Furnace top charging system of blast furnace

By designing the pipeline structure of the furnace top charging system and using gas input and pressure recovery valve control, the stability and safety issues of the blast furnace charging system during high-load operation are solved, air flow upwelling and pollution are avoided, and the efficiency is improved. Productivity and system reliability.

CN221877069UActive Publication Date: 2024-10-22BEIJING SHOUGANG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420324838.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-22
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

The blast furnace top charging system has poor stability during high-load operation, which can easily cause airflow to rise, causing safety accidents and environmental pollution, and the long alternating operation time affects production efficiency.

Method used

A furnace top charging system is designed, including the first pipeline, the second pipeline and the third pipeline, which are controlled by the gas input and pressure recovery valve to avoid direct release, ensure that the gas flow is recovered under the control of the valve body, and increase System reliability and security.

Benefits of technology

It effectively avoids system shutdown and environmental pollution during accidents, maintains production efficiency, and improves the reliability and safety of system operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877069U_ABST
    Figure CN221877069U_ABST
Patent Text Reader

Abstract

The utility model discloses a furnace top charging system of a blast furnace, the furnace top charging system comprises a first pipeline, a second pipeline and a third pipeline, coal gas is conveyed into a charging bucket through the first pipeline, the pressure is equalized by controlling a first pressure equalizing valve in the stamping process, and the gas flow in the blast furnace enters the charging bucket; the first pipeline is communicated with the second pipeline through the pressure recovery valve, enters the second pipeline through the pressure recovery valve and is recovered into a pipe network after penetrating through the injection valve, pollution caused by direct diffusion is avoided, and when uncontrollable abnormity occurs in the high-load operation process of the system, the third pipeline can be communicated between the first pipeline and the second pipeline, so that the safety of the system is improved. According to the utility model, the valve body is arranged in the second pipeline, so that gas introduced during normal blanking and airflow in the charging bucket enter the second pipeline for recovery under the control of the valve body, the shutdown maintenance of the whole system during an accident is avoided, the production operation efficiency is maintained, the environmental pollution caused by direct diffusion under the accident and the safety accident under the operation environment are avoided, and the operation reliability of the system is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of blast furnace equipment, and in particular to a top charging system of a blast furnace. Background Art

[0002] During blast furnace production, various ironmaking raw materials transported by the main belt pass through the flap valve, and the gas (nitrogen) equalizing valve is opened to pressurize the material tank to the same pressure as that in the furnace; when the material surface in the furnace drops to the specified material line, the material distribution chute is started according to the required distribution angle and number of turns to evenly distribute the material in the furnace. After the material is emptied, close the throttle valve and then the lower sealing valve, open the material tank pressure recovery valve to discharge the pressure in the tank, and then open the upper sealing valve to reload; when the upper sealing valve of the No. 1 material tank is closed, the No. 2 material tank is charged according to the above procedure. The two material tanks are alternately operated, and the cycle is repeated to complete the charging work of the blast furnace.

[0003] When a batch of materials is unloaded from the material tank into the furnace and it is necessary to load the material tank, the pressure in the material tank must be released first to allow the material tank to communicate with the atmosphere. This process is called the release process. With the development of blast furnace iron-making technology and the continuous optimization and improvement of blast furnace iron-making systems, the pressure in the furnace continues to increase, which adds a burden to the charging equipment on the top of the blast furnace and increases the operation frequency of various equipment on the top. If the two material tanks operate alternately for too long, it will affect the normal unloading. Long-term high-load operation sometimes causes abnormal action sequences of various parts. Once an erroneous operation occurs, it will cause a major safety accident with a large amount of airflow in the furnace. Moreover, after a large amount of airflow in the furnace rises, it is directly discharged through the release pipe, which will cause emission pollution and safety problems in the working environment. There is waste and it is not conducive to the implementation of environmentally friendly production. Utility Model Content

[0004] In view of the defects existing in the prior art, the present application provides a top charging system for a blast furnace to solve the problems of poor stability and pollution of the blast furnace charging system in the prior art.

