Rigid frame continuous beam bridge pier top bracket

By designing a combination of prefabricated supports, lifting parts and lifting parts, the rapid installation and stable fixation of the bridge pier top bracket is achieved, which solves the problems of cumbersome construction steps and low efficiency in the existing technology, and improves the construction efficiency.

CN221877783UActive Publication Date: 2024-10-22CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420434891.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-10-22
Estimated Expiration
2034-03-06

AI Technical Summary

Technical Problem

The installation of existing bridge pier top brackets is cumbersome and inefficient. It requires component-by-component connection and screw sleeve locking, resulting in low construction efficiency.

Method used

Design a rigid frame continuous beam bridge pier top bracket, including prefabricated supports and detachable lifting parts, connecting parts and lifting parts. By assembling it on the ground in advance and hanging it above the pier with a crane, the construction steps are simplified and the use of The design of the snap-in grooves and reinforcing ribs of the prefabricated support parts and lifting parts enables fixation without screw sleeve locking.

Benefits of technology

The construction steps are simplified, and most splicing operations are completed on the ground, which improves construction efficiency, reduces construction time, and achieves rapid installation and stable fixation of brackets.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221877783U_ABST
    Figure CN221877783U_ABST
Patent Text Reader

Abstract

The utility model discloses a rigid frame continuous beam bridge pier top bracket which comprises prefabricated supporting pieces and lifting pieces detachably arranged on the prefabricated supporting pieces, the prefabricated supporting pieces are arranged on the two side faces in the length direction of a pier, and the number of the prefabricated supporting pieces on each side face is two. The number of the lifting pieces is equal to that of the prefabricated supporting pieces, a connecting piece capable of being folded and stretched is arranged between the two lifting pieces on the same side face, and a hoisting piece used for hanging installation is arranged between the two adjacent lifting pieces on the different side faces. The prefabricated supporting piece is preset on the pier in advance, and the lifting piece, the connecting piece and the hoisting piece are spliced and assembled on the ground in advance, so that the bracket can be uniformly hung to the position above the pier through a crane, the lifting piece and the prefabricated supporting piece can be uniformly fixed after being aligned, the construction process is simplified, and the construction efficiency is improved. And most splicing operations are carried out on the ground, so that the purpose of improving the construction efficiency is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to a pier top bracket of a rigid frame continuous beam bridge pier. Background Art

[0002] Block 0 of the continuous beam pier is the foundation for the later cantilever construction of the upper part of the bridge. It is made of cast-in-place large-volume concrete, and a bracket is installed on the upper part to bear the concrete load during the later cantilever construction.

[0003] At present, when installing the bracket, the fixings for bracket installation are generally prefabricated when the bridge pier is prepared, and then the various components of the bracket are suspended by a crane and connected to the fixings one by one, and then locked in position with screw sleeves. The construction steps are many and the efficiency is low. Utility Model Content

[0004] The purpose of the utility model is to provide a rigid frame continuous beam bridge pier top bracket to solve the above-mentioned shortcomings, so as to achieve the purpose of simple and efficient construction.

[0005] In order to solve the above technical problems, the utility model adopts the following technical solutions: a rigid frame continuous beam pier top bracket, comprising a prefabricated support member and a lifting member detachably arranged on the prefabricated support member, the prefabricated support member is arranged on both side surfaces in the length direction of the pier, and the number of the prefabricated support members on each side is two, the number of the lifting members is equal to the number of the prefabricated support members, a foldable and stretchable connecting member is arranged between the two lifting members on the same side, and a lifting member for hanging installation is arranged between the two adjacent lifting members on different sides.

[0006] Furthermore, the prefabricated support member includes a beam support arranged on the pier and at least one positioning column, and the positioning column is located on the top of the beam support.

[0007] Furthermore, the supporting member includes a column, a crossbeam is arranged on the top of the column, a reinforcing rib for oblique support is arranged between the column and the crossbeam, and a clamping groove adapted to the positioning column is opened on a side of the column close to the pier;

[0008] The clamping groove includes a clamping portion for the positioning column to clamp and an entry and exit portion for the positioning column to enter and exit the clamping portion from the side of the column. The height of the clamping portion is greater than the diameter of the positioning column, and when the positioning column contacts the top of the clamping portion, the bottom of the column contacts the top of the beam support.

[0009] Furthermore, the connecting member is composed of at least two rotating rods, the ends of the two rotating rods close to each other are connected by a hinge, and the ends of the two rotating rods away from each other are rotatably connected to the adjacent columns by a torsion spring;

[0010] When the torsion spring is in a natural state, the distance between the clamping parts of the two clamping grooves on the same side is equal to the distance between the two positioning columns on the same side.

