Building foundation pile
By designing steel mesh frames and mobile structures in building foundation piles, the problems of increased friction and difficulty in connection during foundation pile driving are solved. The foundation piles can be smoothly entered into the soil and the prefabricated floor can be quickly connected, which improves the efficiency of building construction and foundation. Pile integrity.
Patent Information
- Application Number
- CN202420427827.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The existing building foundation piles have increased friction during the piling process, making it difficult to enter the soil, and lack a quick connection structure, which affects the building construction cycle and the integrity of the foundation piles.
A building foundation pile including a first concrete layer and a second concrete layer is designed. A steel mesh frame is set between the two layers, equipped with a mobile structure, springs and mounting frames. The surface of the foundation pile is smoothed into the ground through the cooperation of springs and insert plates. soil, and connect the prefabricated base plate through casings and bolts to enhance the strength and connectivity of the foundation piles.
It enables the foundation piles to smoothly enter the soil during the piling process, increases the friction with the soil, reduces the concrete pouring time through the quick connection structure, and improves the integrity and structural efficiency of the foundation piles.
Smart Images

Figure CN221878153U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of construction engineering, and more specifically, to a building foundation pile. Background Art
[0002] In the process of construction engineering, since the natural soil is not tight enough, building on natural soil is prone to cause building collapse, etc. Therefore, it is necessary to drive piles into the soil and then build houses on the piles to build a stable building structure. Piles play a vital role in construction engineering. Existing building piles need to be driven into the soil. In order to increase the adhesion and friction with the soil, some piles are often provided with barbed structures. When the piles are driven, the friction between the piles and the land is increased, which makes it inconvenient for the piles to enter the soil. At the same time, the existing piles are generally only concrete cylindrical structures. When building on the piles, it is often necessary to pour another layer of base plate on the piles. The existing piles lack a connection structure and cannot be quickly connected to the prefabricated base plate. Concrete pouring is required to form the base plate, which affects the construction period of the building and increases the construction time. Utility Model Content
[0003] 1. Technical issues to be resolved
[0004] In view of the problems existing in the prior art, the utility model provides a building foundation pile to solve the technical problems mentioned in the background technology.
[0005] (II) Technical solution
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a building foundation pile, comprising a first concrete layer and a second concrete layer, a steel mesh frame is arranged between the first concrete layer and the second concrete layer, a movable structure is arranged on the steel mesh frame, the steel mesh frame comprises longitudinal steel bars and transverse steel bars, a plurality of transverse steel bars and longitudinal steel bars are arranged, and the transverse steel bars are arranged equidistantly, so as to form the main body of the entire foundation pile;
[0007] The mobile structure includes a mounting frame, a spring and a mobile plate. The mounting frame is provided with a first mounting hole that cooperates with the longitudinal steel bar, and there are multiple first mounting holes. The mounting frame is sleeved and installed on the longitudinal steel bar and is located between two transverse steel bars. The spring is arranged between the mobile plate and the mounting frame, and there are multiple springs.
[0008] The utility model is further configured such that the longitudinal steel bars and the transverse steel bars are tied and connected, a fixing frame is provided on the longitudinal steel bars, the fixing frame is tied and connected to the longitudinal steel bars, and a second mounting hole matching the longitudinal steel bars is provided on the fixing frame, thereby facilitating the installation of the mounting frame on the longitudinal steel bars.
[0009] The utility model is further configured such that a plurality of second mounting holes are provided, a connecting hole is opened on the fixing frame, a sleeve is provided in the connecting hole, a plurality of sleeves and connecting holes are provided, a thread is provided inside the sleeve, and the sleeve is detachably connected to the connecting hole, thereby facilitating the installation of the sleeve.
[0010] The utility model is further configured such that extension pieces are fixedly provided at both ends of the sleeve, a connecting groove is provided on the fixing frame, the extension piece and the connecting groove are cooperatively connected, threaded holes are provided on the extension piece and the connecting groove, the extension piece and the connecting groove are cooperatively connected by bolts and threads, thereby realizing the installation of the sleeve.
[0011] The utility model is further configured such that the spring is welded to the movable plate and the mounting frame, a limit block cooperating with the movable plate is fixedly arranged inside the first concrete layer, a through hole is opened on the first concrete layer, and a plurality of through holes are arranged to facilitate the connection between the movable plate and the mounting frame.
[0012] The utility model is further configured as follows: a protruding block is fixedly provided on the movable plate, the protruding block cooperates with the through hole, an insert plate is provided between the mounting frame and the movable plate, and the insert plate, the mounting frame and the movable plate are all detachably connected, so that the fixed block can be inserted through the insert plate to stretch the spring and move the movable plate.
[0013] The utility model is further configured that a fixing block is fixedly arranged on the mounting frame and the plug plate, a plurality of the fixing blocks are arranged, and the plug plate is arranged between two fixing blocks, so as to limit the movement of the plug plate.
