Pile end and uplift pile
By designing flanges and pre-embedded steel bars at the pile ends of uplift-resistant piles, a high-strength formed pile end body is formed, which solves the problem of insufficient concrete strength at the pile ends of prestressed uplift-resistant piles and improves the pressure-bearing capacity and durability of the pile ends. sex.
Patent Information
- Application Number
- CN202323670291.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-29
AI Technical Summary
During the construction of prestressed anti-pull piles in strata with groundwater, due to insufficient strength of the concrete at the pile end, the pressure-bearing plate moves up and corrodes due to the tension of the steel strand, resulting in insufficient durability.
Design a pile end, including a flange and a plurality of embedded steel bars. A through-filling hole and a first through hole are provided in the pile end body. The steel strand passes through the first through hole and contacts the flange. The buried steel bars are welded to the main bars to form a high-strength formed pile end body, which avoids on-site pouring and enhances the pressure-bearing capacity.
It improves the strength and durability of the concrete at the pile end, meets the pressure-bearing requirements in all directions, prevents low strength problems caused by sediment or groundwater, and enhances the overall stability and service life of the uplift-resistant pile.
Smart Images

Figure CN221878067U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction engineering, in particular to a pile end and an anti-pulling pile. Background Art
[0002] Prestressed pull-out piles are increasingly being used due to their advantages of avoiding cracks and having a low reinforcement ratio. When constructing in strata with groundwater, the pile end concrete strength is insufficient because the sediment at the bottom of the pile cannot be effectively controlled or the groundwater segregates the concrete at the pile end. The pile end of the prestressed pull-out pile is subject to a large compressive stress due to the prestressing effect; this causes the pile end pressure plate to move upward due to the tension of the steel strand, and the groundwater flows up through the pores between the steel strands and is corroded, resulting in insufficient durability. Utility Model Content
[0003] The purpose of the utility model is to at least solve the problem of low strength of concrete at the pile end. This purpose is achieved through the following technical solutions:
[0004] The first aspect of the utility model provides a pile end, which is arranged at the bottom of the pull-out pile, comprising:
[0005] Flange;
[0006] A plurality of embedded steel bars, wherein the plurality of embedded steel bars are fixed to the flange;
[0007] The pile end body, the flange and part of the embedded steel bars are arranged in the pile end body, and along the axial direction of the pile end body, the pile end body is provided with a pouring hole and a first through hole that penetrate the pile end body, the first through hole is spaced apart from the pouring hole, and the first through hole is for the steel strand of the pull-out pile to pass through so that the steel strand abuts against the flange.
[0008] According to the utility model, the pile end is provided with a pile end body, and a flange and a plurality of embedded steel bars fixed to the flange are arranged inside the pile end body. The plurality of embedded steel bars can be welded to the main bars of the pull-out pile. The pile end body is formed when leaving the factory and does not need to be poured on site. The formed pile end body has high strength and can meet the pressure-bearing requirements in all directions, thus solving the problem of low strength of the pile end concrete due to sediment or groundwater.
[0009] In addition, the pile end according to the utility model may also have the following additional technical features:
[0010] In some embodiments of the present invention, the axis of the pouring hole coincides with the axis of the pile end body.
[0011] In some embodiments of the present invention, there are multiple first through holes, and the number of the first through holes is the same as the number of the steel strands, and the multiple first through holes are arranged at equal intervals in the circumferential direction of the pouring hole.
[0012] In some embodiments of the present invention, the flange is provided with a plurality of second through holes at positions corresponding to the plurality of first through holes, each of the second through holes corresponds to one of the first through holes, and a diameter of the second through hole is smaller than a diameter of the first through hole.
[0013] In some embodiments of the present invention, the pile end body is conical.
[0014] In some embodiments of the present invention, the flange is a flange, and the plurality of embedded steel bars are welded to the flange.
[0015] In some embodiments of the present invention, the pile end body is a concrete component.
[0016] In some embodiments of the present invention, there are multiple through grooves, and the multiple through grooves are arranged at intervals along the circumferential direction of the pile end body.
[0017] A second aspect of the utility model provides an anti-pullout pile, comprising the pile end as described above.
