Forging heat treatment die

By designing an automated forging heat treatment mold and using multi-stage electric hydraulic cylinders and motor-driven conveyor racks to achieve automatic heating, insulation and cooling of materials, the problems of staff injuries and low cooling efficiency during the heat treatment process are solved, and the forging efficiency is improved. and security.

CN221877106UActive Publication Date: 2024-10-22LIAONING PENGCHENG NEW MATERIALS FORGING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420496555.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-10-22
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

When existing forging materials are heated and kept warm during the heat treatment process, workers are easily injured when transporting the materials to the cooling pool. The cooling efficiency is low and the materials are dispersed, resulting in reduced forging efficiency.

Method used

A forging heat treatment mold is designed, including a feed bin, a heating bin, a cooling bin and a conveying device. Multi-stage electric hydraulic cylinders and motor-driven conveying racks are used to achieve automatic heating, insulation and cooling of materials to avoid workers entering high temperature areas. , improve cooling effect and efficiency.

Benefits of technology

It reduces staff handling time, improves the cooling effect of forging materials, avoids injuries to staff, improves forging efficiency, and prevents equipment jitter from affecting heat treatment efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877106U_ABST
    Figure CN221877106U_ABST
Patent Text Reader

Abstract

The utility model discloses a forging heat treatment die which comprises a feeding bin, a heating bin is arranged on the feeding bin, a supporting frame is arranged on the heating bin, a multi-stage electric hydraulic cylinder is arranged on the supporting frame, a first conveying frame is arranged at the telescopic end of the multi-stage electric hydraulic cylinder, a heating device is arranged in the heating bin, and a second conveying frame is arranged at the telescopic end of the multi-stage electric hydraulic cylinder. The first conveying frame is movably installed in the heating device, a cooling bin is arranged on the feeding bin, the first conveying frame is movably installed in the cooling bin, and a conveying device is arranged on the feeding bin. According to the design, heated and insulated forging materials can be moved to the cooling bin to be cooled, the carrying time of workers is shortened, the working efficiency and the cooling effect are improved, and meanwhile, the situation that the bodies of the workers are injured due to the fact that the workers touch the materials in the high-temperature state by mistake when carrying the materials is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of forging processing, in particular to a forging heat treatment die. Background Art

[0002] Heat treatment refers to a metal heat processing technology that uses heating, insulation and cooling to obtain the expected structure and performance of materials in the solid state. When existing forging materials are heat treated, the heating and insulation processes make the forging materials in a high temperature state. When the workers carry the materials to the cooling pool, they may be injured if they accidentally touch the forging materials. At the same time, the materials are more scattered during cooling, and salvage is more time-consuming, which reduces the forging efficiency of the materials.

[0003] For example, the utility model patent with publication number CN215481085U discloses a quenching mold for heat treatment of workpieces, including a mold box, a motor is fixedly installed in the inner cavity of the mold box, an output shaft is fixedly installed at the output end of the motor through a reducer, a No. 1 bevel gear is fixedly installed on the outer surface of the output shaft, a No. 1 rotating shaft is rotatably installed at the bottom of the inner cavity of the mold box, and a No. 2 bevel gear is fixedly installed on the outer surface of the No. 1 rotating shaft. The device requires the staff to manually place the workpiece on the support plate, and wait for the heating block to cool down after the heat treatment is completed. When the heating block is not cooled, it is more dangerous to pick up the workpiece, and the staff may be easily injured if they accidentally touch the heating plate. When there are many workpieces and they are placed too densely, less coolant is sprayed between the workpieces and on the top and bottom, and the cooling effect is poor. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a forging heat treatment die, which solves the problem that when the existing heat treatment die performs heat treatment on the forging material, the heating and insulation processes cause the forging material to be in a high temperature state, and the workers may be injured by accidentally touching the forging material during the process of transporting the material to the cooling pool. At the same time, the material is relatively scattered during cooling, and it is time-consuming to salvage it, which reduces the forging efficiency of the material.