[0005] The above-mentioned purpose of the present application is mainly achieved through the following technical solutions:

[0006] A top charging system for a blast furnace, the top charging system comprising:

[0007] A first pipeline, wherein the first pipeline is used to communicate with the material tank, one end of the first pipeline is used to connect to the gas input end, and a first pressure equalizing valve is provided on one end of the first pipeline close to the material tank;

[0008] A second pipeline, the second pipeline is connected to the material tank, an ejector is provided on the second pipeline, a pressure recovery valve is provided on one end of the second pipeline close to the material tank, and the other end is used to communicate with a recovery end;

[0009] The third pipeline is connected between the ejector and the second pipeline, and an ejection valve is arranged on the third pipeline.

[0010] In an optional embodiment, the furnace top charging system further includes a fourth pipeline, the fourth pipeline is connected to the material tank, and a relief valve is provided on the fourth pipeline.

[0011] In an optional embodiment, the furnace top charging system also includes a dust collector connected to the material tank.

[0012] In an optional embodiment, a second pressure equalizing valve is provided on a side of the dust collector close to the material tank.

[0013] In an optional embodiment, the dust collector is disposed between the material tank and the first pipeline and the second pipeline at the same time.

[0014] In an optional embodiment, the first pipeline and the second pipeline respectively have the same number of connecting ports as the material tanks.

[0015] In an optional embodiment, the furnace top charging system further includes a throttle valve disposed at a discharge port of the material tank.

[0016] In an optional embodiment, the furnace top charging system further includes sealing valves respectively arranged at the feed inlet and the discharge inlet of the material tank.

[0017] In an optional embodiment, the furnace top charging system further includes pressure detection devices respectively arranged in the material tanks.

[0018] In an optional embodiment, the furnace top loading system also includes a controller, which is connected to and controls the throttle valve, the sealing valve, the first pressure equalizing valve, the pressure recovery valve and the ejection valve, and the controller is connected to and collects the signal output by the pressure detection device.

[0019] Compared with the prior art, the advantages of this application are:

[0020] The furnace top charging system in the present application includes a first pipeline and a second pipeline respectively connected to the material tank, one end of the first pipeline is used to connect the gas input end, and a first pressure equalizing valve is provided on the end of the first pipeline close to the material tank, an ejector is provided on the second pipeline, a pressure recovery valve is provided on the end of the second pipeline close to the material tank, and the other end is used to communicate with the recovery end, a third pipeline is provided between the ejector and the second pipeline, and an ejector valve is provided on the third pipeline. During actual operation, the coal gas is transported to the material tank through the first pipeline, and the pressure is equalized by controlling the first pressure equalizing valve during the stamping process, and the furnace of the blast furnace The airflow enters the material tank and enters the second pipeline through the pressure recovery valve, and is recovered into the pipeline network after passing through the ejection valve, avoiding pollution caused by direct release. When uncontrollable abnormalities occur during the high-load operation of the system, the first pipeline and the second pipeline can be connected through the third pipeline, so that the coal gas introduced during normal material discharge and the airflow in the material tank enter the second pipeline for recovery under the control of the valve body, avoiding the overall shutdown maintenance of the system in the event of an accident, maintaining production operation efficiency, avoiding environmental pollution caused by direct release in the event of an accident and safety accidents in the operating environment, and improving the reliability of system operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 A schematic diagram of the principle of the furnace top charging system provided in the embodiment of the present application;

[0023] In the figure: 100, first pipeline; 101, first equalizing pressure valve; 200, second pipeline; 201, ejector; 202, pressure recovery valve; 300, third pipeline; 301, ejector valve; 400, fourth pipeline; 401, relief valve; 501, dust collector; 502, second equalizing pressure valve; 503, throttle valve; 504, sealing valve; 505, pressure detection device; 601, gas input end; 602, recovery end; 603, flap valve; 604, material tank. DETAILED DESCRIPTION

[0024] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. The specific structural and functional details disclosed herein are only used to describe the exemplary embodiments of the present invention. However, the present invention can be embodied in many alternative forms, and it should not be understood that the present invention is limited to the embodiments described herein.