[0018] In some embodiments of the utility model, a steel strand is further included, wherein one end of the steel strand passes through the pile end and abuts against the flange through an extrusion anchor, the diameter of the second through hole of the flange is larger than the diameter of the steel strand, and the diameter of the second through hole of the flange is smaller than the outer diameter of the extrusion anchor. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] By reading the detailed description of the preferred embodiment below, various other advantages and benefits will become clear to those of ordinary skill in the art. The accompanying drawings are only used for the purpose of illustrating the preferred embodiment and are not to be considered as limiting the present invention. Moreover, the same reference numerals are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0020] Figure 1 The schematic diagram of the structure of the pile end according to the embodiment of the utility model is schematically shown;
[0021] Figure 2 Schematically shows a front view of a pile end according to an embodiment of the utility model;
[0022] Figure 3 for Figure 2 Sectional view of the AA plane;
[0023] Figure 4Schematically shows a top view of a pile end according to an embodiment of the utility model;
[0024] Figure 5 The structure diagram of the flange and the embedded steel bars according to the embodiment of the utility model is schematically shown;
[0025] Figure 6 The schematic diagram of the structure of the pull-out pile before pouring concrete according to the embodiment of the utility model is shown schematically;
[0026] Figure 7 for Figure 6 A partial enlarged view of point A in the middle.
[0027] The reference numerals are as follows:
[0028] 100, pile end; 10, pile end body; 11, pouring hole; 12, first through hole; 13, through groove; 20, flange; 21, second through hole; 30, embedded steel bar;
[0029] 200. Steel cage of pull-out pile; 201. Main reinforcement; 202. Steel strand. DETAILED DESCRIPTION
[0030] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0031] It should be understood that the terms used herein are only for the purpose of describing specific example embodiments and are not intended to be limiting. Unless the context clearly indicates otherwise, the singular forms "one", "an" and "said" as used herein may also be meant to include plural forms. The terms "include", "comprise", "contain", and "have" are inclusive, and therefore specify the existence of stated features, steps, operations, elements and / or parts, but do not exclude the existence or addition of one or more other features, steps, operations, elements, parts, and / or combinations thereof. The method steps, processes, and operations described herein are not interpreted as necessarily requiring them to be performed in the specific order described or illustrated, unless the execution order is clearly indicated. It should also be understood that additional or alternative steps may be used.
[0032] Although the terms first, second, third, etc. can be used in the text to describe multiple elements, components, regions, layers and / or sections, these elements, components, regions, layers and / or sections should not be limited by these terms. These terms can only be used to distinguish an element, component, region, layer or section from another region, layer or section. Unless the context clearly indicates, terms such as "first", "second" and other numerical terms do not imply order or sequence when used in the text. Therefore, the first element, component, region, layer or section discussed below can be referred to as the second element, component, region, layer or section without departing from the teaching of the example embodiments.
[0033] For ease of description, spatial relative terms may be used herein to describe the relationship of one element or feature relative to another element or feature as shown in the figure, such as "inside", "outside", "inner side", "outer side", "below", "below", "above", "above", etc. Such spatial relative terms are intended to include different orientations of the device in use or operation in addition to the orientation depicted in the figure. For example, if the device in the figure is turned over, then the elements described as "below other elements or features" or "below other elements or features" will subsequently be oriented as "above other elements or features" or "above other elements or features". Therefore, the example term "below..." can include both above and below orientations.
[0034] like Figures 1 to 5 As shown, according to the embodiment of the utility model, a pile end 100 is proposed, which is arranged at the bottom of the steel cage 200 of the pull-out pile, and includes a flange 20, a plurality of embedded steel bars 30 and a pile end body 10, wherein the plurality of embedded steel bars 30 are fixedly arranged with the flange 20, the flange 20 and part of the embedded steel bars 30 are arranged inside the pile end body 10, and along the axial direction of the pile end body 10, the pile end body 10 is provided with a pouring hole 11 and a first through hole 12 that penetrates the pile end body 10, the first through hole 12 is arranged at intervals from the pouring hole 11, and the first through hole 12 can allow the joint of the steel strand 202 of the steel cage 200 of the pull-out pile to pass through so that the steel strand 202 abuts against the flange 20, and a through groove 13 is provided on the outer peripheral wall of the pile end body 10.
