Road and bridge construction loading machine
By introducing a crushing and anti-blocking mechanism into the road and bridge construction loading machine, the problem of blockage of large materials is solved, the crushing and dredging functions are realized, and the efficiency and convenience of construction loading are improved.
Patent Information
- Application Number
- CN202323591289.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-28
AI Technical Summary
When the existing road and bridge construction loader is conveying materials, large pieces of material that are wet and pasted together or whole large pieces of material can easily block the hopper, resulting in low conveying efficiency.
A loader for road and bridge construction is designed. It adopts a crushing mechanism and an anti-blocking mechanism. The crushing motor drives the screw and crushing plate to crush large materials. It is equipped with an anti-blocking insertion rod to clear the blockage. It is combined with an electric telescopic rod to intelligently control the connecting plate. position to ensure smooth loading operations.
It effectively crushes large pieces of material to prevent blockage and quickly clears the blockage, improving the efficiency and convenience of loading materials in road and bridge construction.
Smart Images

Figure CN221875847U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of road and bridge construction, in particular to a road and bridge construction loading machine. Background Art
[0002] In a road and bridge construction loading machine disclosed in the authorization announcement number CN210084494U, a double-layer vibrating feeding mechanism is arranged, which can feed through the inner bucket body, and drive the inner bucket body to vibrate inside the outer bucket body through the vibration motor, so that the sand and gravel are shaken off and slide down, avoiding the sand and gravel adhering to the inner wall of the inner bucket. The outer bucket body is used for the transition of sand and gravel discharge, which is convenient for docking with the spiral conveying pipe and increasing work efficiency. However, when conveying materials, it is inevitable that there are large pieces of materials or whole large pieces of materials that are wet and stuck together, which are easy to block the hopper when entering the hopper. For this reason, we propose a road and bridge construction loading machine to solve this problem. Utility Model Content
[0003] The purpose of the utility model is to propose a charging machine for road and bridge construction in view of the problems existing in the background technology.
[0004] The technical solution of the utility model is as follows: a loading machine for road and bridge construction comprises a frame, four sets of universal wheels are installed under the frame, a feed hopper is fixedly installed on the frame, a spiral conveying pipe is fixedly installed on the frame, a support platform is fixedly installed on the upper end of the frame at one side of the feed hopper, a connecting plate is slidably installed on the support platform, a motor control console is fixedly installed on the connecting plate, a crushing mechanism is installed on the motor control console, an anti-blocking mechanism is installed on the crushing mechanism, and a position control mechanism is installed between the support platform and the connecting plate.
[0005] Preferably, the pulverizing mechanism comprises a pulverizing motor fixedly mounted on the upper end of a motor control console, a control column is fixedly mounted on the lower surface of the motor control console, and a lifting slot is provided in the middle of the control column.
[0006] Preferably, the output end of the pulverizing motor passes through the motor control console and extends to one end of the inner side of the lifting slot, where a telescopic rod is fixedly installed, and a screw is fixedly installed at the lower end of the telescopic rod.
[0007] Preferably, a screw plate is fixedly installed at the bottom of the lifting groove, a screw hole is opened in the middle of the screw plate, the screw rod passes through the screw hole and is threadedly connected with the screw hole, and a crushing plate is fixedly installed at the bottom end of the screw rod.
[0008] Preferably, the anti-blocking mechanism includes an anti-blocking rod fixedly mounted on the lower end of the crushing plate.
[0009] Preferably, the position control mechanism comprises two slide grooves symmetrically opened on the support platform, a slider is slidably engaged in the slide groove, and the connecting plate is fixedly mounted on the slider.
[0010] Preferably, a position control plate is fixedly mounted on one end of the support platform, and an electric telescopic rod fixedly connected to the connecting plate is fixedly mounted on the position control plate.
[0011] Compared with the existing technology, the beneficial effects of the utility model are:
[0012] (1): The present invention has the function of crushing large pieces of materials, thereby preventing blockages, and also has the function of clearing blockages after blockage, thus facilitating loading operations in road and bridge construction;
[0013] (2): The present application can move the position of the connecting plate through the action of the slide groove, and the position of the connecting plate can be intelligently and electrically controlled by the electric telescopic rod. When the crushing plate and the anti-blocking rod are not needed to clean up large pieces of material and clear congestion, the screw is first driven up by the crushing motor to make the crushing plate and the anti-blocking rod move upward. When they are higher than the feed hopper, the electric telescopic rod is retracted to make the motor control console away from the feed hopper, which facilitates the loading of the feed hopper. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of a road and bridge construction loader;
[0015] Figure 2 It is a schematic diagram of the installation structure between the motor control console and the position control board in a road and bridge construction loader;
[0016] Figure 3 The figure is a schematic diagram of the structure of a control column in a loader for road and bridge construction.
