge pile foundation construction with complex structure and large construction environment limitations. Summary of the invention

[0003] The purpose of the utility model is to overcome the deficiencies of the prior art and provide a pile foundation reinforcement cage positioning platform, which can quickly and accurately determine the center of the pile foundation according to the pile diameter after the reinforcement cage is lowered, avoiding rework caused by pile foundation deviation in the later stage, ensuring that the progress of pile foundation construction is not affected, and at the same time providing a safe and reliable construction platform for the whole process from reinforcement cage hoisting to pile foundation pouring.

[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0005] A pile foundation steel cage positioning platform, comprising a positioning pin, a steel plate platform with a circular hole in the center, a back rib arranged on the lower side of the four edges of the steel plate platform, a plurality of legs arranged on the lower side of the back rib, and a positioning clamping plate horizontally slidably connected to the back rib, wherein a plurality of plug holes are vertically opened on the positioning clamping plate;

[0006] A fixing hole is vertically opened in the middle of the back rib and passes upward through the steel plate platform. The positioning pin can be inserted into the fixing hole and different insertion holes to lock the position of the positioning card. The positioning card can be extended to different lengths toward the center of the circular hole and then locked.

[0007] Furthermore, the number of the positioning clamps is 3 to 8, and the positioning clamps are evenly arranged along the circumference of the circular hole.

[0008] Furthermore, positioning holes are provided at the four corners of the steel plate platform.

[0009] Furthermore, a telescopic hole is horizontally opened in the middle of the back rib, and the positioning clamp plate is penetrated through the telescopic hole.

[0010] Furthermore, the sockets are arranged in two rows along the length direction of the positioning card plate, the spacing between the two rows of sockets is 28 cm, and the spacing between adjacent sockets in each row of sockets is 10 cm.

[0011] Furthermore, the upper sliding connection of the positioning card plate is provided with a positioning tongue, and the positioning tongue can extend from the inner end of the positioning card plate; an elastic reset member is fixed to the lower side of the positioning tongue, and the outer end of the elastic reset member is connected to the positioning card plate, and the elastic reset member drives the inner end of the positioning tongue to extend toward the center of the circular hole.

[0012] Furthermore, an identification area is provided on the upper surface of the positioning tongue, and the identification area is divided into a plurality of sub-segments according to a given distance along the length direction of the positioning card plate, and each of the sub-segments is distinguished by a different mark.

[0013] Furthermore, the total length of the identification area along the length direction of the positioning card plate is smaller than the interval between two adjacent insertion holes.

[0014] Furthermore, the mark can be a color block, a graphic, a number, a letter, a text, or a different number of markers.

[0015] Furthermore, two slides are spaced apart on the lower side of the positioning card plate, a slide groove matching the slide is provided on the positioning tongue, a bottom film is fixed to the lower end of the slide, a front stop is provided at the inner end of the lower side surface of the positioning tongue, and both ends of the length of the elastic return member are respectively fixed on the bottom film and the front stop.

[0016] The beneficial effects of the utility model are:

[0017] The utility model can provide a safe and reliable construction platform, greatly reducing the hidden dangers of construction workers in the process of lowering steel cages and pouring pile foundations, and ensuring the safety of construction workers;

[0018] The utility model determines the center of the pile foundation through four positioning holes, and then determines the center of the steel cage according to the pile diameter through four push-pull positioning clamps, thereby eliminating the error caused by manual positioning, effectively avoiding rework caused by pile foundation deviation in the later stage, and accurately determining the center of the steel cage;

[0019] The utility model can save 0.3 to 0.6 hours of labor per person by installing a steel cage for each pile foundation, can shorten the steel cage alignment time by 15% to 30%, and improve construction efficiency; and has a wide range of applications, and is suitable for on-site installation of steel cages for highway, railway, and municipal bridge pile foundations, and is applicable to pile foundations of different sizes. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:

[0021] Figure 1 This is a schematic diagram of the structure of Example 1 of the utility model.

[0022] Figure 2 It is a bottom view structural schematic diagram of embodiment 1 of the utility model.

[0023] Figure 3 This is a schematic diagram of the top structure of Example 2 of the utility model.

[0024] Figure 4 This is a schematic structural diagram of the positioning tongue of Example 2 of the utility model.

[0025] In the figure, 1-steel plate platform, 2-back rib, 3-leg, 4-telescopic hole, 5-positioning card plate, 6-insertion hole, 7-positioning pin, 8-positioning hole, 9-positioning tongue, 10-slide groove, 11-mark, 12-slide, 13-bottom film, 14-front gear, 15-compression spring. DETAILED DESCRIPTION

[0026] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the present invention.

[0027] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connection" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0028] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.