[0035] According to the utility model, the pile end 100 is provided with a pile end body 10, and a flange 20 and a plurality of embedded steel bars 30 fixed to the flange 20 are provided inside the pile end body 10. The plurality of embedded steel bars 30 can be welded to the main bars 201 of the steel cage 200 of the pull-out pile. The pile end body 10 is formed when it leaves the factory and does not need to be poured on site. The formed pile end body 10 has high strength and can meet the pressure requirements in all directions, thus solving the problem of low strength of the pile end concrete due to sediment or groundwater. In addition, the pile end body 10 is provided with a pouring hole 11 to pour concrete to the bottom of the pile end body 10, and the mud mixture in the pile hole returns upward from the through groove 13. The first through hole 12 allows the joint of the steel strand 202 to pass through and allows the steel strand 202 to abut against the flange 20. Specifically, the steel strand 202 abuts against the flange 20 through an extrusion anchor.
[0036] It is understandable that the axis of the pouring hole 11 coincides with the axis of the pile end body 10. The coincidence of the axis of the pouring hole 11 with the axis of the pile end body 10 allows concrete or other pouring materials to be more directly and evenly distributed below the pile end 100, which helps to improve the pouring efficiency and the uniformity of concrete distribution, thereby improving the strength of the concrete of the pile end 100.
[0037] It can be understood that there are multiple first through holes 12, and the multiple first through holes 12 are arranged at equal intervals in the circumferential direction of the pouring hole 11. The first through holes 12 are arranged at equal intervals in the circumferential direction of the pouring hole 11, which helps to evenly distribute the steel strands 202 and improve the uniformity and overall stability of the connection between the pile end 100 and the steel strands 202. This embodiment is also conducive to optimizing the stress distribution inside the pile end 100 and preventing stress concentration.
[0038] It can be understood that the flange 20 is provided with a plurality of second through holes 21 at positions corresponding to the plurality of first through holes 12, each second through hole 21 corresponds to a first through hole 12, and the diameter of the second through hole 21 is smaller than that of the first through hole 12. The diameter of the second through hole 21 is smaller than that of the second through hole 21, that is, the flange 20 will protrude a portion in the first through hole 12, and the steel strand 202 can abut against the protruding portion through the extrusion anchor. The second through hole 21 is smaller in diameter than the first through hole 12, so that the flange 20 protrudes a portion in the first through hole 12, and the steel strand 202 abuts against this portion through the extrusion anchor, thereby enhancing the connection stability between the steel strand 202 and the pile end 100, and the abutment portion meets the shear verification of the flange 20.
[0039] Specifically, the axis of the first through hole 12 coincides with the axis of the second through hole 21. By coinciding the axis of the first through hole 12 with the axis of the second through hole 21, the steel strand 202 is precisely aligned with the flange 20, thereby enhancing the reliability and stability of the connection. In addition, this coincident axis design simplifies the construction process, because the steel strand 202 can be directly inserted and fixed along a preset path, reducing the complexity and time in the construction.
[0040] It is understandable that the pile end body 10 is also provided with through grooves in the circumferential direction, and the number of through grooves 13 is multiple, and the multiple through grooves 13 are arranged at intervals along the circumferential direction of the pile end body 10. The through grooves 13 can promote the flow of concrete and other materials inside the pile end 100, and speed up and improve the pouring and curing process of concrete.
[0041] Specifically, the pile end body 10 is conical, which helps to reduce mud resistance and makes it easier for the pile end 100 to penetrate into the pile hole.
[0042] Specifically, a plurality of embedded steel bars 30 are welded to the flange 20, which improves the connection strength between the embedded steel bars 30 and the pile end 100. When the steel cage 200 of the pull-out pile is processed, the embedded steel bars are welded to the main bars 201 of the steel cage, which improves the connection reliability between the pile end 100 and the steel cage 200 of the pull-out pile, and is simple and easy to operate.
[0043] Specifically, the pile end body 10 is a prefabricated concrete component, so that the strength of the pile end 100 can meet the design requirements. The prefabricated concrete component has good pressure bearing and durability, is suitable for withstanding long-term underground pressure and environmental impact, and enhances the stability and service life of the pile end 100. It avoids the decrease in the strength of the pile end concrete due to sediment or groundwater seepage at the pile end 100 during construction, thereby meeting the local pressure bearing of the prestressed pull-out pile end 100.
[0044] Specifically, the concrete components use high-strength concrete, which can be reinforced concrete, wherein reinforced concrete refers to a composite material formed by adding steel mesh, steel plate or fiber to concrete to work together to improve the mechanical properties of concrete.
[0045] Specifically, the number of the first through hole 12 and the second through hole 21 can be 6. Figure 4 As shown, six first through holes 12 are evenly spaced around the circumference of the pouring hole 11, and the second through holes 21 are arranged opposite to the first through holes 12. There are also six through slots 13, which are all spaced on the circumferential side wall of the pile end body 10.
