Split mounting type double-row combined pile temporary steel bridge device

By reinforcing the upper and lower parts of the double-row composite piles of the steel bridge, combined with the support truss and vertical stirrup fixing modules, the problems of insufficient load-bearing capacity and uneven settlement of the existing steel bridge were solved, and the mechanization of large-scale equipment machinery was realized. Construction needs, and has the advantages of rapid construction and disassembly.

CN221877708UActive Publication Date: 2024-10-22CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420152939.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-22
Publication Date
2024-10-22
Estimated Expiration
2034-01-22

AI Technical Summary

Technical Problem

Existing steel bridges have limited bearing capacity in canyons and ravines, and are prone to uneven settlement after long-term loading, resulting in structural damage, making it difficult to meet the construction needs of large-scale equipment and machinery.

Method used

The double-row composite pile steel bridge device is used to reinforce the upper and lower parts of the steel pipe piles to reduce the use of mid-span steel pipe piles, improve the integrity and load-bearing capacity of the bridge, and fix the modules by supporting the truss modules and vertical stirrups. Enhance structural stability.

Benefits of technology

It significantly improves the load-bearing capacity of the bridge, avoids the uneven settlement problem of a single row of piles, and allows large equipment machinery to carry out mechanized construction through the access road. It also has the advantages of rapid construction, disassembly, strong applicability and wide range of use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877708U_ABST
    Figure CN221877708U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of bridges, and particularly relates to a split mounting type double-row combined pile temporary steel bridge device. A split mounting type double-row combination pile temporary steel bridge device comprises a plurality of double-row combination piles, each double-row combination pile comprises four steel pipe columns, a double-row steel pipe pile lower combination module and a double-row steel pipe pile upper combination module, and a plurality of supporting truss modules are arranged on the upper portions of the double-row steel pipe pile upper combination modules. Supporting truss connecting modules are arranged between the adjacent supporting truss modules, a temporary steel bridge deck is arranged at the tops of the supporting truss modules, and protective fences are arranged on the two sides of the temporary steel bridge deck at the tops of the supporting truss modules respectively. The double-row combined piles are used, the upper portions and the lower portions of the steel pipe columns are reinforced, so that the integrity of the steel pipe columns is improved, use of midspan steel pipe piles is reduced, the manufacturing cost is saved, meanwhile, the problem that uneven settlement frequently happens to single-row piles is solved, the bearing capacity of a bridge is improved, and the service life of the bridge is prolonged. And large equipment machinery can be allowed to carry out mechanical construction through the shortcut.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of bridges, and particularly relates to an assembled double-row combined pile steel temporary bridge device. Background Art

[0002] At present, a large number of infrastructure under construction need to build many permanent and temporary access roads before construction starts, so as to facilitate the transportation of earth, construction materials and large-scale construction machinery by loaders to and from the construction site. Therefore, being able to quickly build steel temporary bridges that meet different needs at the construction site is of great practical significance for solving the above problems.

[0003] The terrain in western China and its marginal areas is mostly in the form of canyons and gullies. In order to improve productivity and work efficiency, more and more large-scale equipment and machinery are operating on construction sites. Under such terrain, the construction of mechanized equipment and machinery inevitably requires the construction of permanent or temporary access roads. Steel temporary bridges have the characteristics of simple construction technology and strong practicality. However, most of the existing steel temporary bridges have the following problems: (1) Large-scale equipment and machinery are generally large in size and weight. Many steel temporary bridges are supported by a single row of piles and have limited bearing capacity. (2) Under long-term load conditions, many steel temporary bridges are prone to uneven settlement between steel pipe piles, causing stress concentration and damage to the steel temporary bridge structure. Utility Model Content

[0004] In view of the above problems, the purpose of the utility model is to provide an assembled double-row composite pile steel temporary bridge device, by using double-row composite piles and reinforcing the upper and lower parts of the composite pile steel pipes to improve their integrity and reduce the use of mid-span steel pipe piles, thereby saving costs and avoiding the problem of frequent uneven settlement of single-row piles. The double-row composite steel pipe piles greatly improve the bearing capacity of the bridge and can allow large equipment machinery to carry out mechanized construction through this temporary road.

