Steel-wood mixed formwork reinforcing system of shear wall at expansion joint

Through the steel-wood hybrid formwork reinforcement system, anti-slip bolts and PVC pipe structures are used to solve the problem of difficulty in strengthening and dismantling the expansion joints of the traditional formwork system, achieving improvement in construction quality and bolt stability, and avoiding the need for expansion molds and The phenomenon of pulp running.

CN221856176UActive Publication Date: 2024-10-18HEBEI CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420280900.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-10-18
Estimated Expiration
2034-02-06

AI Technical Summary

Technical Problem

The traditional square timber steel pipe formwork system cannot be effectively reinforced and dismantled at the expansion joints, resulting in problems such as loosening of bolts, slipping and shear wall expansion and slurry running.

Method used

The steel-wood hybrid formwork reinforcement system is adopted, and the vertically arranged steel formwork and wooden formwork are fixedly connected with anti-slip bolts, combined with PVC pipe and jacking rod structures to ensure the stability and firmness of the formwork and avoid bolt loosening and slippage. .

Benefits of technology

It effectively solves the problem that the traditional formwork system cannot be reinforced and dismantled, ensures the construction quality, eliminates bolt loosening and shear wall expansion and grouting, and ensures the quality of concrete pouring at the expansion joints.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856176U_ABST
    Figure CN221856176U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel and wood mixed formwork reinforcing system of a shear wall at an expansion joint, which comprises a steel formwork and a wood formwork which are vertically arranged, the steel formwork is fixedly connected with the wood formwork through a plurality of anti-sliding bolts, first nuts which are in one-to-one correspondence with the anti-sliding bolts are fixedly arranged on the surface of the steel formwork, and the steel formwork is fixedly connected with the wood formwork through a plurality of anti-sliding bolts. A shear wall area is arranged between the steel formwork and the wood formwork, an expansion joint area is arranged on the other side of the steel formwork, and an indoor area is arranged on the other side of the wood formwork. According to the steel-wood mixed formwork reinforcing system for the shear wall at the expansion joint, the problem that a traditional square timber steel pipe formwork system cannot be reinforced and dismantled is solved, the phenomena of loosening and sliding of bolts in the reinforcing process or the concrete pouring process are avoided, the situations of formwork expansion and grout leakage of the shear wall are completely eradicated, and the construction efficiency is improved. Therefore, the construction quality of the shear wall at the expansion joint is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a steel-wood mixed formwork reinforcement system of a shear wall at an expansion joint. Background Art

[0002] Currently, many high-rise residential projects have a single-story building area of ​​1000m 2 Due to the large length-to-width ratio of the building and the narrow and long floor structure, a single floor of a high-rise residential project consists of several units, and expansion joints need to be set in the middle of the building to solve the deformation and damage problems caused by temperature expansion and contraction of concrete, foundation settlement, and earthquake collision. The width of the expansion joint is narrow, generally about 200mm, and the shear walls on both sides of the expansion joint are also long, generally about 3500-6000mm in length, which brings difficulties to the simultaneous construction of the main structure on both sides of the expansion joint.

[0003] In the prior art, the formwork plus extruded board is used as the formwork block at the expansion joint. After the shear walls on both sides of the expansion joint are cast at the same time, the traditional square wood steel pipe formwork system cannot be reinforced or removed due to the narrow expansion joint. Double-sided shaped steel formwork is used for reinforcement. The steel formwork on one side of the room needs to be placed in the shear wall position before supporting the top plate, which affects the steel bar acceptance and top plate support. In addition, the steel formwork on one side of the room is not well combined with the wooden formwork of the top plate, which easily leads to the problem of slurry leakage at the junction of the wall and the top plate. Utility Model Content

[0004] The utility model aims to provide a steel-wood hybrid formwork reinforcement system for shear walls at expansion joints, which solves the problem that traditional square wood and steel pipe formwork systems cannot be reinforced or dismantled, avoids the loosening and slipping of bolts during the reinforcement process or the pouring of concrete, and prevents the shear wall from expanding the formwork and leaking slurry.

[0005] To achieve the above-mentioned purpose, the utility model provides a steel-wood hybrid formwork reinforcement system for shear walls at expansion joints, including vertically arranged steel formwork and wooden formwork, the steel formwork being fixedly connected to the wooden formwork by a plurality of anti-slip bolts, a first nut corresponding to the anti-slip bolts being fixedly arranged on the surface of the steel formwork, the shear wall area being between the steel formwork and the wooden formwork, the other side of the steel formwork being the expansion joint area, and the other side of the wooden formwork being the indoor area.

