Concrete-filled steel tube lattice type three-limb column of fabricated plant
By adopting the concrete-filled steel tube lattice three-leg column structure of the prefabricated factory building in high-intensity areas and high-wind pressure areas, combined with welded steel strips and corrosion-resistant coatings, the existing technology solves the problem of steel tube lattice columns in high-intensity areas. The problem of long construction period and large amount of steel has been solved. The vertical support capacity and construction period have been optimized, which reduces the construction cost and improves the durability of the structure.
Patent Information
- Application Number
- CN202323435144.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2033-12-18
AI Technical Summary
Existing technology In high-intensity areas or high-wind pressure areas, it is difficult for steel tube lattice columns to meet the vertical bearing capacity, lateral stiffness and horizontal displacement. At the same time, the construction period is long and the amount of steel is large, resulting in high construction costs and incineration of factory buildings. The single-story industrial factory structure has strict control over vertical bearing capacity, lateral stiffness and horizontal displacement.
The steel tube concrete lattice three-leg column structure of the prefabricated factory is used. By setting multiple steel tube concrete lattice columns and welded steel strips, combined with concrete fillers and corrosion-resistant coatings, the rigidity and durability of the structure are improved, and through optimization The design saves steel consumption and achieves green construction and resource conservation.
It achieves vertical support capacity in high-intensity areas and high-wind-pressure areas, shortens the construction period, reduces civil engineering costs, provides a larger effective building area, and improves the corrosion resistance and durability of the structure.
Smart Images

Figure CN221855974U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of assembled factory buildings, in particular to a steel tube concrete lattice type three-leg column of an assembled factory building. Background Art
[0002] Municipal solid waste is one of the main environmental problems currently faced by my country. At present, municipal solid waste is generally treated by incineration. Municipal solid waste contains a large amount of combustible substances. Incineration can reduce the volume and weight of municipal solid waste. After high-temperature incineration at 850 to 1100 degrees Celsius, harmful components in the solid waste except heavy metals are fully decomposed, and various odorous gases are decomposed at high temperature, with obvious waste reduction effect; the waste treatment speed is fast and does not need long-term storage; the heat generated by waste incineration can be recycled for heating or power generation, and the slag generated by incineration can be used as cement raw materials or brick making, etc., which can realize the resource utilization of waste. The main body of the incineration room and flue gas purification room in the main plant of municipal solid waste incineration power generation is a single-story industrial plant with a high single-story height (about 35 to 40 meters) and a large span (about 20 to 40 meters). Therefore, the vertical bearing capacity, lateral stiffness and horizontal displacement of the main structure are relatively strict.
[0003] Conventional plant vertical support systems mainly adopt the following two methods: First, reinforced concrete columns or reinforced concrete lattice columns are used. This method is difficult to support the construction formwork, has a long construction period, and has high requirements for construction technology. It is currently only used in some high-intensity areas (8 degrees and above) and is rarely used now; second, steel tube lattice columns are used as the vertical support system of the plant. This method has a short construction period and a high degree of mechanization, which is more in line with the requirements of environmental protection and resource conservation of prefabricated buildings. However, in high-intensity areas or high wind pressure areas, it is necessary to meet the vertical bearing capacity and lateral stiffness while controlling the horizontal displacement of the top of the structure. Therefore, the selected steel tube columns have a larger cross-section, a smaller limb distance, and a larger overall steel consumption; both methods have disadvantages, so we propose a steel tube concrete lattice three-limb column for prefabricated plants. Utility Model Content
[0004] The utility model aims to provide a steel tube concrete lattice three-leg column for an assembled factory building to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a steel tube concrete lattice three-legged column of an assembled factory building, comprising a first steel tube concrete lattice column, a first concrete filler, a second steel tube concrete lattice column and a third steel tube concrete lattice column, wherein the second steel tube concrete lattice column is arranged on one side of the first steel tube concrete lattice column, the third steel tube concrete lattice column is arranged on one side of the second steel tube concrete lattice column, a first cavity is arranged inside the first steel tube concrete lattice column, the first concrete filler is arranged inside the first cavity, a second cavity is arranged inside the second steel tube concrete lattice column, and a second concrete filler is arranged inside the second cavity, and the third steel tube concrete lattice column is arranged inside There is a third cavity, and a third concrete filler is arranged inside the third cavity, welding grooves are arranged on the outer walls of the first steel tube concrete lattice column, the second steel tube concrete lattice column, and the third steel tube concrete lattice column, and the first steel tie bar, the second steel tie bar, the third steel tie bar, and the fourth steel tie bar are sequentially arranged between the first steel tube concrete lattice column, the second steel tube concrete lattice column, and the third steel tube concrete lattice column, and the first steel tie bar, the second steel tie bar, the third steel tie bar, and the fourth steel tie bar are welded in pairs through the second welding point, and the first steel tie bar, the second steel tie bar, the third steel tie bar, and the fourth steel tie bar are welded to the first steel tube concrete lattice column, the second steel tube concrete lattice column, and the third steel tube concrete lattice column through the first welding point.
