Automatic multi-layer arrangement device for steel pipes
By designing an automatic multi-layer steel pipe arrangement device and using components such as a pipe swinging cart, a pipe dialing trolley, and a grabbing device, the automatic arrangement and transportation of steel pipes is realized, and the problems of safety hazards and high-intensity labor in the existing technology are solved. , improving efficiency and safety.
Patent Information
- Application Number
- CN202420541175.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-20
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
There are safety hazards and high-intensity labor requirements in the existing multi-layer arrangement process of steel pipes, especially in harsh environments, and manual assistance is required, resulting in low efficiency.
An automatic multi-layer steel pipe arrangement device is designed, including a pipe swinging cart, a pipe dialing trolley, a pipe rowing trolley, a grabbing device, etc., to achieve multi-layer arrangement and transportation of steel pipes in an automated manner, reducing manual operations and improving efficiency.
It realizes the automation of multi-layer arrangement of steel pipes, reduces the labor intensity of workers, reduces safety hazards, improves operating efficiency, and adapts to the needs of different steel pipe racks.
Smart Images

Figure CN221875767U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel pipe transportation, in particular to an automatic steel pipe multi-layer arranging device. Background Art
[0002] From the arrival of steel pipes to the processing in the workshop, it needs to go through a series of processes such as unloading, storage and unpacking, pipe arrangement, and pipe loading into the conveyor line. In the pipe arrangement process, there are two existing multi-layer pipe arrangement methods, such as Figure 3 As shown, one type of multi-layer pipe row has a layer of pad between two layers of steel pipes, and the other type of multi-layer pipe row has two layers of steel pipes in direct contact. The specific operation process is as follows:
[0003] Laying out multi-layer pipe rows I, put the steel pipes that need to be arranged into pipe rows on the material rack, and the workers stand on it and use manpower to move the steel pipes one by one to make them roll to the designated position. If they are not in place at one time, they need to move them multiple times. When the first layer of steel pipes is placed, the workers lift the pads from the storage position to the first layer of steel pipes one by one, and repeat the placement of the pads until the placement is completed. Then place the second layer of steel pipes. After the second layer of steel pipes is placed, place the pads on the second layer of steel pipes. Repeat the above process until the multi-layer pipe rows are completed. In this process, the rolling of the steel pipes can easily cause safety accidents, and the manual placement of pipes is labor-intensive, especially in winter and summer;
[0004] To lay out multi-layer pipe rows II, place the steel pipes that need to be arranged into rows on the material rack. Workers stand on it and use manpower to push the steel pipes one by one to make them roll to the designated position. If they are not in place in one go, they need to be pushed multiple times. When the first layer of steel pipes is laid out, the second layer of steel pipes is laid out until the laying is completed. In this process, the rolling of the steel pipes can easily cause safety accidents, and the work intensity is high when laying out the pipes manually, especially in winter and summer.
[0005] Secondly, in the process of arranging steel pipes, it is necessary to carry out pipe loading and random pipe picking. Although mechanization is realized during pipe loading and transportation, there is still a situation where the steel pipe is far away from the work station and cannot be continuously loaded. Manual assistance is still required for secondary pipe arrangement. When picking pipes, workers are required to find the selected steel pipes and lift them to the end of the rack, and then use a pipe grabber or transport line to transport them to the appropriate location. The work intensity is high and there are safety hazards.
[0006] In order to reduce the potential safety hazards in the above-mentioned operation process, we proposed an automatic steel pipe multi-layer arrangement device. Utility Model Content
[0007] The utility model aims to provide an automatic steel pipe multi-layer arrangement device to realize the automation of the steel pipe multi-layer arrangement and improve the efficiency of the steel pipe multi-layer arrangement.
[0008] In order to achieve the above technical objectives and the above technical effects, the utility model provides the following technical solutions:
[0009] An automatic steel pipe multi-layer swinging and arranging device includes a pipe swinging trolley, and is characterized in that a pipe shifting trolley and a pipe arranging trolley are installed on the top of the pipe swinging trolley, a pipe shifting device is installed on the pipe shifting trolley, a grabbing device I is installed at the front and rear parts of the pipe arranging trolley, a grabbing device II is installed in the middle part of the pipe arranging trolley, and a pipe insertion device is installed on the right side of the pipe arranging trolley.