[0006] Preferably, the steel formwork includes a first panel, a lifting ring and a back rib, the back rib is a plurality of evenly distributed transverse channel steels and vertical channel steels, the back rib is welded to one side of the expansion joint area of ​​the first panel, the first nut is arranged at the junction of the transverse channel steel and the vertical channel steel, the lifting ring is a U-shaped ring, and the open end of the lifting ring is welded to the frame of the back rib.

[0007] Preferably, the wooden formwork includes a second panel and a plurality of main keels evenly arranged along the horizontal direction of the second panel, the main keel is fixedly connected to one side of the indoor area of ​​the second panel through a plurality of secondary keels, and the secondary keels are evenly arranged along the vertical direction of the main keel.

[0008] Preferably, a plurality of first through holes are provided on the main keel, a plurality of second through holes are provided on the surface of the second panel, and a third through hole is provided at the intersection of the back ribs, and the anti-slip bolt passes through the first through hole, the second through hole and the third through hole in sequence and is fixedly connected to the first nut.

[0009] Preferably, the anti-slip bolt includes a screw rod and a second nut and a third nut arranged on the screw rod, the screw rod includes a first non-threaded segment, a first threaded segment, a second non-threaded segment and a second threaded segment arranged in sequence, the first nut is movably connected to the second threaded segment, the first nut is fixedly connected to the second non-threaded segment, the second nut is movably connected to the first threaded segment, the third nut is movably connected to the first threaded segment, and the third nut is fixedly connected to the first non-threaded segment.

[0010] Preferably, a plurality of evenly spaced load-bearing supports are provided at the bottom of the shear wall area along the direction of the steel formwork.

[0011] Preferably, the anti-slip bolts all penetrate the shear wall area through PVC pipes, and the shear wall area is provided with top rods corresponding to the PVC pipes one by one.

[0012] Therefore, the utility model adopts the above-mentioned steel-wood hybrid formwork reinforcement system of the shear wall at the expansion joint, and its technical effects are as follows:

[0013] (1) The utility model solves the problem that in the traditional practice of expansion joints, extruded plates are used as template blocks at the expansion joints. After the shear walls on both sides of the expansion joints are cast simultaneously, the traditional square wood and steel pipe template system cannot be reinforced or removed due to the narrowness of the expansion joints. The utility model ensures the thickness of the steel bar protective layer in the expansion joints, thereby ensuring the construction quality of the expansion joints.

[0014] (2) The utility model avoids the phenomenon of bolt loosening and slipping during the reinforcement process or the pouring of concrete by welding the first bolt on the steel formwork and tightening the second nut to the main keel on one side of the indoor area, thereby preventing the shear wall from expanding the formwork and slurry leakage.

[0015] The technical solution of the utility model is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1It is a structural schematic diagram of an embodiment of a steel-wood hybrid formwork reinforcement system for a shear wall at an expansion joint of the utility model;

[0017] Figure 2 It is a structural schematic diagram of a steel formwork of an embodiment of a steel-wood hybrid formwork reinforcement system for a shear wall at an expansion joint of the utility model;

[0018] Figure 3 The utility model is a structural schematic diagram of an anti-slip bolt in an embodiment of a steel-wood hybrid formwork reinforcement system for a shear wall at an expansion joint.

[0019] Reference numerals

[0020] 1. Steel formwork; 11. First panel; 12. Lifting ring; 13. Back rib; 131. Third through hole; 132. First nut;

[0021] 2. wooden template; 21. second panel; 211. second through hole; 22. main keel; 221. first through hole; 23. secondary keel;

[0022] 3. Shear wall area; 4. Expansion joint area; 5. Indoor area;

[0023] 6. Anti-slip bolt; 61. Screw rod; 611. First non-threaded section; 612. First threaded section; 613. Second non-threaded section; 614. Second threaded section; 62. Second nut; 63. Third nut. DETAILED DESCRIPTION

[0024] The technical solution of the utility model is further described below through the accompanying drawings and embodiments.

[0025] Unless otherwise defined, the technical terms or scientific terms used in the present invention shall have the usual meanings understood by persons with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. Words such as "include" or "comprise" and the like mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. Words such as "connect" or "connected" and the like are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.

