Positioning deviation prevention equipment for pile foundation construction

By using a combination of upper positioning steel bars, lower positioning steel bars and pre-cast concrete seats during pile foundation construction, combined with an adjustable support rod mechanism, the problem of insufficient structural strength of the existing equipment is solved, and more stable pile foundation positioning and Higher stability.

CN221855518UActive Publication Date: 2024-10-18SHANDONG SHENJI CONSTR ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202420186189.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-10-18
Estimated Expiration
2034-01-25

AI Technical Summary

Technical Problem

The existing positioning and anti-deviation equipment for pile foundation construction has insufficient support structure strength and small contact area, resulting in poor positioning effect. Especially when the soil is soft or there is a lot of shallow groundwater, the stability of the pile foundation is difficult to ensure.

Method used

A device including upper positioning steel bars, lower positioning steel bars, precast concrete seats, horizontal threaded rods, movable plates, support rods and reinforced ribs is designed. Through the combination of precast concrete and steel bars, stable underground positioning is provided, and The adjustable support positioning mechanism ensures stable support at the bottom of the pile foundation.

Benefits of technology

Through the enhanced structural design and the use of pre-cast concrete seats, this equipment improves the stability and overall positioning effect of the underground part of the pile foundation. It can provide more stable support in soft soil or shallow groundwater conditions, ensuring the stability of the pile foundation. Stability and positioning accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855518U_ABST
    Figure CN221855518U_ABST
Patent Text Reader

Abstract

The utility model discloses a pile foundation construction positioning deviation prevention device which comprises a pile foundation body, an upper positioning steel bar and a lower positioning steel bar are fixedly installed on the side face of the bottom end of the pile foundation body, a horizontal threaded rod penetrates through a hole formed in a movable plate, and the top end of a supporting rod is rotationally connected with the bottom face of an installation plate. Reinforcing rib plates are fixedly mounted on the two sides of the mounting plate, a mounting hole is formed in the vertical part of the mounting plate in a penetrating mode, the inner wall of the mounting hole is attached to a connecting bolt, a fastening nut is mounted at one end of the connecting bolt, the other end of the connecting bolt is fixed to the outer side face of a locking clamp, and the locking clamp is fixed to the pile foundation body in a surrounding mode. According to the positioning deviation-preventing equipment for pile foundation construction, a novel structural design is adopted, the underground part of a pile foundation is positioned and fixed by matching pre-cast concrete with steel bars, and the bottom of the pile foundation is stably supported and positioned by matching with a supporting and positioning mechanism which is mounted at the top and is adjustable in height and inclination angle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile foundation positioning, in particular to a positioning and anti-deviation device for pile foundation construction. Background Art

[0002] Pile foundation refers to a type of foundation in a building, that is, a deep foundation composed of a series of piles and caps. The function of the pile foundation is to transfer the building load to the underlying soil to reduce the pressure of the building on the ground. When the soil of some foundations is loose or there is a lot of shallow groundwater, positioning and anti-deviation equipment is required to position and fix the pile foundation.

[0003] The existing positioning and anti-deviation equipment for pile foundation construction, such as the authorized Chinese utility model patent with publication number CN219653712U, entitled "A pile foundation positioning and anti-deviation device for pile foundation engineering", only supports and positions the upper part of the pile foundation through a simple support rod, and the support structure is not strong enough, the contact area with the pile foundation is small, and the overall positioning effect is ineffective. Therefore, it is necessary to design a positioning and anti-deviation equipment for pile foundation construction to address the above problems. Utility Model Content

