Construction site aerated brick hoisting tool

By designing the combined structure of cages, pallets and support bars, the problem of troublesome operation of existing aerated brick hoisting tools is solved, the convenient hoisting and efficient construction of aerated bricks are realized, and the operation convenience and safety of the construction site are improved. sex.

CN221876284UActive Publication Date: 2024-10-22左涛
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420423379.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-01
Publication Date
2024-10-22
Estimated Expiration
2034-03-01

AI Technical Summary

Technical Problem

The existing aerated brick hoisting tools are troublesome to operate, especially during the hoisting and hoisting process, it is inconvenient to transport the aerated bricks through the top or side openings, which affects construction efficiency and safety.

Method used

An aerated brick lifting tool including a cage, a support plate and a support bar is designed. The bottom of the cage has openings and installation holes formed by arc-shaped parts. The support bars pass through these holes. The bottom of the support plate is provided with a recessed groove for easy installation. For forklift operation, the support bars are fixed under the pallet through threaded connections, simplifying the lifting process of aerated bricks.

Benefits of technology

It improves the operational convenience and construction efficiency of aerated brick hoisting, reduces the operational complexity for workers, and ensures the stability and safety of the hoisting process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221876284U_ABST
    Figure CN221876284U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of aerated brick hoisting, and discloses a construction site aerated brick hoisting tool which comprises a cage frame, a supporting plate and supporting strips, a cage cavity with a bottom opening is formed in the cage frame, the supporting plate is arranged on the bottom opening, and the bottoms of a plurality of aerated bricks abut against the supporting plate; a plurality of arc-shaped pieces are downwards and convexly arranged on the two sides of the bottom of the cage frame, mounting holes with transverse openings are defined by the arc-shaped pieces, the supporting strips penetrate through the mounting holes in the two sides of the bottom of the cage frame respectively, and the middles of the supporting strips are located below the supporting plate; when a forklift transports the supporting plate and the multiple aerated bricks stacked on the supporting plate to a hoisting station, the cage frame covers the multiple aerated bricks from top to bottom, the supporting plate and the multiple aerated bricks are arranged in the cage cavity together, the mounting holes are formed below the supporting plate, the multiple supporting strips penetrate through the mounting holes in the two sides of the bottom of the cage frame respectively, and the multiple aerated bricks are arranged in the cage cavity. A hoisting structure is formed. Therefore, in the process of hoisting the hoisting structure, the supporting strip supports the supporting plate to support the plurality of aerated bricks, and the overall operation is simple and high in efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model patent relates to the technical field of aerated brick hoisting, and specifically, to aerated brick hoisting tools at construction sites. Background Art

[0002] Aerated brick, also known as autoclaved aerated concrete board, is a lightweight, porous building material with good thermal insulation performance, widely used in building walls, roof panels and other parts. Due to its light weight, large volume and easy damage, safety and stability during the hoisting process are particularly important. Therefore, the research and development and application of aerated brick hoisting tools are of great significance to improving construction efficiency and quality.

[0003] In the prior art, aerated bricks are stacked and placed on a pallet, and after the pallet is transferred to a lifting station by a forklift, the aerated bricks are moved from the pallet to a lifting cage. The lifting cage includes a cage cavity with a top opening, and the aerated bricks are placed in half of the cage cavity through the top opening, or a swing door is provided on one side of the lifting cage, and the swing door is opened to form a side opening, and the aerated bricks are moved into the cage cavity through the side opening. However, since the lifting cage has a certain height and a large number of aerated bricks, it is troublesome to move the aerated bricks into the cage cavity from either the top opening or the side opening, and the operation is inconvenient. Utility Model Content

[0004] The utility model aims to provide a construction site aerated brick hoisting tool, aiming to solve the problem that the aerated brick hoisting operation is relatively troublesome in the prior art.