[0026] As shown in the figure, a steel-wood hybrid formwork reinforcement system for shear walls at expansion joints includes a vertically arranged steel formwork 1 and a wood formwork 2, a shear wall area 3 is between the steel formwork 1 and the wood formwork 2, the other side of the steel formwork 1 is the expansion joint area 4, and the other side of the wood formwork 2 is the indoor area 5. The steel formwork 1 is fixedly connected to the wood formwork 2 by a plurality of anti-slip bolts 6. The surface of the steel formwork 1 in the expansion joint area 4 is fixedly provided with a first nut 132 corresponding to the anti-slip bolt 6, and the anti-slip bolt 6 passes through the shear wall area 3 through a PVC pipe. The shear wall area 3 is provided with a top rod corresponding to the PVC pipe, and the length of the top rod is the same as the thickness of the shear wall area 3 to ensure the cross-sectional size of the shear wall area 3. The bottom of the shear wall area 3 is provided with a plurality of evenly spaced load-bearing brackets along the direction of the steel formwork 1, and the interval between the load-bearing brackets is two meters, which is convenient for adjusting the position of the steel formwork 1 and effectively preventing the steel formwork 1 from sliding downward.

[0027] Specifically, the steel formwork 1 includes a first panel 11, a lifting ring 12 and a back rib 13. The back rib 13 is a plurality of evenly distributed transverse channel steels and vertical channel steels. The back rib 13 is welded to one side of the expansion joint area 4 of the first panel 11. The first nut 132 is arranged at the junction of the transverse channel steel and the vertical channel steel. The lifting ring 12 is a U-shaped ring. The open end of the lifting ring 12 is welded to the frame of the back rib 13. The lifting ring 12 is used for lifting the steel formwork 1 into the shear wall area 3 by a tower crane or other device.

[0028] The wooden formwork 2 includes a second panel 21 and a plurality of main keels 22 evenly arranged in the horizontal direction of the second panel 21. The main keel 22 is fixedly connected to one side of the indoor area 5 of the second panel 21 through a plurality of secondary keels 23. The secondary keels 23 are evenly arranged in the vertical direction of the main keel 22. A plurality of first through holes 221 are arranged on the main keel 22, a plurality of second through holes 211 are arranged on the surface of the second panel 21, and a third through hole 131 is arranged at the intersection of the back rib 13. The anti-slip bolt 6 passes through the first through hole 221, the second through hole 211 and the third through hole 131 in sequence and is fixedly connected to the first nut 132.

[0029] The anti-slip bolt 6 includes a screw rod 61 and a second nut 62 and a third nut 63 arranged on the screw rod 61. The screw rod 61 includes a first non-threaded segment 611, a first threaded segment 612, a second non-threaded segment 613 and a second threaded segment 614 arranged in sequence. The first nut 132 is movably connected to the second threaded segment 614, the first nut 132 is fixedly connected to the second non-threaded segment 613, the second nut 62 is movably connected to the first threaded segment 612, the third nut 63 is movably connected to the first threaded segment 612, and the third nut 63 is fixedly connected to the first non-threaded segment 611. The screw rod 61 rotates into the first nut 132, and stops rotating when it becomes difficult to rotate. At this time, the screw rod 61 is effectively connected to the first nut 132 or the third nut 63, realizing the anti-slip function, and then the second nut 62 is rotated on one side of the indoor area 5 to reinforce the wooden formwork 2.

[0030] Embodiment 1

[0031] Engineering application example: A residential construction project with a total construction area of ​​71,682.73 square meters, including: Building No. 1 with a construction area of ​​17,816.13 square meters, Building No. 2 with a construction area of ​​11,971.47 square meters, Building No. 6 with a construction area of ​​17,680.17 square meters, Building No. 7 with a construction area of ​​11,906.24 square meters, and an underground garage with a construction area of ​​11,847.94 square meters. Buildings No. 1, No. 2, No. 6, and No. 7 are all 18 stories above ground, the underground garage is two stories underground, the building eaves height is 57.5 meters, the reinforced concrete shear wall structure has a service life of 50 years, and the seismic intensity is eight degrees. It is a reinforced concrete frame shear wall structure system. The shear wall at the expansion joint adopts the steel-wood hybrid formwork reinforcement system construction method. The specific operation steps are as follows:

[0032] S1. According to the structural diagram in the design drawing, determine the geometric shape and size requirements of the first panel 11, the specifications and spacing of the back ribs 13, and draw the assembly diagram of the first panel 11 and the back ribs 13, and the processing details of the accessories.