[0004] The purpose of the utility model is to provide a positioning and anti-deviation device for pile foundation construction, so as to solve the problem in the above background technology that the existing positioning and anti-deviation device for pile foundation construction only supports and positions the upper part of the pile foundation by simple support rods, and the support structure is insufficient in strength, the contact area with the pile foundation is small, and the overall positioning effect is ineffective.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a positioning and anti-deviation device for pile foundation construction, comprising a pile basic body, wherein an upper positioning steel bar and a lower positioning steel bar are fixedly installed on the side surface of the bottom end of the pile basic body, and the ends of the upper positioning steel bar and the lower positioning steel bar are both arranged in a precast concrete seat, and the precast concrete seat is arranged in a precast pit, and a horizontal threaded rod is fixedly installed on the top surface of the precast concrete seat, and the horizontal threaded rod passes through a hole opened on a movable plate, and the bottom surface of the movable plate is fitted with the top surface of the precast concrete seat, and a support rod is rotatably installed on the top surface of the movable plate, and the top end of the support rod is rotatably connected to the bottom surface of the mounting plate, and reinforcing rib plates are fixedly installed on both sides of the mounting plate, and a mounting hole is penetrated through the vertical part of the mounting plate, and the inner wall of the mounting hole is fitted with a connecting bolt, and a fastening nut is installed on one end of the connecting bolt, and the other end of the connecting bolt is fixed on the outer side surface of a locking card, and the locking card is surrounded and fixed on the pile basic body.

[0006] Preferably, the upper positioning steel bars and the lower positioning steel bars are located in the same vertical plane, and the upper positioning steel bars and the lower positioning steel bars are distributed at equal angles on both sides of the pile basic body with respect to the center of the pile basic body.

[0007] Preferably, the length of the connection portion between the upper positioning steel bars and the lower positioning steel bars and the precast concrete seat is greater than half the length of the precast concrete seat, and the precast concrete seat is symmetrically distributed about the pile base.

[0008] Preferably, locking nuts are installed on the horizontal threaded rods, and the locking nuts are symmetrically distributed about the center of the movable plate.

[0009] Preferably, the movable plate is threadedly connected to the horizontal threaded rods, the horizontal threaded rods are distributed at equal intervals, and support rods are installed at equal intervals on the top surface of the movable plate.

[0010] Preferably, the front view shape of the mounting plate is an "L" shape, and the vertical portion of the mounting plate is symmetrically provided with mounting holes.

[0011] Compared with the prior art, the utility model has the following beneficial effects: the positioning and anti-deviation equipment for pile foundation construction adopts a new structural design, and the part of the pile foundation located underground is positioned and fixed by precast concrete combined with steel bars, and the support and positioning mechanism with adjustable height and inclination angle installed on the top is used to stably support and position the bottom of the pile foundation;

[0012] 1. The upper and lower positioning steel bars are connected to the precast concrete seat in the precast pit to form a whole, and the underground part of the pile body is stably positioned and fixed, which can improve the overall stability of the pile body when the foundation soil is soft or there is a lot of shallow groundwater;

[0013] 2. The locking card can be installed at a suitable height on the pile base by sliding the movable plate along the horizontal threaded rod and rotating the support rod to adjust the inclination angle. At the same time, the movable plate is squeezed and locked by symmetrically distributed locking nuts, the support rods are evenly spaced, and the mounting plate of the symmetrically installed reinforcing rib plate can stably support and position the locking card and the above-ground part of the pile base. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the front view structure of the utility model;

[0015] Figure 2 This is a schematic diagram of the front cross-sectional structure of the utility model;

[0016] Figure 3 This is a schematic diagram of the top view structure of the utility model;

[0017] Figure 4 It is a schematic diagram of the top cross-sectional structure of the upper positioning steel bars, the lower positioning steel bars and the precast concrete seat of the utility model.