[0005] The utility model is implemented as follows: a construction site aerated brick hoisting tool comprises a cage frame, a support plate and a support bar, wherein the cage frame has a cage cavity with a bottom opening, the support plate is arranged on the bottom opening, and the bottoms of a plurality of aerated bricks are pressed against the support plate; a plurality of arc-shaped pieces are convexly provided downwardly on both sides of the bottom of the cage frame, the arc-shaped pieces enclose a mounting hole with a transverse opening, the support bar respectively passes through the mounting holes on both sides of the bottom of the cage frame transversely, and the middle part of the support bar is located below the support plate;

[0006] When the forklift transports the pallet and the multiple aerated bricks stacked on the pallet to the lifting station, the cage is covered on the multiple aerated bricks from top to bottom, the pallet and the multiple aerated bricks are placed in the cage cavity together, the mounting holes are arranged under the pallet, and then the multiple support bars are respectively passed through the mounting holes on both sides of the bottom of the cage to form a lifting tool.

[0007] Optionally, a plurality of lifting ears are provided on the top of the cage, and the plurality of lifting ears are arranged at intervals along the circumference of the cage.

[0008] Optionally, the cage frame has a plurality of longitudinal ribs arranged longitudinally, and both sides of the longitudinal ribs extend outward away from the cage cavity to form two mounting bars, and the mounting bars are extended along the length direction of the longitudinal ribs. Two mounting bars are spaced apart to form an mounting gap, and the lower end of the lifting ear is welded and fixed in the mounting gap.

[0009] Optionally, the arc-shaped member is U-shaped, and the upper end of the arc-shaped member is welded and fixed in the installation interval.

[0010] Optionally, the plurality of arc-shaped members are symmetrically arranged on both sides of the bottom of the cage.

[0011] Optionally, downwardly extending sections are provided on the other two sides of the bottom of the cage frame, the bottom of the downwardly extending section is arranged lower than the bottom of the arc-shaped member, and the bottom of the downwardly extending section has a flat bottom surface.

[0012] Optionally, the bottom of the support plate is recessed upward to form two recessed grooves for forklift forks to be inserted into, the recessed grooves extend along the length direction of the support plate, and the two fork grooves are arranged in parallel.

[0013] Optionally, the top of the support bar abuts against the bottom of the recessed groove.

[0014] Optionally, the support bar includes a straight support section and a limiting section that limits the support section and completely passes through the mounting hole from back to front, the end of the support section is connected to the middle of the limiting section, the support section and the limiting section are vertically connected to each other, the length of the limiting section is greater than the aperture of the mounting hole, and the support section and the limiting section are integrally formed.

[0015] Optionally, the other end of the support section is threadedly connected to a limiting rod, a screw hole is provided in the middle of the limiting rod, and the other end of the support section is fixedly installed in the screw hole;

[0016] After the support section is passed horizontally through the mounting holes on both sides of the bottom of the cage by holding the limiting section, the limiting rod is fixedly connected to the support section through a threaded connection. Under the action of the limiting rod and the limiting section, the support bar is fixedly arranged under the support plate.

[0017] Compared with the prior art, the aerated brick lifting tool for construction sites provided by the utility model has the advantages that in the process of lifting the lifting structure, the support bar supports the pallet to hold multiple aerated bricks. The overall operation is simple and has good operational convenience. When the forklift transfers the pallet and aerated bricks to the lifting station, the workers only need to set the cage cover on the aerated bricks and then pass the support bar through the installation hole. The operation process is fast and does not require complicated skills, which greatly improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1It is a main schematic diagram of the construction site aerated brick lifting tool provided by the utility model;

[0019] Figure 2 It is a schematic diagram of the main view of the lower part of the cage provided by the utility model;

[0020] Figure 3 It is a schematic diagram of the connection of the longitudinal ribs, the lifting ears and the arc-shaped parts provided by the utility model;

[0021] Figure 4 It is a structural schematic diagram of the support bar and the limiting rod provided by the utility model. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0023] The implementation of the present utility model is described in detail below in conjunction with specific embodiments.

[0024] The same or similar numbers in the drawings of this embodiment correspond to the same or similar parts; in the description of the present utility model, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the drawings, it is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0025] Reference Figure 1-4 As shown, it is a preferred embodiment provided by the utility model.