[0014] The utility model is further configured such that a support frame is arranged inside the second concrete layer, a notch is opened on the second concrete layer, and a protrusion cooperating with the notch is arranged on the support frame, thereby facilitating the connection between the support frame and the second concrete layer.
[0015] (III) Beneficial effects
[0016] Compared with the prior art, the utility model provides a building foundation pile, which has the following beneficial effects:
[0017] 1. The utility model sets a movable structure. During the piling process, the protruding block is located inside the first concrete layer along with the movable plate and the mounting frame, so that the surface of the first concrete layer is smooth, which facilitates the entire foundation pile to enter the soil. The wider plug plate is inserted between the two fixed blocks to stretch the spring so that the protruding block extends out through the hole. After that, concrete is poured in the first concrete layer and the second concrete layer, so that the protruding block is inserted into the soil and the friction with the soil is increased.
[0018] 2. The utility model provides a fixing frame to be tied to the steel mesh frame, a connecting hole is provided on the fixing frame, a sleeve is provided in the connecting hole, and the sleeve is installed on the fixing frame through the cooperation of an extension piece and a connecting groove, so that it is convenient to connect the prefabricated concrete base plate and the sleeve by bolts, thereby facilitating the installation of the prefabricated concrete base plate.
[0019] 3. The utility model connects the entire foundation pile structure through the cooperation of the first concrete layer, the second concrete layer and the steel mesh frame, and arranges a support frame inside the second concrete layer, so as to ensure the strength of the entire foundation pile during piling. After being clamped and driven into the soil, concrete is poured between the first concrete layer and the second concrete layer to form a complete foundation pile, so as to ensure the integrity and supporting performance of the foundation pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The figure is a schematic diagram of the overall structure of a building foundation pile;
[0021] Figure 2 It is a structural schematic diagram of a fixing frame for removing building foundation piles;
[0022] Figure 3 The present invention is a structural schematic diagram of a mobile structure of a building foundation pile;
[0023] Figure 4 It is a schematic diagram of the matching structure of a fixing frame and a sleeve of a building foundation pile;
[0024] Figure 5 The present invention is a schematic diagram of the coordination structure of a first concrete layer, a second concrete layer and a support frame of a building foundation pile.
[0025] In the figure: 1. first concrete layer; 2. second concrete layer; 3. longitudinal reinforcement; 4. transverse reinforcement; 5. mounting frame; 6. spring; 7. movable plate; 8. first mounting hole; 9. fixing frame; 10. second mounting hole; 11. connecting hole; 12. sleeve; 13. extension piece; 14. connecting groove; 15. threaded hole; 16. limit block; 17. through hole; 18. protruding block; 19. plug plate; 20. fixing block; 21. support frame; 22. missing groove; 23. protrusion. DETAILED DESCRIPTION
[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present utility model will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0027] It should be noted that, unless otherwise specified, all technical and scientific terms used in this application have the same meanings as commonly understood by ordinary technicians in the technical field to which this application belongs.
[0028] In the present invention, unless otherwise specified, directions such as "up" and "down" are usually used in reference to the directions shown in the drawings, or in reference to the vertical, perpendicular or gravity direction; similarly, for ease of understanding and description, "left" and "right" are usually used in reference to the left and right shown in the drawings; "inside" and "outside" refer to the inside and outside relative to the outline of each component itself, but the above-mentioned directions are not used to limit the present invention.
[0029] See also Figure 1-5 A building foundation pile comprises a first concrete layer 1 and a second concrete layer 2, a steel mesh frame is arranged between the first concrete layer 1 and the second concrete layer 2, a movable structure is arranged on the steel mesh frame, the steel mesh frame comprises longitudinal steel bars 3 and transverse steel bars 4, a plurality of transverse steel bars 4 and longitudinal steel bars 3 are arranged, and the transverse steel bars 4 are arranged equidistantly, a support frame 21 is arranged inside the second concrete layer 2, a notch 22 is opened on the second concrete layer 2, and a convex block 23 matching the notch 22 is arranged on the support frame 21;
[0030] The mobile structure includes a mounting frame 5, a spring 6 and a mobile plate 7. The mounting frame 5 is provided with a first mounting hole 8 that cooperates with the longitudinal steel bar 3. There are multiple first mounting holes 8. The mounting frame 5 is sleeved and installed on the longitudinal steel bar 3 and is located between two transverse steel bars 4. The spring 6 is arranged between the mobile plate 7 and the mounting frame 5. There are multiple springs 6.
[0031] In this embodiment, the entire pile foundation structure is formed by the cooperation of the steel mesh and the first concrete layer 1 and the second concrete layer 2, the steel mesh is formed by the binding of the transverse steel bars 4 and the longitudinal steel bars 3, and the support frame 21 is installed in the second concrete layer 2 by the cooperation of the protrusion 23 and the groove 22, so as to support the second concrete layer 2.
