Prefabricated prestressed steel lattice composite foundation pit stand column square pile
By prefabricating prestressed steel lattice composite foundation pit column square piles, the construction difficulties and environmental protection issues of column piles in the basement structure have been solved, the process has been unified and the cost has been reduced, and the construction convenience and pile quality have been improved.
Patent Information
- Application Number
- CN202323526980.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-22
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-22
AI Technical Summary
In the construction of basement structures, especially the use of bored piles for foundation pit support with a small number of column piles, there are construction difficulties and environmental protection issues. There is an urgent need for a process similar to that of basement structural piles to reduce costs.
Prefabricated prestressed steel lattice composite foundation pit column square piles are used, including square pile pile bodies, spiral stirrups, embedded angle steel and water-stopping steel plates. They are pressed into the soil by static pressure or hammering methods, and are welded during the excavation process. Steel decking and water-stopping steel plates are used to connect the supporting beams.
It realizes the unification of construction technology, avoids mud treatment, reduces costs, and improves the quality of pile formation and the convenience of construction.
Smart Images

Figure CN221878105U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the field of construction engineering foundation pit enclosure engineering design, material manufacturing and construction, and relates to a support structure for creating a working surface for basement structure construction, and a column pile and steel lattice structure complex for supporting the deadweight of a support beam of the support structure. Background Art
[0002] The engineering piles of the basement structure adopt prefabricated prestressed square pipe piles, and the basement support structure adopts an internal support structure. The supporting columns are made of water-stop steel plates due to the waterproofing requirements of the basement floor. Steel lattice is a very good process. Generally, bored cast-in-place piles + steel lattice columns are used, but bored cast-in-place piles are used specifically for the small number of column piles for foundation pit support. The construction and mud treatment and environmental protection are quite inconvenient, and there is an urgent need to use column piles with the same process as the basement structure piles. Summary of the invention
[0003] In order to overcome the problem that the same project engineering piles only have prefabricated prestressed square pipe piles, and the basement retaining structure has internal supporting column piles, and to overcome the construction difficulty of only having column piles and sporadic bored cast-in-place piles in a single project, and in order to reduce costs, the utility model provides a prefabricated prestressed steel lattice composite foundation pit column square piles. The steel lattice is conveniently connected to the retaining support structure, and the prefabricated pile making process is the same as the ordinary prefabricated pile process. After the support beam concrete is poured and cured, the soil is excavated, and the steel connecting plates are welded accordingly with the excavation depth. The prefabricated prestressed square piles are chiseled out accordingly with the excavation depth until the excavation reaches the bottom of the basement floor cushion layer.
[0004] The technical solution adopted by the utility model to solve its technical problems is:
[0005] A prefabricated prestressed steel lattice composite foundation pit column square pile, comprising a square pile body, the square pile body is provided with spiral stirrups, four upper corners of the square pile body are pre-embedded with angle steels, the length of the pre-embedded angle steels is the sum of the foundation pit excavation depth and the bottom anchoring length, the angle steels are connected to the pipe pile concrete through anchor bars; the pre-embedded angle steels are provided with steel tie plates from top to bottom according to the layer spacing, and water stop steel plates are provided at corresponding positions of the basement floor of the square pile body.
[0006] Furthermore, the density of the spiral stirrups at the upper and lower ends of the square pile body is greater than that of the spiral stirrups in the middle.
[0007] Furthermore, anchor bars are welded to the embedded angle steels, and steel tie plates and water-stop steel plates are welded to the embedded angle steels.
[0008] Furthermore, the prefabricated prestressed steel lattice composite square pipe piles are pressed into the soil by static pressure or hammering.
[0009] The upper end of the square pile body is connected to the foundation pit support beam.
[0010] The beneficial effects of the utility model are mainly manifested in: the prefabricated prestressed square pipe piles and the steel lattice are a composite body, the construction process of pile driving is unified, no mud or other environmentally friendly materials required for bored piles are produced, the prefabricated prestressed steel lattice composite square pipe piles are factory-made, and the quality of column piles is controllable; in order to facilitate static pressure or hammer pile formation, the steel tie plates of the prefabricated prestressed steel lattice composite square pipe piles are welded during the excavation stage; the construction is convenient and the cost is reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the reinforcement arrangement of square piles of prefabricated prestressed steel lattice composite foundation pit columns.
[0012] Figure 2 It is a schematic diagram of the concrete pouring and forming of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0013] Figure 3 It is the end plan view of the prefabricated prestressed steel lattice composite foundation pit column square pile.
[0014] Figure 4 It is a status diagram of the first step in the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0015] Figure 5 It is a status diagram of the second step of the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0016] Figure 6 It is the status diagram of the third step of the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0017] Figure 7 It is the status diagram of the fourth step of the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0018] Figure 8 It is the status diagram of the fifth step of the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0019] Fig. 9 It is the status diagram of the sixth step of the construction of prefabricated prestressed steel lattice composite foundation pit column square piles.
[0020] Among them, 1 is the spiral stirrups at the upper and lower ends; 2 is the spiral stirrups in the middle, 3 is the embedded angle steel, 4 is the anchor bar; 5 is the pipe pile body, 6 is the water-stop steel plate, and 7 is the foundation pit support beam. DETAILED DESCRIPTION
[0021] The utility model is further described below in conjunction with the accompanying drawings.