[0033] S2, cutting of back rib 13 and production of first panel 11 accessories

[0034] (1) Cutting: Cut the first panel 11 according to its design size and check the diagonal size of each piece to ensure that the four corners are square. Cut the channel steel according to the cutting size and check whether the channel steel is straight after cutting.

[0035] (2) Accessories production:

[0036] a. The ring 12 is made by bending a 700mm long screw 61 into a U-shaped ring on a bending machine.

[0037] b. Processing of anti-slip bolts 6, using high-strength tension bolts to process through-wall screws 61.

[0038] S3, Steel Formwork 1 Welding Assembly

[0039] a. Place the first panel 11 with a thickness of 4mm on a flat site, splice it according to the designed standard steel template 1, place the channel steel back rib 13 on the first panel 11, and ensure that a channel steel vertical rib is set in the center of the joint of the first panel 11. After checking that everything is correct, start welding the back ribs 13 around the steel template 1, check that the size meets the design requirements, and then weld the remaining back ribs 13. The welding between the channel steels is firm, and finally the first panel 11 and the back ribs 13 are temporarily fixed by spot welding to form a whole.

[0040] b. According to the designed panel layout, rivets are used to anchor the first panel 11 to the horizontal ribs of the channel steel between the vertical ribs of the channel steel.

[0041] c. Drilling and welding the first nut 132: According to the design drawing, draw a position diagram of the third through hole 131 at the intersection of the back rib 13, and draw a line on the surface of the back rib 13 to mark the position of the third through hole 131, and use a drill to drill a hole; weld the first nut 132 on the surface of the third through hole 131 of the back rib 13, and during the later reinforcement, the screw 61 in the expansion joint area 4 is connected to it.

[0042] d. Welding of the lifting ring 12: The position of the lifting ring 12 should ensure the balance of the steel formwork 1 when it is lifted. A U-shaped ring is made of round steel with a U-shaped height of about 300mm. It is set on the frame of the upper channel steel back rib 13 of the first panel 11, 0.2 to 0.25L away from the edge of the first panel 11 (L is the template length). The lifting ring 12 is firmly welded to the frame of the back rib 13, and the total length of the double-sided weld at the welding point is 200mm.

[0043] S4, Steel Formwork 1 Production and Correction

[0044] After each piece of standard steel formwork 1 is processed, it is strictly inspected according to the design drawings and quality acceptance standards. If the quality is unqualified, it should be reworked and repaired. After the processing size, flatness and diagonal of the steel formwork 1 are checked and verified, the surface rust and debris are promptly removed, the isolation agent is applied, and the templates are numbered in sequence in a conspicuous position. Before the shear wall area 3 template is set up, the construction personnel will give technical and safety technical explanations to the workers to ensure the construction quality.

[0045] S5. Positioning and setting out of shear wall area 3

[0046] Before installing the formwork, pop up the wall position line on the floor and establish a control line 200mm away from the inner edge of the wall.

[0047] S6. Installation of load-bearing bracket

[0048] Before pouring the next layer of concrete, a PVC pipe is embedded in the upper end of the shear wall area 3 100mm away from the lower end of the floor. After the lower layer of concrete is demolded, short steel bars are inserted into the embedded PVC pipe on the top of the wall as load-bearing brackets for the steel formwork 1. The bracket spacing is two meters, which is convenient for adjusting the position of the steel formwork 1 and effectively preventing the steel formwork from sliding downward.

[0049] S7. Lift the steel formwork 1 into place

[0050] Chisel and clean the shear wall area 3 of the expansion joint area 4, and paste a sponge strip along the upper edge of the lower outer wall. After the load-bearing bracket is installed, use a tower crane to lift the steel formwork 1 into place and keep it close to the wall concrete to prevent debris from falling in and affecting the flatness of the wall.

[0051] S8, indoor area 5 wooden formwork 2 assembly support

[0052] The wooden formwork 2 on one side of the indoor area 5 is supported and reinforced with a secondary keel 23 (square wood), a second panel 21 (wooden board), and a main keel 22 (steel pipe). Before sealing the formwork, the prefabricated 40mm×40mm×wall thickness top rod (the top rod is fine stone concrete, and the strength grade of fine stone concrete is one level higher than the strength grade of structural concrete) is sealed in time according to the spacing of the screws 61. One screw 61 must be sealed on each side to ensure the cross-sectional size of the shear wall area 3.