[0005] The technical solution of the utility model is: an assembled double-row composite pile steel temporary bridge device, including a plurality of double-row composite piles, the double-row composite piles including four steel pipe columns, a double-row steel pipe pile lower composite module and a double-row steel pipe pile upper composite module, a plurality of support truss modules are arranged on the upper part of the double-row steel pipe pile upper composite module, a support truss connection module is arranged between adjacent support truss modules, a steel temporary bridge deck is arranged on the top of the support truss module, guardrails are respectively arranged on both sides of the steel temporary bridge deck on the top of the support truss module, a plurality of vertical stirrup fixing modules are arranged at the bottom of the guardrail, and the vertical stirrup fixing module is fixedly connected to the support truss module.

[0006] The lower combined module of the double-row steel pipe piles is located at the lower part of the steel pipe column, and includes a transverse support, which is connected between adjacent steel pipe columns. A scissors brace is also provided between the steel pipe columns above the transverse support, and connecting welding pieces are provided at the connection between the transverse support and the scissors brace and the steel pipe column.

[0007] The supporting truss module includes outer vertical channel steels arranged relatively parallel to each other, the two ends of the outer vertical channel steels are respectively connected to transverse channel steels, the middle of the transverse channel steels is connected to a central vertical channel steel, an oblique channel steel is arranged between the central vertical channel steel and the transverse channel steels and the outer vertical channel steels, and a channel steel fixing welding piece is arranged at the connection between the central vertical channel steel and the oblique channel steel.

[0008] The upper combined module of the double-row steel pipe piles is located on the upper part of the steel pipe column, and includes a transverse channel steel support, which is connected between adjacent steel pipe columns. A transverse support connecting welding piece is provided at the connection between the transverse channel steel support and the steel pipe column. Embedded I-beams are provided in parallel at the top of adjacent steel pipe columns. A plurality of longitudinal I-beams are provided on the top of the embedded I-beams. The longitudinal I-beams are vertically arranged with the embedded I-beams. A bottom support reinforcement welding piece is provided at the connection between the embedded I-beams and the steel pipe column.

[0009] The supporting truss connection module comprises a bolt connection block, a plurality of connection grooves are respectively provided at both ends of the bolt connection block, connection bolts are provided in the connection grooves, connection nuts are provided on the connection bolts, and thickened gaskets are provided between the connection nuts and the connection grooves.

[0010] The vertical stirrup fixing module includes an I-beam, and arc-shaped fixing screws are respectively provided at both ends of the I-beam. The bottom of the arc-shaped fixing screw is connected to a triangular steel and an arc-shaped pre-tightening nut, and the guardrail is fixed on the top of the I-beam.

[0011] The technical effects of the utility model are: 1. The utility model uses double-row composite piles and reinforces the upper and lower parts of the composite pile steel pipes with double-row steel pipe pile lower composite modules and double-row steel pipe pile upper composite modules to improve their integrity and reduce the use of mid-span steel pipe piles, saving construction costs while avoiding the problem of frequent uneven settlement of single-row piles. The double-row composite steel pipe piles greatly improve the bearing capacity of the bridge and allow large equipment and machinery to carry out mechanized construction through this walkway; 2. The utility model uses a modular structure of a steel temporary bridge using double-row composite piles in conjunction with a supporting truss module. Compared with the existing concrete bridge structure, the steel temporary bridge under the double-row steel pipe composite piles also has the advantages of fast construction speed, detachability, strong applicability, and a wide range of uses.

[0012] The following is a further description with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 The utility model is a structural schematic diagram of an assembled double-row combined pile steel temporary bridge device.

[0014] Figure 2It is a structural schematic diagram of the lower combined module of the double-row steel pipe piles of the utility model.

[0015] Figure 3 It is a structural schematic diagram of the supporting truss module of the utility model.

[0016] Figure 4 It is a structural schematic diagram of the upper combined module of the double-row steel pipe piles of the utility model.

[0017] Figure 5 It is a structural schematic diagram of the support truss connection module of the utility model.

[0018] Figure 6 It is a structural schematic diagram of a vertical stirrup fixing module of the utility model.

