Zero-stage air generator with large-flow output
By designing a large-flow zero-stage air generator, using compressed air source and catalytic dehydrocarbonization activated carbon filtration technology, combined with gas buffer technology, the problem of insufficient output flow in the existing technology has been solved, and a low-cost, large-flow output zero-stage air generator has been realized. Air supply meets the charging and deflating needs of FLTD multi-stage gas switch.
Patent Information
- Application Number
- CN202322918439.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-10-30
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-10-30
AI Technical Summary
The output flow rate of the existing zero-stage air generator is insufficient to meet the large-flow charging and deflating requirements in high-power pulse technology fields such as FLTD multi-stage gas switches, and the cost is high.
A zero-level air generator with large flow output is designed. It uses a compressed air source to generate clean and dry air, and prepares zero-level air through catalytic dehydrocarbonization, activated carbon filtration, etc., combined with gas cache technology, to achieve high flow output, which is suitable for Filling and deflating requirements of FLTD multi-stage gas switch.
It realizes low-cost, high-flow output zero-level air supply, expands the industrial application scope of zero-level air, meets the charging and deflating needs of FLTD multi-level gas switches, reduces costs, and expands the scope of application.
Smart Images

Figure CN221867937U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a gas processing device, in particular to a zero-level air generator with large flow output. Background Art
[0002] Fast-front linear pulse transformer driver (FLTD) is an important development direction of new high-power Z-pinch driver and a new topic in the field of high-power pulse technology. One of the key technical problems restricting the development of FLTD is the development of a switch with low jitter, high current, low inductance and long life, namely, a FLTD multi-level multi-channel gas switch (hereinafter referred to as FLTD gas switch). The insulating gas of the gas switch is zero-grade air and the protective gas is high-purity nitrogen.
[0003] The FLTD gas switch needs to be filled with high-purity nitrogen as the protective gas when it is idle or not in the test state; during the discharge test, the internal protective nitrogen gas needs to be emptied and filled with zero-grade air as the insulating gas; after the discharge test, the test gas needs to be purged with high-purity nitrogen first, and then the nitrogen needs to be replaced with zero-grade air, and the filling is completed. In other words, the insulating gas zero-grade air and the protective gas high-purity nitrogen are often used during the test.
[0004] Zero-grade air can be prepared by using compressed air source through catalytic dehydrogenation, activated carbon filtering of impurity gases, etc., or by using high-purity nitrogen and high-purity oxygen. The former is prepared by using compressed air source, so it has a wider range of applications and low cost; the latter requires the use of two kinds of high-purity gases, and the gas production process requires the completion of high-purity oxygen production and synthetic air production processes, so the cost is much higher than the former.
[0005] However, the output flow of the zero-level air generator using a compressed air source is relatively small, and is only suitable for the preparation of laboratory-grade zero-level air. The output flow rate is generally 20L / min, which cannot meet the large-flow output requirements in certain special applications. The present application provides a large-flow zero-level air generator, which can especially meet the needs of charging and discharging in the FLTD multi-stage gas switch charging and discharging test. Summary of the invention
[0006] In order to solve the deficiencies of the prior art, the utility model provides a zero-level air generator with a large flow output, which is particularly suitable for the needs of charging and discharging in the charging and discharging test of the FLTD multi-stage gas switch.
[0007] In order to solve the above technical problems, the utility model adopts the following technical solutions:
[0008] A zero-level air generator with large flow output comprises an air processing unit, a zero-level air preparation unit and a zero-level air buffer container;
[0009] The air handling unit uses a compressed air source to generate clean and dry air, which is stored in an air buffer tank and output from the air buffer tank when used;
[0010] A zero-level air preparation unit, wherein the input gas of the zero-level air preparation unit is connected to the output gas of the air processing unit, and the output gas of the zero-level air preparation unit is divided into two parallel paths, one of which is connected to the air inlet of the zero-level air buffer container, and the output gas of the zero-level air buffer container flows through the second precision filter assembly and the one-way valve to output zero-level air, and the air inlet of the zero-level air buffer container is provided with a second solenoid valve, and the other path is connected in parallel to the zero-level air output after passing through the third solenoid valve;
[0011] The second precision filter assembly includes two precision filters connected in series, and the front and rear stages thereof are filters of >100 μm (micrometer) and larger than 1 μm (micrometer), respectively.