[0026] The utility model provides a construction site aerated brick hoisting tool, comprising a cage frame 100, a support plate 500 and a support bar 400, wherein the cage frame 100 is provided with a cage cavity with a bottom opening, the support plate 500 is arranged on the bottom opening, and the bottoms of a plurality of aerated bricks are pressed against the support plate 500; a plurality of arc-shaped pieces 200 are protruding downward on both sides of the bottom of the cage frame 100, and the arc-shaped pieces 200 enclose a mounting hole 201 with a transverse opening, and the support bar 400 respectively passes through the mounting holes 201 on both sides of the bottom of the cage frame 100 transversely, and the middle part of the support bar 400 is located below the support plate 500;

[0027] When the forklift transports the pallet 500 and the multiple aerated bricks stacked on the pallet 500 to the lifting station, the cage 100 is covered on the multiple aerated bricks from top to bottom, the pallet 500 and the multiple aerated bricks are placed in the cage cavity together, the mounting holes 201 are arranged under the pallet 500, and then the multiple support bars 400 are respectively passed through the mounting holes 201 on both sides of the bottom of the cage 100 to form a lifting tool.

[0028] The above-mentioned construction site aerated brick lifting tool, during the process of lifting the lifting structure, the support bar 400 supports the pallet 500 to hold multiple aerated bricks. The overall operation is simple and has good operational convenience. When the forklift transfers the pallet 500 and the aerated bricks to the lifting station, the worker only needs to cover the cage 100 on the aerated brick, and then pass the support bar 400 through the installation hole 201. The operation process is fast and does not require complex skills, which greatly improves the construction efficiency.

[0029] The top of the cage 100 is provided with a plurality of lifting ears 300, and the plurality of lifting ears 300 are arranged at intervals along the circumference of the cage 100. In this way, the cage 100 can be stably lifted by connecting the lifting rope of the crane to the plurality of lifting ears 300.

[0030] The cage frame 100 has a plurality of longitudinal ribs 110 arranged longitudinally, and the two sides of the longitudinal ribs 110 extend outward away from the cage cavity to form two mounting bars 111, and the mounting bars 111 extend along the length direction of the longitudinal ribs 110. The two mounting bars 111 are spaced to form a mounting interval 1111, and the lower end of the lifting lug 300 is welded and fixed in the mounting interval 1111. In this way, the overall structural strength of the cage frame 100 is strengthened by the action of the longitudinal ribs 110, and the lifting lug 300 is welded and fixed in the mounting interval 1111, and the welding strength is stronger and more stable.

[0031] Specifically, the arc-shaped member 200 is in a U shape, and the upper end of the arc-shaped member 200 is welded and fixed in the installation space 1111. In this way, the welding strength is stronger and more stable.

[0032] Specifically, the plurality of arc-shaped members 200 are symmetrically arranged on both sides of the bottom of the cage frame 100. In this way, the extension direction of the support bar 400 is consistent with the length direction of the support plate 500, and the support plate 500 is subjected to more uniform force.

[0033] The other two sides of the bottom of the cage 100 are provided with downwardly extending sections 101, the bottom of the lower extension section 101 is arranged lower than the bottom of the arc-shaped member 200, and the bottom of the lower extension section 101 has a flat bottom surface. In this way, when the cage 100 is placed at the hoisting station, its bottom surface is pressed against the ground, and the arc-shaped member 200 is suspended, so as to prevent the arc-shaped member 200 from being pressed against the ground and damaged.

[0034] The bottom of the support plate 500 is recessed upward to form two recessed grooves 501 for forklift forks to be inserted, and the recessed grooves 501 are arranged along the length direction of the support plate 500, and the two fork grooves are arranged in parallel. In this way, the recessed grooves 501 can be inserted into the forks to ensure stability.

[0035] Specifically, the top of the support bar 400 abuts against the bottom of the recessed groove 501. In this way, the insertion space provided by the recessed groove 501 can also be used for the support bar 400 to pass through, so that when the support bar 400 is in the hanging position, it is convenient for the support bar 400 to pass through the two mounting holes 201.

[0036] The support bar 400 includes a straight support section 401 and a limiting section 402 that limits the support section 401 from completely passing through the mounting hole 201 from the back to the front. The end of the support section 401 is connected to the middle of the limiting section 402. The support section 401 and the limiting section 402 are vertically connected to each other. The length of the limiting section 402 is greater than the aperture of the mounting hole 201. The support section 401 and the limiting section 402 are integrally formed. In this way, the limiting section 402 prevents the support bar 400 from completely passing through the mounting hole 201. At the same time, the limiting section 402 is integrally formed to ensure strength and prevent the support bar 400 from falling off during the hoisting process.