[0029] Example 1

[0030] like Figure 1 to Figure 2 As shown, a pile foundation steel cage positioning platform comprises a positioning pin 7, a steel plate platform 1 with a circular hole in the center, a back rib 2 arranged on the lower side of the four edges of the steel plate platform 1, a plurality of legs 3 arranged on the lower side of the back rib 2, and a positioning card plate 5 horizontally slidably connected to the back rib 2, the positioning card plate 5 is flush, and a plurality of plug holes 6 are vertically opened on the positioning card plate 5; positioning holes 8 are opened at the four corners of the steel plate platform 1; the steel plate platform 1 can be a whole plate, or it can be composed of four quarter-sized steel plate platforms 1;

[0031] A fixing hole is vertically opened in the middle of the back rib 2 and passes upward through the steel plate platform 1. The positioning pin 7 can be inserted into the fixing hole and different insertion holes 6 to lock the position of the positioning card plate 5, and the positioning card plate 5 can be extended to different lengths in the direction of the center of the circular hole and then locked; before the steel cage is lowered, the positioning card plate 5 can be completely pulled out or pulled out to the maximum extent, and then the steel cage can be lowered, and then the positioning card plate 5 can be inserted into the telescopic hole 4 to push the steel cage to adjust the position of the steel cage.

[0032] like Figure 1 to Figure 2 As shown, the number of the positioning clamps 5 is 3 to 8, and the positioning clamps 5 are evenly arranged along the circumference of the circular hole. Preferably, the number of the positioning clamps 5 is 4, and each positioning clamp 5 is arranged in the middle of the dorsal rib 2.

[0033] like Figure 1 to Figure 2 As shown, a telescopic hole 4 is horizontally opened in the middle of the back rib 2 , and the positioning clamping plate 5 is penetrated through the telescopic hole 4 , and the positioning clamping plate 5 can be completely pulled out from the telescopic hole 4 .

[0034] like Figure 1 to Figure 2 As shown, the sockets 6 are arranged in two rows along the length direction of the positioning card plate 5, the spacing between the two rows of sockets 6 is 28 cm, and the spacing between adjacent sockets 6 in each row of sockets 6 is 10 cm.

[0035] In a specific embodiment, the length and width of the steel plate platform 1 are 240cm×240cm, and the inner diameter of the circular hole is 220cm; the positioning card plate 5 is cut from a 40cm wide×50cm long×1cm thick steel plate. The positioning card plate 5 is punched with two rows of steel bar sockets 6, with a longitudinal spacing of 10cm and a transverse spacing of 28cm, a total of 8 sockets 6, which are used to fix the positioning card plate 5 to extend to different lengths; the back rib 2 and the four legs 3 are welded with 10# channel steel, and a 42cm wide telescopic hole 4 is reserved on the back rib 2 for pushing and pulling the positioning card plate 5;

[0036] The use of the utility model includes the following steps:

[0037] Step 1: transport the positioning platform to the site along with the steel cage;

[0038] Step 2: Positioning platform in place: After the site is repaired, the surveyor measures and lays out four "cross" positioning points according to the position of the pile foundation, adjusts and places the positioning platform according to these four positioning points, and makes the intersection of the positioning platform axis coincide with the center of the pile foundation, using the positioning platform as a reference to ensure the accuracy of the center position of the pile foundation;

[0039] Step 3, positioning the positioning holes 8: After the positioning platform is placed, insert the fixed steel bars into the positioning holes 8 at the four corners, and insert them not less than 0.5m below the ground; before inserting the fixed steel bars, use square wood or steel to support the four legs 3, requiring the four legs 3 of the platform to be stable and firm, and use a level to measure the relative elevation of the four corners of the positioning platform to ensure that the steel plate platform 1 is level;

[0040] Step 4, lifting of the steel cage: After the positioning platform is in place, the lifting operation of the steel cage begins; a 25t truck crane is used to lift the steel frame into place; three-point lifting is adopted; the first lifting point is at the lower part of the frame, the second lifting point is set at the reinforcing stirrup in the middle of the steel cage, and the third lifting point is set at the first layer of reinforcing stirrups or determined according to the length of the steel frame and the specific conditions of the construction site; when lifting, first lift the first lifting point to lift the frame slightly, and lift it at the same time as the second and third lifting points; after the frame leaves the ground, the first and second lifting points stop lifting, and continue to lift the third point; as the third lifting point continues to rise, slowly relax the first and second lifting points until the frame is perpendicular to the ground, and stop lifting; when the frame enters the hole, it should be straightened and slowly lowered, and it is strictly forbidden to swing and hit the wall;

[0041] Step 4: After the last section of the steel cage is lowered, insert the positioning card 5 into the telescopic hole 4, adjust the positioning card 5 to make the center of the steel cage consistent with the center of the pile foundation, and then insert the positioning pin 7; after the welding of the steel cage suspension bar is completed, the crane continues to lower the steel cage, insert the steel rod at the lifting ring, and transfer the weight of the steel cage from the crane hook to the rigid positioning platform;

[0042] Step 5, pouring concrete for pile foundation: After the cast-in-place pile reinforcement cage is hoisted in place, the pile body concrete pouring construction is carried out. After the cast-in-place pile foundation is completed, the casing is pulled out, the outer sleeve of the driver is fixed to the top of the first section casing, the driver links the casing and reverses the rotation to lift it up, and then lifts the casing to the bottom of the Nth section casing to pull out the pile hole.