[0005] To achieve the above objectives, the utility model is implemented through the following technical solutions: a forging heat treatment mold, including a feed bin, a heating bin is provided on the feed bin, a support frame is provided on the heating bin, a multi-stage electric hydraulic cylinder is provided on the support frame, a first conveying frame is provided on the telescopic end of the multi-stage electric hydraulic cylinder, a heating device is provided in the heating bin, the first conveying frame is movably installed in the heating device, a cooling bin is provided on the feed bin, the first conveying frame is movably installed in the cooling bin, and a conveying device is provided on the feed bin.

[0006] Preferably, the conveying device includes a pair of support plates, and a conveying bin is arranged on the upper wall surface of the pair of support plates, and the conveying bin is arranged in the feeding bin. A first motor is rotatably arranged in the conveying bin, a first sprocket is arranged on the driving end of the first motor, and a second sprocket is rotatably arranged in the conveying bin, and chains are arranged on the first sprocket and the second sprocket.

[0007] Preferably, a support block is slidably installed on the conveying bin, the support block is arranged on the chain, a hook is rotatably installed on the support block, a second motor is arranged in the support block, a first gear is arranged on the driving end of the second motor, a second gear is arranged on the hook, and the first gear and the second gear are meshed with each other.

[0008] Preferably, a second conveying frame is movably mounted on the conveying bin, a supporting ring is provided on the second conveying frame, the hook is movably arranged in the supporting ring, and a plurality of fixing devices are arranged in the second conveying frame.

[0009] Preferably, the fixing device comprises a lower block and an upper block, the upper block is inserted into the lower block, a plurality of support columns are arranged on the lower block, and forging materials are arranged on the plurality of support columns.

[0010] Preferably, a first multi-stage electric telescopic rod is provided on the support frame, a gate is provided on the telescopic end of the first multi-stage electric telescopic rod, a second multi-stage electric telescopic rod is provided on the conveying bin, a baffle is provided on the telescopic end of the second multi-stage electric telescopic rod, and the baffle is movably installed in the cooling bin.

[0011] Beneficial Effects

[0012] The forging heat treatment die provided by the utility model has the following beneficial effects:

[0013] The feed bin of the present design is provided with a heating bin, a support frame is provided on the heating bin, a multi-stage electric hydraulic cylinder is provided on the support frame, a first conveying frame is provided on the telescopic end of the multi-stage electric hydraulic cylinder, a heating device is provided in the heating bin, and the first conveying frame is movably installed in the heating device; a cooling bin is provided on the feed bin, and the first conveying frame is movably installed in the cooling bin. The device can put the forging materials after heating and heat preservation into the cooling bin for cooling, thereby reducing the time required for staff to carry the materials, improving work efficiency and cooling effect, and at the same time avoiding the situation where staff accidentally touch the materials in a high-temperature state while carrying them, causing physical injuries to the staff.

[0014] The conveying device of the present design includes a pair of support plates, a conveying bin is arranged on the upper wall surface of the pair of support plates, the conveying bin is arranged in the feed bin, a first motor is rotatably arranged in the conveying bin, a first sprocket is arranged on the driving end of the first motor, a second sprocket is rotatably arranged in the conveying bin, a chain is arranged on the first sprocket and the second sprocket, a support block is slidably installed on the conveying bin, the support block is arranged on the chain, a hook is rotatably installed on the support block, a second motor is arranged in the support block, a first gear is arranged on the driving end of the second motor, a second gear is arranged on the hook, the first gear and the second gear are meshed with each other, a second conveying frame is movably installed on the conveying bin, a support ring is arranged on the second conveying frame, and the hook is movably arranged in the support ring. The device can load and unload forging materials without the need for staff to enter the high-temperature area, thereby preventing the staff from being scalded.