[0018] In the figure: 1. Pile basic body; 2. Upper positioning steel bar; 3. Lower positioning steel bar; 4. Precast concrete seat; 5. Precast pit; 6. Horizontal threaded rod; 7. Locking nut; 8. Movable plate; 9. Support rod; 10. Mounting plate; 11. Reinforcement plate; 12. Mounting hole; 13. Connecting bolt; 14. Fastening nut; 15. Locking card. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] See also Figure 1-4 The utility model provides a technical solution: a positioning and anti-deviation device for pile foundation construction, including a pile basic body 1, an upper positioning steel bar 2, a lower positioning steel bar 3, a precast concrete seat 4, a precast pit 5, a horizontal threaded rod 6, a locking nut 7, a movable plate 8, a support rod 9, a mounting plate 10, a reinforcing rib plate 11, a mounting hole 12, a connecting bolt 13, a fastening nut 14 and a locking card 15. The upper positioning steel bar 2 and the lower positioning steel bar 3 are fixedly installed on the side of the bottom end of the pile basic body 1. The ends of the upper positioning steel bar 2 and the lower positioning steel bar 3 are both arranged in the precast concrete seat 4, the precast concrete seat 4 is arranged in the precast pit 5, and the precast concrete A horizontal threaded rod 6 is fixedly installed on the top surface of the soil seat 4, and the horizontal threaded rod 6 passes through the hole opened on the movable plate 8. The bottom surface of the movable plate 8 fits with the top surface of the precast concrete seat 4. A support rod 9 is rotatably installed on the top surface of the movable plate 8. The top end of the support rod 9 is rotatably connected to the bottom surface of the mounting plate 10. Reinforcing rib plates 11 are fixedly installed on both sides of the mounting plate 10. A mounting hole 12 is penetrated through the vertical part of the mounting plate 10. The inner wall of the mounting hole 12 fits with the connecting bolt 13. A fastening nut 14 is installed at one end of the connecting bolt 13, and the other end of the connecting bolt 13 is fixed to the outer side of the locking card 15, and the locking card 15 is surrounded and fixed on the pile basic body 1.

[0021] In this example, the upper positioning steel bars 2 and the lower positioning steel bars 3 are on the same vertical plane, and are distributed at equal angles on both sides of the pile basic body 1 about the center of the pile basic body 1. The above-mentioned structural design enables multiple upper positioning steel bars 2 and lower positioning steel bars 3 to be connected to the precast concrete seat 4, so as to stably position the underground part of the pile basic body 1.

[0022] The length of the connection part between the upper positioning steel bars 2 and the lower positioning steel bars 3 and the precast concrete seat 4 is greater than half the length of the precast concrete seat 4, and the precast concrete seat 4 is symmetrically distributed about the pile basic body 1. The above-mentioned structural design ensures that the connection strength between the upper positioning steel bars 2 and the lower positioning steel bars 3 and the precast concrete seat 4 is sufficient, and can effectively limit and prevent the underground part of the pile basic body 1 from deviation from both sides.

[0023] A locking nut 7 is installed on the horizontal threaded rod 6, and the locking nut 7 is symmetrically distributed about the center of the movable plate 8. The above-mentioned structural design enables the locking nut 7 to be easily rotated and displaced, squeezing the movable plate 8 from both sides, and quickly and stably fixing the relative position of the movable plate 8 and the horizontal threaded rod 6.

[0024] The movable plate 8 is threadedly connected to the horizontal threaded rod 6, the horizontal threaded rod 6 is evenly spaced, and support rods 9 are evenly spaced installed on the top surface of the movable plate 8. The above structural design enables the horizontal threaded rod 6 to stably support and position the movable plate 8, and the movable plate 8 and the support rod 9 can stably support and position the mounting plate 10 and the locking card 15.

[0025] The front view shape of the mounting plate 10 is an "L" shape, and the vertical part of the mounting plate 10 is symmetrically provided with mounting holes 12. The above-mentioned structural design enables the mounting plate 10 to provide a stable mounting base for the support rod 9, and can be stably connected to the connecting bolts 13 fixed to the outer side of the locking card 15 through the mounting holes 12, thereby ensuring the overall stability of the supporting structure.

