Shock-resistant and load-bearing assembled hanging bracket
By adjusting the tilt direction of the cable-stayed channel steel and combining suspension channel steel, horizontal support channel steel and other structures, the problem of the seismic hanger installation space becoming longer and unable to bear the load is solved, and a hanger that can be installed efficiently and load-bearing in a small space is realized design, reducing construction costs.
Patent Information
- Application Number
- CN202420582199.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2034-03-25
AI Technical Summary
The existing anti-seismic hangers are installed with diagonal support rods facing outwards, which results in a longer installation space, difficult construction and inability to bear load, and cannot meet the dual requirements of earthquake resistance and load-bearing.
A prefabricated hanger that takes into account both earthquake resistance and load-bearing is designed. By adjusting the diagonal brace direction of the cable-stayed channel steel to tilt inward in the second or third direction, a combination of suspension channel steel, transverse bracket channel steel, and T-shaped connectors are designed. The combined structure with right-angle connectors is installed on the concrete roof to shorten the length of the hanger, increase the load-bearing capacity, and enhance the installation firmness through T-shaped fixings and right-angle connectors.
It achieves enhanced seismic resistance and load-bearing capacity without changing the length of the hanger, simplifies the installation process, reduces the number of load-bearing brackets, and reduces construction costs.
Smart Images

Figure CN221857797U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of hangers, in particular to an assembled hanger that takes both earthquake resistance and load-bearing into consideration. Background Art
[0002] Pipeline installation accounts for a large proportion of electromechanical installation projects. The manufacture and installation of pipeline supports and hangers play a major role in pipeline installation, which is directly related to the load-bearing direction and appearance of the pipeline. The oblique support rods of existing seismic hangers are installed outward, which makes the installation space of the hanger longer, makes on-site construction more difficult, and has a poor appearance. The existing seismic hangers only meet seismic requirements and cannot bear weight. Utility Model Content
[0003] To this end, it is necessary to provide an assembled hanger that is both earthquake-resistant and load-bearing, so as to solve the technical problem that the oblique support rods of the existing earthquake-resistant hanger are installed outward, causing the installation space of the hanger to become longer, making on-site construction more difficult and unable to bear load.
[0004] To achieve the above-mentioned purpose, the inventor provides an assembled hanger that takes into account both earthquake resistance and load-bearing properties, including at least one group of lifting components and fixings, the top of the lifting components is installed on the concrete top plate through the fixings; the lifting components include suspension channel steels, cross-support channel steels, inclined channel steels, T-shaped connectors and right-angle connectors, the suspension channel steels are extended along a first direction, the cross-support channel steels are extended along a second direction, the suspension channel steels and the cross-support channel steels are connected to each other through T-shaped connectors and right-angle connectors, the bottom of the inclined channel steels is installed on the suspension channel steels, and the top of the inclined channel steels is used to be installed on the concrete top plate, and the inclined channel steels are inclined inwardly in the second direction or inclined in the third direction.
[0005] Different from the prior art, the above technical solution uses the diagonal steel brace, but its direction is inclined toward the inside of the second direction or the third direction, so that the length of the assembled hanger that takes into account both earthquake resistance and load-bearing along the second direction remains unchanged. Compared with the existing earthquake-resistant assembled hanger technology, the overall length of the hanger is shortened, which is convenient for installation and can also be installed in a small space. At the same time, it can play a load-bearing role, reduce the number of load-bearing brackets installed, and save construction costs.
[0006] As an embodiment of the utility model, the fixing piece is a T-shaped fixing piece, which includes a fixed end plate and a fixed sleeve. The bottom of the fixed end plate is welded with a fixed sleeve. The fixed end plate is used to be installed on the concrete top plate, and the fixed sleeve is installed on the top of the suspension channel steel.
[0007] In this way, the T-shaped fixing piece is installed on the top of the suspension channel steel. Specifically, during the actual installation, the fixed end plate is fixed to the concrete top plate by four bolts, the top of the suspension channel steel is inserted into the fixing sleeve (that is, the fixing sleeve is installed on the top of the suspension channel steel), and then two short bolts are used on both sides of the fixing sleeve to lock the suspension channel steel and the fixing sleeve, which increases the firmness of the hanger and facilitates installation.
[0008] As an implementation mode of the utility model, the hanging assembly includes three suspension channel steels and one cross-support channel steel, and the bottoms of the three suspension channel steels are respectively connected to the front, middle and rear of the cross-support channel steel.
