Concrete pouring and distributing trolley with track structure

By designing a rail-structured concrete pouring distribution trolley and providing an operating platform and funnel fixing components, the problem of small pouring space and safety hazards was solved, and safe and efficient concrete pouring was achieved.

CN221877571UActive Publication Date: 2024-10-22CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323472278.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-19
Publication Date
2024-10-22
Estimated Expiration
2033-12-19

AI Technical Summary

Technical Problem

When pouring concrete on the basis of equipment such as short columns in the inspection pit, the pouring space is small, it is inconvenient for personnel to operate, and there is a lack of operating platform for construction, which poses safety risks.

Method used

A track structure concrete pouring distribution trolley is designed, including a distribution vehicle seat equipped with track wheels and a funnel body. It is equipped with a protective component to provide an operating platform, and is suitable for funnel bodies of different specifications through the funnel fixing component to ensure stability and safety. .

Benefits of technology

It provides a safe operating platform to prevent people from falling, and avoids the difficulty of unloading materials on both sides through direct leakage pouring, improving construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877571U_ABST
    Figure CN221877571U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete pouring and distributing equipment, in particular to a track structure concrete pouring and distributing trolley which comprises a distributing trolley seat provided with track wheels and a funnel body and further comprises a protection assembly used for providing an operation platform to protect operators from falling off. Comprising a C-shaped protective fence installed on a cloth vehicle seat and a closed fence door arranged on the C-shaped protective fence. The funnel fixing assembly is used for fixing funnel bodies of different specifications to keep stable and comprises two symmetrically-arranged clamping seats and an outer ring body fixedly connected to the clamping seats, and an arc-shaped clamping plate is arranged on the inner side of the outer ring body; the arranged protection assembly can be matched with the cloth vehicle seat to provide a personnel operation platform, and personnel can be prevented from falling off; and meanwhile, the funnel fixing assembly can be suitable for clamping and fixing funnel body structures of different specifications, the distribution trolley adopts a direct leakage pouring mode, and the problem that discharging is not easy when discharging pouring is conducted on the two sides is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete pouring material distribution equipment, in particular to a concrete pouring material distribution trolley with a track structure. Background Art

[0002] Inspection pit stubs are common rail structures in maintenance pits of vehicle depot garages and are widely used in urban light rail and underground rail transit construction.

[0003] The foundation of equipment such as the short column in the inspection pit can only be poured with concrete after the track is fine-tuned. The current conventional practice is: after the track is fine-tuned, it is provided with track wheels for movement, and a supporting cube or inverted quadrangular hopper is used to set holes on both sides of the hopper for concrete pouring; however, the pouring space is small and the operation is inconvenient for personnel, resulting in low construction efficiency and other problems. At the same time, the existing structure lacks an operating platform for personnel to construct, and personnel still construct on the track, which poses a safety hazard;

[0004] In order to solve the above problems, it is necessary to consider how to fix the funnel and provide a construction operation platform for personnel; in view of this, we propose a track structure concrete pouring distribution trolley. Utility Model Content

[0005] The utility model aims to solve the deficiencies mentioned in the above-mentioned background technology and provide a track structure concrete pouring material distribution trolley.

[0006] In order to solve the above technical problems, the utility model adopts the following technical solutions:

[0007] A track structure concrete pouring material distribution trolley, comprising a material distribution vehicle seat equipped with track wheels, and a funnel body installed on the material distribution vehicle seat for carrying concrete, and further comprising:

[0008] A protection assembly, used to provide an operating platform to protect operators from falling, including a C-shaped guardrail installed on the fabric car seat and a closed gate provided on the C-shaped guardrail;

[0009] The funnel fixing assembly is used to fix the funnel bodies of different specifications to keep them stable, and comprises two symmetrically arranged clamping seats and an outer ring body fixedly connected to the clamping seats, wherein an arc-shaped clamping plate is arranged inside the outer ring body.

[0010] Preferably, the C-shaped guardrail is rotatably mounted with the closing gate via a plurality of hinges, and latches are mounted at the corresponding closed surfaces of the C-shaped guardrail and the closing gate.