[0017] Figure numerals: 1. frame; 2. universal wheel; 3. feed hopper; 4. spiral conveyor pipe; 5. support platform; 6. slide; 7. connecting plate; 8. motor control console; 9. crushing motor; 10. control column; 11. lifting slot; 12. telescopic rod; 13. screw rod; 14. screw plate; 15. screw hole; 16. crushing plate; 17. anti-blocking plug rod; 18. position control board; 19. electric telescopic rod. DETAILED DESCRIPTION
[0018] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments. Example
[0019] like Figure 1-3As shown, a road and bridge construction loading machine proposed by the utility model comprises a frame 1, four sets of universal wheels 2 are installed below the frame 1, a feed hopper 3 is fixedly installed on the frame 1, a spiral conveying pipe 4 is fixedly installed on the frame 1, a support platform 5 is fixedly installed on the upper end of the frame 1 at one side of the feed hopper 3, a connecting plate 7 is slidably installed on the support platform 5, a motor control console 8 is fixedly installed on the connecting plate 7, a crushing motor 9 is installed on the motor control console 8, a control column 10 is fixedly installed on the lower surface of the motor control console 8, a lifting groove 11 is provided in the middle of the control column 10, a telescopic rod 12 is fixedly installed at one end inside the lifting groove 11 at the output end of the crushing motor 9, a screw 13 is fixedly installed at the lower end of the telescopic rod 12, a screw plate 14 is fixedly installed at the bottom of the lifting groove 11, a screw hole 15 is provided in the middle of the screw plate 14, the screw 13 penetrates the screw hole 15 and is threadedly connected with the screw hole 15, a crushing plate 16 is fixedly installed at the bottom of the screw 13, and an anti-blocking plug 17 is fixedly installed at the lower end of the crushing plate 16.
[0020] The loader 12 is moved to a suitable position beside the feeding vehicle, and then the sand and gravel are put into the feeding hopper 3 and transported to the feeding vehicle through the spiral conveying pipe 4. When large pieces of materials or whole large pieces of materials that are wet and stuck together appear in the sand and gravel, the telescopic rod 12 and the screw 13 are driven to rotate by the crushing motor 9, and the screw 13 is driven to rise and fall by the threaded action of the screw 13 and the screw hole 15. In this way, the crushing plate 16 can be controlled to rotate up and down, and the large pieces of materials can be quickly crushed, which is convenient for the transportation of materials and prevents the large pieces of materials from blocking the feeding hopper 3. When the feeding hopper 3 is blocked, the anti-blocking plug rod 17 installed at the bottom of the crushing plate 16 is continuously moved downward and inserted into the feeding port of the feeding hopper 3, so that the hopper can be quickly unblocked to further prevent blockage. The present application has the function of crushing large pieces of materials, and then has the function of preventing blockage, and also has the function of unblocking blockage after blockage, which is convenient for the loading operation of road and bridge construction. Example
[0021] like Figure 1-3 As shown, a road and bridge construction loading machine proposed by the utility model, compared with the first embodiment, this embodiment also includes: two slide grooves 6 symmetrically opened on the support platform 5, a slider is slidably clamped in the slide groove 6, a connecting plate 7 is fixedly installed on the slider, a position control plate 18 is fixedly installed at one end of the support platform 5, and an electric telescopic rod 19 fixedly connected to the connecting plate 7 is fixedly installed on the position control plate 18.
[0022] In this embodiment, the position of the connecting plate 7 can be moved by the action of the slide groove 6, and the position of the connecting plate 7 can be intelligently and electrically controlled by the electric telescopic rod 19. When the crushing plate 16 and the anti-blocking rod 17 are not needed to clean up large materials and clear congestion, the screw 13 is first driven up by the crushing motor 9 to make the crushing plate 16 and the anti-blocking rod 17 move upward. When it is higher than the feed hopper 3, the electric telescopic rod 19 is retracted to make the motor control console 8 away from the feed hopper 3, which facilitates the loading of the feed hopper 3.
[0023] The implementation modes of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited thereto, and various changes can be made within the knowledge scope of technicians in the relevant technical field without departing from the purpose of the present invention.
Claims
1. A road and bridge construction loading machine, comprising a frame (1), characterized in that: Four sets of universal wheels (2) are installed below the frame (1); a feed hopper (3) is fixedly installed on the frame (1); a spiral conveying pipe (4) is fixedly installed on the frame (1); a support platform (5) is fixedly installed on the upper end of the frame (1) and located on one side of the feed hopper (3); a connecting plate (7) is slidably installed on the support platform (5); a motor control console (8) is fixedly installed on the connecting plate (7); a crushing mechanism is installed on the motor control console (8); an anti-blocking mechanism is installed on the crushing mechanism; and a position control mechanism is installed between the support platform (5) and the connecting plate (7).
2. A road and bridge construction loading machine according to claim 1, characterized in that: The pulverizing mechanism comprises a pulverizing motor (9) fixedly mounted on the upper end of a motor control console (8); a control column (10) is fixedly mounted on the lower surface of the motor control console (8); and a lifting slot (11) is provided in the middle of the control column (10).
3. A road and bridge construction loading machine according to claim 2, characterized in that: The output end of the pulverizing motor (9) passes through the motor control console (8) and extends to the inner end of the lifting slot (11), where a telescopic rod (12) is fixedly mounted, and a screw rod (13) is fixedly mounted at the lower end of the telescopic rod (12).
4. A road and bridge construction loading machine according to claim 3, characterized in that: A screw plate (14) is fixedly mounted on the bottom of the lifting groove (11), a screw hole (15) is provided in the middle of the screw plate (14), the screw rod (13) passes through the screw hole (15) and is threadedly connected to the screw hole (15), and a crushing plate (16) is fixedly mounted on the bottom end of the screw rod (13).
5. A road and bridge construction charging machine according to claim 4, characterized in that: The anti-blocking mechanism comprises an anti-blocking plug rod (17) fixedly mounted on the lower end of the crushing plate (16).
6. A road and bridge construction charging machine according to claim 5, characterized in that: The position control mechanism comprises two slide grooves (6) symmetrically arranged on the support platform (5), a slider is slidably engaged in the slide grooves (6), and the connecting plate (7) is fixedly mounted on the slider.
7. A road and bridge construction charging machine according to claim 6, characterized in that: A position control plate (18) is fixedly mounted on one end of the support platform (5), and an electric telescopic rod (19) fixedly connected to the connecting plate (7) is fixedly mounted on the position control plate (18).