[0046] The preparation method of the pile end 100 of the present embodiment is to first design and manufacture a template according to the outer contour of the prefabricated cone head to ensure the accuracy and stability of the template; secondly, place the flange plate welded with the embedded steel bars 30 into the template and fix it to ensure that the positions of the flange plate and the steel bars are accurate and correspond to the design requirements of the pile end 100; then, pour high-strength concrete in the template to ensure that the concrete fully fills the template without bubbles or voids; then, after the concrete pouring is completed, proper curing is carried out to ensure that the concrete reaches sufficient strength and durability; finally, after the concrete reaches the standard strength through curing, the template is removed to complete the preparation of the pile end 100.
[0047] like Figure 6 to Figure 7 As shown, this embodiment further provides a reinforcement cage 200 of an anti-pullout pile, and the reinforcement cage 200 of the anti-pullout pile includes the pile end 100 mentioned above.
[0048] Specifically, the steel cage 200 of the pull-out pile also includes a steel strand 202, and one end of the steel strand 202 passes through the pile end 100 and abuts against the flange 20 through an extrusion anchor. The main reinforcement 201 of the steel cage 200 of the pull-out pile and the pile end 100 are connected in the following manner: first, one end of the steel strand 202 passes through the top of the first through hole 12 of the pile end 100, and is anchored at the bottom of the second through hole 21 using an extrusion anchor, and the steel strand 202 is straightened to ensure that the extrusion anchor abuts against the lower part of the flange. Then, the first through hole 12 and the second through hole 21 are sealed with a high-strength grouting material to ensure the sealing and structural stability of the connection. Next, the steel cage is processed and constructed, and the main reinforcement 201 of the steel cage 200 of the pull-out pile is welded with the embedded steel bars 30 to form a steel cage, ensuring that the welding is firm and the position is accurate. Finally, the steel strand 202 is tied to the structural steel cage to ensure the overall stability and connection strength of the steel strand 202 and the steel cage. This embodiment improves the stability and pull-out resistance of the overall structure by ensuring a firm connection between the steel strands 202 and the flange and a secure welding of the steel cage.
[0049] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the utility model should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope of the claims.
Claims
1. A pile end, arranged at the bottom of a pull-out pile, characterized in that: include: Flange; A plurality of embedded steel bars, wherein the plurality of embedded steel bars are fixed to the flange; The pile end body, the flange and part of the embedded steel bars are arranged in the pile end body, and along the axial direction of the pile end body, the pile end body is provided with a pouring hole and a first through hole that penetrate the pile end body, the first through hole is spaced apart from the pouring hole, and the first through hole is for the steel strand of the pull-out pile to pass through so that the steel strand abuts against the flange.
2. The pile end according to claim 1, characterized in that: The axis of the pouring hole coincides with the axis of the pile end body.
3. The pile tip according to claim 1, characterized in that: There are a plurality of the first through holes, and the number of the first through holes is the same as the number of the steel strands. The plurality of the first through holes are arranged at equal intervals in the circumferential direction of the pouring hole.
4. The pile tip according to claim 3, characterized in that: The flange is provided with a plurality of second through holes at positions corresponding to the plurality of first through holes, each of the second through holes corresponds to one of the first through holes, and a diameter of the second through hole is smaller than a diameter of the first through holes.
5. The pile end according to any one of claims 1 to 4, characterized in that: The pile end body is conical.
6. The pile end according to any one of claims 1 to 4, characterized in that: The plurality of embedded steel bars are welded to the flange.
7. The pile end according to any one of claims 1 to 4, characterized in that: The pile end body is a concrete component.
8. The pile end according to any one of claims 1 to 4, characterized in that: A through groove is arranged on the outer peripheral wall of the pile end body. There are a plurality of through grooves, and the plurality of through grooves are arranged at intervals along the circumferential direction of the pile end body.
9. An anti-pullout pile, characterized in that: The pile end comprises the pile end as claimed in any one of claims 1 to 8.
10. The pull-out pile according to claim 9, characterized in that: It also includes a steel strand, one end of which passes through the pile end and abuts against the flange through an extrusion anchor, the diameter of the second through hole of the flange is larger than the diameter of the steel strand, and the diameter of the second through hole of the flange is smaller than the outer diameter of the extrusion anchor.