[0009] In this way, the three suspension channels and one cross-bracing channel are installed to form a mountain shape as a whole. In some embodiments, a corresponding number of cross-bracing channels can be set according to the number of columns of the pipeline (i.e., the number along the first direction). For example, when there are two columns of pipelines, two cross-bracing channels need to be set. Among them, the inclined-stayed channel can be installed on any one of the suspension channels, or on three suspension channels, or on two suspension channels connected to the front and rear of the cross-bracing channel, etc.
[0010] As an implementation mode of the utility model, the bottom of one of the suspension channel steels is connected to the middle part of the cross-support channel steel through a T-shaped connector.
[0011] In this way, the load-bearing capacity of the assembled hanger that takes into account both earthquake resistance and load-bearing properties is increased by the T-shaped connector.
[0012] As an embodiment of the utility model, the T-shaped connecting piece includes a connecting vertical steel and a connecting horizontal steel. The bottom of the connecting vertical steel is welded with a connecting horizontal steel. The connecting vertical steel is sleeved and installed at the bottom of one of the hanging channel steels, and the connecting horizontal steel is sleeved and installed in the middle of the horizontal support channel steel.
[0013] In this way, the connecting vertical steel and the connecting horizontal steel can be U-shaped, or the connecting horizontal steel can be square. Specifically, the bottom of one of the suspension channel steels is inserted into the connecting vertical steel (that is, the connecting vertical steel is installed on the bottom of one of the suspension channel steels), and then fixed by four bolts on both sides and corresponding nuts. After that, the middle part of the horizontal support channel steel is inserted into the connecting horizontal steel (that is, the connecting horizontal steel is installed in the middle part of the horizontal support channel steel), and fixed by six bolts on both sides and corresponding nuts, thereby increasing the load-bearing capacity of the assembled hanger that takes into account both earthquake resistance and load-bearing, while facilitating installation.
[0014] As an implementation mode of the utility model, the T-shaped connector also includes a gasket, and the gasket is installed on the inner side of the connecting vertical steel, and the gasket is used to contact the bottom of one of the hanging channel steels.
[0015] The gasket may be multiple pieces or have the same shape as the connecting vertical steel. The stability of the connection between the connecting vertical steel and one of the suspension channel steels is enhanced by arranging the gasket.
[0016] In this way, the suspension channel steel is connected to the middle part of the horizontal support channel steel through a T-shaped connector. Specifically, the bottom of one of the suspension channel steels is inserted into the connecting vertical steel (that is, the connecting vertical steel is installed on the bottom of one of the suspension channel steels), and then fixed by four bolts on both sides and corresponding nuts. After that, the middle part of the horizontal support channel steel is inserted into the connecting horizontal steel (that is, the connecting horizontal steel is installed in the middle part of the horizontal support channel steel), and fixed by six bolts on both sides and corresponding nuts, thereby increasing the load-bearing capacity of the assembled hanger that takes into account both earthquake resistance and load-bearing, while facilitating installation.
[0017] As an implementation mode of the utility model, the hanging assembly includes two right-angle connectors, and the bottoms of the other two hanging channel steels are respectively connected to the front and rear of the cross-support channel steel through the right-angle connectors.
[0018] In this way, the load-bearing capacity and stability of the assembled hanger that takes into account both earthquake resistance and load-bearing properties are increased through right-angle connectors.
[0019] As an embodiment of the utility model, the two right-angle connecting members include two vertical connecting sleeves and two transverse connecting sleeves, each vertical connecting sleeve includes a first vertical plate, a second vertical plate and a third vertical plate connected in sequence, and each transverse connecting sleeve includes a first transverse plate, a second transverse plate and a third transverse plate connected in sequence; the bottom of the second vertical plate is welded to one end of the second transverse plate, and the angle between the second vertical plate and the second transverse plate is a right angle; the two vertical connecting sleeves are respectively mounted on the bottom of the other two suspension channel steels, and the two transverse connecting sleeves are respectively mounted on the front and rear of the transverse support channel steel.