[0010] Preferably, in an automatic steel pipe multi-layer arrangement device, a pipe arrangement rack is provided below the pipe arrangement trolley, a discharging rack is installed at the tail end of the pipe arrangement rack, a conveyor line is provided on the right side of the discharging rack, and a turning mechanism is installed between the conveyor line and the discharging rack.
[0011] Preferably, in an automatic steel pipe multi-layer arranging device, the top of the pipe arrangement rack is in contact with the pipe arrangement steel pipes, and pad bars I and pad bars II are detachably installed on the pipe arrangement steel pipes.
[0012] Preferably, in an automatic steel pipe multi-layer swinging device, the pipe swinging trolley adopts a movable four-column gantry structure, and a slide rail is installed on the upper end of the pipe swinging trolley.
[0013] Preferably, in an automatic steel pipe multi-layer arranging device, the pipe shifting trolley and the pipe arranging trolley are both mobile, and guide wheels matching with slide rails are installed at the lower ends of the pipe shifting trolley and the pipe arranging trolley.
[0014] Preferably, in an automatic steel pipe multi-layer arrangement device, the grabbing device I is used to place and remove pad bars I and pad bars II.
[0015] Preferably, in an automatic steel pipe multi-layer arrangement device, the grabbing device II is used to place and grab the steel pipes in the tube arrangement.
[0016] A pipe arrangement method of an automatic steel pipe multi-layer swing arrangement device, applied to the above-mentioned automatic steel pipe multi-layer swing arrangement device, includes the following methods:
[0017] A. Multilayer tube row Ⅰ
[0018] a1. The steel pipe rolls down from the landing device onto the pipe stack, the pipe swinging trolley moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device shifts the steel pipe to the designated position. If the steel pipe lands at the designated position, the pipe shifting device does not need to be started;
[0019] a2. After the first layer of steel pipes is placed, the grabbing device I moves the pad bar I from the position where the pad bar I is placed to the appropriate position of the first layer of steel pipes, and repeats the placement until the placement is completed;
[0020] B. Multilayer tube row Ⅱ
[0021] b1. The steel pipe rolls down from the landing device onto the pipe stack, the pipe swinging trolley moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device shifts the steel pipe to the designated position. If the steel pipe lands at the designated position, there is no need to start the pipe shifting device;
[0022] b2. After the first layer of steel pipes is placed, the grabbing device I moves the pad bar II from the position where the pad bar II is placed to the appropriate position of the first layer of steel pipes, and repeats the placement until the placement is completed;
[0023] b3. Repeat action b. After the second layer of steel pipes is placed, the grabbing device II moves all the steel pipes on the first pad bar II close to the discharging rack to the appropriate position close to the discharging rack. The grabbing device I moves the pad bar II to the storage position. Repeat this action until all the pad bars II on the first layer of steel pipes are removed.
[0024] Compared with the prior art, the beneficial effects of the utility model are:
[0025] The utility model has a reasonable structural design, and utilizes a pipe swinging trolley, a pipe shifting trolley, a pipe arranging trolley, a pipe shifting device, a pipe inserting device, a grabbing device I, a grabbing device II, etc. to swing the steel pipes that need multi-layer swinging and transport them to the conveying line, thereby realizing the automation of multi-layer swinging and arranging of steel pipes, being suitable for different steel pipe racks, and improving the efficiency of multi-layer swinging and arranging of steel pipes;
[0026] The whole device of the utility model has a compact structure and a high degree of automation, does not require manual operation, reduces the labor intensity of workers, avoids workers working in harsh environments, and reduces potential safety hazards in the manual operation process. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solution of the present invention, the drawings required for use in the description of the specific implementation methods will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0028] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0029] Figure 2 It is a front structural schematic diagram of the utility model;
[0030] Figure 3 It is a schematic diagram of the top structure of the utility model.
[0031] In the figure: 1. Pipe swinging trolley; 2. Pipe shifting trolley; 3. Pipe shifting device; 4. Pipe arrangement trolley; 5. Grabbing device I; 6. Pipe insertion device; 7. Turning mechanism; 8. Discharging rack; 9. Conveyor line; 10. Pipe arrangement steel pipes; 11. Pad bar I; 12. Pipe arrangement rack; 13. Grab device II; 14. Pad bar II. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0033] See also Figure 1-3 As shown, this embodiment is an automatic steel pipe multi-layer arranging device, including a pipe swinging trolley 1, a pipe shifting trolley 2 and a pipe arrangement trolley 4 are installed on the top of the pipe swinging trolley 1, a pipe shifting device 3 is installed on the pipe shifting trolley 2, and the pipe shifting device 3 can move the steel pipe forward, a gripping device Ⅰ5 is installed at the front and rear parts of the pipe arrangement trolley 4, a gripping device Ⅱ13 is installed in the middle part of the pipe arrangement trolley 4, and a pipe insertion device 6 is installed on the right side of the pipe arrangement trolley 4.