[0025] In blast furnace production, the gas recovery valve of the material tank needs to be opened to release gas before loading, so that the material tank is at the same pressure as the atmosphere. Then open the sealing valve on the material tank to allow the furnace charge to enter the material tank from the head material storage along the flap valve material chute. After the loading is completed, close the upper sealing valve. Before the top material tank is discharged into the furnace, it is necessary to pressurize the material tank to balance the pressure in the material tank with the pressure in the furnace. This process is the pressure equalization process. The pressure equalization valve is used to pressurize the material tank. The material tank pressure equalization valve is divided into two systems: one equalization valve (gas) and two equalization valves (nitrogen).

[0026] In daily production, one equalizing valve is generally used to equalize the pressure of the material tank, and the second equalizing valve is used as a backup. When a batch of materials is put into the furnace after the material tank, when it is necessary to load the material tank, the pressure in the material tank must be released first to make the material tank connected to the atmosphere. This process is the release process, and the gas recovery valve and the emergency release valve are used. With the development of modern blast furnace iron-making technology, the continuous optimization and improvement of blast furnace iron-making system, the pressure in the furnace is constantly increasing. The daily molten iron output of No. 1 and No. 2 blast furnaces is as high as more than 7,000 tons, and the materials used in the furnace are as high as about 14,000 tons, which adds a burden to the blast furnace top charging equipment. The hydraulic equipment on the top of the furnace has increased the operation frequency. The alternating operation time of the two material tanks cannot exceed 3 minutes. Exceeding it will affect the normal unloading. Long-term high-load operation sometimes causes abnormal action sequences of various parts. At present, the weighing bucket weighs the furnace charge in the material tank inaccurately, resulting in inaccurate furnace materials. At the same time, the equalizing pressure of the blast furnace top material tank is about 2.28 kg. Since the lower sealing valve is directly connected to the blast furnace, once it is opened by mistake, it will cause a major safety accident with a large amount of airflow in the furnace. In recent years, accidents on the top of blast furnaces have occurred frequently, seriously affecting personal and property safety. This also puts higher requirements on the stable and long-life operation of blast furnace system equipment.

[0027] At present, environmental protection pressure is generally high, and production restrictions and shutdowns are inevitable. Whether the blast furnace can continue to operate safely during the non-production restriction period directly determines whether the planned output can be successfully completed. Ensuring the safe and stable operation of the furnace top equipment, extending the blast furnace maintenance cycle, and reducing the shutdown maintenance time have become measures generally taken by various steel companies. How to ensure that the hydraulic equipment of the blast furnace top charging system meets the safety of production operation under high-load production conditions has become an urgent problem that needs to be solved.

[0028] like Figure 1As shown, a top charging system of a blast furnace, the top charging system comprises a first pipeline 100, a second pipeline 200 and a third pipeline 300, wherein:

[0029] like Figure 1 As shown, the first pipeline 100 is used to be connected to the material tank 604, and one end of the first pipeline 100 is used to connect to the gas input end 601. The gas is transported to one end of the first pipeline 100 and can enter the material tank 604 for operation under the guidance of the first pipeline 100, and a first pressure equalizing valve 101 is provided on one end of the first pipeline 100 close to the material tank 604.

[0030] like Figure 1 As shown, the first pressure equalizing valve 101 is a device for reducing fluid pressure in a pipeline system. Its function is to ensure that the pressure in the pipeline system is maintained at a set appropriate level to meet the needs of downstream equipment or pipelines.

[0031] like Figure 1 As shown, the second pipeline 200 is connected to the material tank 604, an ejector 201 is provided on the second pipeline 200, a pressure recovery valve 202 is provided on one end of the second pipeline 200 close to the material tank 604, and the other end is used to connect to the recovery end 602.