[0011] Preferably, the C-shaped guardrail and the closed gate are provided with conductive embedded grooves and inner grooves on the corresponding surfaces thereof;

[0012] An inner insert plate is elastically mounted in the inner groove via a plurality of spring columns, and the inner insert plate is used for being inserted in the embedding groove.

[0013] Preferably, the material placing vehicle seat is provided with a moving groove and a material placing through hole for unloading the poured concrete.

[0014] The bottoms of the two clamping seats are both connected with sliding blocks for being slidably installed in the moving grooves.

[0015] Preferably, corresponding surfaces of the two clamping seats are provided with lifting ears, fastening bolts are detachably mounted on the lifting ears on both sides, and a conical groove for receiving the funnel body is provided on the clamping seat.

[0016] Preferably, an arc-shaped clamping plate is slidably mounted on the inner side of the outer ring body through a connecting rod, and nuts for adjusting the clamping inner diameter of the arc-shaped clamping plates on both sides are threadedly mounted on the connecting rod.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] The track structure concrete pouring distribution trolley can provide a personnel operating platform in conjunction with the distribution vehicle seat through the provided protection component, and can prevent personnel from falling; at the same time, the provided funnel fixing component can be suitable for clamping and fixing funnel body structures of different specifications. The distribution trolley adopts a direct leak casting method to avoid the problem of difficult unloading of materials during unloading and casting on both sides. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention. In the drawings:

[0020] Figure 1 This is one of the overall structural diagrams of the utility model;

[0021] Figure 2 This is the second schematic diagram of the overall structure of the utility model;

[0022] Figure 3 This is an exploded view of the overall structure of the utility model;

[0023] Figure 4 It is a partial enlarged schematic diagram of the utility model;

[0024] Figure 5 It is a schematic diagram of the funnel fixing component of the utility model.

[0025] The meaning of each number in the figure is:

[0026] 1. Fabric seat; 11. Lifting frame; 101. Moving groove; 102. Fabric through hole; 2. Track wheel; 3. C-type guardrail; 301. Embedded groove; 4. Closing gate; 401. Inner groove; 5. Hinge; 6. Latch; 7. Inner plug-in plate; 8. Spring column; 9. Funnel fixing assembly; 91. Clamping seat; 911. Conical groove; 912. Lifting ear; 92. Outer ring body; 93. Sliding block; 94. Arc splint; 95. Connecting rod; 96. Nut; 97. Fastening bolt; 10. Funnel body. DETAILED DESCRIPTION

[0027] The following will be combined with the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0028] See also Figure 1-5 The utility model describes the above technical solution in detail through the following embodiments:

[0029] A track structure concrete pouring material distribution trolley comprises a material distribution vehicle seat 1 equipped with a track wheel 2, and a funnel body 10 mounted on the material distribution vehicle seat 1 for carrying concrete, and further comprises:

[0030] A protection component, used to provide an operating platform to protect operators from falling, including a C-shaped protection fence 3 installed on the fabric carrier 1 and a closed fence door 4 provided on the C-shaped protection fence 3;

[0031] The funnel fixing assembly 9 is used to fix the funnel bodies 10 of different specifications to maintain stability, and includes two symmetrically arranged clamping seats 91 and an outer ring body 92 fixedly connected to the clamping seats 91 , and an arc-shaped clamping plate 94 is provided on the inner side of the outer ring body 92 .

[0032] like Figure 1 As shown, in this embodiment, the C-shaped guardrail 3 is rotatably mounted with a closing gate 4 via three hinges 5, and a latch 6 is installed at the corresponding closed surfaces of the C-shaped guardrail 3 and the closing gate 4; the latch plays a protective role in order to maintain the closed state.

[0033] like Figure 4In the structure shown, the corresponding surfaces of the C-shaped guardrail 3 and the closed gate 4 are respectively provided with a conductive embedding groove 301 and an inner groove 401; an inner plug plate 7 is elastically installed in the inner groove 401 through a spring column 8, and the inner plug plate 7 is used to be inserted in the embedding groove 301. The spring column 8 can protrude when it is not closed, directly reminding the personnel to perform the operation, and the latch 6 cannot be inserted when the inner plug plate 7 is not closed. The two cooperate with each other to improve the protection measures.