[0006] Preferably, a first bottom layer, a first high temperature resistant layer, a first middle layer and a first surface layer are sequentially arranged on the outer surfaces of the first steel tube concrete lattice column, the second steel tube concrete lattice column and the third steel tube concrete lattice column, thereby improving the corrosion resistance and durability of the first steel tube concrete lattice column, the second steel tube concrete lattice column and the third steel tube concrete lattice column and extending their service life.
[0007] Preferably, a second bottom layer, a second high temperature resistant layer, a second middle layer and a second surface layer are sequentially arranged on the outer surfaces of the first steel tie bar, the second steel tie bar, the third steel tie bar and the fourth steel tie bar, thereby improving the corrosion resistance and durability of the first steel tie bar, the second steel tie bar, the third steel tie bar and the fourth steel tie bar and extending their service life.
[0008] Preferably, the first steel tie bar, the second steel tie bar, the third steel tie bar and the fourth steel tie bar are all embedded with reinforcing ribs, and the reinforcing ribs are made of tungsten steel, thereby improving the structural strength.
[0009] Preferably, the first bottom layer and the second bottom layer are both epoxy zinc-rich primers, which can protect the steel structure from corrosion and enhance the adhesion of the paint film on the steel surface.
[0010] Preferably, the first high temperature resistant layer and the second high temperature resistant layer are both inorganic silicate coatings, which have excellent fire resistance and rust resistance and meet the requirements of waste incineration plants.
[0011] Preferably, the first middle layer and the second middle layer are both polyurethane coatings, which have excellent UV resistance and aging resistance, and enhance the durability of the steel structure.
[0012] Preferably, the first surface layer and the second surface layer are both fluorocarbon topcoats, which have weather resistance, heat resistance, low temperature resistance, chemical resistance, and unique non-stick and low friction properties.
[0013] Compared with the prior art, the utility model has the following beneficial effects: the steel tube concrete lattice three-legged column of the assembled factory building not only has the rigidity of concrete, but also takes into account the advantages of short steel structure construction period, resource conservation and green construction, and saves steel consumption, which can significantly reduce the cost of civil engineering in actual engineering;
[0014] By providing a first steel tube concrete lattice column, a second steel tube concrete lattice column, a third steel tube concrete lattice column, a first steel tie bar, a second steel tie bar, a third steel tie bar, and a fourth steel tie bar, the steel tube concrete lattice three-leg column is subjected to secondary innovative optimization on the basis of the existing design. Specifically, on the basis of conventional reinforced concrete columns and steel tube lattice columns, the first steel tube concrete lattice column, the second steel tube concrete lattice column, and the third steel tube concrete lattice column are adopted, and the first cavity, the second cavity, and the third cavity inside the first steel tube concrete lattice column, the second steel tube concrete lattice column, and the third steel tube concrete lattice column are respectively provided with a first concrete filler, a second concrete filler, and a third concrete filler, and The first steel tube concrete lattice column, the second steel tube concrete lattice column, the third steel tube concrete lattice column and the fourth steel tie bar are welded in sequence between the first steel tube concrete lattice column, the second steel tube concrete lattice column and the third steel tube concrete lattice column, so that the vertical supporting columns of the tall single-story factory building have both the rigidity of concrete and the advantages of short steel structure construction period, resource conservation and green construction. Secondly, compared with conventional steel tube lattice columns, the first steel tube concrete lattice column, the second steel tube concrete lattice column and the third steel tube concrete lattice column after innovative optimization save steel consumption, which can significantly reduce the cost of civil engineering in actual projects. Moreover, the steel tube concrete lattice three-legged column can provide a larger effective building area while taking into account the advantages of concrete and steel structures. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the top view structure of the utility model;
[0016] Figure 2 This is a front view structural schematic diagram of the utility model;
[0017] Figure 3 For the utility model Figure 1 The enlarged structural diagram at A in the middle;
[0018] Figure 4 It is a partial cross-sectional enlarged structural schematic diagram of the first steel tube concrete lattice column of the utility model;
[0019] Figure 5 It is a schematic diagram of a partially enlarged cross-section of the first steel tie bar of the utility model.