[0053] S9, anti-slip bolt 6 fixed

[0054] Insert the PVC pipe into the third through hole 131 reserved on the first panel 11 in the expansion joint area 4; then insert the screw 61 from the indoor area 5 toward the expansion joint area 4, and connect the screw 61 to the first nut 132. When the screw 61 has difficulty rotating, stop rotating. At this time, the screw 61 is effectively connected to the first nut 132; then rotate the second nut 62 on one side of the indoor area 5 for reinforcement.

[0055] S10, Acceptance of steel-wood hybrid formwork reinforcement system

[0056] Correct the verticality of the formwork on one side of the indoor area 5 of the steel-wood hybrid reinforcement system. After the formwork is corrected, tighten the second nut 62 on one side of the indoor area 5 to ensure that the formwork is firmly fixed.

[0057] S11. Pouring concrete

[0058] When starting to pour concrete, pay attention to the concrete flow rate to prevent the steel formwork 1 from being impacted, displaced or deformed due to excessive flow rate. The concrete in the shear wall area 3 should be poured and vibrated in layers to ensure the quality of concrete pouring.

[0059] S12, dismantling of the standard steel formwork 1

[0060] After the concrete is finally set, loosen the second nut 62 and the third nut 63 on one side of the indoor area 5 in time. The demoulding sequence is opposite to the installation sequence. If the template is adsorbed or adhered to the concrete wall, use a crowbar to pry the upper edge of the template, and do not use a sledgehammer to hit the template to ensure that the edges and corners are not damaged when demoulding.

[0061] Therefore, the utility model adopts the above-mentioned steel-wood hybrid formwork reinforcement system for the shear wall at the expansion joint, which solves the problem that the traditional square wood and steel pipe formwork system cannot be reinforced or dismantled, avoids the loosening and slipping of bolts during the reinforcement process or the pouring of concrete, and prevents the shear wall from expanding the formwork and leaking the slurry.

[0062] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Although the utility model has been described in detail with reference to the preferred embodiments, ordinary technicians in this field should understand that they can still modify or replace the technical solution of the utility model with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the utility model.

Claims

1. A steel-wood hybrid formwork reinforcement system for shear walls at expansion joints, characterized in that: It includes a vertically arranged steel formwork and a wooden formwork, wherein the steel formwork is fixedly connected to the wooden formwork by a plurality of anti-slip bolts, and a first nut corresponding to the anti-slip bolts is fixedly arranged on the surface of the steel formwork, a shear wall area is between the steel formwork and the wooden formwork, the other side of the steel formwork is an expansion joint area, and the other side of the wooden formwork is an indoor area.

2. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 1 is characterized in that: The steel formwork includes a first panel, a lifting ring and a back rib, wherein the back rib is a plurality of evenly distributed transverse channel steels and vertical channel steels, the back rib is welded to one side of the expansion joint area of ​​the first panel, the first nut is arranged at the junction of the transverse channel steel and the vertical channel steel, the lifting ring is a U-shaped ring, and the open end of the lifting ring is welded to the frame of the back rib.

3. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 2 is characterized in that: The wooden formwork includes a second panel and a plurality of main keels evenly arranged along the horizontal direction of the second panel. The main keel is fixedly connected to one side of the indoor area of ​​the second panel through a plurality of secondary keels. The secondary keels are evenly arranged along the vertical direction of the main keel.

4. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 3 is characterized in that: The main keel is provided with a plurality of first through holes, the surface of the second panel is provided with a plurality of second through holes, the intersections of the back ribs are provided with third through holes, and the anti-slip bolts sequentially penetrate the first through holes, the second through holes and the third through holes and are fixedly connected with the first nut.

5. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 4 is characterized in that: The anti-slip bolt includes a screw rod and a second nut and a third nut arranged on the screw rod. The screw rod includes a first non-threaded segment, a first threaded segment, a second non-threaded segment and a second threaded segment arranged in sequence. The first nut is movably connected to the second threaded segment, the first nut is fixedly connected to the second non-threaded segment, the second nut is movably connected to the first threaded segment, the third nut is movably connected to the first threaded segment, and the third nut is fixedly connected to the first non-threaded segment.

6. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 1 is characterized in that: A plurality of load-bearing brackets with uniform intervals are arranged at the bottom of the shear wall area along the direction of the steel formwork.

7. The steel-wood hybrid formwork reinforcement system for shear walls at expansion joints according to claim 1 is characterized in that: The anti-slip bolts all penetrate the shear wall area through PVC pipes, and the shear wall area is provided with top rods corresponding to the PVC pipes one by one.