[0011] Further, the lifting member includes a side plate rotatably arranged on two adjacent beams on different sides, a connecting plate is arranged between the two side plates, a lifting ring for hooking the hook is arranged on the connecting plate, and a limiting part for preventing the lifting member from further rotating downward from the horizontal body is arranged on the side plate;

[0012] When the lifting member is rotated to a horizontal state, the top of the lifting member is flush with the top of the lifting member.

[0013] The beneficial effects of the utility model are embodied in:

[0014] The utility model presets prefabricated support members on the bridge piers in advance, and splices and assembles the lifting members, connecting members and lifting members on the ground in advance, so that the brackets can be uniformly hung above the bridge piers by a crane, and after the lifting members and the prefabricated support members are aligned in position, they can be uniformly fixed. By simplifying the construction steps and because most of the splicing operations are performed on the ground, the purpose of improving construction efficiency is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional view of the utility model;

[0016] Figure 2 This is a structural view of the lifting member and the connecting member of the utility model;

[0017] Figure 3 It is a schematic diagram of the splicing of the utility model and the bridge pier.

[0018] In the figure:

[0019] 1. Prefabricated support member; 11. Beam support; 12. Positioning column; 2. Lifting member; 21. Column; 22. Crossbeam; 23. Reinforcement rib; 24. Snap-in groove; 3. Connecting member; 31. Rotating rod; 4. Lifting member; 41. Side plate; 42. Connecting plate; 43. Lifting ring. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-3The utility model discloses a pier top bracket of a rigid frame continuous beam bridge pier, comprising a prefabricated support member 1 and a lifting member 2 detachably arranged on the prefabricated support member 1, the prefabricated support member 1 is arranged on both side surfaces in the length direction of the pier, and the number of prefabricated support members 1 on each side is two, the number of lifting members 2 is equal to the number of prefabricated support members 1, a foldable and stretchable connecting member 3 is arranged between two supporting members 2 on the same side, and a lifting member 4 for hanging installation is arranged between two adjacent supporting members 2 on different sides.

[0022] The utility model presets a prefabricated support member 1 on the bridge pier in advance, and assembles the lifting member 2, the connecting member 3 and the lifting member 4 on the ground in advance, so that the bracket can be uniformly hung above the bridge pier by a crane, and after the lifting member 2 and the prefabricated support member 1 are aligned, they can be uniformly fixed, and the purpose of improving construction efficiency is achieved by simplifying the construction steps and because most of the splicing operations are performed on the ground.

[0023] In one embodiment, the prefabricated support member 1 includes a beam support 11 disposed on the pier and at least one positioning column 12 , wherein the positioning column 12 is located on the top of the beam support 11 .

[0024] Such a design enables the lifting member 2 to be suspended and supported not only by the positioning column 12 , but also to support the bottom of the lifting member 2 by the beam support 11 , thereby distributing the force on the top of the lifting member 2 , thereby achieving the purpose of improving the supporting stability of the lifting member 2 .

[0025] In one embodiment, the supporting member 2 includes a column 21, a cross beam 22 is arranged on the top of the column 21, a reinforcing rib 23 for oblique support is arranged between the column 21 and the cross beam 22, and a clamping groove 24 adapted to the positioning column 12 is opened on one side of the column 21 close to the bridge pier;

[0026] The clamping groove 24 includes a clamping portion for the positioning column 12 to clamp and an entry and exit portion for the positioning column 12 to enter and exit the clamping portion from the side of the column 21. The height of the clamping portion is greater than the diameter of the positioning column 12, and when the positioning column 12 contacts the top of the clamping portion, the bottom of the column 21 contacts the top of the beam support 11.

[0027] With this design, the lifting member 2 can be moved between the two prefabricated support members 1 on the same side after the connecting member 3 is folded. Then, after the connecting member 3 is unfolded, the snap-in groove 24 of the lifting member 2 can gradually approach the positioning column 12 until the positioning column 12 moves into the snap-in groove 24. Thereafter, the lifting member 2 falls under the action of gravity, so that the positioning column 12 contacts the top of the snap-in portion, thereby ensuring that the position is fixed in the absence of external force, and there is no need to subsequently lock the position through a screw sleeve, which further simplifies the construction steps and improves construction efficiency.

[0028] In one embodiment, the connecting member 3 is composed of at least two rotating rods 31, the ends of the two rotating rods 31 close to each other are connected by a hinge, and the ends of the two rotating rods 31 away from each other are rotatably connected to the adjacent pillars 21 through a torsion spring;

[0029] When the torsion spring is in a natural state, the distance between the clamping parts of the two clamping grooves 24 on the same side is equal to the distance between the two positioning columns 12 on the same side.

