Building material hoisting net for landscaping construction
Through interwoven multi-strand steel wire mesh strips and connecting strips, combined with the design of lifting straps, the problems of difficulty in manufacturing and high cost of use of building materials lifting meshes in the existing technology are solved, and efficient and low-cost building materials handling and lifting effects are achieved.
Patent Information
- Application Number
- CN202421232840.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-05-31
AI Technical Summary
The existing building material hoisting nets used in landscaping construction are difficult to manufacture, which increases the cost of use. Moreover, the hoisting nets have insufficient transport capacity and service life, resulting in high manufacturing costs and large losses.
The first and second mesh bars are evenly distributed and interwoven, forming a mesh structure through connecting bars and lifting straps to disperse the force of the building materials, improve the strength and transport capacity of the lifting net, and use multi-strand steel wire ropes and Die-cast parts enhance joint stability.
It achieves simple and efficient manufacturing, reduces the use cost, improves the hoisting strength and transport capacity of the hoisting net, prolongs the service life and reduces losses.
Smart Images

Figure CN221876299U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a building material hoisting net for garden greening construction, belonging to the technical field of garden greening. Background Art
[0002] In the construction of garden landscaping, due to the topography, there are different heights of the terrain, such as the height difference between flat land and mountains, the height difference between landscape lakes and the ground, etc., usually various large-scale equipment and machinery are needed to facilitate the transfer and transportation of various heavier building materials (such as bricks, cement, steel bars, etc.). The most commonly used device for lifting building materials is the hook, and there are other tools such as lifting rings, lifting suction cups, clamps and lifting nets. Among them, the lifting net, as a flexible tool, is convenient for lifting and moving objects of different shapes, and can supply materials well.
[0003] A Chinese patent application with publication number CN210635603U discloses a construction material lifting net for construction sites, including reinforcing ropes and a pallet. The reinforcing ropes are installed on the outer wall at the four corners of the upper end of the pallet. There are four reinforcing ropes in total, and lifting rings are provided at the ends of the four reinforcing ropes.
[0004] In actual application scenarios, since building materials need to be manually transported to the lifting net, workers usually stack the building materials irregularly to improve the transportation efficiency. At the same time, in the above-mentioned prior art, the building materials are neatly stacked on the pallet of the lifting net. The amount of building materials carried depends on the size of the pallet. If the pallet is too large, the area that can be wrapped around the lifting net for building materials will be reduced, which will also reduce the lifting height of the building materials and reduce the carrying capacity of the lifting net. If the pallet is too small, the amount of building materials that can be placed on the pallet will be reduced, and the carrying capacity of the lifting net will also be reduced accordingly. It is necessary to calculate the reasonable capacity during manufacturing, which is difficult to manufacture and increases the manufacturing cost. The material of the pallet is a great challenge. The use of metal materials will increase the dead weight of the lifting net, thereby increasing the burden on the crane, and the amount of building materials carried needs to be reduced accordingly. At the same time, the use loss of the lifting net is usually large, which also poses a great challenge to the use cost. Utility Model Content
[0005] The utility model aims to provide a building material hoisting net for garden greening construction, which solves the problems of great manufacturing difficulty and increased use cost in the prior art.
[0006] The above technical purpose of the utility model is mainly solved by the following technical solutions: a building material hoisting net for landscaping construction, comprising a plurality of evenly distributed and interwoven first and second nets, the first and second nets are interwoven to form a plurality of mesh holes, both ends of the plurality of the first and second nets are connected to the same connecting bar, the connecting bar is connected to evenly distributed lifting belts, the lifting belt is formed with a lifting ring, the first net, the second net, the connecting bar and the lifting belt are all twisted and formed by multiple strands of steel wire ropes; the first and second nets are interwoven to form a mesh structure and form a plurality of mesh holes, which can disperse the force of the building materials on the hoisting net and reduce In order to reduce the loss of the lifting net, both ends of the first net bar and the second net bar are connected to the same connecting bar, so that the connecting bar can connect the first net bar and the second net bar uniformly to form the edge of the lifting net, avoid the looseness of the first net bars and the second net bars, and strengthen the strength of the lifting net. The lifting belt can be connected to the connecting bar, so that the lifting equipment acts on the lifting ring of the lifting belt. The lifting belt bears the force of the connecting bar, and the connecting bar bears the action of the building materials, the first net bar and the second net bar. The force can be dispersed in stages to improve the lifting strength of the lifting net. At the same time, the lifting net has no external restrictions on the amount of building materials that can be carried, and has a simple structure, low manufacturing cost, no fear of loss, and greatly reduces the cost of use.