[0022] Reference Figures 1 to 9A prefabricated prestressed steel lattice composite foundation pit column square pile, including a square pile body 5, the square pile body 5 is provided with spiral stirrups, the upper four corners of the square pile body 5 are pre-embedded angle steels 3, the length of the pre-embedded angle steels 3 is the sum of the foundation pit excavation depth and the bottom anchoring length, the pre-embedded angle steels 3 are connected to the pipe pile concrete through anchor bars 4; the pre-embedded angle steels 3 are provided with steel tie plates from top to bottom according to the layer spacing, and a waterstop steel plate 6 is provided at the corresponding position of the basement floor of the square pile body.
[0023] Furthermore, the density of the spiral stirrups 1 at the upper and lower ends of the square pile body is greater than the density of the spiral stirrups 2 in the middle.
[0024] Furthermore, anchor bars 4 are welded to the embedded angle steel 3 , and steel tie plates and water-stop steel plates 6 are welded to the embedded angle steel 3 .
[0025] Furthermore, the prefabricated prestressed steel lattice composite square pipe piles are pressed into the soil by static pressure or hammering.
[0026] The upper end of the square pile body 5 is connected to the support beam 7 .
[0027] In the scheme of this embodiment, a certain length of angle steel is embedded in the four corners during factory manufacturing. The length of the embedded angle steel is the excavation depth of the foundation pit + the bottom anchor length. The welded anchor bars on the embedded angle steel are connected to the pile concrete. The prefabricated prestressed steel lattice composite square pipe piles are pressed into the soil by static pressure or hammering. The length of the prefabricated prestressed steel lattice composite square pipe piles is determined by calculation according to the load of the supporting columns and the "Design Parameter Table of Physical and Mechanical Indicators of Foundation Soil" in the geological exploration report and the corresponding geological exploration soil layer profile. The foundation pit support beam 7 is connected to the prefabricated prestressed steel lattice composite square pipe piles, and the earth excavation is the same as usual. With each layer of soil excavated, a layer of steel tie plates is welded to the prefabricated prestressed steel lattice composite square pipe piles, and the spacing of the steel tie plates is based on the design spacing of the column piles. As one layer of soil is excavated, the concrete of the prefabricated prestressed steel lattice composite square pipe piles is correspondingly chiseled out (the steel tie plate is welded on the embedded angle steel of the prefabricated prestressed steel lattice composite square pipe piles first, and the concrete of the prefabricated prestressed steel lattice composite square pipe piles is chiseled out later), until the soil is excavated to the bottom of the basement floor cushion layer. Then, the water stop steel plate 6 is welded on the corresponding position of the basement floor of the prefabricated prestressed steel lattice composite square pipe piles to construct the basement floor.
[0028] The construction process of this embodiment is as follows:
[0029] The first step is to prefabricate prestressed steel lattice composite square pipe piles by static pressure or hammering;
[0030] The second step is to manufacture the foundation pit support beam 7 on the prefabricated prestressed steel lattice composite square pipe pile column pile, pour concrete and maintain it;
[0031] Step 3: excavation of earthwork under the foundation pit support beam 7;
[0032] Step 4: weld the slabs to the prefabricated prestressed steel lattice composite square pipe piles and remove the concrete of the prefabricated prestressed steel lattice composite square pipe piles;
[0033] Step 5: Excavate the soil and weld the tie plates simultaneously with the column piles, and simultaneously remove the concrete of the prefabricated prestressed steel lattice composite square pipe piles;
[0034] Step 6: Weld the water-stop steel plate 6 on the basement foundation section of the prefabricated prestressed steel lattice composite square pipe piles, and pour the foundation concrete.
[0035] In the scheme of this embodiment, the overall basement structure adopts prefabricated prestressed square piles, so how to press the lower foundation part of the column pile into the soil by static pressure or hammering method, which can not only meet the pile-making process, but also meet the conventional column steel lattice structure of the basement floor waterproofing requirements of the upper foundation pit excavation part of the column pile, is the focus of the work to solve the support column pile, and requires convenient construction, economical and cheap, and cost saving. The prefabricated prestressed steel lattice composite foundation pit column square pile process has been used in the foundation pit project of Hangzhou Xiaoshan Technician College, which meets the requirements of foundation pit support column piles, saves 10,000 yuan per column pile, and saves about 160,000 yuan in total.
[0036] The contents described in the embodiments of this specification are merely enumerations of implementation forms of the utility model concept and are for illustrative purposes only. The protection scope of the utility model should not be considered to be limited to the specific forms described in this embodiment, and the protection scope of the utility model also extends to equivalent technical means that ordinary technicians in this field can think of based on the concept of the utility model.
Claims
1. A prefabricated prestressed steel lattice composite foundation pit column square pile, characterized in that: It comprises a square pile body, which is provided with spiral stirrups, and angle steels are embedded at four upper corners of the square pile body, the length of the embedded angle steels being the sum of the foundation pit excavation depth and the bottom anchoring length, and the angle steels are connected to the pipe pile concrete via anchor bars; steel gusset plates are arranged on the embedded angle steels from top to bottom according to the layer spacing, and waterstop steel plates are arranged on corresponding positions of the basement floor of the square pile body.
2. The prefabricated prestressed steel lattice composite foundation pit column square pile according to claim 1, characterized in that: Anchor bars are welded on the embedded angle steels, and steel tie plates and water-stop steel plates are welded on the embedded angle steels.
3. The prefabricated prestressed steel lattice composite foundation pit column square pile according to claim 1 or 2, characterized in that: The prefabricated prestressed steel lattice composite square pipe piles are pressed into the soil by static pressure or hammering.
4. The prefabricated prestressed steel lattice composite foundation pit column square pile according to claim 1 or 2, characterized in that: The upper end of the square pile body is connected to the foundation pit support beam.
Citation Information
Cited By
Prefabricated prestressed steel lattice composite foundation pit stand column square pile
CN117569339A