[0030] This design enables the operator to change the folding state of the connecting member 3 by loosening or tightening the pull rope after connecting the connecting member 3 with the pull rope, thereby completing the state switching operation of the connecting member 3 on the ground.

[0031] In a specific implementation, the length of the beam support 11 can be extended and made into a stepped shape, so that the bottom of the column 21 can also contact the beam support 11 when the connecting member 3 is in the folded state. When the crane is lifting, the weight of the lifting member 2 itself causes the lifting member 2 to automatically move toward the other lifting member 2, thereby completing the automatic folding of the connecting member 3. After the crane moves the column 21 to contact the top step of the stepped beam support 11, the lifting member 2 is lifted by the beam support 11, so that the torsion spring of the connecting member 3 is no longer squeezed by external force, thereby being able to push the connecting member 3 to unfold, thereby achieving the purpose of adjusting the connecting member 3 without pulling the rope.

[0032] In one embodiment, the lifting member 4 includes a side plate 41 rotatably arranged on two adjacent beams 22 on different sides, a connecting plate 42 is arranged between the two side plates 41, a lifting ring 43 for hooking is arranged on the connecting plate 42, and a limiting portion for preventing the lifting member 4 from further rotating downward from the horizontal state is arranged on the side plate 41;

[0033] When the lifting member 4 rotates to a horizontal state, the top of the lifting member 4 is flush with the top of the lifting member 2.

[0034] Such a design enables the lifting member 4 to not only serve as a component for limiting the spacing between the lifting members 2 and assisting the crane in lifting, but also, after the lifting is completed, by separating the hook from the lifting ring 43, the lifting member 4 can be flipped to a horizontal position under the action of its own gravity, thereby assisting in supporting the lifting member 2.

[0035] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0036] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the utility model, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the utility model.

[0037] In addition, "plurality" means two or more.

[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A rigid frame continuous beam bridge pier top bracket, characterized by: The invention comprises a prefabricated support member (1) and a lifting member (2) detachably arranged on the prefabricated support member (1); the prefabricated support member (1) is arranged on both side surfaces in the length direction of the pier, and the number of the prefabricated support members (1) on each side is two, the number of the lifting members (2) is equal to the number of the prefabricated support members (1), a foldable and stretchable connecting member (3) is arranged between two of the lifting members (2) on the same side, and a lifting member (4) for hanging installation is arranged between two adjacent lifting members (2) on different sides.

2. According to claim 1, a rigid frame continuous beam bridge pier top bracket is characterized by: The prefabricated support member (1) comprises a beam support (11) arranged on a bridge pier and at least one positioning column (12), wherein the positioning column (12) is located on the top of the beam support (11).

3. According to claim 2, a rigid frame continuous beam bridge pier top bracket is characterized by: The supporting member (2) comprises a column (21), a crossbeam (22) is arranged on the top of the column (21), a reinforcing rib (23) for oblique support is arranged between the column (21) and the crossbeam (22), and a clamping groove (24) adapted to the positioning column (12) is provided on a side of the column (21) close to the bridge pier; The clamping groove (24) comprises a clamping portion for clamping the positioning column (12) and an entry and exit portion for the positioning column (12) to enter and exit the clamping portion from the side of the column (21); the height of the clamping portion is greater than the diameter of the positioning column (12); and when the positioning column (12) contacts the top of the clamping portion, the bottom of the column (21) contacts the top of the beam support (11).

4. The rigid frame continuous beam bridge pier top bracket according to claim 3, characterized in that: The connecting member (3) is composed of at least two rotating rods (31), the ends of the two rotating rods (31) approaching each other are connected by a hinge, and the ends of the two rotating rods (31) away from each other are rotatably connected to the adjacent pillars (21) by a torsion spring; When the torsion spring is in a natural state, the distance between the clamping parts of the two clamping grooves (24) on the same side is equal to the distance between the two positioning columns (12) on the same side.

5. The rigid frame continuous beam bridge pier top bracket according to claim 3, characterized in that: The lifting member (4) comprises a side plate (41) rotatably arranged on two adjacent cross beams (22) on different sides, a connecting plate (42) is arranged between the two side plates (41), a lifting ring (43) for hooking a lifting hook is arranged on the connecting plate (42), and a limiting portion for preventing the lifting member (4) from further rotating downward from a horizontal body is arranged on the side plate (41); When the lifting member (4) is rotated to a horizontal state, the top of the lifting member (4) is flush with the top of the lifting member (2).