[0012] The zero-level air buffer container is provided with a third safety valve and a third pressure gauge for monitoring the pressure inside the container.
[0013] It also includes a nitrogen production unit and a nitrogen buffer tank. The input of the nitrogen production unit is connected to the output of the air processing unit. The output gas of the nitrogen production unit is temporarily stored in the nitrogen buffer tank. The output gas of the nitrogen buffer tank is used as the output of high-purity nitrogen.
[0014] The nitrogen production unit adopts PSA nitrogen production system.
[0015] The nitrogen buffer tank is provided with a second safety valve and a second pressure gauge for monitoring the pressure inside the tank.
[0016] The zero-level air preparation unit processes the clean dry air output by the air handling unit through catalytic dehydrogenation, heat dissipation, and activated carbon filtration. 2 , NO and NO 2 After removing impurity gases, zero-grade air is output.
[0017] The air handling unit comprises a compression component, a filter component, a dehydration and drying component, an air buffer tank and a clean air output;
[0018] The compression assembly includes an air compressor and an air filter disposed at the air inlet of the air compressor;
[0019] The filter assembly includes a steam-water separator and a solid impurity filter assembly connected in sequence, and the solid impurity filter assembly includes a primary filter for filtering large particles of solid impurities and a precision filter for filtering small micro particles connected in sequence in the front and rear stages;
[0020] A dewatering and drying component includes a deep dewatering component, a dust filter and an oil removal filter which are sequentially connected through pipelines according to the air flow direction. The deep dewatering component includes a preliminary dewatering device and a deep drying device. The preliminary dewatering device adopts a cold dryer, and the deep drying device adopts an adsorption dryer.
[0021] The air inlet end of the air buffer tank is connected to the air outlet end of the dehydration drying component, and the air outlet end of the air buffer tank is connected to the first precision filter component to provide the output of clean dry air. The first precision filter component includes two precision filters connected in series in the front and rear stages, which are filters of >100μm (micrometer) and greater than 1μm (micrometer) respectively.
[0022] The air compressor adopts a large-flow air compressor.
[0023] The top of the air buffer tank is provided with a first safety valve and a first pressure gauge for monitoring the pressure inside the tank.
[0024] A drain valve is provided at the bottom of the air buffer tank.
[0025] The zero-level air preparation unit and the air handling unit are both known technologies.
[0026] Compared with the prior art, this application mainly provides a large-flow zero-level air generator, which uses laboratory-level zero-level air preparation technology (i.e., using a compressed air source to obtain clean and dry air, and then preparing zero-level air by catalytic dehydrogenation, activated carbon filtering of impurity gases, etc.), combined with gas caching technology, to obtain large-flow output zero-level air, expanding the industrial-level application of zero-level air. Compared with the zero-level air equipment of synthetic technology, it has the advantages of low cost and wide application range. This application also includes nitrogen preparation, especially to meet the needs of filling and discharging in the inflation and discharge tests of FLTD multi-stage gas switches. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a structural schematic diagram of the utility model. DETAILED DESCRIPTION
[0028] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0029] It should also be noted that this article involves the input and output of gas, so the terms "connection" and "parallel" mentioned in this article generally refer to the delivery of gas through pipeline connection. Of course, it can also be directly connected. The terms "front and rear stages", "rear stage" and "front stage" mentioned in this article generally refer to the pipelines or components through which the gas flows front and back, in order to express the order in which the gas flows in the components. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to the specific circumstances.
[0030] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In addition, the meaning of "multiple" and "several" is two or more, unless otherwise clearly and specifically defined.
[0031] See also Figure 1 Now, an embodiment of a zero-level air generator with large flow output provided by the utility model is described.