[0034] A pipe discharging rack 12 is provided below the pipe discharging trolley 4 , a discharging rack 8 is installed at the tail end of the pipe discharging rack 12 , a conveying line 9 is provided on the right side of the discharging rack 8 , and a turning mechanism 7 is installed between the conveying line 9 and the discharging rack 8 .
[0035] The top of the tube rack 12 is in contact with the tube row steel pipe 10 , and the tube row steel pipe 10 is detachably mounted with a pad bar Ⅰ 11 and a pad bar Ⅱ 14 .
[0036] The pipe swinging trolley 1 adopts a movable four-column gantry structure and can be moved between different pipe discharging racks. A slide rail is installed on the upper end of the pipe swinging trolley 1.
[0037] The pipe shifting trolley 2 and the pipe arranging trolley 4 are both mobile, and guide wheels matching with slide rails are installed at the lower ends of the pipe shifting trolley 2 and the pipe arranging trolley 4, so as to be easily installed on the pipe swinging trolley 1 and moved.
[0038] The grabbing device Ⅰ5 is used to place and remove the pad bars Ⅰ11 and the pad bars Ⅱ14.
[0039] The grabbing device II 13 is used for placing and grabbing the steel pipes 10 in the pipe row.
[0040] A pipe arrangement method of an automatic steel pipe multi-layer swing arrangement device, applied to the automatic steel pipe multi-layer swing arrangement device, includes the following methods:
[0041] A. Multilayer tube row Ⅰ
[0042] a1. The steel pipe rolls down from the landing device onto the pipe stack, the pipe swinging trolley 1 moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley 2 moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device 3 shifts the steel pipe to the specified position. If the steel pipe lands at the specified position, the pipe shifting device 3 does not need to be started;
[0043] a2. After the first layer of steel pipes is placed, the grabbing device I5 moves the pad bar I11 from the position where the pad bar I11 is placed to the appropriate position of the first layer of steel pipes, and repeats the placement until the placement is completed;
[0044] B. Multilayer tube row Ⅱ
[0045] b1. The steel pipe rolls down from the landing device onto the pipe stack, the pipe swinging trolley 1 moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley 2 moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device 3 shifts the steel pipe to the specified position. If the steel pipe lands at the specified position, the pipe shifting device 3 does not need to be started;
[0046] b2. After the first layer of steel pipes is placed, the grabbing device I5 moves the pad bar II 14 from the position where the pad bar II 14 is placed to the appropriate position of the first layer of steel pipes, and repeats the placement until the placement is completed;
[0047] b3. Repeat action b1. After the second layer of steel pipes is placed, the grabbing device Ⅱ13 moves all the steel pipes on the first pad bar Ⅱ14 close to the discharging rack 8 to a suitable position close to the discharging rack 8. The grabbing device Ⅰ5 moves the pad bar Ⅱ14 to the storage position of the pad bar. Repeat this action until all the pad bars Ⅱ14 on the first layer of steel pipes are removed.