[0007] Preferably, both ends of the first mesh and the second mesh are bypassed by the connecting strip and are interwoven on each second mesh and each first mesh respectively; both ends of the first mesh and the second mesh are bypassed by the connecting strip and are interwoven on each second mesh and each first mesh respectively, so that both ends of each first mesh and both ends of each second mesh can be respectively compressed at the connection between the two ends of the first mesh and the two ends of the second mesh through the tensioned state of the multiple first mesh and the multiple second mesh themselves, and the first mesh and the second mesh are both multi-strand steel wire ropes, which can be compressed and shaped after their own deformation and bending, and are difficult to loosen, the structure is stable and reliable, and the assembly is simpler.
[0008] Preferably, the diameter of the first mesh bar and the second mesh bar is smaller than the diameter of the connecting bar and the lifting belt; the setting of the diameter of the first mesh bar and the second mesh bar being smaller than the diameter of the connecting bar and the lifting belt facilitates rapid assembly and molding, avoids the first mesh bar and the second mesh bar having larger diameters and increasing the molding difficulty, and avoids the increase in thickness and weight after molding and reducing the lifting efficiency. The connecting bar and the lifting belt bear the weight of the first mesh bar, the second mesh bar and the building materials as a whole, and have higher strength requirements. A larger diameter can enhance their own strength, and enhance the load capacity and stability of the lifting net.
[0009] Preferably, the two ends of the connecting strip are pressed and connected by an integrally formed first die-casting; the two ends of the connecting strip are pressed and connected by the first die-casting, which can strengthen the connection strength of the connection at the two ends of the connecting strip, making the connection at the connection tighter and more stable, avoiding the loosening of the connection at the end of the connecting strip and causing danger, thereby ensuring safety during use.
[0010] Preferably, the connecting strip is bent around to form a plurality of connecting rings, every two of the connecting rings are connected to two ends of a lifting belt, and the lifting ring is formed by bending the lifting belt around; the connecting ring is formed by bending the connecting strip around, and the lifting ring is formed by bending the lifting belt around, thereby realizing the integrated forming of the connecting ring and the lifting ring, thereby making the structure more stable. At the same time, during lifting, the connecting ring and the lifting ring will be deformed due to the lifting, and thus will be pressed against each other due to the deformation, thereby increasing the connection stability of the connection. The molding is simple and convenient, the manufacturing cost is low, and the structural strength is higher.
[0011] Preferably, the two ends of the lifting belt are bent to form rings that are mounted on the connecting ring and are tightly connected by an integrally formed second die-casting. The two ends of the lifting belt are tightly connected by the second die-casting, which can strengthen the connection strength of the connection at the two ends of the lifting belt, making the connection at the two ends of the lifting more tight and stable, avoiding the loose connection at the end of the lifting belt to cause danger, and enhancing safety during use.
[0012] Therefore, the utility model has the characteristics of simple and efficient manufacturing, low manufacturing cost, and reduced use cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a structural schematic diagram of the utility model.
[0014] Figure 2 yes Figure 1 Schematic diagram of the longitudinal section structure. DETAILED DESCRIPTION
[0015] The technical solution of the utility model is further specifically described below through embodiments and in conjunction with the accompanying drawings.
[0016] like Figure 1-2 As shown, a building material lifting net for landscaping construction includes a plurality of evenly distributed and interwoven first net strips 1 and second net strips 2, the first net strips 1 and second net strips 2 are interwoven to form a plurality of mesh holes 3, both ends of the plurality of first net strips 1 and second net strips 2 are connected to the same connecting strip 4, the connecting strip 4 is connected to evenly distributed lifting belts 5, a lifting ring 51 is formed on the lifting belt 5, and the first net strips 1, the second net strips 2, the connecting strips 4 and the lifting belts 5 are all twisted and formed by multiple strands of steel wire ropes.
[0017] The above-mentioned first mesh strips and second mesh strips are both formed by twisting multiple strands of steel wire ropes. A plurality of first mesh strips and a plurality of second mesh strips are interwoven with each other to form a mesh structure and form a plurality of mesh holes. The connecting strips are formed by twisting more multiple strands of steel wire ropes and have higher strength. The connecting strips pass through the ends of each first mesh strip and the ends of the second mesh strips to form the edge of the lifting net. The connecting strips and the first mesh strips and the second mesh strips form a complete and stable mesh structure. A plurality of evenly distributed lifting belts are connected to the connecting strips. After the building materials are loaded on the lifting net, each lifting belt can be picked up and the lifting ring can be fixed on the lifting equipment, so that a large amount of building materials can be transported and transferred.
[0018] like Figure 2 As shown, both ends of the first mesh strips 1 and the second mesh strips 2 pass around the connecting strips 4 and are interwoven on each second mesh strip 2 and each first mesh strip 1 respectively. The diameters of the first mesh strips 1 and the second mesh strips 2 are smaller than the diameters of the connecting strips 4 and the lifting belts 5.