[0032] A zero-level air generator with large flow output, comprising an air processing unit E, a zero-level air preparation unit A and a zero-level air buffer container B;
[0033] The air handling unit E uses a compressed air source to generate clean and dry air, which is stored in an air buffer tank and output from the air buffer tank when used;
[0034] A zero-level air preparation unit A, the input gas of the zero-level air preparation unit A is connected to the output gas of the air processing unit E, the output gas of the zero-level air preparation unit A is divided into two parallel paths, one of which is connected to the air inlet of the zero-level air buffer container B, the air outlet end of the zero-level air buffer container B is connected to the second precision filter component B01 and the one-way valve B04 as zero-level air output, the air inlet of the zero-level air buffer container B is provided with a second solenoid valve V2, and the other path is connected in parallel to the zero-level air output after passing through the third solenoid valve V3;
[0035] The second precision filter assembly B01 includes two precision filters connected in series, and the front and rear stages thereof are filters of >100 μm (micrometers) and larger than 1 μm (micrometers), respectively.
[0036] The zero-level air buffer container B is provided with a third safety valve B02 and a third pressure gauge B03 for monitoring the pressure inside the container.
[0037] It also includes a nitrogen production unit C and a nitrogen buffer tank D. The input gas of the nitrogen production unit C is connected to the output gas of the air treatment unit E. The output gas of the nitrogen production unit C is temporarily stored in the nitrogen buffer tank D. The output gas of the nitrogen buffer tank D is output as high-purity nitrogen.
[0038] Nitrogen production unit C adopts PSA nitrogen production system.
[0039] The nitrogen buffer tank D is provided with a second safety valve and a second pressure gauge for monitoring the pressure inside the tank.
[0040] The zero-level air preparation unit A processes the clean dry air outputted from the air treatment unit E through catalytic dehydrogenation, heat dissipation, and activated carbon filtration. 2 , NO and NO 2 After removing impurity gases, zero-grade air is output.
[0041] The air processing unit E comprises a compression component E01, a filter component E02, a dehydration and drying component E03, an air buffer tank E04 and a clean air output;
[0042] The compression assembly E01 includes an air compressor and an air filter provided at the air inlet of the air compressor;
[0043] The filter assembly E02 includes a water-steam separator and a solid impurity filter assembly connected in sequence. The solid impurity filter assembly includes a primary filter for filtering large solid impurities and a precision filter for filtering small micro particles connected in sequence in the front and rear stages.
[0044] The dewatering and drying component E03 includes a deep dewatering component, a dust filter E031 and an oil removal filter E032 which are sequentially connected through pipelines according to the air flow direction. The deep dewatering component includes a preliminary dewatering device E033 and a deep drying device E034. The preliminary dewatering device adopts a cold dryer, and the deep drying device adopts an adsorption dryer.
[0045] The air inlet end of the air buffer tank E04 is connected to the air outlet end of the dehydration and drying component E03. The output airflow of the air buffer tank E04 provides clean dry air output after passing through the first precision filter component E05. The first precision filter component E05 includes two precision filters connected in series in the front and rear stages, which are filters of >100μm (micrometers) and greater than 1μm (micrometers), respectively.
[0046] The air compressor adopts a large-flow air compressor.
[0047] The top of the air buffer tank E04 is provided with a first safety valve E041 and a first pressure gauge for monitoring the pressure inside the tank.
[0048] A drain pipe is provided at the bottom of the air buffer tank E04, and a drain valve is provided on the drain pipe.
[0049] The zero-level air preparation unit A and the air treatment unit E are both known technologies.
[0050] The output air flow of the air buffer tank E04 provides clean dry air output after passing through the first precision filter assembly E05, which can be used as the input air source of the zero-grade air preparation unit A and the input air source of the nitrogen production unit C.
[0051] As a feasible implementation method, the input gas source end of the zero-level air preparation unit A can be provided with a first solenoid valve V1 to control the on / off of the input gas, and can also be used as a selection of the input gas source of the nitrogen production unit C and the zero-level air preparation unit A. When the first solenoid valve V1 is opened, the input gas of the zero-level air preparation unit A is connected to the clean dry air produced by the air treatment unit E, and the zero-level air preparation unit A produces gas; when the first solenoid valve V1 is closed, the nitrogen production unit C is started to produce nitrogen.
