Power transmission concrete pole foundation
By introducing structures such as steel casings, connecting beams, adjusting joists, and reaction beams on the basis of cement double poles, and using adjusting screws for adjustment, the problem of deformation of transmission cement poles in weak geological areas has been solved, and reinforcement and leveling has been achieved. , ensuring the safe and stable operation of transmission lines and protecting the strength and durability of cement poles.
Patent Information
- Application Number
- CN202420403117.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-01
AI Technical Summary
The foundation of transmission cement poles is prone to deformation and uneven settlement during sand dune flow in weak geological areas or during coal mining, resulting in tilt and affecting the safe and stable operation of transmission lines. Existing reinforcement and leveling methods require power outage or destruction of the original cement poles, causing damage. Its strength and durability.
Adopt a cement double-pole infrastructure, including steel casings, connecting beams, adjusting joists, reaction beams and adjusting screws. Through preset intervals and adjustable structural design, the cement poles are reinforced and leveled to maintain their horizontal plane. Stable and avoid damaging the original cement pole.
It realizes simple reinforcement and leveling when the cement poles undergo uneven deformation or settlement, ensuring the safe and stable operation of the transmission line without damaging the strength and durability of the cement poles themselves.
Smart Images

Figure CN221855584U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of electric power transmission, in particular to a power transmission cement pole foundation. Background Art
[0002] When the transmission cement pole foundation is built in areas with soft geology such as moving sand dunes and mining-affected areas, the cement pole foundation will often undergo varying degrees of deformation and uneven settlement during the movement of sand dunes and coal mining, causing the cement pole to tilt and affecting the safe and stable operation of the transmission line.
[0003] At present, the reinforcement and leveling of the cement double-pole foundation basically involves power outage and manual straightening when deformation occurs, and replacement if the deformation is serious. There are also methods of embedding reinforcement into the cement pole and connecting it to the newly added concrete structure. In this method, when the original cement double pole is connected to the newly added concrete structure, the concrete and main pole of the original cement pole need to be destroyed, affecting the strength and durability of the cement pole itself. Utility Model Content
[0004] The utility model provides a power transmission cement pole foundation, which solves the problem that when the power transmission cement pole foundation is tilted, it is difficult to level it, which affects the strength and durability of the cement pole itself.
[0005] In order to solve the above technical problems, the technical solution of the utility model is as follows:
[0006] A power transmission cement pole foundation, comprising:
[0007] A cement double rod, the cement double rod comprising a first cement rod and a second cement rod;
[0008] The first cement rod and the second cement rod are both provided with a steel casing;
[0009] A connecting beam fixed to the first cement rod and the second cement rod through the steel casing;
[0010] an adjustable joist fixed at both ends of the connecting beam;
[0011] A reaction beam fixed to the bottom of the first cement rod and the second cement rod, with a preset interval between the connecting beam and the reaction beam;
[0012] A plurality of adjusting screws pass through the adjusting support beam and are fixedly connected to the reaction beam.
[0013] Optionally, the steel casing is welded to the first cement pole and the second cement pole;
[0014] Fixed steel bars are arranged on the outer surface of the steel casing, and the fixed steel bars are arranged perpendicular to the first cement rod and the second cement rod.
[0015] Optionally, the connecting beam and the adjusting support beam form an I-shaped structure;
[0016] The connecting beam is cast and fixed to the first cement rod and the second cement rod through the fixed steel bars on the outer surface of the steel casing.
[0017] Optionally, a plurality of through holes are preset on the connecting beam, so that the top end of the adjusting screw passes through the through hole and extends out of the end surface of the connecting beam.
[0018] Optionally, the reaction beam is cast and fixed at the bottom of the first cement rod and the second cement rod, and the connecting beam is arranged parallel to the reaction beam.
[0019] Optionally, the reaction beam is a square structure with a plurality of reserved holes provided at its edge, and the bottom of the adjusting screw is fixed inside the reaction beam through the reserved holes.
