Small-clear-distance tunnel safety reinforcing system

Through the combined reinforcement system of high-pressure jet grouting piles, isolation piles and triaxial mixing pile water-stop curtains, the construction safety problem of small-clearance double-line shield tunnels in adverse geological environments is solved, and efficient reinforcement effects and construction flexibility are achieved. It is suitable for the safety reinforcement of double-line shield tunnels with small clearance distance.

CN221856718UActive Publication Date: 2024-10-18POWERCHINA RAILWAY CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323486902.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-20
Publication Date
2024-10-18
Estimated Expiration
2033-12-20

AI Technical Summary

Technical Problem

The existing reinforcement measures have a limited scope of application and are difficult to effectively solve the construction safety problems of small-clearance double-line shield tunnels in adverse geological environments, especially the risks when large-diameter shield machines enter and exit the tunnel.

Method used

A safe reinforcement system is adopted that combines high-pressure jet grouting piles, isolation piles and three-axis mixing pile water-stop curtains. The high-pressure jet grouting piles overlap with the three-axis mixing piles, and the isolation piles are set along the center line of the tunnel to form a multi-level reinforcement structure. Ensure construction safety and stability.

Benefits of technology

This reinforcement system improves the safety and applicability of tunnel construction, can effectively prevent underground water inflow and seepage, adapts to different construction conditions, is flexible and efficient, and ensures easy and economical construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221856718U_ABST
    Figure CN221856718U_ABST
Patent Text Reader

Abstract

The utility model discloses a small-clear-distance tunnel safety reinforcing system, and relates to the technical field of tunnel construction. Comprising high-pressure jet grouting piles, isolation piles and a three-axis stirring pile waterproof curtain, the high-pressure jet grouting piles are reinforced at a shield tunnel entering section, the high-pressure jet grouting piles in the first row of the shield tunnel entering section are in lap joint with the three-axis stirring pile waterproof curtain by 200 mm, and the isolation piles are driven along the center line of a left tunnel and the center line of a right tunnel. The device is safe, reliable, high in applicability and easy and convenient to construct and operate, and has good technical and economic benefits.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of tunnel construction, and more specifically relates to a small-clearance tunnel safety reinforcement system. Background Art

[0002] The shield machine is a tunnel boring machine that uses the shield method. During the construction process, there is no need for large-scale demolition on the ground, no traffic is blocked, no noise is generated during construction, the ground does not sink, and the normal life of residents is not affected. The basic working principle of the shield machine is that a cylindrical steel component moves forward along the axis of the tunnel while excavating the soil. The shell of the cylindrical component is the shield, which plays a temporary support role for the excavated tunnel section that has not yet been lined, bearing the pressure of the surrounding soil layer, and sometimes also bearing the groundwater pressure and keeping the groundwater out. Excavation, soil discharge, lining and other operations are carried out under the cover of the shield. The construction of large-diameter shield machines entering and exiting the tunnel is one of the main risks of tunnel engineering. At the same time, the engineering geological conditions on site, the shield diameter, and the tunnel burial depth will have a certain impact on the soil at the entrance during the excavation process. The use of a reliable and safe reinforcement scheme at the entrance is an effective means to ensure the safety of the shield machine entering and exiting the entrance. The construction of the tunnel entrance is complicated. Using only one reinforcement method cannot solve the existing hazards. It is often necessary to form a system of several reinforcement methods to ensure the safety of construction. The existing reinforcement measures have limited scope of application. There are few reinforcement methods for small clearance double-line shield tunnels. Combined with the adverse geological environment, higher reinforcement requirements are therefore required. Utility Model Content

[0003] The technical problem to be solved by the utility model is to provide a safety reinforcement system which can be used for tunnels with small clearance, which is safe and reliable, has strong applicability and is easy to construct and operate.

[0004] In order to solve the above technical problems, the technical solution adopted by the utility model is:

[0005] A safety reinforcement system that can be used for tunnels with small clearances consists of high-pressure jet grouting piles, isolation piles, and a three-axis mixing pile water-stop curtain. The high-pressure jet grouting piles are used for reinforcement in the shield tunneling section. The first row of high-pressure jet grouting piles in the shield tunneling section overlaps the three-axis mixing pile water-stop curtain by 200 mm, and the isolation piles are driven along the left and right tunnel center lines.

[0006] Preferably, the high-pressure rotary jet piles adopt double-tube high-pressure rotary jet piles, the pressure of the high-pressure cement slurry is greater than 20MPa, the lifting speed is 6-12cm / min, the rotation speed is 8-12rpm, the effective diameter is 800mm, P.O42.5 grade ordinary Portland cement is adopted, and the final cement content is higher than 25%, the unconfined compressive strength after 28 days is required to be not less than 0.8MPa, the permeability coefficient is not greater than 1*10-7cm / s, the vertical deviation of the borehole during construction should not exceed 1%, and the pile position deviation should not be greater than 50mm.