[0043] Application examples:

[0044] The Yingbin Road viaduct project of a certain airport includes a total of 2,234 bored piles, and the bored pile foundation uses C30 underwater concrete. Generally, two workers are required to locate the pile foundation reinforcement cage, and the installation of each pile foundation can save 0.3 to 0.6 labor costs. The labor unit price is calculated at 300 yuan. In this example project, there are 2,234 pile foundations, and the labor cost can be saved at least: 0.3×300×2,234=201,060 yuan. The application of this positioning platform solves the problems of the difficulty of accurate positioning of the pile foundation reinforcement cage and the lack of hardened floor on the working surface, greatly saving construction time, being safe and reliable, improving construction efficiency, saving costs, and achieving good results, which has been unanimously praised by the owner and the supervision unit.

[0045] The utility model has the following advantages:

[0046] 1. High safety: From steel cage hoisting to pile foundation pouring, the whole process provides a safe and reliable construction platform, which greatly reduces the hidden dangers of construction workers in the process of lowering steel cage and pile foundation pouring, and ensures the safety of construction workers;

[0047] 2. High accuracy: The center of the pile foundation is determined by four positioning holes 8, and then the center of the steel cage is determined by four push-pull positioning plates 5 according to the pile diameter, eliminating the error caused by manual positioning and effectively avoiding rework caused by pile foundation deviation in the later stage;

[0048] 3. Simple process: The positioning platform has a simple structure, is easy to use, and can be used repeatedly. The positioning platform can be transported to the site together with the steel cage transport vehicle and unloaded to the hole position, and the positioning operation is simple; when the utility model is working, the center position is first determined through the four positioning holes 8, and then the steel cage is hoisted and lowered to the designed elevation in the circular hole of the positioning platform, and finally the positioning clamping plate 5 is pushed to adjust the position of the steel cage so that the steel cage is in the center of the installation, so as to achieve the purpose of accurately and quickly positioning the installation steel cage;

[0049] 4. High construction efficiency: Generally, two workers are needed to position the steel cage of a pile foundation. With this technology, the installation of the steel cage for each pile foundation can save 0.3 to 0.6 hours per person, and the steel cage positioning time can be shortened by 15% to 30%;

[0050] 5. Wide range of applications: Suitable for on-site installation of steel cages for highway, railway and municipal bridge pile foundations, and can be applied to pile foundations of different sizes.

[0051] Example 2

[0052] This embodiment is another implementation based on Embodiment 1. The description of the same technical solutions as Embodiment 1 will be omitted, and only the technical solutions different from Embodiment 1 will be described.

[0053] In this embodiment 2, a positioning tongue 9 is also provided at the inner end of the positioning clamp 5. Since the spacing between the insertion holes 6 on the positioning clamp 5 is relatively large, it is necessary to estimate with the naked eye whether the distance between the steel cage and the inner end edge of the positioning clamp 5 is the same at the end of the steel cage centering. Therefore, in embodiment 2, the positioning tongue 9 can be used to quantitatively identify the distance from the positioning clamp 5 to the steel cage in the final steel cage centering step.

[0054] like Figure 3 to Figure 4 As shown, the upper sliding connection of the positioning card plate 5 is provided with a positioning tongue 9, and the positioning tongue 9 can extend from the inner end of the positioning card plate 5; an elastic reset member is fixed to the lower side of the positioning tongue 9, and the outer end of the elastic reset member is connected to the positioning card plate 5, and the elastic reset member drives the inner end of the positioning tongue 9 to extend toward the center of the circular hole; specifically, two slides 12 are arranged at intervals on the lower side of the positioning card plate 5, and a slide groove 10 matching the slide 12 is arranged on the positioning tongue 9, and a bottom plate 13 is fixed to the lower end of the slide 12, and a front stop 14 is arranged at the inner end of the lower side surface of the positioning tongue 9, and the length ends of the elastic reset member are respectively fixed on the bottom plate 13 and the front stop 14; the positioning tongue 9 can be fully retracted to the bottom of the positioning opening card plate, and when the positioning card plate 5 pushes the steel cage, the positioning tongue 9 on the positioning card plate 5 is in a fully retracted state; the elastic reset member can adopt a compression spring 15 or an elastic polyurethane block or an elastic rubber block.