[0032] The ejector 201 ejects (discharges) a fluid in a fluid system to generate attraction or reduce the pressure of the system. The working principle of the ejector 201 is to use a high-speed flowing fluid to generate negative pressure, thereby ejecting or extracting other fluids or gases.

[0033] The pressure recovery valve 202 is used in the fluid system. Its main function is to recover or reduce the energy loss caused by pressure loss during the fluid flow process by improving the energy efficiency of the system. The pressure recovery valve 202 is used to reduce the speed of the fluid in the system and is arranged between the second pipeline 200 and the material tank 604 to recover or reduce the pressure of the fluid. Through the operation of the pressure recovery valve 202, the airflow in the material tank 604 can enter the second pipeline 200 and enter the recovery pipeline through the ejector 201 to avoid direct release.

[0034] like Figure 1 As shown, the third pipeline 300 is connected between the ejector 201 and the second pipeline 200 , and an ejection valve 301 is provided on the third pipeline 300 .

[0035] The ejection valve 301 is a device for ejecting steam. By operating and controlling the ejection valve 301, the first pipeline 100 and the second pipeline 200 are connected, so that the gas introduced into the first pipeline 100 can enter the recovery pipeline again, providing the operating conditions required for the maintenance of the furnace top charging system.

[0036] In an optional embodiment, the working principle of the furnace top charging system in the present application is: the furnace top charging system includes a first pipeline 100 and a second pipeline 200 respectively connected to the material tank 604, one end of the first pipeline 100 is used to connect to the gas input end 601, and a first pressure equalizing valve 101 is provided on the end of the first pipeline 100 close to the material tank 604, an ejector 201 is provided on the second pipeline 200, a pressure recovery valve 202 is provided on the end of the second pipeline 200 close to the material tank 604, and the other end is used to connect to the recovery end 602, and a third pipeline 300 is provided between the ejector 201 and the second pipeline 200, and an ejector valve 301 is provided on the third pipeline 300. In actual operation, the gas is transported to the material tank through the first pipeline 100 604, and during the stamping process, the first pressure equalizing valve 101 is controlled to equalize the pressure, the air flow in the blast furnace enters the material tank 604, and enters the second pipeline 200 through the pressure recovery valve 202, and is recovered to the pipeline network after passing through the ejection valve 301, avoiding the pollution caused by direct release, and when uncontrollable abnormalities occur during the high-load operation of the system, the first pipeline 100 and the second pipeline 200 can be connected through the third pipeline 300, so that the coal gas introduced for normal material discharge and the air flow in the material tank 604 enter the second pipeline 200 for recovery under the control of the valve body, avoiding the overall shutdown maintenance of the system in the event of an accident, maintaining production operation efficiency, and avoiding environmental pollution caused by direct release in the event of an accident and safety accidents in the working environment, thereby improving the reliability of system operation.

[0037] like Figure 1 As shown, in an optional embodiment, the furnace top loading system also includes a fourth pipeline 400, the fourth pipeline 400 is connected to the material tank 604, and the fourth pipeline 400 is provided with a relief valve 401. By adding a fourth pipeline 400 and setting a relief valve 401 on the fourth pipeline 400, the relief valve 401 can be operated under specific operating conditions to provide a way to release the airflow, thereby improving the flexibility of operating operations.

[0038] like Figure 1 As shown, in an optional embodiment, the furnace top loading system also includes a dust collector 501 connected to the material tank 604. After the airflow in the material tank 604 is discharged from the material tank 604, it first passes through the dust collector 501 to capture dust, thereby improving operation reliability.

[0039] like Figure 1 As shown, in an optional embodiment, a second pressure equalizing valve 502 is provided on the side of the dust collector 501 close to the material tank 604, and the second pressure equalizing valve 502 cooperates with the operation to facilitate corresponding opening and closing operations to control the on and off state before the airflow enters the dust collector 501.