[0032] More specifically, after the pile driving is completed, the protruding block 18 provided on the movable plate 7 is inserted into the soil around the entire foundation pile by the movable structure, thereby increasing the friction between the foundation pile and the soil.
[0033] See also Figure 1-Figure 5 As an implementation method for increasing the friction between the foundation pile and the soil: the spring 6 is welded to the movable plate 7 and the mounting frame 5, a limit block 16 cooperating with the movable plate 7 is fixedly arranged inside the first concrete layer 1, a through hole 17 is opened on the first concrete layer 1, and a plurality of through holes 17 are arranged, a protruding block 18 is fixedly arranged on the movable plate 7, and the protruding block 18 cooperates with the through hole 17, a plug plate 19 is arranged between the mounting frame 5 and the movable plate 7, and the plug plate 19 and the mounting frame 5 and the movable plate 7 are all detachably connected, and a fixed block 20 is fixedly arranged on the mounting frame 5 and the plug plate 19, and a plurality of fixed blocks 20 are arranged, and the plug plate 19 is arranged between two fixed blocks 20;
[0034] Specifically, during the piling process, the mounting frame 5 and the movable plate 7 are both located between the first concrete layer 1 and the second concrete layer 2, so that the first concrete layer 1 remains smooth during the piling process, which facilitates the entire pile foundation structure to enter the soil. After the entire pile foundation structure enters the soil, the plug plate 19 is inserted between the two fixed blocks 20 provided on the mounting frame 5 and the movable frame. Due to the width of the plug plate 19, the spring 6 is pushed to extend, pushing the movable plate 7 to move, thereby pushing the protruding block 18 out of the through hole 17 opened on the first concrete layer 1 and inserting it into the soil. After the plug plate 19 is completed, concrete is poured between the two limit blocks 16 of the first concrete layer 1, thereby casting the mobile structure in the concrete, fixing the position of the mobile structure, and placing the pile foundation in the ground.
[0035] Please refer to Figure 1-5 , as an implementation method for facilitating the connection of an external precast concrete base plate: the longitudinal steel bar 3 and the transverse steel bar 4 are tied and connected, a fixing frame 9 is provided on the longitudinal steel bar 3, the fixing frame 9 and the longitudinal steel bar 3 are tied and connected, a second mounting hole 10 matching with the longitudinal steel bar 3 is opened on the fixing frame 9, and a plurality of second mounting holes 10 are provided, a connecting hole 11 is opened on the fixing frame 9, a sleeve 12 is provided in the connecting hole 11, and a plurality of sleeves 12 and connecting holes 11 are provided, and a thread is provided inside the sleeve 12, and the sleeve 12 and the connecting hole 11 are detachably connected, and extension pieces 13 are fixedly provided at both ends of the sleeve 12, a connecting groove 14 is opened on the fixing frame 9, the extension piece 13 and the connecting groove 14 are matched and connected, and threaded holes 15 are opened on the extension piece 13 and the connecting groove 14, and the extension piece 13 and the connecting groove 14 are matched and connected by bolts and threads;
[0036] Specifically, the fixing frame 9 is sleeved and installed on the dynamic reinforcement through the cooperation of the second installation hole 10 and the longitudinal reinforcement 3, and is fixed by tying with steel wire. After the piling is completed, the fixing frame 9 is cast together with the first concrete layer 1 and the second concrete layer 2 and fixed to the top of the entire foundation pile. The sleeve 12 is installed in the connecting hole 11 through the cooperation of the extension piece 13 and the connecting groove 14, and the sleeve 12 is fixed to the fixing frame 9 through the cooperation of the bolt and the threaded hole 15, so as to facilitate the connection between the prefabricated base plate and the fixing frame 9 through the cooperation of the bolt and the sleeve 12.
[0037] In summary, when used as a whole:
[0038] When the entire pile foundation structure is constructed, the entire pile foundation structure is constructed by the cooperation of the steel mesh frame with the first concrete layer 1 and the second concrete layer 2, and the steel mesh frame is constructed by binding the transverse steel bars 4 and the longitudinal steel bars 3. The fixing frame 9 is sleeved and installed on the dynamic steel bars through the cooperation of the second mounting hole 10 and the longitudinal steel bars 3, and is fixed by binding with steel wire. After the piling is completed, the fixing frame 9 is cast together with the first concrete layer 1 and the second concrete layer 2, and the mounting frame 5 is installed on the longitudinal steel bars 3 through the first mounting hole 8 opened on the mounting frame 5, and is fixed by binding with steel wire. The support frame 21 is installed in the second concrete layer 2 through the cooperation of the protrusion 23 and the groove 22, so as to support the second concrete layer 2.