[0019] Figure markings: 1-lower assembly module of double-row steel pipe piles; 2-support truss module; 3-upper assembly module of double-row steel pipe piles; 4-support truss connection module; 5-vertical stirrup fixing module; 6-guardrail; 7-steel pipe column; 11-connecting welding piece; 12-scissors support; 13-lateral support; 21-outer vertical channel steel; 22-oblique channel steel; 23-channel steel fixing welding piece; 24-center vertical channel steel; 25-lateral channel steel; 31-longitudinal I-beam; 32-bottom support reinforcement welding piece; 33-lateral support connecting welding piece; 34-lateral channel steel support; 35-embedded I-beam; 41-connecting bolt; 42-thickened gasket; 43-connecting nut; 44-bolt connection block; 51-arc fixing screw; 52-triangular steel; 53-arc pre-tightening nut; 54-I-beam. DETAILED DESCRIPTION Example 1

[0020] like Figure 1 to Figure 6 As shown, an assembled double-row composite pile steel temporary bridge device includes a plurality of double-row composite piles, wherein the double-row composite piles include four steel pipe columns 7, a double-row steel pipe pile lower composite module 1 and a double-row steel pipe pile upper composite module 3, wherein a plurality of support truss modules 2 are arranged on the upper portion of the double-row steel pipe pile upper composite module 3, a support truss connection module 4 is arranged between adjacent support truss modules 2, a steel temporary bridge deck is arranged on the top of the support truss module 2, guardrails 6 are arranged on both sides of the steel temporary bridge deck on the top of the support truss module 2, a plurality of vertical stirrup fixing modules 5 are arranged on the bottom of the guardrail 6, and the vertical stirrup fixing module 5 is fixedly connected to the support truss module 2.

[0021] The utility model uses double-row composite piles and reinforces the upper and lower parts of the composite pile steel pipe columns with double-row steel pipe pile lower composite modules and double-row steel pipe pile upper composite modules to improve their integrity and reduce the use of mid-span steel pipe piles, thereby saving construction costs and avoiding the problem of frequent uneven settlement of single-row piles. The double-row composite steel pipe piles greatly improve the bearing capacity of the bridge and allow large equipment and machinery to carry out mechanized construction through this access road. The utility model uses a modular structure of a steel temporary bridge using double-row composite piles in conjunction with a supporting truss module. Compared with the existing concrete bridge structure, the steel temporary bridge under the double-row steel pipe composite piles also has the advantages of fast construction speed, detachability, strong applicability, and a wide range of uses. Example 2

[0022] On the basis of Example 1, in this embodiment, preferably, the lower combined module 1 of the double-row steel pipe piles is located at the lower part of the steel pipe column 7, and includes a transverse support 13, and the transverse support 13 is connected between adjacent steel pipe columns 7. A scissors brace 12 is also provided between the steel pipe columns 7 above the transverse support 13, and a connecting welding piece 11 is provided at the connection between the transverse support 13 and the scissors brace 12 and the steel pipe column 7.

[0023] The lower combined module 1 of the double-row steel pipe piles of the utility model is located at the lower part of the steel pipe column 7, and includes a transverse support 13, and the transverse support 13 is connected between the adjacent steel pipe columns 7. A scissor brace 12 is also provided between the steel pipe columns 7 above the transverse support 13. The transverse support 13 and the scissor brace 12 ensure the structural stability of the lower part of the steel pipe column 7, and reinforce the double-row combined piles. Example 3

[0024] On the basis of Example 1 or Example 2, in this embodiment, preferably, the supporting truss module 2 includes outer vertical channel steels 21 arranged relatively parallel, the two ends of the outer vertical channel steels 21 are respectively connected to transverse channel steels 25, the middle of the transverse channel steels 25 is connected to a central vertical channel steel 24, an oblique channel steel 22 is provided between the central vertical channel steel 24 and the transverse channel steels 25 and the outer vertical channel steels 21, and a channel steel fixing welding piece 23 is provided at the connection between the central vertical channel steel 24 and the oblique channel steel 22.