[0020] In the figure: 1. first steel tube concrete lattice column; 2. first cavity; 3. first concrete filling; 4. second steel tube concrete lattice column; 5. second cavity; 6. second concrete filling; 7. third steel tube concrete lattice column; 8. third cavity; 9. third concrete filling; 10. first steel tie bar; 11. second steel tie bar; 12. third steel tie bar; 13. fourth steel tie bar; 14. welding groove; 15. first welding point; 16. second welding point; 17. first bottom layer; 18. first high temperature resistant layer; 19. first middle layer; 20. first surface layer; 21. second bottom layer; 22. second high temperature resistant layer; 23. second middle layer; 24. second surface layer; 25. reinforcing ribs. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. All other embodiments obtained by ordinary technicians in the field without creative work based on the embodiments of the utility model shall fall within the scope of protection of the utility model.
[0022] See also Figure 1-5 The utility model provides an embodiment: a steel tube concrete lattice three-legged column of an assembled factory building, comprising a first steel tube concrete lattice column 1, a first concrete filler 3, a second steel tube concrete lattice column 4 and a third steel tube concrete lattice column 7, the second steel tube concrete lattice column 4 is arranged on one side of the first steel tube concrete lattice column 1, the third steel tube concrete lattice column 7 is arranged on one side of the second steel tube concrete lattice column 4, the first steel tube concrete lattice column 1 is provided with a first cavity 2, the first concrete filler 3 is arranged inside the first cavity 2, the second steel tube concrete lattice column 4 is provided with a second cavity 5, and the second cavity 5 is provided with a second concrete filler 6, the third steel tube concrete lattice column 7 is provided with a third cavity 8, and the third cavity 8 is provided with a third concrete filler 9;
[0023] Welding grooves 14 are arranged on the outer walls of the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7. The first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are arranged in sequence between the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7. The first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are welded in pairs through the second welding point 16, and the first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are welded to the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7 through the first welding point 15;
[0024] The first bottom layer 17, the first high temperature resistant layer 18, the first middle layer 19, and the first surface layer 20 are sequentially arranged on the outer surfaces of the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7, thereby improving the corrosion resistance and durability of the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7 and extending their service life;
[0025] The outer surfaces of the first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are sequentially provided with a second bottom layer 21, a second high temperature resistant layer 22, a second middle layer 23, and a second surface layer 24, which improves the corrosion resistance and durability of the first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13, and prolongs the service life;
[0026] The first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are all embedded with reinforcing ribs 25, and the reinforcing ribs 25 are made of tungsten steel, which improves the structural strength;
[0027] The first bottom layer 17 and the second bottom layer 21 are both epoxy zinc-rich primers, which can protect the steel structure from corrosion and enhance the adhesion of the paint film on the steel surface;
[0028] The first high temperature resistant layer 18 and the second high temperature resistant layer 22 are both inorganic silicate coatings, which have good fire resistance and rust resistance, meeting the requirements of waste incineration plants;
[0029] The first middle layer 19 and the second middle layer 23 are both polyurethane coatings, which have good UV resistance and anti-aging capabilities, and enhance the durability of the steel structure;
[0030] The first surface layer 20 and the second surface layer 24 are both fluorocarbon topcoats, which have weather resistance, heat resistance, low temperature resistance, chemical resistance, and unique non-stick and low friction properties.
[0031] When the embodiment of the present application is used: first, the steel tube concrete lattice three-legged column is subjected to secondary innovative optimization on the basis of the existing design. Specifically, on the basis of conventional reinforced concrete columns and steel tube lattice columns, a first steel tube concrete lattice column 1, a second steel tube concrete lattice column 4, and a third steel tube concrete lattice column 7 are adopted, and a first concrete filler 3, a second concrete filler 6, and a third concrete filler 9 are respectively arranged in the first cavity 2, the second cavity 5, and the third cavity 8 inside the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7. The first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are welded in sequence between the concrete lattice columns 7, so that the vertical support columns of the tall single-story factory building have both the rigidity of concrete and the advantages of short steel structure construction period, resource conservation and green construction. Secondly, compared with conventional steel tube lattice columns, the first steel tube concrete lattice column 1, the second steel tube concrete lattice column 4, and the third steel tube concrete lattice column 7 after innovative optimization save steel consumption, which can significantly reduce the cost of civil engineering in actual projects. Moreover, the steel tube concrete lattice three-legged column takes into account the advantages of concrete and steel structure at the same time and can provide a larger effective building area. Then, due to the first steel The surfaces of the steel tube concrete lattice column 1, the second steel tube concrete lattice column 4 and the third steel tube concrete lattice column 7 are provided with a first bottom layer 17, a first high temperature resistant layer 18, a first middle layer 19 and a first surface layer 20 in sequence, and the surfaces of the first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12 and the fourth steel tie bar 13 are provided with a second bottom layer 21, a second high temperature resistant layer 22, a second middle layer 23 and a second surface layer 24 in sequence, wherein the first bottom layer 17 and the second bottom layer 21 are both epoxy zinc-rich primers, which can protect the steel structure from corrosion and enhance the adhesion of the paint film on the steel surface, and the first high temperature resistant layer 18 and the second high temperature resistant layer 22 are both inorganic silicate coatings, which have good fire resistance and rust resistance. To meet the needs of waste incineration plants, the first middle layer 19 and the second middle layer 23 are both polyurethane coatings, which have excellent UV resistance and anti-aging capabilities, and enhance the durability of the steel structure. The first surface layer 20 and the second surface layer 24 are both fluorocarbon topcoats, which are weather-resistant, heat-resistant, low-temperature-resistant, and chemical-resistant. They also have unique non-stickiness and low friction. Moreover, the reinforcing ribs 25 inside the first steel tie bar 10, the second steel tie bar 11, the third steel tie bar 12, and the fourth steel tie bar 13 are made of tungsten steel, which has a series of excellent properties such as high hardness, wear resistance, good strength and toughness, heat resistance, and corrosion resistance. In summary, the corrosion resistance and durability of the steel tube concrete lattice three-legged column are improved, and the service life is extended.