[0020] In this way, the bottoms of the other two suspension channels are respectively connected to the front and rear of the cross-support channel by two right-angle connectors, wherein the angle between the second vertical plate and the second cross plate is a right angle, so that the right-angle connector can connect the two suspension channels to the front and rear of the cross-support channel. Specifically, the bottoms of the two suspension channels are inserted into the two vertical connection sleeves (i.e., the two vertical connection sleeves are respectively sleeved and installed on the bottoms of the other two suspension channels), and then fixed by four bolts on both sides and corresponding nuts. Afterwards, the front and rear of the cross-support channel are inserted into the two horizontal connection sleeves (i.e., the two horizontal connection sleeves are respectively sleeved and installed on the front and rear of the cross-support channel), and then fixed by four bolts on both sides and corresponding nuts, thereby increasing the load-bearing and stability of the assembled hanger that takes into account both earthquake resistance and load-bearing, while facilitating installation.
[0021] As an embodiment of the utility model, the two right-angle connectors also include two pairs of reinforcement assemblies, and the reinforcement assemblies include two reinforcement rods; one end of the two reinforcement rods is respectively welded to the bottom of the first vertical plate and the third vertical plate, and the other end of the two reinforcement rods is respectively welded to one end of the first horizontal plate and the third horizontal plate.
[0022] Thus, in order to enhance the stability and firmness of the right-angle connector, a reinforcing assembly is provided. Specifically, under the action of the reinforcing rod, the connection between the vertical connecting sleeve and the transverse connecting sleeve is strengthened. Optionally, a triangular structure is formed between the reinforcing rod and the vertical connecting sleeve and the transverse connecting sleeve, so that the connection is more firm and stable.
[0023] As an embodiment of the utility model, an assembled hanger that takes into account both earthquake resistance and load-bearing characteristics includes two groups of lifting components, and the fixing parts are π-shaped fixing parts; the π-shaped fixing parts include a connecting plate, a first sleeve and a second sleeve, the connecting plate is installed on the concrete top plate, the first sleeve and the second sleeve are installed on the bottom of the connecting plate, the first sleeve is sleeved and installed on the top of one group of lifting components, and the second sleeve is sleeved and installed on the top of the other lifting component.
[0024] In this way, by providing two sets of lifting components, the firmness of the lifting is further enhanced, so that heavier pipes can be lifted.
[0025] The above-mentioned records related to the content of the utility model are only an overview of the technical solution of the present application. In order to enable ordinary technicians in the field to more clearly understand the technical solution of the present application, and then implement it according to the text of the specification and the contents recorded in the drawings, and to make the above-mentioned purpose and other purposes, features and advantages of the present application easier to understand, the following is an explanation in combination with the specific implementation method and drawings of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The drawings are only used to illustrate the principles, implementation methods, applications, characteristics and effects of the specific embodiments of the present application and other related contents, and shall not be considered as limitations of the present application.
[0027] In the drawings of the specification:
[0028] Figure 1 A schematic diagram of an embodiment of the present application showing a pipeline disposed on an assembled hanger that takes into account both earthquake resistance and load-bearing properties;
[0029] Figure 2 Schematic diagram of an assembled hanger that takes into account both earthquake resistance and load-bearing according to an embodiment of the present application Figure 1 ;
[0030] Figure 3 A schematic diagram of a T-shaped fixing member according to an embodiment of the present application;
[0031] Figure 4A schematic diagram of a T-shaped connector according to an embodiment of the present application;
[0032] Figure 5 Another schematic diagram of a T-shaped connector according to an embodiment of the present application;
[0033] Figure 6 A schematic diagram of a right-angle connector according to an embodiment of the present application;
[0034] Figure 7 This is a schematic diagram of the interior of a right-angle connector according to an embodiment of the present application;
[0035] Figure 8 Schematic diagram of an assembled hanger that takes into account both earthquake resistance and load-bearing according to an embodiment of the present application Figure 2 ;
[0036] Fig. 9 This is a schematic diagram of a π-shaped fixing member according to an embodiment of the present application.