[0037] As a preferred embodiment, the other end of the support section 401 is threadedly connected to a limiting rod 410, a screw hole is provided in the middle of the limiting rod 410, and the other end of the support section 401 is fixedly installed in the screw hole;

[0038] After the support section 401 is passed horizontally through the mounting holes 201 on both sides of the bottom of the cage frame 100 by holding the limiting section 402, the limiting rod 410 is fixedly connected to the support section 401 through threaded connection. Under the action of the limiting rod 410 and the limiting section 402, the support bar 400 is fixedly arranged under the support plate 500. In this way, the support bar 400 is prevented from falling off during the hoisting process.

[0039] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. Construction site aerated brick lifting tool, characterized by: The invention comprises a cage frame, a support plate and a support bar, wherein the cage frame has a cage cavity with a bottom opening, the support plate is arranged on the bottom opening, and the bottoms of the plurality of aerated bricks are pressed against the support plate; a plurality of arc-shaped pieces are protruding downward on both sides of the bottom of the cage frame, and the arc-shaped pieces enclose a mounting hole with a transverse opening, and the support bar respectively passes through the mounting holes on both sides of the bottom of the cage frame transversely, and the middle part of the support bar is located below the support plate; When the forklift transports the pallet and the multiple aerated bricks stacked on the pallet to the lifting station, the cage is covered on the multiple aerated bricks from top to bottom, the pallet and the multiple aerated bricks are placed in the cage cavity together, the mounting holes are arranged under the pallet, and then the multiple support bars are respectively passed through the mounting holes on both sides of the bottom of the cage to form a lifting tool.

2. The construction site aerated brick lifting tool as claimed in claim 1, characterized in that: The top of the cage is provided with a plurality of lifting ears, and the plurality of lifting ears are arranged at intervals along the circumference of the cage.

3. The construction site aerated brick lifting tool as claimed in claim 2, characterized in that: The cage frame has a plurality of longitudinal ribs arranged longitudinally, and the two sides of the longitudinal ribs extend outward away from the cage cavity to form two mounting strips. The mounting strips are extended along the length direction of the longitudinal ribs, and the two mounting strips are spaced to form a mounting gap, and the lower end of the lifting ear is welded and fixed in the mounting gap.

4. The construction site aerated brick lifting tool as claimed in claim 1, characterized in that: The arc-shaped member is in a U shape, and the upper end of the arc-shaped member is welded and fixed in the installation space.

5. The construction site aerated brick lifting tool as claimed in claim 1, characterized in that: The plurality of arc-shaped members are symmetrically arranged on both sides of the bottom of the cage.

6. The construction site aerated brick lifting tool as claimed in claim 5, characterized in that: The other two sides of the bottom of the cage frame are provided with downwardly extending sections, the bottom of the downwardly extending section is arranged lower than the bottom of the arc-shaped member, and the bottom of the downwardly extending section has a flat bottom surface.

7. The construction site aerated brick lifting tool as claimed in claim 1, characterized in that: The bottom of the support plate is recessed upward to form two recessed grooves for forklift forks to be inserted into. The recessed grooves are extended along the length direction of the support plate, and the two recessed grooves are arranged in parallel.

8. The construction site aerated brick lifting tool as claimed in claim 7, characterized in that: The top of the support bar abuts against the bottom of the recessed groove.

9. The construction site aerated brick lifting tool according to claim 1, characterized in that: The support bar includes a straight support section and a limiting section that limits the support section and completely passes through the mounting hole from back to front. The end of the support section is connected to the middle of the limiting section. The support section and the limiting section are vertically connected to each other. The length of the limiting section is greater than the aperture of the mounting hole. The support section and the limiting section are integrally formed.

10. The construction site aerated brick hoisting tool according to claim 9, characterized in that: The other end of the support section is threadedly connected to a limiting rod, a screw hole is provided in the middle of the limiting rod, and the other end of the support section is fixedly installed in the screw hole; After the support section is passed horizontally through the mounting holes on both sides of the bottom of the cage by holding the limiting section, the limiting rod is fixedly connected to the support section through a threaded connection. Under the action of the limiting rod and the limiting section, the support bar is fixedly arranged under the support plate.