[0015] The fixing device of the present design comprises an upper block and a lower block, the upper block is inserted on the lower block, a number of supporting columns are arranged on the lower block, and forging materials are arranged on the supporting columns. The device plays a fixing role. When the machine is running, it prevents the equipment from shaking and causing the forging materials to be close to each other, thereby affecting the heat treatment efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the whole of the utility model.

[0017] Figure 2 It is a schematic diagram of the first conveying frame of the utility model.

[0018] Figure 3 It is a schematic diagram of the second conveying rack of the present invention.

[0019] Figure 4 For the utility model Figure 1 A partial enlarged view of point A in the middle.

[0020] Figure 5 It is a schematic diagram of the fixing device of the present utility model.

[0021] In the figure: 1, second conveyor frame; 2, conveyor bin; 3, chain; 4, gate; 5, first multi-stage electric telescopic rod; 6, support frame; 7, multi-stage electric hydraulic cylinder; 8, first conveyor frame; 9, heating device; 10, support plate; 11, second multi-stage electric telescopic rod; 12, second sprocket; 13, cooling bin; 14, baffle; 15, feed bin; 16, heating bin; 17, support ring; 18, hook; 19, second gear; 20, second motor; 21, first gear; 22, support block; 23, first motor; 24, first sprocket; 25, upper block; 26, lower block; 27, support column; 28, forging material. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0023] See also Figure 1-5 The utility model provides a technical solution: a forging heat treatment die, comprising a feed bin 15, a heating bin 16 is arranged on the feed bin 15, a support frame 6 is arranged on the heating bin 16, a multi-stage electric hydraulic cylinder 7 is arranged on the support frame 6, a first conveying frame 8 is arranged on the telescopic end of the multi-stage electric hydraulic cylinder 7, a heating device 9 is arranged in the heating bin 16, the first conveying frame 8 is movably installed in the heating device 9, a cooling bin 13 is arranged on the feed bin 15, the first conveying frame 8 is movably installed in the cooling bin 13, and a conveying device is arranged on the feed bin 15;

[0024] The multi-stage electric hydraulic cylinder 7 is driven to extend and retract, and the first conveying frame 8 is driven to rise and fall, so that the first conveying frame 8 is movably installed in the heating bin 16, the feeding bin 15 and the cooling bin 13;

[0025] The heating device 9 is only used to heat the workpiece, which is not within the protection scope of this design. It belongs to the existing mature technology, and its heating method belongs to the common technical knowledge, so its structure is not described in detail;

[0026] The cooling chamber 13 is filled with coolant for cooling the heated forging material 28 .

[0027] The present embodiment is further configured such that the conveying device includes a pair of support plates 10, a conveying bin 2 is provided on the upper wall surface of the pair of support plates 10, the conveying bin 2 is provided in the feed bin 15, a first motor 23 is rotatably provided in the conveying bin 2, a first sprocket 24 is provided on the driving end of the first motor 23, a second sprocket 12 is rotatably provided in the conveying bin 2, and a chain 3 is provided on the first sprocket 24 and the second sprocket 12;

[0028] The first motor is driven to rotate, which drives the first sprocket 24 to rotate, so that the chain 3 moves, and further the support block 22 moves.

[0029] This embodiment is further configured such that a support block 22 is slidably mounted on the conveying bin 2, the support block 22 is arranged on the chain 3, a hook 18 is rotatably mounted on the support block 22, a second motor 20 is arranged in the support block 22, a first gear 21 is arranged on the driving end of the second motor 20, a second gear 19 is arranged on the hook 18, and the first gear 21 and the second gear 19 are meshed;

[0030] The second motor 20 is driven to rotate, which drives the first gear 21 to rotate, so that the second gear 19 rotates, and then the hook 18 rotates, and the hook 18 is controlled to be movably installed in the support ring 17.