[0007] Preferably, the pile foundation of the isolation pile adopts a mud layer (or a stable liquid layer) to protect the wall and drill the hole. The diameter of the hole of the isolation pile reaches the designed pile diameter. The pile foundation of the isolation pile should have a steel cage, the pile position deviation is less than or equal to 50mm, the cumulative settlement of the pile top is less than or equal to 20mm, and the allowable deviation of the verticality of the pile body is 1 / 200.

[0008] Preferably, the steel cage comprises a plurality of longitudinal steel bars, spirally welded steel stirrups and a plurality of reinforcing stirrups. The longitudinal steel bars are arranged at intervals along the circumference. The spirally welded steel stirrups are spirally welded and connected to the longitudinal steel bars. The reinforcing stirrups are welded and connected to the longitudinal steel bars in a circle.

[0009] Preferably, the longitudinal steel bar spacing deviation is less than or equal to 10 mm, the stiffening stirrup spacing deviation is less than or equal to 20 mm, the steel cage length deviation is less than or equal to 100 mm, and the steel bar protective layer deviation is less than or equal to 20 mm.

[0010] Preferably, the mixing piles of the three-axis mixing pile water-stop curtain are made of ordinary Portland cement with strength grade 42.5, the cement content of the mixing piles is 15% of the natural mass of the soil and the water-cement ratio is 0.6, and the pile length of the mixing piles is greater than or equal to the designed pile length.

[0011] The beneficial effect produced by adopting the above technical scheme is that the utility model is composed of high-pressure rotary jet piles, isolation piles and three-axis mixing pile water-stop curtains. The three reinforcement methods are all produced by on-site construction, which can ensure the construction quality of each reinforcement pile, and have the advantages of high safety, strong pertinence and wide applicability. This reinforcement system has sufficient reinforcement force and can also prevent underground water gushing, seepage and other phenomena. In addition, the reinforcement components in this system can be designed according to the actual construction conditions, tunnel burial depth, shield diameter and other requirements, with good flexibility in use and reliable performance. In summary, this safety reinforcement system is safe and reliable, highly applicable, easy to construct and operate, and has good technical and economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] Figure 1 It is a schematic diagram of the safety reinforcement method system for small clearance tunnels;

[0013] Figure 2 It is a schematic diagram of the steel cage structure of the isolation pile;

[0014] In the figure: 1. High-pressure jet grouting piles; 2. Three-axis mixing pile water-stop curtain; 3. Isolation piles; 3-1. Longitudinal reinforcement; 3-2. Spiral welded stirrups; 3-3. Reinforcing stirrups. DETAILED DESCRIPTION

[0015] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0016] The small clearance tunnel safety reinforcement system provided by the utility model is a reinforcement system with simple structure, convenient construction, good force bearing performance and excellent safety performance. Figure 1 As shown in the figure, the main body is composed of high-pressure jet grouting piles 1, three-axis mixing pile water-stop curtain 2, and isolation piles 3; high-pressure jet grouting piles 1 are used to reinforce the shield tunneling section, and the piles are arranged at a row spacing of 600mm. The first row of jet grouting piles overlaps the three-axis mixing pile water-stop curtain 2 by 200mm. Isolation piles 3 are set along the center lines of the left and right tunnels, with a pile diameter of 800mm, a horizontal spacing of 1.2m, and a pile length of 16.8m. They are divided into two sections. The first section is set along the center line of the excavation direction, starting from 1.1 at the three-axis mixing pile water-stop curtain outside the shield starting shaft, with a total length of 50.4. The second section is 69.645 in total, and the last isolation pile is 0.8 away from the shield receiving shaft.

[0017] High-pressure jet grouting pile 1 adopts double-tube high-pressure jet grouting pile, and the pressure of high-pressure cement slurry should be greater than 20MPa, the lifting speed is 6-12cm / min, the rotation speed is 8-12rpm, and the effective diameter is 800mm. Ordinary Portland cement of PO 42.5 grade is adopted, and the final cement content should not be less than 25%. The unconfined compressive strength after 28 days is required to be not less than 0.8MPa, and the permeability coefficient is not greater than 1*10 -7 cm / s. During construction, it should be ensured that the vertical deviation of the drill hole should not exceed 1% and the pile position deviation should not be greater than 50mm.

[0018] The pile foundation of the isolation pile 3 is made of mud (or stabilizing liquid) wall protection hole. The pile position deviation should not be greater than 50mm, and the cumulative settlement of the pile top should not be greater than 20mm. At the same time, the pile hole diameter must reach the designed pile diameter, and the verticality deviation of the pile body is allowed to be 1 / 200. The pile foundation of the isolation pile 3 should have a steel cage, which includes longitudinal steel bars 3-1, spiral welded stirrups 3-2, and reinforcing stirrups 3-3. The spacing deviation of the longitudinal steel bars 3-1 should not be greater than 10mm, the spacing deviation of the reinforcing stirrups 3-3 should not be greater than 20mm, the steel cage length deviation should not be greater than 100mm, and the steel protection layer deviation should not be greater than 20mm; high-pressure rotary jet piles 1, three-axis mixing water-stop curtain 2, the high-pressure rotary jet piles 1 in the first row of the shield tunneling section and the mixing pile water-stop curtain 2 overlap by 200mm to perform overlap reinforcement.