[0025] The supporting truss module 2 of the utility model includes outer vertical channel steels 21 arranged relatively parallel, and the two ends of the outer vertical channel steels 21 are respectively connected to transverse channel steels 25, and the middle of the transverse channel steels 25 is connected to a central vertical channel steel 24. An oblique channel steel 22 is provided between the central vertical channel steel 24 and the transverse channel steels 25 and the outer vertical channel steels 21. The central vertical channel steel 24 and the oblique channel steels 22 ensure the structural stability of the supporting truss module 2. Example 4

[0026] On the basis of Example 1 or Example 3, in this embodiment, preferably, the upper combination module 3 of the double-row steel pipe piles is located on the upper part of the steel pipe column 7, including a transverse channel steel support 34, the transverse channel steel support 34 is connected between adjacent steel pipe columns 7, and a transverse support connecting welding piece 33 is provided at the connection between the transverse channel steel support 34 and the steel pipe column 7, and an embedded I-beam 35 is provided in parallel at the top of the adjacent steel pipe column 7, and a plurality of longitudinal I-beams 31 are provided on the top of the embedded I-beam 35, and the longitudinal I-beam 31 is vertically arranged with the embedded I-beam 35, and a bottom support reinforcement welding piece 32 is provided at the connection between the embedded I-beam 35 and the steel pipe column 7.

[0027] The double-row steel pipe pile upper combination module 3 of the utility model is located on the upper part of the steel pipe column 7, and includes a transverse channel steel support 34. The transverse channel steel support 34 is connected between adjacent steel pipe columns 7. The transverse channel steel support 34 ensures the structural stability of the upper part of the steel pipe column 7. Embedded I-beams 35 are arranged in parallel on the top of adjacent steel pipe columns 7. A plurality of longitudinal I-beams 31 are arranged on the top of the embedded I-beams 35. The longitudinal I-beams 31 are arranged perpendicular to the embedded I-beams 35. The longitudinal I-beams 31 are used to support the support truss module 2. Example 5

[0028] On the basis of Example 1, in this embodiment, preferably, the supporting truss connection module 4 includes a bolt connection block 44, and a plurality of connection grooves are respectively provided at both ends of the bolt connection block 44, a connecting bolt 41 is provided in the connecting groove, a connecting nut 43 is provided on the connecting bolt 41, and a thickened gasket 42 is provided between the connecting nut 43 and the connecting groove.

[0029] The supporting truss connection module 4 of the utility model includes a bolt connection block 44, and a plurality of connection grooves are respectively provided at both ends of the bolt connection block 44. A connecting bolt 41 is provided in the connecting groove, and a connecting nut 43 is provided on the connecting bolt 41. When in use, the supporting truss modules 2 at both ends of the bolt connection block 44 are fixedly connected by the connecting bolt 41 and the connecting nut 43. Example 6

[0030] On the basis of Example 1 or Example 5, in this embodiment, preferably, the vertical stirrup fixing module 5 includes an I-beam 54, and arc-shaped fixing screws 51 are respectively provided at both ends of the I-beam 54, and the bottom of the arc-shaped fixing screw 51 is connected to a triangular steel 52 and an arc-shaped pre-tightening nut 53, and the guardrail 6 is fixed on the top of the I-beam 54.

[0031] The vertical stirrup fixing module 5 of the utility model includes an I-beam 54, and arc-shaped fixing screws 51 are respectively provided at both ends of the I-beam 54. The bottom of the arc-shaped fixing screw 51 is connected to a triangular steel 52 and an arc-shaped pre-tightening nut 53. When in use, the channel steel sleeves on both sides of the supporting truss module 2 are arranged between the I-beam 54, the arc-shaped fixing screw 51 and the triangular steel 52, and the triangular steel 52 is pushed by the arc-shaped pre-tightening nut 53 to fix the vertical stirrup fixing module 5 to the supporting truss module 2.

[0032] The implementation principle of the utility model is as follows: first, a steel pipe column 7 is driven into the ground below the position of the temporary bridge to be built, and a transverse support 13 is connected between adjacent steel pipe columns 7. A scissor brace 12 is arranged between the steel pipe columns 7 above the transverse support 13. The connection between the transverse support 13 and the scissor brace 12 and the steel pipe columns 7 is welded and fixed by a connecting welding piece 11. On the upper part of the steel pipe columns 7, a transverse channel steel support 34 is arranged between adjacent steel pipe columns 7. An embedded I-beam 35 is arranged in parallel on the top of adjacent steel pipe columns 7. A plurality of longitudinal I-beams 31 are arranged on the top of the embedded I-beam 35. The longitudinal I-beam 31 is arranged perpendicular to the embedded I-beam 35. A support truss module 2 is fixed on the upper part of the longitudinal I-beam 31. Adjacent supporting truss modules 2 are fixedly connected via supporting truss connecting modules 4. After the supporting truss modules 2 are erected, a steel temporary bridge deck is arranged on the top of the supporting truss modules 2, and guardrails 6 are respectively arranged on both sides of the steel temporary bridge deck on the top of the supporting truss modules 2. A plurality of vertical stirrup fixing modules 5 are installed at the bottom of the guardrails 6, and the vertical stirrup fixing modules 5 are fixedly connected to the supporting truss modules 2.