[0031] This embodiment is further configured such that a second conveying frame 1 is movably mounted on the conveying bin 2, a support ring 17 is provided on the second conveying frame 1, the hook 18 is movably arranged in the support ring 17, and a plurality of fixing devices are arranged in the second conveying frame 1;

[0032] The second conveying frame 1 is movably arranged in the first conveying frame 8 .

[0033] This embodiment is further configured such that the fixing device comprises a lower block 26 and an upper block 25, the upper block 25 is inserted on the lower block 26, a plurality of support columns 27 are arranged on the lower block 26, and a plurality of the support columns 27 are provided with forging materials 28;

[0034] The forging material 28 is sleeved on the support column 27 to prevent the forging materials from being close to each other due to the shaking of the equipment, which may affect the heat treatment efficiency.

[0035] The upper block 25 is installed on the lower block 26 by plug-in, which can increase the speed of loading and unloading the upper block 25 by the staff, thereby improving the efficiency of the heat treatment.

[0036] This embodiment is further configured such that a first multi-stage electric telescopic rod 5 is provided on the support frame 6, a gate 4 is provided on the telescopic end of the first multi-stage electric telescopic rod 5, a second multi-stage electric telescopic rod 11 is provided on the conveying bin 2, a baffle 14 is provided on the telescopic end of the second multi-stage electric telescopic rod 11, and the baffle 14 is movably installed in the cooling bin 13;

[0037] The first multi-stage electric telescopic rod 5 is driven to extend and retract, and the gate 4 is driven to rise and fall, so as to open and close the feed bin 15, and the gate 4 is movably arranged on the conveying bin 2;

[0038] The second multi-stage electric telescopic rod 11 is driven to extend and retract, thereby driving the baffle 14 to move, so that the cooling chamber 13 can be opened and closed.

[0039] Embodiment: When the forging material 28 is heat treated, the forging material 28 is put on the support column 27 to prevent the equipment from shaking and causing the forging materials to be close to each other, affecting the efficiency of the heat treatment. The upper block 25 is installed on the lower block 26 in a plug-in manner, which can increase the speed of loading and unloading the upper block 25 by the staff, thereby improving the efficiency of the heat treatment. The fixing device is prevented from being in the second conveyor frame 1, driving the second motor 20 to rotate, driving the first gear 21 to rotate, causing the second gear 19 to rotate, and then causing the hook 18 to rotate, controlling the hook 18 to rotate into the support ring 17, driving the multi-stage electric hydraulic cylinder 7 to extend and retract, driving the first conveyor frame 8 to rise and fall, and then causing the first conveyor frame 8 to move to the feed The first motor is driven to rotate, driving the first sprocket 24 to rotate, so that the chain 3 moves, driving the support block 22 to move, and then the second conveyor frame 1 moves to the first conveyor frame 8, so that the staff does not need to enter the high-temperature area to load and unload forging materials, and prevent the staff from being scalded. The second motor 20 is driven to rotate, driving the first gear 21 to rotate, so that the second gear 19 rotates, and then the hook 18 rotates, and the hook 18 is controlled to leave the support ring 17, and the first multi-stage electric telescopic rod 5 is driven to extend and retract, driving the gate 4 to rise and fall, and the feeding bin 15 can be closed, and the multi-stage electric hydraulic cylinder 7 is driven to extend and retract, driving the first conveyor frame 8 to rise and fall, and then the first conveyor frame 8 moves to the heating bin 16, and the heating is turned on. The device 9 heats the forging material 28. After the heating is completed, the heating device 9 is turned off to keep the forging material 28 warm. After the insulation is completed, the second multi-stage electric telescopic rod 11 is driven to extend and retract, driving the baffle 14 to move, and the cooling bin 13 can be opened. The multi-stage electric hydraulic cylinder 7 is driven to extend and retract, driving the first conveyor frame 8 to rise and fall, and then the first conveyor frame 8 is moved into the cooling bin 13 for rapid cooling, reducing the time required for staff to carry and shortening the journey, thereby improving work efficiency and cooling effect, and avoiding the situation where staff accidentally touch the material in a high-temperature state when carrying it, causing physical injuries to the staff. After the cooling is completed, the multi-stage electric hydraulic cylinder 7 is driven to extend and retract, driving the first conveyor frame 8 to rise and fall, and then the first conveyor frame 8 is moved into the cooling bin 13 for rapid cooling. The first conveyor frame 8 is moved into the feed bin 15, the first multi-stage electric telescopic rod 5 is driven to extend and retract, and the gate 4 is driven to rise and fall, so that the feed bin 15 can be opened. At the same time, the second multi-stage electric telescopic rod 11 is driven to extend and retract, and the baffle 14 is driven to move, so that the cooling bin 13 can be closed, and the second motor 20 is driven to rotate, and the first gear 21 is driven to rotate, so that the second gear 19 is rotated, and then the hook 18 is rotated, and the control hook 18 is installed in the support ring 17, and the first motor is driven to rotate, and the first sprocket 24 is driven to rotate, so that the chain 3 moves, and the support block 22 moves, so that the second conveyor frame 1 moves to the loading and unloading position, and the staff takes out the forging material 28 in the fixing device to complete the heat treatment process.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A forging heat treatment die, comprising a feed bin (15), characterized in that: The feed bin (15) is provided with a heating bin (16), the heating bin (16) is provided with a support frame (6), the support frame (6) is provided with a multi-stage electric hydraulic cylinder (7), the telescopic end of the multi-stage electric hydraulic cylinder (7) is provided with a first conveying frame (8), a heating device (9) is provided in the heating bin (16), the first conveying frame (8) is movably installed in the heating device (9), the feed bin (15) is provided with a cooling bin (13), the first conveying frame (8) is movably installed in the cooling bin (13), and the feed bin (15) is provided with a conveying device.