[0040] like Figure 1 As shown, in an optional embodiment, the dust collector 501 is simultaneously arranged between the material tank 604 and the first pipeline 100 and the second pipeline 200, so that when the airflow in the first pipeline 100 and the second pipeline 200 passes through, the airflow is filtered by the dust collector 501, thereby improving operation reliability.

[0041] like Figure 1 As shown, in an optional embodiment, the first pipeline 100 and the second pipeline 200 respectively have the same number of connecting ports as the material tanks 604, that is, in the actual operation process, two material tanks 604 are provided for alternating operation, and correspondingly, the first pipeline 100 is respectively provided with two connecting ports connected to the two material tanks 604, and the second pipeline 200 is also respectively provided with two connecting ports connected to the two material tanks 604.

[0042] It should be noted that a valve body is provided at one end of each communication port to facilitate separate control.

[0043] like Figure 1 As shown, in an optional embodiment, the furnace top charging system further includes a throttle valve 503 disposed at the discharge port of the material tank 604 , and the throttle valve 503 controls the discharge amount to facilitate adjustment and control to match the pressure of the material tank 604 .

[0044] like Figure 1 As shown, in an optional embodiment, the furnace top loading system also includes sealing valves 504 respectively arranged at the feed port and the discharge port of the material tank 604, and the two sealing valves 504 are controlled in combination to perform production rhythm control, corresponding to the operation of the flap valve 603, to control the two ends of different material tanks 604.

[0045] like Figure 1 As shown, in an optional embodiment, the furnace top charging system further includes a pressure detection device 505 respectively arranged in the material tank 604 to obtain the pressure value in the material tank 604 in a timely manner.

[0046] like Figure 1 As shown, in an optional embodiment, the furnace top loading system also includes a controller, which is connected to and controls the throttle valve 503, the sealing valve 504, the first pressure equalizing valve 101, the pressure recovery valve 202 and the ejection valve 301, and the controller is connected to and collects the signal output by the pressure detection device 505. After obtaining the pressure value, the operating status of the throttle valve 503, the sealing valve 504, the first pressure equalizing valve 101, the pressure recovery valve 202 and the ejection valve 301 is controlled by the controller.

[0047] Specifically, during operation, after the flap valve 603 turns over to the sealing valve 504 at the feed port, various iron-making raw materials transported by the main belt pass through the flap valve 603 and enter the left and right receiving ports, the sealing valve 504 at the feed port, and the material tank 604 respectively. After a batch of materials is pulled, the sealing valve 504 at the feed port receives a signal and is closed through the controller. After the set time for closing the sealing valve 504 at the feed port is obtained; the first equalizing valve 101 on the material tank 604 is opened, and after the pressure detection device 505 detects that the pressure in the material tank 604 is the same as the air flow pressure in the blast furnace, the first equalizing valve 101 of the material tank 604 is closed in a chain manner. After obtaining the closing signal of the first equalizing valve 101, when the material level in the furnace drops to the specified material line, the probe is lifted to its original position, and the sealing valve 501 at the discharge port is opened in a chain manner. 4. After receiving the opening signal of the sealing valve 504 at the discharge port, the throttle valve 503 is interlockedly opened to the target opening and then the material is discharged. The charge is evenly distributed in the furnace. After the material tank 604 is emptied, the throttle valve 503 is interlockedly closed. After receiving the throttle valve 503 closed in place signal until the set time, the sealing valve 504 at the discharge port is closed. After receiving the signal to close the sealing valve 504 at the discharge port until the set time, the pressure recovery valve 202 is driven to open by the controller. When the pressure obtained by the pressure detection device 505 drops to the set value, the ejection valve 301 is opened. When the pressure drops to the set range, the ejection valve 301 is closed. After a certain period of operation, the sealing valve 504 at the feed port is opened to carry out the next charging sequence. The two material tanks 604 are operated alternately, and the cycle is repeated to complete the charging work into the blast furnace.