[0020] Optionally, the adjusting screw includes a fixed anchor and an adjusting rod, and the fixed anchor and the adjusting rod are fixedly connected;
[0021] The adjusting rod is provided with a fixing assembly, and the adjusting support beam is connected with the adjusting rod through the fixing assembly.
[0022] Optionally, the fixing anchor is an inverted "T"-shaped structure, and an anchor plate is fixed to the end of the fixing anchor;
[0023] The fixing anchor is fixed to the reaction beam through the anchor plate.
[0024] Optionally, the adjusting rod is provided with an adjusting thread, and the position of the fixing assembly on the adjusting rod is adjusted by the adjusting thread, thereby adjusting the positions of the adjusting support beam and the connecting beam.
[0025] Optionally, the outer dimensions of the reaction beam are greater than or equal to the outer dimensions of the connecting beam and the adjusting support beam.
[0026] The above solution of the utility model includes at least the following beneficial effects:
[0027] The above scheme of the utility model includes: a cement double pole, the cement double pole includes a first cement pole and a second cement pole; the first cement pole and the second cement pole are both provided with a steel casing; a connecting beam fixed to the first cement pole and the second cement pole through the steel casing; an adjustment support beam fixed to both ends of the connecting beam; a reaction beam fixed to the bottom of the first cement pole and the second cement pole, a preset interval is provided between the connecting beam and the reaction beam; a plurality of adjustment screws passing through the adjustment support beam and fixedly connected to the reaction beam. The scheme of the utility model is simple to install and does not damage the cement pole itself. It can be reinforced and leveled when uneven deformation and settlement occur to the power transmission cement pole, so that it remains on the same horizontal plane, ensuring the safe and stable operation of the power transmission line. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is an elevation view of the power transmission cement pole foundation provided by the utility model;
[0029] Figure 2 It is a structural schematic diagram of the connecting beam and the adjusting joist provided by the utility model;
[0030] Figure 3 It is a structural schematic diagram of the reaction beam provided by the utility model;
[0031] Figure 4 It is a structural schematic diagram of the adjusting screw provided by the utility model.
[0032] Description of reference numerals:
[0033] 11. First cement rod; 12. Second cement rod; 13. Steel casing; 21. Connecting beam; 22. Adjusting support beam; 3. Reaction beam; 4. Adjusting screw; 41. Fixed anchor; 411. Anchor plate; 42. Adjusting rod; 43. Fixed assembly. DETAILED DESCRIPTION
[0034] The exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0035] like Figure 1 As shown, an embodiment of the utility model provides a power transmission cement pole foundation, comprising:
[0036] A double cement rod, the double cement rod comprising a first cement rod 11 and a second cement rod 12;
[0037] The first cement rod 11 and the second cement rod 12 are both provided with a steel casing 13;
[0038] A connecting beam 2 fixed to the first cement rod 11 and the second cement rod 12 through the steel casing 13;
[0039] Adjustable joists 22 fixed at both ends of the connecting beam 21;
[0040] A reaction beam 3 is fixed at the bottom of the first cement rod 11 and the second cement rod 12, and a preset interval is set between the connection beam 21 and the reaction beam 3;
[0041] A plurality of adjusting screws 4 pass through the adjusting support beam 22 and are fixedly connected to the reaction beam 3 .
[0042] The power transmission cement pole foundation in this embodiment adopts a cement double-pole foundation structure. The top of the cement double-pole can be fixedly connected by a crossbeam to form a pole tower for erecting power transmission lines; the bottom is fixed in the reaction beam 3, and a circle of concrete reaction beams 3 are cast around the bottom of the first cement pole 11 and the second cement pole 12, and a plurality of adjustment screws 4 are pre-embedded on the reaction beam 3;
[0043] A circle of steel casing 13 is welded at the middle position of the first cement rod 11 and the second cement rod 12, and reinforcement is planted on the periphery of the steel casing 13. The connecting beam 2 is cast on the periphery of the steel casing 13 through the reinforcement, and forms an "I" shape with the adjusting support beam 22, and the bottom surface of the adjusting support beam 22 is 50 mm away from the top surface of the reaction beam 3. A hole for the adjusting screw 4 is reserved in the adjusting support beam 22, and the adjusting screw 4 is passed through it.