2. A forging heat treatment die according to claim 1, characterized in that: The conveying device comprises a pair of support plates (10), a conveying bin (2) is arranged on the upper wall surface of the pair of support plates (10), the conveying bin (2) is arranged in the feeding bin (15), a first motor (23) is rotatably arranged in the conveying bin (2), a first sprocket (24) is arranged on the driving end of the first motor (23), a second sprocket (12) is rotatably arranged in the conveying bin (2), and chains (3) are arranged on the first sprocket (24) and the second sprocket (12).

3. A forging heat treatment die according to claim 2, characterized in that: A support block (22) is slidably mounted on the conveying bin (2), the support block (22) is arranged on the chain (3), a hook (18) is rotatably mounted on the support block (22), a second motor (20) is arranged inside the support block (22), a first gear (21) is arranged on the driving end of the second motor (20), a second gear (19) is arranged on the hook (18), and the first gear (21) and the second gear (19) are meshed with each other.

4. A forging heat treatment die according to claim 3, characterized in that: A second conveying frame (1) is movably mounted on the conveying bin (2), a supporting ring (17) is provided on the second conveying frame (1), the hook (18) is movably arranged in the supporting ring (17), and a plurality of fixing devices are arranged in the second conveying frame (1).

5. A forging heat treatment die according to claim 4, characterized in that: The fixing device comprises a lower block (26) and an upper block (25), wherein the upper block (25) is inserted into the lower block (26), a plurality of support columns (27) are arranged on the lower block (26), and a plurality of the support columns (27) are provided with forging materials (28).

6. A forging heat treatment die according to claim 5, characterized in that: The support frame (6) is provided with a first multi-stage electric telescopic rod (5), the telescopic end of the first multi-stage electric telescopic rod (5) is provided with a gate (4), the conveying bin (2) is provided with a second multi-stage electric telescopic rod (11), the telescopic end of the second multi-stage electric telescopic rod (11) is provided with a baffle (14), and the baffle (14) is movably installed in the cooling bin (13).