[0033] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed in the present invention should be included in the protection scope of the present invention.

Claims

1. An assembled double-row combined pile steel temporary bridge device, characterized in that: The double-row combined piles include four steel pipe columns (7), a double-row steel pipe pile lower combined module (1) and a double-row steel pipe pile upper combined module (3); a plurality of support truss modules (2) are arranged on the upper part of the double-row steel pipe pile upper combined module (3); a support truss connection module (4) is arranged between adjacent support truss modules (2); a steel temporary bridge deck is arranged on the top of the support truss module (2); guardrails (6) are respectively arranged on both sides of the steel temporary bridge deck on the top of the support truss module (2); a plurality of vertical stirrup fixing modules (5) are arranged on the bottom of the guardrail (6); and the vertical stirrup fixing modules (5) are fixedly connected to the support truss module (2).

2. According to claim 1, the assembled double-row combined pile steel temporary bridge device is characterized by: The double-row steel pipe pile lower assembly module (1) is located at the bottom of the steel pipe column (7), and comprises a transverse support (13), wherein the transverse support (13) is connected between adjacent steel pipe columns (7), and a scissor brace (12) is further provided above the transverse support (13) between the steel pipe columns (7), and a connecting welding piece (11) is provided at the connection between the transverse support (13) and the scissor brace (12) and the steel pipe column (7).

3. According to claim 1, the assembled double-row combined pile steel temporary bridge device is characterized by: The support truss module (2) comprises outer vertical channel steels (21) arranged relatively parallel to each other, the two ends of the outer vertical channel steels (21) are respectively connected to transverse channel steels (25), the middle of the transverse channel steels (25) is connected to a central vertical channel steel (24), an oblique channel steel (22) is provided between the central vertical channel steel (24), the transverse channel steels (25) and the outer vertical channel steels (21), and a channel steel fixing welding piece (23) is provided at the connection between the central vertical channel steel (24) and the oblique channel steel (22).

4. According to claim 1, the assembled double-row combined pile steel temporary bridge device is characterized by: The double-row steel pipe pile upper assembly module (3) is located on the upper part of the steel pipe column (7), and comprises a transverse channel steel support (34). The transverse channel steel support (34) is connected between adjacent steel pipe columns (7). A transverse support connecting welding piece (33) is provided at the connection between the transverse channel steel support (34) and the steel pipe column (7). An embedded I-beam (35) is provided in parallel at the top of the adjacent steel pipe column (7). A plurality of longitudinal I-beams (31) are provided at the top of the embedded I-beam (35). The longitudinal I-beam (31) and the embedded I-beam (35) are arranged vertically. A bottom support reinforcement welding piece (32) is provided at the connection between the embedded I-beam (35) and the steel pipe column (7).

5. According to claim 1, the assembled double-row combined pile steel temporary bridge device is characterized by: The support truss connection module (4) comprises a bolt connection block (44), a plurality of connection grooves are respectively provided at both ends of the bolt connection block (44), a connection bolt (41) is provided in the connection groove, a connection nut (43) is provided on the connection bolt (41), and a thickened gasket (42) is provided between the connection nut (43) and the connection groove.

6. According to claim 1, the assembled double-row combined pile steel temporary bridge device is characterized by: The vertical stirrup fixing module (5) comprises an I-beam (54), with arc-shaped fixing screws (51) respectively provided at both ends of the I-beam (54), a triangular steel (52) and an arc-shaped pre-tightening nut (53) being connected to the bottom of the arc-shaped fixing screw (51), and the guardrail (6) being fixedly arranged on the top of the I-beam (54).