[0044] When the transmission cement pole foundation is deformed and adjusted, a jack is placed between the adjustment support beam 22 and the reaction beam 3, and the structure is adjusted by using the jack and the embedded adjustment screw 4, and then backfilling is performed.
[0045] The solution of this embodiment is easy to install and does not damage the cement pole itself. When the foundation of the power transmission cement pole is tilted or settled, it can be reinforced and leveled to ensure that it is on the same horizontal plane, thereby ensuring the safe and stable operation of the transmission line.
[0046] In an optional embodiment of the present utility model, the steel casing 13 is welded to the first cement rod 11 and the second cement rod 12;
[0047] Fixed steel bars are arranged on the outer surface of the steel casing 13 , and the fixed steel bars are arranged perpendicular to the first cement rod 11 and the second cement rod 12 .
[0048] In this embodiment, the concrete protective layer within the range of 200 mm below the ground of the cement double rod is chiseled off, a circle of steel casing 13 is welded around the main reinforcement of the cement rod, and reinforcement is planted around the steel casing 13. The fixed steel bar is perpendicular to the direction of the cement double rod and is arranged parallel to the reaction beam 3.
[0049] like Figure 2 As shown, in an optional embodiment of the present utility model, the connecting beam 21 and the adjusting support beam 22 form an “I”-shaped structure;
[0050] The connection beam 21 is cast and fixed to the first cement rod 11 and the second cement rod 12 through the fixed steel bars on the outer surface of the steel casing 13 .
[0051] In this embodiment, pouring is performed along the fixed steel bars to form a cubic-shaped connecting beam 21, and an adjustable joist 22 is poured on the connecting beam 21 to form an "I"-shaped structure;
[0052] The thickness of the connecting beam 21 and the adjusting joist 22 are the same, and the connecting beam 21 and the adjusting joist 22 are on the same horizontal plane and are both perpendicular to the cement double rods. The thickness of the connecting beam 21 and the adjusting joist 22 can be adjusted according to actual working conditions.
[0053] In this embodiment, the connecting beam 21 and the adjusting supporting beam 22 can be assembled in sections or integrally formed.
[0054] For example Figure 2 As shown, in an optional embodiment of the present invention, a plurality of through holes are preset on the adjusting support beam 22, so that the top end of the adjusting screw 4 passes through the through hole and extends out of the end surface of the adjusting support beam 22.
[0055] In this embodiment, a hole for the adjusting screw 4 is reserved near the end of the adjusting support beam 22 , through which the adjusting screw 4 can pass, and the adjusting support beam 22 can move vertically following the adjusting screw 4 .
[0056] In an optional embodiment of the present invention, the reaction beam 3 is cast and fixed at the bottom of the first cement rod 11 and the second cement rod 12 , and the connecting beam 21 is arranged parallel to the reaction beam 3 .
[0057] In an optional embodiment of the present invention, the reaction beam 3 is a square structure, and a plurality of reserved holes are provided at the edge position, and the bottom of the adjusting screw 4 is fixed inside the reaction beam 3 through the reserved holes.
[0058] In the above embodiment, Figure 3As shown, the reaction beam 3 is a rectangular structure, and the bottoms of the first cement rod 11, the second cement rod 12 and the adjusting screw 4 are all fixed in the reaction beam 3 to provide support for the bottom of the overall structure; a plurality of reserved holes are provided at the edges on both sides of the reaction beam 3 for fixing the adjusting screw 4.
[0059] The connecting beam 21 is arranged in parallel with the reaction beam 3 , and a distance of at least 500 mm is arranged between them.
[0060] The thickness of the reaction beam 3 can be adjusted according to actual working conditions.