[0037] The reference numerals in the above drawings are described as follows:
[0038] 100. Assembled hanger that takes into account both earthquake resistance and load-bearing performance;
[0039] 200, pipeline;
[0040] 300, hoisting assembly;
[0041] 1. Suspension channel steel;
[0042] 2. Horizontal support channel steel;
[0043] 3. Inclined channel steel;
[0044] 4. T-shaped fixings;
[0045] 41. Fixed end plate;
[0046] 42. Fixed sleeve;
[0047] 5. T-shaped connector;
[0048] 51. Connect vertical steel;
[0049] 52. Connect the horizontal steel;
[0050] 6. Right angle connector;
[0051] 61. Right angle connector body;
[0052] 611, vertical connection sleeve;
[0053] 6111, first vertical board;
[0054] 6112, second vertical board;
[0055] 6113, the third vertical board;
[0056] 612, transverse connecting sleeve;
[0057] 6121, first horizontal board;
[0058] 6122, second horizontal board;
[0059] 6123, third horizontal board;
[0060] 6131, reinforcement rod;
[0061] 62. Shell;
[0062] 7. π-shaped fixings;
[0063] 71. Connecting plate;
[0064] 72. First sleeve;
[0065] 73. Second sleeve;
[0066] a. First direction;
[0067] b. the inner side of the second direction;
[0068] c. the outer side in the second direction;
[0069] d. Third direction. DETAILED DESCRIPTION
[0070] In order to explain in detail the possible application scenarios, technical principles, specific schemes that can be implemented, and the purposes and effects that can be achieved, the following is a detailed description of the specific embodiments listed in conjunction with the accompanying drawings. The embodiments described herein are only used to more clearly illustrate the technical solutions of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0071] Reference to "embodiment" herein means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present application. The term "embodiment" appearing in various places in the specification does not necessarily refer to the same embodiment, nor does it particularly limit its independence or association with other embodiments. In principle, in the present application, as long as there is no technical contradiction or conflict, the various technical features mentioned in the embodiments can be combined in any way to form a corresponding implementable technical solution.
[0072] Unless otherwise defined, the technical terms used in this document have the same meanings as those generally understood by those skilled in the art to which this application belongs; the use of relevant terms in this document is only for describing specific embodiments and is not intended to limit this application.
[0073] In the description of this application, the term "and / or" is an expression used to describe the logical relationship between objects, indicating that three relationships may exist, for example, X and / or Y, which means: X exists, Y exists, and X and Y exist at the same time. In addition, the character " / " in this article generally indicates that the objects before and after are in a logical relationship of "or".
[0074] In the present application, terms such as “first” and “second” are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship of quantity, priority or sequence between these entities or operations.
[0075] Without further limitations, in this application, the words "include", "comprises", "has" or other similar expressions used in the sentences are intended to cover non-exclusive inclusion. These expressions do not exclude the presence of additional elements in the process, method or product including the elements, so that the process, method or product including a series of elements may include not only those limited elements, but also other elements not explicitly listed, or also include elements inherent to such process, method or product.
[0076] Similar to the understanding in the Examination Guidelines, in this application, expressions such as "greater than", "less than", "exceed" and the like are understood to exclude the number itself; expressions such as "above", "below", "within" and the like are understood to include the number itself. In addition, in the description of the embodiments of this application, "multiple" means more than two (including two), and similar expressions related to "multiple" are also understood in this way, such as "multiple groups", "multiple times", etc., unless otherwise clearly and specifically limited.
[0077] In the description of the embodiments of the present application, space-related expressions used, such as "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "vertical", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc., indicate the orientation or position relationship based on the orientation or position relationship shown in the specific embodiments or drawings, and are only for the convenience of describing the specific embodiments of the present application or facilitating the reader's understanding, and do not indicate or imply that the referred device or component must have a specific position, a specific orientation, or be constructed or operated in a specific orientation, and therefore cannot be understood as a limitation on the embodiments of the present application.
[0078] Unless otherwise expressly specified or limited, in the description of the embodiments of the present application, the terms such as "install", "connect", "connect", "fix", "set", etc. used should be understood in a broad sense. For example, the "connection" can be a fixed connection, a detachable connection, or an integrated setting; it can be a mechanical connection, an electrical connection, or a communication connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For technicians in the technical field to which the present application belongs, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0079] The existing diagonal support rods of the earthquake-resistant hanger are installed outward, which makes the installation space of the hanger longer and makes on-site construction more difficult. The applicant discovered the above problem and diagonally supported the diagonal channel steel 3, but its direction was tilted inward in the second direction (the prior art is to tilt the diagonal channel steel 3 toward the outside c of the second direction) or the third direction d, so that the length of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing along the second direction remains unchanged. Compared with the prior art, the overall length of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing is shortened, which is convenient for installation and can also be installed in places with small spaces. At the same time, the assembled hanger 100 that takes into account both earthquake resistance and load-bearing can play a load-bearing role, reducing the number of load-bearing brackets installed and saving construction costs (i.e., the cost of building construction and the cost of installing building facilities and equipment).
[0080] The present application discloses an assembled hanger 100 that is both earthquake-resistant and load-bearing and is mainly used for hanging a pipeline 200 .