[0019] The two ends of the first mesh bar and the two ends of the second mesh bar are respectively bent around the connecting bar and rotated to form loops, and are tightly connected to the side walls of the connecting bar. The ends of the first mesh bar and the second mesh bar are respectively interwoven and arranged on each second mesh bar and each first mesh bar after bypassing the connecting bar. When loaded with building materials, the weight of the building materials will press each first mesh bar and the second mesh bar, so that the first mesh bar and the second mesh bar are taut, and the bent ends of each first mesh bar and each second mesh bar can be pressed against each other by each second mesh bar and each first mesh bar, respectively, so as to avoid the bent ends of each first mesh bar and each second mesh bar from being disengaged. At the same time, the first mesh bar and the second mesh bar are both twisted and formed by multiple strands of steel wire ropes, which not only increases the friction between the first mesh bar, the second mesh bar and the connecting bar, but also is directly shaped by the properties of the steel wire rope itself after bending, further avoiding loosening.
[0020] The diameters of the first mesh bars and the second mesh bars are smaller than the diameters of the connecting bars and the lifting belts. The diameters of the first mesh bars and the second mesh bars are the same, so that the mesh structure is more tightly interwoven and can more evenly disperse the force of the building materials on the first mesh bars and the second mesh bars, thereby reducing losses. Since the connecting bars and the lifting belts need to bear the gravity of the first mesh bars, the second mesh bars and the building materials, higher strength requirements are required. The first mesh bars and the second mesh bars are interwoven to form a mesh structure, and the force of the building materials on the lifting net is dispersed through the mesh structure. The building materials can be stacked at will, which does not affect the handling and transfer of the building materials and improves the handling efficiency of the building materials.
[0021] like Figure 1 As shown, the two ends of the connecting strip 4 are pressed and connected by an integrally formed first die-casting 41, and the connecting strip 4 is bent around to form a plurality of connecting rings 42, and every two connecting rings 42 are connected to the two ends of a lifting belt 5, and the lifting ring 51 is formed by bending the lifting belt 5 around, and the two ends of the lifting belt 5 are bent to form a ring mounted on the connecting ring 42 and pressed and connected by an integrally formed second die-casting 52.
[0022] The above-mentioned first die-casting and second die-casting are both made of metal materials and die-casted as one piece using existing die-casting equipment on the market. They are directly die-cast at the connection points at both ends of the connecting strip and the connection points at both ends of the lifting belt to ensure the structural strength of the connection points and prevent the connection points from being easily detached. The connecting strip is bent around to form a plurality of connecting rings, and the lifting ring of the lifting belt is sleeved on the connecting ring. The lifting ring and the connecting ring are respectively integrally formed with the lifting belt and the connecting strip, which can improve the lifting strength and ensure structural stability.
Claims
1. A building material hoisting net for landscaping construction, characterized by: The invention comprises a plurality of evenly distributed and interwoven first mesh strips (1) and second mesh strips (2), wherein the first mesh strips (1) and the second mesh strips (2) are interwoven to form a plurality of mesh holes (3), both ends of the plurality of the first mesh strips (1) and the second mesh strips (2) are connected to the same connecting strip (4), the connecting strip (4) is connected to evenly distributed lifting belts (5), a lifting ring (51) is formed on the lifting belt (5), and the first mesh strips (1), the second mesh strips (2), the connecting strips (4) and the lifting belts (5) are all formed by twisting a plurality of steel wire ropes.
2. The building material hoisting net for landscaping construction according to claim 1 is characterized by: Both ends of the first mesh strips (1) and the second mesh strips (2) pass around the connecting strips (4) and are respectively interwoven on each second mesh strip (2) and each first mesh strip (1).
3. The building material hoisting net for landscaping construction according to claim 1 or 2, characterized in that: The diameters of the first mesh strips (1) and the second mesh strips (2) are smaller than the diameters of the connecting strips (4) and the lifting belts (5).
4. The building material hoisting net for landscaping construction according to claim 1 is characterized by: The two ends of the connecting strip (4) are tightly connected by an integrally formed first die-casting (41).
5. The building material hoisting net for landscaping construction according to claim 1 or 4, characterized in that: The connecting strip (4) is bent around to form a plurality of connecting rings (42), and every two connecting rings (42) are connected to two ends of a lifting belt (5), and the lifting ring (51) is formed by bending the lifting belt (5) around.
6. The building material hoisting net for landscaping construction according to claim 5 is characterized by: The two ends of the lifting belt (5) are bent to form a ring that is sleeved on the connecting ring (42) and is tightly connected by an integrally formed second die-casting (52).