[0061] like Figure 4 As shown, in an optional embodiment of the present utility model, the adjusting screw 4 includes a fixing anchor 41 and an adjusting lever 42, and the fixing anchor 41 and the adjusting lever 42 are fixedly connected;
[0062] The adjusting rod 42 is provided with a fixing assembly 43 , and the adjusting support beam 22 is connected to the adjusting rod 42 via the fixing assembly 43 .
[0063] In this embodiment, a part of the fixing anchor 41 of the adjusting screw 4 is buried in the reaction beam 3 to fix the adjusting screw 4, and the other part is between the adjusting support beam 22 and the reaction beam 3, so as to facilitate the placement of the jack to adjust the structure of the adjusting support beam 22;
[0064] A fixing assembly 43 is provided on the adjusting rod 42 . The fixing assembly 43 is composed of a plurality of sets of nuts and can fix the adjusting support beam 22 between the plurality of sets of nuts so that the adjusting support beam 22 is fixed to the adjusting screw 4 .
[0065] In this embodiment, the diameter of the adjusting screw 4 is adjustable, and the diameter of the adjusting screw 4 can be adjusted according to the load-bearing capacity and bending resistance required in the actual working environment;
[0066] The height of the adjusting screw 4 is set to 0.5 m to 1 m.
[0067] In an optional embodiment of the present utility model, the fixing anchor 41 is an inverted "T"-shaped structure, and an anchor plate 411 is fixed to the end of the fixing anchor 41;
[0068] The fixing anchor 41 is fixed to the reaction beam 3 via the anchor plate 411 .
[0069] In this embodiment, an integrally formed anchor plate 411 is fixed to the end of the fixing anchor 41 to form an inverted "T"-shaped structure;
[0070] The anchor plate 411 is a flat plate structure, and the area of the anchor plate 411 can be designed according to actual needs, so that the contact area with the reaction beam 3 is larger and the connection is more firm.
[0071] In an optional embodiment of the present invention, the adjusting rod 42 is provided with an adjusting thread, and the position of the fixing assembly 43 on the adjusting rod 42 is adjusted by the adjusting thread, thereby adjusting the positions of the adjusting support beam 22 and the connecting beam 21.
[0072] In this embodiment, the fixing assembly 43 is screwed to the adjusting thread on the adjusting rod 42, and the fixing assembly 43 clamps the adjusting joist 22 to the adjusting rod 42;
[0073] When the tower foundation is tilted or offset, the fixing assembly 43 is moved along the adjustment thread, thereby changing the height and angle of the adjustment joist 22 so that the cement pole foundation is maintained at the same horizontal height.
[0074] In an optional embodiment of the present invention, the outer dimensions of the reaction beam 3 are greater than or equal to the outer dimensions of the connecting beam 21 and the adjusting support beam 22 .
[0075] In this embodiment, the outer dimensions of the reaction beam 3 are greater than or equal to the outer dimensions of the connecting beam 21 and the adjusting support beam 22, ensuring that the center of gravity of the transmission cement pole foundation is located below the whole, increasing the adjustable angle range, and improving the overall stability.
[0076] The power transmission cement pole foundation described in the above embodiment of the utility model can also be obtained by modifying the existing power transmission double pole. A specific construction method is as follows:
[0077] (1) Casting concrete reaction beam 3. According to the spacing between the cement double rods, a circle of concrete reaction beam 3 is cast around the double rods. Two adjusting screws 4 are embedded in the reaction beam 3.
[0078] (2) Chisel off the concrete protective layer within 200 mm below the ground of the cement double rod, weld a circle of steel casing 13 around the main reinforcement of the cement rod, plant reinforcement around the steel casing 13, and then cast an "I-shaped" concrete connecting beam 21 and an adjustment joist 22 around the steel casing 13. The outer dimensions of the connecting beam 1 and the adjustment joist 22 are consistent with the reaction beam 3 cast below, and their bottom surfaces are 500 mm above the concrete reaction beam 3. A hole for the adjustment screw 4 is reserved in the adjustment joist 22, and the adjustment screw 4 passes through it.