[0081] According to some embodiments of the present application, please refer to Figure 1 to Figure 2 The present embodiment relates to an assembled hanger 100 that takes into account both earthquake resistance and load-bearing properties, including at least one set of hoisting components 300 and fixings, the top of the hoisting components 300 is installed on the concrete top plate through the fixings; the hoisting components 300 include a suspension channel steel 1, a cross-support channel steel 2, a diagonal channel steel 3, a T-shaped connector 5 and a right-angle connector 6, the suspension channel steel 1 is extended along a first direction a, the cross-support channel steel 2 is extended along a second direction, the cross-support channel steel 2 is firmly connected to the suspension channel steel 1 through the T-shaped connector 5 and the right-angle connector 6; the bottom of the diagonal channel steel 3 is installed on the suspension channel steel 1, and the top of the diagonal channel steel 3 is used to be installed on the concrete top plate, and the diagonal channel steel 3 is inclined toward the inner side b of the second direction or toward the third direction d.
[0082] The inclined channel steel 3 is arranged with diagonal bracing, wherein the bottom of the inclined channel steel 3 is mounted on the suspension channel steel 1 through a bottom hinge, and the top of the inclined channel steel 3 is mounted on the concrete top plate through a top hinge, forming a triangular inclined brace. Optionally, when multiple suspension channel steels 1 and corresponding multiple inclined channel steels 3 are provided, the multiple inclined channel steels 3 may all be inclined toward the inner side b of the second direction, or may all be inclined toward the third direction d, or a part may be inclined toward the inner side b of the second direction, and the other part may be inclined toward the third direction d.
[0083] The T-shaped fixing member 4 increases the firmness of the assembled hanger 100 which is both earthquake-resistant and load-bearing when installed on the concrete top plate.
[0084] The above technical solution braces the inclined channel steel 3, but its direction is inclined toward the inside of the second direction or the third direction d, so that the length of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing along the second direction remains unchanged. Compared with the prior art, the overall length of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing is shortened, which is convenient for installation and can also be installed in a small space. At the same time, the assembled hanger 100 that takes into account both earthquake resistance and load-bearing can play a load-bearing role, reducing the number of load-bearing brackets installed and saving construction costs (i.e., the cost of building construction and the cost of installing building facilities and equipment).
[0085] According to some embodiments of the present application, optionally, Figure 2 and Figure 3 As shown, the fixing member is a T-shaped fixing member 4, which includes a fixed end plate 41 and a fixed sleeve 42. The fixed sleeve 42 is welded to the bottom of the fixed end plate 41. The fixed end plate 41 is used to be installed on the concrete top plate, and the fixed sleeve 42 is sleeved and installed on the top of the suspension channel steel 1.
[0086] Optionally, the cross section of the fixing sleeve 42 may be U-shaped or rectangular.
[0087] In this way, the T-shaped fixing member 4 is installed on the top of the suspension channel steel 1. Specifically, during the actual installation, the fixed end plate 41 is fixed to the concrete top plate by four bolts, the top of the suspension channel steel 1 is inserted into the fixed sleeve 42 (that is, the fixed sleeve 42 is sleeved and installed on the top of the suspension channel steel 1), and then the suspension channel steel 1 and the fixed sleeve 42 are locked with two short bolts on both sides of the fixed sleeve 42, which increases the firmness of the hanger and facilitates installation.
[0088] According to some embodiments of the present application, optionally, Figure 1 and Figure 2 As shown, the hoisting assembly 300 includes three suspension channel steels 1 and one cross-bracing channel steel 2 , and the bottoms of the three suspension channel steels 1 are respectively connected to the front, middle and rear of the cross-bracing channel steel 2 .
[0089] In this way, the three suspension channels 1 and one cross-bracing channel 2 are installed to form a mountain shape as a whole. In some embodiments, a corresponding number of cross-bracing channel steels 2 can be set according to the number of columns of the pipeline 200 (i.e., the number along the first direction a). For example, when the pipeline 200 is provided with two columns, two cross-bracing channel steels 2 need to be provided. Among them, the inclined-stayed channel steel 3 can be installed on any one of the suspension channels 1, or on three suspension channels 1, or on two suspension channels 1 connected to the front and rear of the cross-bracing channel steel 2, etc.