[0048] The specific implementation of this embodiment is as follows:
[0049] When performing the multi-layer pipe row I swinging arrangement, the steel pipe is rolled down from the descending device onto the pipe stack. If it does not land at the designated position, the pipe swinging trolley 1 moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley 2 moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device 3 shifts the steel pipe to the designated position. If it lands at the designated position, there is no need to start the pipe shifting device. After the first layer of steel pipes is placed, the grabbing device I5 moves the pad bar I11 from the position where the pad bar I11 is placed to the appropriate position of the first layer of steel pipes, and the placement is repeated until the placement is completed. This device realizes the swinging of the multi-layer pipe row I through the above actions;
[0050] When performing the multi-layer pipe row II swinging mode, the steel pipe is rolled from the landing device onto the pipe stack. If it does not land at the designated position, the pipe swinging trolley 1 moves to the appropriate position of the pipe stack where the pipe needs to be swung, the pipe shifting trolley 2 moves to the appropriate position of the steel pipe where the pipe needs to be shifted, and the pipe shifting device 3 shifts the steel pipe to the designated position. If it lands at the designated position, there is no need to start the pipe shifting device. After the first layer of steel pipes is placed, the gripping device I5 moves the pad bar II 14 from the position where the pad bar II 16 is placed to the appropriate position of the first layer of steel pipes, and the placement is repeated until the placement is completed. After the second layer of steel pipes is placed, the gripping device II 13 moves all the steel pipes on the first pad bar II 14 close to the discharging rack 8 to the appropriate position in the direction close to the discharging rack 8, and the gripping device I5 moves the pad bar II 14 to the position where the pad bar is stored. This action is repeated until all the pad bars II 14 on the first layer of steel pipes are removed. The above-mentioned action of the device realizes the swinging of the multi-layer pipe row II.
[0051] When the steel pipe needs to be transported to the required position, the pipe swinging trolley 1 moves to the pipe pile where the steel pipe needs to be transported, the pipe arrangement trolley 4 moves to the appropriate position, the pipe insertion device 3 first inserts and pulls the steel pipe from the multi-layer pipe pile to a single-layer pipe pile, and then the pipe insertion device 6 inserts and pulls the steel pipe to roll onto the discharge rack 8, and the turning mechanism 7 moves the steel pipe to the roller of the conveyor line 9, and the steel pipe is transported to the required position along the conveyor line 9, and this action is repeated until the steel pipe that needs to be transported is transported.
[0052] When there is a special situation where pipes need to be picked, the grabbing device II 13 can pick out the steel pipes, and then transport them to the required location using a pipe grabbing machine or a transport line.
[0053] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0054] The preferred embodiments of the utility model disclosed above are only used to help explain the utility model. The preferred embodiments do not describe all the details in detail, nor do they limit the utility model to the specific implementation methods described. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the utility model, so that technicians in the relevant technical field can well understand and use the utility model. The utility model is limited only by the claims and their full scope and equivalents.
Claims
1. An automatic steel pipe multi-layer arranging device, comprising a pipe arranging vehicle (1), characterized in that: A pipe shifting trolley (2) and a pipe arranging trolley (4) are installed on the top of the pipe swinging trolley (1); a pipe shifting device (3) is installed on the pipe shifting trolley (2); a gripping device I (5) is installed at the front and rear parts of the pipe arranging trolley (4); a gripping device II (13) is installed in the middle part of the pipe arranging trolley (4); and a pipe inserting device (6) is installed on the right side of the pipe arranging trolley (4).
2. The automatic steel pipe multi-layer arrangement device according to claim 1, characterized in that: A pipe discharging rack (12) is provided below the pipe discharging trolley (4), a discharging rack (8) is installed at the tail end of the pipe discharging rack (12), a conveyor line (9) is provided on the right side of the discharging rack (8), and a turning mechanism (7) is installed between the conveyor line (9) and the discharging rack (8).
3. The automatic steel pipe multi-layer arrangement device according to claim 2, characterized in that: The top of the tube rack (12) is in contact with a tube row steel pipe (10), and a pad bar I (11) and a pad bar II (14) are detachably mounted on the tube row steel pipe (10).
4. The automatic steel pipe multi-layer arrangement device according to claim 1, characterized in that: The pipe swinging trolley (1) adopts a movable four-column gantry structure, and a slide rail is installed on the upper end of the pipe swinging trolley (1).
5. The automatic steel pipe multi-layer arrangement device according to claim 1, characterized in that: The pipe shifting trolley (2) and the pipe displacing trolley (4) are both movable, and guide wheels matching with the slide rails are installed at the lower ends of the pipe shifting trolley (2) and the pipe displacing trolley (4).
6. The automatic steel pipe multi-layer arrangement device according to claim 3, characterized in that: The grabbing device I (5) is used to place and remove the pad bar I (11) and the pad bar II (14).
7. The automatic steel pipe multi-layer arrangement device according to claim 3, characterized in that: The grabbing device II (13) is used for placing and grabbing the steel pipes (10) in the pipe row.
Citation Information
Cited By
Automatic multi-layer arrangement device and method for steel pipes
CN118083597A
An automatic multi-layer steel pipe arranging device and method
CN118083597B