[0034] like Figure 3 and Figure 5 As shown in the structure, the material distributing vehicle seat 1 of this embodiment is provided with a movable groove 101 and a material distributing through hole 102 for discharging the poured concrete, and the bottoms of the two clamping seats 91 are connected with a slider 93 for slidingly installing in the movable groove 101; ears 912 are provided on the corresponding surfaces of the two clamping seats 91, and fastening bolts 97 are detachably installed on the ears 912 on both sides, and a conical groove 911 for receiving the funnel body 10 is provided on the clamping seat 91; considering that although the discharge ports of the funnels of different specifications can be provided with the same axis, the diameters of the funnel bodies are inconsistent, in order to adapt to the casting environments with different requirements, the funnel bodies 10 of different specifications are adopted, such as Figure 5 In the structure shown, an arc-shaped clamping plate 94 is slidably installed on the inner side of the outer ring body 92 through a connecting rod 95, and a nut 96 for adjusting the clamping inner diameter of the arc-shaped clamping plates 94 on both sides is threadedly installed on the connecting rod 95. By adjusting the position relationship of the nut 96, in conjunction with the clamping seat 91 provided in this embodiment, the internal funnel body 10 can be clamped and stabilized.

[0035] The working principle of the track structure concrete pouring distribution trolley of this embodiment is as follows: Figure 1 and Figure 2 The structure shown is installed with a hanging frame 11. In this embodiment, the hanging frame 11 does not have a hook chain drawn. This structure is for hanging the funnel body 10. It is a prior art and therefore no further explanation is given. The fastening bolts 97 installed on both sides are adjusted according to the different specifications of the funnel body 10, and the arc-shaped clamping plate 94 is clamped and fixed by adjusting the nut 96. During operation, the person stands inside the rear C-shaped guardrail 3 to close the latch 6 and the inner plug plate 7.

[0036] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indications will also change accordingly.

[0037] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.

Claims

1. A track structure concrete pouring material distribution trolley, comprising a material distribution vehicle seat (1) equipped with track wheels (2), and a funnel body (10) installed on the material distribution vehicle seat (1) for carrying concrete, characterized in that: Also includes: A protection component, used for providing an operating platform to protect operators from falling, comprising a C-shaped protection rail (3) installed on the fabric-laying vehicle seat (1) and a closing gate (4) provided on the C-shaped protection rail (3); The funnel fixing assembly (9) is used to fix the funnel bodies (10) of different specifications to maintain stability, and comprises two symmetrically arranged clamping seats (91) and an outer ring body (92) fixedly connected to the clamping seats (91), wherein an arc-shaped clamping plate (94) is provided on the inner side of the outer ring body (92).

2. The track structure concrete pouring material distribution trolley according to claim 1, characterized in that: The C-shaped guardrail (3) is rotatably mounted with the closing gate (4) via a plurality of hinges (5), and latches (6) are mounted at the closed corresponding surfaces of the C-shaped guardrail (3) and the closing gate (4).

3. The track structure concrete pouring material distribution trolley as claimed in claim 2, characterized in that: The C-shaped guardrail (3) and the closed gate (4) are provided with a conductive embedded groove (301) and an inner groove (401) on the corresponding surfaces thereof; An inner insert plate (7) is elastically mounted in the inner groove (401) via a plurality of spring columns (8), and the inner insert plate (7) is used to be inserted into the embedding groove (301).

4. The track structure concrete pouring material distribution trolley according to claim 1, characterized in that: The material distributing vehicle seat (1) is provided with a moving groove (101) and a material distributing through hole (102) for discharging poured concrete. The bottoms of the two clamping seats (91) are both connected with a sliding block (93) for being slidably mounted in the movable groove (101).

5. The track structure concrete pouring material distribution trolley as claimed in claim 4, characterized in that: The corresponding surfaces of the two clamping seats (91) are provided with lifting ears (912), and fastening bolts (97) are detachably installed on the lifting ears (912) on both sides, and the clamping seat (91) is provided with a conical groove (911) for receiving the funnel body (10).

6. The track structure concrete pouring material distribution trolley according to claim 1, characterized in that: An arc-shaped clamping plate (94) is slidably mounted on the inner side of the outer ring body (92) via a connecting rod (95), and nuts (96) for adjusting the clamping inner diameter of the arc-shaped clamping plates (94) on both sides are threadedly mounted on the connecting rod (95).