[0090] According to some embodiments of the present application, optionally, Figure 2 , Figure 4 and Figure 5 As shown, the T-shaped connector 5 includes a connecting vertical steel 51 and a connecting horizontal steel 52. The connecting horizontal steel 52 is welded to the bottom of the connecting vertical steel 51. The connecting vertical steel 51 is sleeved and installed on the bottom of one of the hanging channel steels 1, and the connecting horizontal steel 52 is sleeved and installed in the middle of the horizontal support channel steel 2.
[0091] The connecting vertical steels and the connecting horizontal steels can be U-shaped, or the connecting horizontal steels can be square-shaped.
[0092] In this way, the suspension channel steel 1 is connected to the middle part of the cross-bracing channel steel 2 through the T-shaped connector 5. Specifically, the bottom of one of the suspension channel steels 1 is inserted into the connecting vertical steel 51 (that is, the connecting vertical steel 51 is installed on the bottom of one of the suspension channel steels 1), and then fixed by four bolts on both sides and corresponding nuts. Afterwards, the middle part of the cross-bracing channel steel 2 is inserted into the connecting horizontal steel 52 (that is, the connecting horizontal steel 52 is installed in the middle part of the cross-bracing channel steel 2), and fixed by six bolts on both sides and corresponding nuts, thereby increasing the load-bearing capacity of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing, while facilitating installation.
[0093] According to some embodiments of the present application, optionally, the T-shaped connector 5 further includes a gasket, and the gasket is installed on the inner side of the connecting vertical steel 51, and the gasket is used to contact the bottom of one of the hanging channel steels 1.
[0094] The gasket may be multiple pieces or have the same shape as the connecting vertical steel 51. The gasket is provided to enhance the stability of the connection between the connecting vertical steel 51 and one of the suspension channel steels 1, so as to avoid a gap when the connecting vertical steel 51 is installed on the bottom of one of the suspension channel steels 1, which may cause shaking during use.
[0095] According to some embodiments of the present application, optionally, Figure 2 and Figure 6 As shown, the hoisting assembly 300 includes two right-angle connectors 6, and the bottoms of the other two suspension channel steels 1 are connected to the front and rear of the cross-bracing channel steel 2 through the right-angle connectors 6 respectively.
[0096] In this way, the right-angle connector 6 increases the load-bearing capacity and stability of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing properties.
[0097] According to some embodiments of the present application, optionally, Figure 2 and Figure 7 As shown, the two right-angle connectors 6 include two vertical connecting sleeves 611 and two transverse connecting sleeves 612, each vertical connecting sleeve 611 includes a first vertical plate 6111, a second vertical plate 6112 and a third vertical plate 6113 connected in sequence, and each transverse connecting sleeve 612 includes a first transverse plate 6121, a second transverse plate 6122 and a third transverse plate 6123 connected in sequence; the bottom of the second vertical plate 6112 is welded to one end of the second transverse plate 6122, and the angle between the second vertical plate 6112 and the second transverse plate 6122 is a right angle; the two vertical connecting sleeves 611 are respectively mounted on the bottom of the other two suspension channel steels 1, and the two transverse connecting sleeves 612 are respectively mounted on the front and rear of the transverse support channel steel 2.
[0098] The first vertical plate 6111, the second vertical plate 6112, and the third vertical plate 6113 connected in sequence, means that one side of the first vertical plate 6111 is connected to one side of the second vertical plate 6112, and the other side of the second vertical plate 6112 is connected to one side of the third vertical plate 6113, and the connection forms a U shape. The first horizontal plate 6121, the second horizontal plate 6122, and the third horizontal plate 6123 are connected in sequence, which means that one side of the first horizontal plate 6121 is connected to one side of the second horizontal plate 6122, and the other side of the second horizontal plate 6122 is connected to one side of the third horizontal plate 6123, and the connection forms a U shape.
[0099] Optionally, the bottom of the second vertical plate 6112 and one end of the second horizontal plate 6122 may be connected via an arc transition.
[0100] In this way, the bottoms of the other two suspension channel steels 1 are connected to the front and rear of the cross-bracing channel steel 2 respectively through two right-angle connectors 6, wherein the angle between the second vertical plate 6112 and the second horizontal plate 6122 is a right angle (such as Figure 6The angle shown in e in the figure) means that the right-angle connector 6 can connect the two suspension channels 1 to the front and rear of the cross-support channel 2 respectively. Specifically, during the actual installation, the two horizontal connecting sleeves 612 are arranged relatively to each other, and the bottoms of the two suspension channels 1 are inserted into the two vertical connecting sleeves 611 (that is, the two vertical connecting sleeves 611 are respectively sleeved and installed on the bottoms of the other two suspension channels 1), and then fixed by four bolts on both sides and corresponding nuts. Afterwards, the front and rear of the cross-support channel 2 are inserted into the two horizontal connecting sleeves 612 (that is, the two horizontal connecting sleeves 612 are respectively sleeved and installed on the front and rear of the cross-support channel 2), and then fixed by four bolts on both sides and corresponding nuts, thereby increasing the load-bearing and stability of the assembled hanger 100 that takes into account both earthquake resistance and load-bearing, while facilitating installation.