Claims
1. A steel tube concrete lattice three-leg column for an assembled factory building, characterized in that: The invention comprises a first steel tube concrete lattice column (1), a first concrete filler (3), a second steel tube concrete lattice column (4) and a third steel tube concrete lattice column (7), wherein the second steel tube concrete lattice column (4) is arranged on one side of the first steel tube concrete lattice column (1), and the third steel tube concrete lattice column (7) is arranged on one side of the second steel tube concrete lattice column (4); a first cavity (2) is arranged inside the first steel tube concrete lattice column (1), and the first concrete filler (3) is arranged inside the first cavity (2); a second cavity (5) is arranged inside the second steel tube concrete lattice column (4), and a second concrete filler (6) is arranged inside the second cavity (5); a third cavity (8) is arranged inside the third steel tube concrete lattice column (7), and a third concrete filler (9) is arranged inside the third cavity (8); and the first steel tube concrete lattice column (1) is provided with a first cavity (2); the first concrete filler (3) is arranged inside the first cavity (2); the second concrete filler (5) is arranged inside the second cavity (5); the third concrete filler (6) is arranged inside the third cavity (8); Welding grooves (14) are provided on the outer walls of the soil lattice column (1), the second steel tube concrete lattice column (4), and the third steel tube concrete lattice column (7); a first steel tie bar (10), a second steel tie bar (11), a third steel tie bar (12), and a fourth steel tie bar (13) are sequentially provided between the first steel tube concrete lattice column (1), the second steel tube concrete lattice column (4), and the third steel tube concrete lattice column (7); the first steel tie bar (10), the second steel tie bar (11), the third steel tie bar (12), and the fourth steel tie bar (13) are welded in pairs through second welding points (16); and the first steel tie bar (10), the second steel tie bar (11), the third steel tie bar (12), and the fourth steel tie bar (13) are welded to the first steel tube concrete lattice column (1), the second steel tube concrete lattice column (4), and the third steel tube concrete lattice column (7) through first welding points (15).
2. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 1, characterized in that: A first bottom layer (17), a first high temperature resistant layer (18), a first middle layer (19) and a first surface layer (20) are sequentially arranged on the outer surfaces of the first steel tube concrete lattice column (1), the second steel tube concrete lattice column (4) and the third steel tube concrete lattice column (7).
3. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 1, characterized in that: A second bottom layer (21), a second high temperature resistant layer (22), a second middle layer (23) and a second surface layer (24) are sequentially arranged on the outer surfaces of the first steel tie bar (10), the second steel tie bar (11), the third steel tie bar (12) and the fourth steel tie bar (13).
4. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 1, characterized in that: The first steel tie bar (10), the second steel tie bar (11), the third steel tie bar (12), and the fourth steel tie bar (13) are all embedded with reinforcing ribs (25), and the reinforcing ribs (25) are made of tungsten steel.
5. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 2, characterized in that: The first bottom layer (17) and the second bottom layer (21) are both epoxy zinc-rich primers.
6. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 2, characterized in that: The first high temperature resistant layer (18) and the second high temperature resistant layer (22) are both inorganic silicate coatings.
7. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 2, characterized in that: The first middle layer (19) and the second middle layer (23) are both polyurethane coatings.
8. The steel tube concrete lattice three-legged column of the prefabricated factory building according to claim 2, characterized in that: The first surface layer (20) and the second surface layer (24) are both fluorocarbon topcoats.