[0055] like Figure 3 to Figure 4 As shown, an identification area is provided on the upper surface of the positioning tongue 9, and the identification area is divided into a plurality of sub-segments according to a given distance along the length direction of the positioning card plate 5, and each of the sub-segments is distinguished by a different mark 11; by seeing the exposed length of the identification area, the extended length of the positioning tongue 9 on each positioning card plate 5 can be clearly and conveniently compared, and then the positioning card plate 5 or other pushing components can be used to push the steel cage to adjust the center of the steel cage.

[0056] like Figure 3 to Figure 4 As shown, the total length of the identification area along the length direction of the positioning card plate 5 is less than the interval between two adjacent insertion holes 6; when the offset distance from the steel cage to the center of the circular hole is greater than the interval between the two insertion holes 6, the positioning pin 7 is adjusted by advancing the positioning hole 8 one grid, and when the offset distance from the steel cage to the center of the circular hole is less than the interval between the two insertion holes 6, the extended length of the positioning tongue 9 is compared, and then the position of the steel cage is manually adjusted.

[0057] like Figure 3 to Figure 4As shown, the mark 11 is used to distinguish different sub-blocks, to intuitively see the extension length of the positioning tongue 9 and whether the extension lengths of all the positioning tongues 9 are the same. The mark 11 can be a color block, a graphic, a number, a letter, a text, or a different number of marks 11. Figure 4 Different numbers of circular patterns are used to distinguish the positioning tongues 9 of each gear position.

[0058] It is to be understood that the above description is only exemplary and the embodiments of the present application do not limit this. The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model shall be within the scope of protection of the pending claims of the present utility model.

Claims

1. A pile foundation steel cage positioning platform, characterized by: It comprises a positioning pin (7), a steel plate platform (1) with a circular hole in the center, a back rib (2) arranged on the lower side of the four edges of the steel plate platform (1), a plurality of legs (3) arranged on the lower side of the back rib (2), and a positioning card (5) horizontally slidably connected to the back rib (2), wherein the positioning card (5) is vertically provided with a plurality of insertion holes (6); A fixing hole is vertically opened in the middle of the back rib (2) and passes upward through the steel plate platform (1). The positioning pin (7) can be inserted into the fixing hole and different insertion holes (6) to lock the position of the positioning card plate (5). The positioning card plate (5) can be extended to different lengths in the direction of the center of the circular hole and then locked.

2. The pile foundation steel cage positioning platform according to claim 1 is characterized in that: The number of the positioning clamping plates (5) is 3 to 8, and the positioning clamping plates (5) are evenly arranged along the circumference of the circular hole.

3. The pile foundation steel cage positioning platform according to claim 1, characterized in that: Positioning holes (8) are provided at the four corners of the steel plate platform (1).

4. The pile foundation steel cage positioning platform according to claim 1, characterized in that: A telescopic hole (4) is horizontally opened in the middle of the back rib (2), and the positioning clamping plate (5) is arranged to penetrate the telescopic hole (4).

5. The pile foundation reinforcement cage positioning platform according to claim 1, characterized in that: The sockets (6) are arranged in two rows along the length direction of the positioning card plate (5), the spacing between the two rows of sockets (6) is 28 cm, and the spacing between adjacent sockets (6) in each row of sockets (6) is 10 cm.

6. The pile foundation steel cage positioning platform according to claim 1, characterized in that: The upper portion of the positioning card plate (5) is slidably connected to a positioning tongue (9), and the positioning tongue (9) can extend from the inner end of the positioning card plate (5); an elastic reset member is fixed to the lower side of the positioning tongue (9), and the outer end of the elastic reset member is connected to the positioning card plate (5), and the elastic reset member drives the inner end of the positioning tongue (9) to extend toward the center of the circular hole.

7. The pile foundation reinforcement cage positioning platform according to claim 6, characterized in that: An identification area is provided on the upper surface of the positioning tongue (9), and the identification area is divided into a plurality of sub-segments at a given distance along the length direction of the positioning card plate (5), and each sub-segment is distinguished by a different mark (11).

8. The pile foundation reinforcement cage positioning platform according to claim 7, characterized in that: The total length of the identification area along the length direction of the positioning card plate (5) is less than the interval between two adjacent insertion holes (6).

9. The pile foundation reinforcement cage positioning platform according to claim 7, characterized in that: The mark (11) can be a color block, a graphic, a number, a letter, a text, or a different number of marks (11).

10. The pile foundation reinforcement cage positioning platform according to claim 7, characterized in that: Two slides (12) are arranged at intervals on the lower side of the positioning card plate (5); a slide groove (10) matching the slide (12) is arranged on the positioning card tongue (9); a bottom plate (13) is fixed to the lower end of the slide (12); a front stop (14) is arranged at the inner end of the lower side surface of the positioning card tongue (9); and the two ends of the length of the elastic return member are respectively fixed to the bottom plate (13) and the front stop (14).