[0101] According to some embodiments of the present application, optionally, Figure 2 , Figure 6 and Figure 7 As shown, the two right-angle connectors 6 also include two pairs of reinforcement components, and the reinforcement components include two reinforcement rods 6131; one end of the two reinforcement rods 6131 is welded to the bottom of the first vertical plate 6111 and the third vertical plate 6113 respectively, and the other end of the two reinforcement rods 6131 is welded to one end of the first horizontal plate 6121 and the third horizontal plate 6123 respectively (that is, one end of the first horizontal plate 6121 and the third horizontal plate 6123 close to the first vertical plate 6111 and the third vertical plate 6113).
[0102] Among them, one right-angle connector 6 corresponds to one vertical connecting sleeve 611, one horizontal connecting sleeve 612 and a pair of reinforcing components. Figure 6 As shown, the two right-angle connectors 6 are L-shaped as a whole, and the cross section is rectangular. The right-angle connector 6 includes a right-angle connector body 61 and a shell 62, in which the right-angle connector body 61 is installed, and the right-angle connector body 61 includes a corresponding vertical connection sleeve 611, a horizontal connection sleeve 612 and a reinforcement component.
[0103] One ends of the two right-angle connectors 6 are respectively sleeved and installed on the bottoms of the other two suspension channel steels 1, and the other ends of the two right-angle connectors 6 are respectively sleeved and installed on the front and rear of the cross-support channel steel 2.
[0104] Thus, in order to enhance the stability and firmness of the right-angle connector 6, a reinforcing assembly is provided. Specifically, the connection between the vertical connecting sleeve 611 and the horizontal connecting sleeve 612 is strengthened under the action of the reinforcing rod 6131. Optionally, a triangular structure is formed between the reinforcing rod 6131, the vertical connecting sleeve 611 and the horizontal connecting sleeve 612, so that the connection is more firm and stable.
[0105] According to some embodiments of the present application, optionally, the suspension channel steel 1 and the cross-support channel steel 2 are both U-shaped, and the two outer sides of the U-shape have grooves on their inner folds, and the grooves are used for the mounting blocks to slide into. The mounting blocks are used to cooperate with bolts to make the connection between the suspension channel steel 1 and the cross-support channel steel 2 through the T-shaped connector 5 and the right-angle connector 6 more stable.
[0106] The mounting block is provided with threaded holes corresponding to the suspension channel steel 1 and the cross support channel steel 2. The mounting block has a certain thickness so that the bolts can be more firmly connected after passing through the mounting block. In some embodiments, the mounting holes can directly replace the nuts for easy installation and removal.
[0107] According to some embodiments of the present application, optionally, Figure 8 and Fig. 9 As shown, the assembled hanger 100 that takes into account both earthquake resistance and load-bearing properties includes two groups of lifting components 300, and the fixing parts are π-shaped fixing parts 7; the π-shaped fixing parts 7 include a connecting plate 71, a first sleeve 72 and a second sleeve 73, the connecting plate 71 is installed on the concrete top plate, and the first sleeve 72 and the second sleeve 73 are installed on the bottom of the connecting plate 71, the first sleeve 72 is sleeved and installed on the top of one group of lifting components 300, and the second sleeve 73 is sleeved and installed on the top of the other lifting component 300.
[0108] Since the top of the hoisting assembly 300 is the top of the suspension channel steel 1, the first sleeve 72 and the second sleeve 73 are sleeved and installed on the top of the suspension channel steel 1. In this way, by providing two sets of hoisting assemblies 300, the firmness of the hoisting is further enhanced, so that a heavier pipe 200 can be hoisted.
[0109] It should be noted that although the above embodiments have been described in this article, this does not limit the scope of patent protection of the utility model. Therefore, based on the innovative concept of the utility model, changes and modifications to the embodiments described herein, or equivalent structural or equivalent process transformations made using the contents of the utility model specification and drawings, directly or indirectly applying the above technical solutions to other related technical fields, are all included in the scope of patent protection of the utility model.