[0052] The input gas of the zero-level air preparation unit A is connected to the clean air output by the air treatment unit E. The output gas of the zero-level air preparation unit A is divided into two paths. One path is connected to the zero-level air buffer container B after passing through the second solenoid valve V2. The second solenoid valve V2 controls the opening and closing of the input gas of the zero-level air buffer container B. The output gas of the zero-level air buffer container B flows through the second precision filter component B01 as the zero-level air output. The other path is connected in parallel to the zero-level air output through the third solenoid valve V3. The second precision filter component B01 includes two precision filters in series, and the front and rear stages are respectively greater than 100μm and greater than 1 (micron) filters, which filter the output gas of the zero-level air buffer container B to prevent the contamination of the output gas by particulate matter or impurities that may exist in the zero-level air buffer container B. As a feasible implementation method, a one-way valve B04 is added to the output gas rear stage of the second precision filter component B01 to prevent backflow during air path inflation.
[0053] Similarly, the first precision filter assembly filters the particles or impurities that may exist in the air buffer tank to prevent the output clean and dry air from being contaminated.
[0054] The on-off valve involved in this application can be a solenoid valve, and of course other valve groups or manual valves can also be used. When a solenoid valve is selected, the automatic control of the valve can be achieved through a controller. In terms of the control of various components (such as air compressors) and other related valve components in this application, automatic monitoring through various automation means such as microcontroller MCU / PLC / configuration is also a common technical means used by those skilled in the art, and will not be described in detail here. All various modified applications made according to the substantial control principle of this application are also within the scope of protection of this patent.
[0055] The following is an explanation using the inflation process of a FLTD gas switch as an example.
[0056] After the zero-level air preparation unit A is started, the zero-level air buffer container B is pre-charged, that is, the prepared zero-level air is first stored in the zero-level air buffer container B and reaches a certain pressure. When the FLTD gas switch equipment is charged, the third solenoid valve V3 is opened, the zero-level air preparation unit A outputs gas, and the zero-level air stored in the zero-level air buffer container B is also output at the same time to complete the charging together, so that the instantaneous charging flow rate is increased, and when the volume and pressure of the zero-level air buffer container B are appropriate, the gas switch charging volume requirements can be met.
[0057] The nitrogen production startup process when the FLTD gas switch is charged with nitrogen. Start the air handling unit E first (start the cold dryer and the adsorption dryer first, and after working for 5 minutes, start the air compressor. The steam-water separator is opened for 5 seconds every 5 minutes to drain water. The time only indicates the time period. The specific time here can be adjusted according to the actual situation). Air buffer tank When the pressure reaches a certain value (the minimum is greater than the membrane pressure of the PSA nitrogen production system at the rear stage), the nitrogen production unit C (PSA nitrogen production system is selected in this embodiment) is started, and the nitrogen production unit C cooperates with the nitrogen buffer tank D to produce nitrogen, and replaces the nitrogen purity in the nitrogen buffer tank D to more than 99.99% through replacement, and then outputs nitrogen. The output gas of the nitrogen buffer tank D is connected to the input end of the FLTD gas switch through a pipeline, and the prepared high-purity nitrogen is used to purge the gas pipeline connected to the FLTD gas switch and the inside of the switch. After the purge is qualified, the protective gas high-purity nitrogen is output to the FLTD gas switch.
[0058] When the FLTD gas switch is conducting a discharge test, the protective gas nitrogen is first exhausted, and then the insulating gas zero-grade air is filled in. Similarly, before the zero-grade air is filled in, the output gas of the zero-grade air needs to be connected to the input end of the FLTD gas switch through a pipeline.