[0019] The isolation pile 3 is constructed by drilling with a rotary drilling rig. In order to prevent the collapse of the hole or damage to the pile body quality due to the close construction distance or short interval between two adjacent piles during the bored pile construction, the skipping hole construction is adopted. The three-axis mixing pile water-stop curtain 2 uses ordinary silicate cement with a strength grade of 42.5. The cement content of the mixing pile is 15% of the natural mass of the soil and the water-cement ratio is 0.6. At the same time, the pile length of the mixing pile is controlled to be not less than the designed pile length.

[0020] The construction process of this utility model is:

[0021] Construction of the main structure of the end well of the open-cut section → reinforcement of the starting end → construction of high-pressure jet grouting pile 1 → construction of isolation pile 3. The isolation pile 3 in the reinforcement body should be completed before the end reinforcement.

[0022] In the early stage of construction, the types and locations of underground pipelines and underground obstacles should be clarified, and corresponding technical measures should be taken to reasonably arrange the locations of construction machinery, transmission pipelines and power lines to ensure the smooth establishment of the later reinforcement system. High-pressure jet grouting piles 1 First, the pile axis, hole position, and hole mouth elevation are measured and laid out according to the measurement reference point. After the drilling rig is in place, the pile driver is leveled and centered, and the verticality of the pile driver is adjusted to ensure that the drill rod should be consistent with the pile position, the deviation should be within 10mm, and the drill rod verticality error is less than 1 / 250. After that, the cement slurry is mixed. The mixing time should not be less than 30s when using a high-speed mixer and not less than 90s when using an ordinary mixer. Then, the grouting is poured in with the help of a jet pipe. After reaching the designed depth, drilling is stopped and the shotcrete pipe is gradually raised to ensure that the expected reinforcement height is achieved.

[0023] In the early stage of the construction of isolation pile 3, the steel bars should be processed in the manufacturer. The isolation piles are drilled and constructed with a rotary drilling rig to prevent damage caused by the close construction distance of adjacent piles during the bored pile construction. The construction is carried out in batches and the pile position is determined according to the construction drawings and the on-site wire control points. Then the casing is buried, and the mud is prepared and the drilling rig is used to start drilling. No displacement or settlement should occur during the drilling process. After the drilling is completed, the quality of the hole needs to be checked. Then the steel bars processed by the manufacturer are formed into a steel cage, and the hanging rod is used to put it into the pile hole. After the construction is completed, the guide tube connected with a quick threaded joint is lowered, and the borehole is cleaned for a second time. Then the guide tube method is used for concrete pouring pile construction. Finally, the quality of the completed pile body is inspected, and it must meet the design requirements.

[0024] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.

Claims

1. A small clearance tunnel safety reinforcement system, characterized in that: It is composed of high-pressure rotary jet piles, isolation piles, and three-axis mixing pile water-stop curtain; the high-pressure rotary jet piles are reinforced in the shield tunnel entry section, and the first row of high-pressure rotary jet piles in the shield tunnel entry section overlaps with the three-axis mixing pile water-stop curtain; the isolation piles are driven along the left and right tunnel center lines and overlap with the three-axis mixing pile water-stop curtain.

2. A small clearance tunnel safety reinforcement system according to claim 1, characterized in that: The high-pressure rotary jet piles are double-tube high-pressure rotary jet piles.

3. A small clearance tunnel safety reinforcement system according to claim 1, characterized in that: The pile foundation of the isolation pile adopts a mud layer or a stable liquid layer to protect the wall and form a hole, and the pile foundation of the isolation pile is provided with a steel cage.

4. A small clearance tunnel safety reinforcement system according to claim 3, characterized in that: The steel cage comprises a plurality of longitudinal steel bars, spirally welded stirrups and a plurality of reinforcing stirrups; the longitudinal steel bars are arranged at intervals along the circumference, the spirally welded steel stirrups are spirally welded and connected to the longitudinal steel bars, and the reinforcing stirrups are welded and connected to the longitudinal steel bars in a circle.

5. A small clearance tunnel safety reinforcement system according to claim 4, characterized in that: The deviation of longitudinal steel bar spacing is less than or equal to 10mm, the deviation of stiffening stirrup spacing is less than or equal to 20mm, and the deviation of steel cage length is less than or equal to 100mm.

6. A small clearance tunnel safety reinforcement system according to claim 1, characterized in that: The mixing piles of the three-axis mixing pile water-stop curtain are made of silicate cement with strength grade 42.5; the pile length of the mixing pile is greater than or equal to the designed pile length.