[0048] It should be understood that the terms first, second, etc. are only used to distinguish descriptions and should not be understood as indicating or implying relative importance. Although the terms first, second, etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are only used to distinguish one unit from another unit. For example, the first unit may be referred to as the second unit, and similarly, the second unit may be referred to as the first unit without departing from the scope of the exemplary embodiments of the present utility model.

[0049] It should be understood that the term "and / or" in this article is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent three situations: A exists alone, B exists alone, and A and B exist at the same time. The term " / and" in this article describes another relationship between associated objects, indicating that two relationships may exist. For example, A / and B can represent two situations: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the previous and next associated objects are in an "or" relationship.

[0050] It should be understood that in the description of the present invention, the terms "upper", "vertical", "inside", "outside", etc. indicate orientations or positional relationships that are customarily placed when the disclosed product is used, or are orientations or positional relationships that are customarily understood by those skilled in the art. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

[0051] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be a communication between the two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] The terms used herein are only used to describe specific embodiments and are not intended to limit the exemplary embodiments of the utility model. As used herein, the singular forms "one", "an", and "the" are intended to include plural forms unless the context clearly indicates the opposite meaning. It should also be understood that the terms "include", "comprise", "include", and / or "comprising" when used herein specify the existence of the claimed features, integers, steps, operations, units, and / or components, and do not exclude the existence or increase of one or more other features, quantities, steps, operations, units, components, and / or their combinations.

[0053] Specific details are provided in the following description to facilitate a complete understanding of the exemplary embodiments. However, it should be understood by those of ordinary skill in the art that the exemplary embodiments may be implemented without these specific details. In other embodiments, well-known processes, structures, and techniques may not be shown in unnecessary detail to avoid making the exemplary embodiments unclear.

[0054] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

[0055] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field.

Claims

1. A blast furnace top charging system, It is characterized in that The furnace top charging system comprises: A first pipeline, wherein the first pipeline is used to communicate with the material tank, one end of the first pipeline is used to connect to the gas input end, and a first pressure equalizing valve is provided on one end of the first pipeline close to the material tank; A second pipeline, the second pipeline is connected to the material tank, an ejector is provided on the second pipeline, a pressure recovery valve is provided on one end of the second pipeline close to the material tank, and the other end is used to communicate with a recovery end; The third pipeline is connected between the ejector and the second pipeline, and an ejection valve is arranged on the third pipeline.

2. The top charging system of a blast furnace according to claim 1, Features: The furnace top charging system also includes a fourth pipeline, the fourth pipeline is connected to the material tank, and a relief valve is provided on the fourth pipeline.

3. The top charging system of a blast furnace according to claim 1, Features: The furnace top charging system also includes a dust collector connected to the material tank.

4. The top charging system of a blast furnace according to claim 3, Features: A second pressure equalizing valve is provided on one side of the dust collector close to the material tank.

5. The top charging system of a blast furnace according to claim 3, Features: The dust collector is disposed between the material tank and the first pipeline and the second pipeline.

6. The top charging system of a blast furnace according to claim 1, Features: The first pipeline and the second pipeline respectively have the same number of communication ports as the material tanks.

7. The top charging system of a blast furnace according to claim 1, Features: The furnace top charging system also includes a throttle valve arranged at the discharge port of the material tank.

8. The top charging system of a blast furnace according to claim 7, Features: The furnace top charging system also includes sealing valves respectively arranged at the feed inlet and the discharge inlet of the material tank.

9. The top charging system of a blast furnace according to claim 8, Features: The furnace top charging system also includes pressure detection devices respectively arranged in the material tanks.

10. The top charging system of a blast furnace according to claim 9, Features: The furnace top charging system also includes a controller, which is connected to and controls the throttle valve, the sealing valve, the first pressure equalizing valve, the pressure recovery valve and the ejection valve, and is connected to and collects the signal output by the pressure detection device.