[0059] Before charging the zero-level air, start the zero-level air preparation unit A and pre-charge the zero-level air buffer container B, that is, store the prepared zero-level air in the zero-level air buffer container B and reach a certain pressure. The specific operation is as follows:
[0060] Open the first solenoid valve V1, start the zero-level air preparation unit A, and after the preheating of the zero-level air preparation unit A is completed, open the third solenoid valve V3, and use the output gas of the zero-level air to first purge the connecting pipelines between the FLTD gas switches and the inside of the switch. After the purge lasts for a period of time (5 minutes, the purge flow rate is 100L / min), the purge is completed. Close the third solenoid valve V3, open the second solenoid valve V2, and store the prepared zero-level air in the zero-level air storage container B. When the gas pressure reaches a certain level, close the second solenoid valve V2 and open the third solenoid valve V3.
[0061] When the FLTD gas switch is inflated, the inflating valves on the switch device and the connecting pipeline are opened, and the zero-level air buffer container B and the zero-level air preparation unit A inflate the FLTD gas switch at the same time. The instantaneous inflating flow rate can be very large (1m3 air buffer tank, 500L zero-level air tank, the inflating flow rate can reach 500L / min), meeting the inflating volume requirements of the FLTD gas switch. When the FLTD gas switch is inflated, the third solenoid valve V3 is closed, and the second solenoid valve V2 is opened to pre-inflate the zero-level air storage container B (i.e., the zero-level air tank in this embodiment).
[0062] After the discharge test of the FLTD gas switch is completed, high-purity nitrogen is connected for purging. After the purging is completed, zero-grade air is connected, the nitrogen is replaced with the prepared zero-grade air, and the inflation of the FLTD gas switch is completed.
[0063] The shutdown process of the entire gas production system is to first set the nitrogen production unit (PSA nitrogen production system in the embodiment) to enter the standby mode, and shut down the key components of the air handling unit (shut down the air compressor, cold dryer, and adsorption dryer), and then shut down the entire gas production system.
[0064] In the embodiment, the zero-level air preparation unit and the air treatment unit are both known technologies.
[0065] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A zero-level air generator with large flow output, comprising an air processing unit (E), a zero-level air preparation unit (A) and a zero-level air buffer container (B), characterized in that: The air handling unit (E) uses a compressed air source to generate clean and dry air, which is stored in an air buffer tank and output from the air buffer tank when used; A zero-level air preparation unit (A), the input air of the zero-level air preparation unit (A) is connected to the output air of the air processing unit (E), the output air of the zero-level air preparation unit (A) is divided into two parallel paths, one path is connected to the air inlet of the zero-level air buffer container (B), the air outlet end of the zero-level air buffer container (B) is connected to the second precision filter component (B01) and the one-way valve (B04) as zero-level air output, the air inlet of the zero-level air buffer container (B) is provided with a second solenoid valve (V2), and the other path is connected in parallel to the zero-level air output after passing through a third solenoid valve (V3); The second precision filter assembly (B01) comprises two precision filters connected in series, wherein the front and rear stages thereof are filters of >100 μm and filters of greater than 1 μm respectively.
2. A zero-level air generator with large flow output according to claim 1, characterized in that: The zero-level air buffer container (B) is provided with a third safety valve (B02) and a third pressure gauge (B03) for monitoring the pressure inside the container.
3. A zero-level air generator with large flow output according to claim 1, characterized in that: It also includes a nitrogen production unit (C) and a nitrogen buffer tank (D), wherein the input gas of the nitrogen production unit (C) is connected to the output gas of the air treatment unit (E), the output gas of the nitrogen production unit (C) is temporarily stored in the nitrogen buffer tank (D), and the output gas of the nitrogen buffer tank (D) is output as high-purity nitrogen.
4. A zero-level air generator with large flow output according to claim 3, characterized in that: The nitrogen production unit (C) adopts the PSA nitrogen production system.
5. A zero-level air generator with large flow output according to claim 3, characterized in that: The nitrogen buffer tank (D) is provided with a second safety valve and a second pressure gauge for monitoring the pressure inside the tank.
6. A zero-level air generator with large flow output according to claim 1, characterized in that: The zero-grade air preparation unit (A) performs catalytic dehydrogenation, heat dissipation, and activated carbon filtration of SO2, NO and NO2 impurity gases on the clean dry air output by the air treatment unit (E) and then outputs zero-grade air.