[0026] Working principle: When the device is installed, the pile basic body 1, the upper positioning steel bar 2 and the lower positioning steel bar 3 are already Figure 2 As shown, the pile body 1 is buried in the foundation soil, precast pits 5 are dug in the foundation on both sides of the pile body 1, concrete is poured into the precast pits 5, and the concrete solidifies to form a precast concrete seat 4. The precast concrete seat 4 forms an integrated structure with the upper positioning steel bars 2 and the lower positioning steel bars 3 to limit the underground part of the pile body 1 and prevent deviation;

[0027] Then, fit the vertical part of the mounting plate 10 with the outer side of the locking card 15, insert the connecting bolt 13 into the mounting hole 12, install the fastening nut 14 at the end of the connecting bolt 13 and screw it in, connect and fix the mounting plate 10 and the locking card 15, then rotate the locking nut 7 away from both sides of the movable plate 8, push the movable plate 8 to slide horizontally along the horizontal threaded rod 6, and synchronously rotate the support rod 9 to change the installation height of the mounting plate 10 and the locking card 15 until the installation height of the mounting plate 10 and the locking card 15 is appropriate, fit the inner side of the symmetrically distributed locking card 15 with the pile basic body 1, and fit the ends of the symmetrically distributed locking card 15, and use bolts and nuts to close and connect the locking card 15 to the pile basic body 1. Figure 3In the state shown, the locking card 15 is fixed at a suitable position on the pile basic body 1, and the rotationally symmetrically distributed locking nuts 7 squeeze the two sides of the movable plate 8 to fix the horizontal position of the movable plate 8. The movable plate 8, the support rod 9, the mounting plate 10 and the locking card 15 stably support and position the above-ground part of the pile basic body 1. This is the working principle of the positioning and anti-deviation equipment for pile foundation construction.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A positioning and anti-deviation device for pile foundation construction, comprising a pile foundation body (1), characterized in that: An upper positioning steel bar (2) and a lower positioning steel bar (3) are fixedly installed on the side surface of the bottom end of the pile basic body (1), and the ends of the upper positioning steel bar (2) and the lower positioning steel bar (3) are both arranged in a precast concrete seat (4), and the precast concrete seat (4) is arranged in a precast pit (5). A horizontal threaded rod (6) is fixedly installed on the top surface of the precast concrete seat (4), and the horizontal threaded rod (6) passes through a hole provided on the movable plate (8). The bottom surface of the movable plate (8) is in contact with the top surface of the precast concrete seat (4), and the top surface of the movable plate (8) is rotated. A support rod (9) is installed, the top end of the support rod (9) is rotatably connected to the bottom surface of the mounting plate (10), and reinforcing rib plates (11) are fixedly installed on both sides of the mounting plate (10). A mounting hole (12) is penetrated through the vertical part of the mounting plate (10), and the inner wall of the mounting hole (12) is in contact with a connecting bolt (13). A fastening nut (14) is installed at one end of the connecting bolt (13), and the other end of the connecting bolt (13) is fixed to the outer side surface of a locking card (15), and the locking card (15) is surrounded and fixed on the pile basic body (1).

2. The positioning and anti-deviation device for pile foundation construction according to claim 1, characterized in that: The upper positioning steel bars (2) and the lower positioning steel bars (3) are located on the same vertical plane, and the upper positioning steel bars (2) and the lower positioning steel bars (3) are distributed at equal angles on both sides of the pile basic body (1) about the center of the pile basic body (1).

3. The positioning and anti-deviation device for pile foundation construction according to claim 1, characterized in that: The length of the connection portion between the upper positioning steel bar (2) and the lower positioning steel bar (3) and the precast concrete seat (4) is greater than half the length of the precast concrete seat (4), and the precast concrete seat (4) is symmetrically distributed with respect to the pile basic body (1).

4. The positioning and anti-deviation device for pile foundation construction according to claim 1, characterized in that: The horizontal threaded rod (6) is provided with a locking nut (7), and the locking nut (7) is symmetrically distributed about the center of the movable plate (8).

5. The positioning and anti-deviation device for pile foundation construction according to claim 1, characterized in that: The movable plate (8) is threadedly connected to the horizontal threaded rod (6), the horizontal threaded rods (6) are distributed at equal intervals, and support rods (9) are installed at equal intervals on the top surface of the movable plate (8).

6. The positioning and anti-deviation device for pile foundation construction according to claim 1, characterized in that: The front view shape of the mounting plate (10) is an "L" shape, and the vertical portion of the mounting plate (10) is symmetrically provided with mounting holes (12).

Citation Information