Claims
1. An assembled hanger that takes into account both earthquake resistance and load-bearing characteristics, characterized in that: It comprises at least one set of hoisting components and fixing parts, and the top of the hoisting components is installed on the concrete top plate through the fixing parts; The hanging assembly includes a suspension channel steel, a cross-support channel steel, an inclined channel steel, a T-shaped connector and a right-angle connector. The suspension channel steel is extended along a first direction, and the cross-support channel steel is extended along a second direction. The suspension channel steel and the cross-support channel steel are connected through the T-shaped connector and the right-angle connector. The bottom of the inclined channel steel is installed on the suspension channel steel, and the top of the inclined channel steel is used to be installed on a concrete top plate. The inclined channel steel is inclined toward the inside of the second direction or toward a third direction.
2. The assembled hanger with both earthquake resistance and load-bearing properties according to claim 1 is characterized in that: The fixing piece is a T-shaped fixing piece, and the T-shaped fixing piece includes a fixed end plate and a fixed sleeve. The fixed sleeve is welded to the bottom of the fixed end plate, and the fixed end plate is used to be installed on the concrete top plate. The fixed sleeve is sleeved and installed on the top of the suspension channel steel.
3. The assembled hanger with both earthquake resistance and load-bearing properties according to claim 1 is characterized in that: The hoisting assembly includes three suspension channel steels and one cross-support channel steel, and the bottoms of the three suspension channel steels are respectively connected to the front, middle and rear of the cross-support channel steel.
4. The assembled hanger with both earthquake resistance and load-bearing properties according to claim 3 is characterized in that: The bottom of one of the suspension channel steels is connected to the middle of the cross-support channel steel through the T-shaped connecting piece.
5. The assembled hanger with both earthquake resistance and load-bearing properties according to claim 4 is characterized in that: The T-shaped connector includes a connecting vertical steel and a connecting horizontal steel. The connecting horizontal steel is welded to the bottom of the connecting vertical steel. The connecting vertical steel is sleeved and installed at the bottom of one of the hanging channel steels. The connecting horizontal steel is sleeved and installed in the middle of the horizontal support channel steel.
6. The assembled hanger with both earthquake resistance and load bearing properties according to claim 5 is characterized in that: The T-shaped connector also includes a gasket, which is installed on the inner side of the connecting vertical steel and is used to contact the bottom of one of the hanging channel steels.
7. The assembled hanger with both earthquake resistance and load bearing properties according to claim 4 is characterized in that: The hoisting assembly includes two right-angle connectors, and the bottoms of the other two suspension channel steels are respectively connected to the front and rear of the cross-support channel steel through the right-angle connectors.
8. The assembled hanger with both earthquake resistance and load bearing properties according to claim 7, characterized in that: The two right-angle connectors include two vertical connecting sleeves and two horizontal connecting sleeves, each of the vertical connecting sleeves includes a first vertical plate, a second vertical plate and a third vertical plate connected in sequence, and each of the horizontal connecting sleeves includes a first horizontal plate, a second horizontal plate and a third horizontal plate connected in sequence; The bottom of the second vertical plate is welded to one end of the second horizontal plate, and the angle between the second vertical plate and the second horizontal plate is a right angle; The two vertical connection sleeves are respectively sleeved and installed on the bottom of the other two suspension channel steels, and the two horizontal connection sleeves are respectively sleeved and installed on the front and rear of the horizontal support channel steels.
9. The assembled hanger with both earthquake resistance and load bearing properties according to claim 8, characterized in that: The two right-angle connectors further include two pairs of reinforcement components, each of which includes two reinforcement rods; One end of the two reinforcing rods is welded to the bottom of the first vertical plate and the third vertical plate respectively, and the other end of the two reinforcing rods is welded to one end of the first horizontal plate and the third horizontal plate respectively.
10. The assembled hanger with both earthquake resistance and load-bearing properties according to claim 1, characterized in that: The seismic-resistant and load-bearing assembled hanger comprises two sets of hanging components, and the fixing piece is a π-shaped fixing piece; The π-shaped fixing member includes a connecting plate, a first sleeve and a second sleeve. The connecting plate is installed on the concrete top plate. The first sleeve and the second sleeve are installed on the bottom of the connecting plate. The first sleeve is installed on the top of one group of the lifting components, and the second sleeve is installed on the top of another group of the lifting components.