[0079] (3) In order to ensure the structural safety of the cement pole during construction and avoid its tilting and deformation during construction, a tension wire must be installed at an appropriate height in the vertical direction of the line to provide horizontal protection for the cement pole before construction.
[0080] (4) If deformation adjustment is required later, a jack is placed between the adjustment support beam 22 and the reaction beam 3, and the structure is adjusted using the jack and the embedded adjustment screw 4. Then backfilling is performed.
[0081] The above is a preferred embodiment of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A power transmission cement pole foundation, characterized in that: include: A double cement rod, the double cement rod comprising a first cement rod (11) and a second cement rod (12); The first cement rod (11) and the second cement rod (12) are both provided with a steel casing (13); a connecting beam (21) fixed to the first cement rod (11) and the second cement rod (12) through the steel casing (13); Adjustable joists (22) fixed at both ends of the connecting beam (21); A reaction beam (3) fixed at the bottom of the first cement rod (11) and the second cement rod (12), wherein a preset interval is provided between the connection beam (21) and the reaction beam (3); A plurality of adjusting screw rods (4) pass through the adjusting support beam (22) and are fixedly connected to the reaction beam (3).
2. The power transmission cement pole foundation according to claim 1, characterized in that: The steel casing (13) is welded to the first cement rod (11) and the second cement rod (12); Fixed steel bars are arranged on the outer surface of the steel casing (13), and the fixed steel bars are arranged perpendicularly to the first cement rod (11) and the second cement rod (12).
3. The power transmission cement pole foundation according to claim 2, characterized in that: The connecting beam (21) and the adjusting supporting beam (22) form an I-shaped structure; The connection beam (21) is cast and fixed to the first cement rod (11) and the second cement rod (12) through the fixed steel bars on the outer surface of the steel casing (13).
4. The power transmission cement pole foundation according to claim 3, characterized in that: The adjusting support beam (22) is preset with a plurality of through holes, so that the top end of the adjusting screw rod (4) passes through the through holes and protrudes out of the end surface of the adjusting support beam (22).
5. The power transmission cement pole foundation according to claim 1, characterized in that: The reaction beam (3) is cast and fixed on the bottom of the first cement rod (11) and the second cement rod (12), and the connection beam (21) is arranged parallel to the reaction beam (3).
6. The power transmission cement pole foundation according to claim 1, characterized in that: The reaction beam (3) is a square structure, with a plurality of reserved holes provided at its edge, and the bottom of the adjustment screw (4) is fixed inside the reaction beam (3) through the reserved holes.
7. The power transmission cement pole foundation according to claim 6, characterized in that: The adjusting screw (4) comprises a fixing anchor (41) and an adjusting lever (42), and the fixing anchor (41) and the adjusting lever (42) are fixedly connected; The adjusting rod (42) is provided with a fixing assembly (43), and the adjusting support beam (22) is connected to the adjusting rod (42) via the fixing assembly (43).
8. The power transmission cement pole foundation according to claim 7, characterized in that: The fixing anchor (41) is an inverted "T"-shaped structure, and an anchor plate (411) is fixed to the end of the fixing anchor (41); The fixing anchor (41) is fixed to the reaction beam (3) via the anchor plate (411).
9. The power transmission cement pole foundation according to claim 7, characterized in that: The adjusting rod (42) is provided with an adjusting thread, and the position of the fixing component (43) on the adjusting rod (42) is adjusted by the adjusting thread, thereby adjusting the positions of the adjusting support beam (22) and the connecting beam (21).
10. The power transmission cement pole foundation according to claim 1, characterized in that: The outer dimensions of the reaction beam (3) are greater than or equal to the outer dimensions of the connecting beam (21) and the adjusting support beam (22).
Citation Information
Cited By
Quick-mounted support of overhead power transmission line with horizontal arrangement of phase conductors for emergency recovery operations
RU2835653C1