[0039] During the piling process, the mounting frame 5 and the movable plate 7 are both located between the first concrete layer 1 and the second concrete layer 2, so that the first concrete layer 1 remains smooth during the piling process, which facilitates the entire pile foundation structure to enter the soil. After the entire pile foundation structure enters the soil, the plug plate 19 is inserted between the two fixed blocks 20 provided on the mounting frame 5 and the movable frame. Due to the width of the plug plate 19, the spring 6 is pushed to extend, pushing the movable plate 7 to move, thereby pushing the protruding block 18 out of the through hole 17 opened on the first concrete layer 1 and inserting it into the soil. After the plug plate 19 is completed, concrete is poured between the two limit blocks 16 of the first concrete layer 1, thereby casting the movable structure in the concrete, fixing the position of the movable structure, and placing the pile foundation in the ground.
[0040] After the piling is completed, the fixing frame 9 is cast together with the first concrete layer 1 and the second concrete layer 2 and fixed to the top of the entire foundation pile. The sleeve 12 is installed in the connecting hole 11 through the cooperation of the extension piece 13 and the connecting groove 14, and the sleeve 12 is fixed to the fixing frame 9 through the cooperation of the bolts and the threaded holes 15, so as to facilitate the connection between the prefabricated base plate and the fixing frame 9 through the cooperation of the bolts and the sleeve 12.
[0041] In all the schemes mentioned above, the connection between two parts can be selected according to actual conditions by welding, bolt and nut matching connection, bolt or screw connection or other well-known connection methods, which are not described here one by one. In the above, all fixed connections are preferably welded. Although the embodiments of the utility model have been shown and described, it can be understood by ordinary technicians in this field that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the utility model. The scope of the utility model is defined by the attached claims and their equivalents.
Claims
1. A building foundation pile, comprising a first concrete layer (1) and a second concrete layer (2), characterized in that: A steel mesh is provided between the first concrete layer (1) and the second concrete layer (2), a movable structure is provided on the steel mesh, the steel mesh comprises longitudinal steel bars (3) and transverse steel bars (4), a plurality of transverse steel bars (4) and longitudinal steel bars (3) are provided, and the transverse steel bars (4) are arranged at equal distances; The mobile structure comprises a mounting frame (5), a spring (6) and a mobile plate (7); the mounting frame (5) is provided with a first mounting hole (8) which cooperates with the longitudinal steel bar (3); a plurality of the first mounting holes (8) are provided; the mounting frame (5) is sleeved and installed on the longitudinal steel bar (3) and is located between two transverse steel bars (4); the spring (6) is provided between the mobile plate (7) and the mounting frame (5); a plurality of the springs (6) are provided.
2. A building foundation pile according to claim 1, characterized in that: The longitudinal steel bars (3) and the transverse steel bars (4) are connected by binding, a fixing frame (9) is provided on the longitudinal steel bars (3), the fixing frame (9) and the longitudinal steel bars (3) are connected by binding, and a second mounting hole (10) matching with the longitudinal steel bars (3) is provided on the fixing frame (9).
3. A building foundation pile according to claim 2, characterized in that: A plurality of the second mounting holes (10) are provided, a connecting hole (11) is provided on the fixing frame (9), a sleeve (12) is provided in the connecting hole (11), a plurality of the sleeves (12) and the connecting hole (11) are provided, a thread is provided inside the sleeve (12), and the sleeve (12) and the connecting hole (11) are detachably connected.
4. A building foundation pile according to claim 3, characterized in that: Both ends of the sleeve (12) are fixedly provided with extension pieces (13), the fixing frame (9) is provided with a connecting groove (14), the extension piece (13) and the connecting groove (14) are matched and connected, the extension piece (13) and the connecting groove (14) are both provided with threaded holes (15), and the extension piece (13) and the connecting groove (14) are matched and connected by bolts and threads.
5. The building foundation pile according to claim 1, characterized in that: The spring (6) is welded to the movable plate (7) and the mounting frame (5); a limit block (16) cooperating with the movable plate (7) is fixedly arranged inside the first concrete layer (1); a through hole (17) is opened on the first concrete layer (1); and a plurality of through holes (17) are arranged.
6. A building foundation pile according to claim 5, characterized in that: A protruding block (18) is fixedly provided on the movable plate (7), and the protruding block (18) cooperates with the through hole (17). An inserting plate (19) is provided between the mounting frame (5) and the movable plate (7), and the inserting plate (19) is detachably connected to the mounting frame (5) and the movable plate (7).
7. A building foundation pile according to claim 6, characterized in that: A fixing block (20) is fixedly arranged on both the mounting frame (5) and the plug board (19), a plurality of the fixing blocks (20) are arranged, and the plug board (19) is arranged between two fixing blocks (20).
8. A building foundation pile according to claim 7, characterized in that: A support frame (21) is arranged inside the second concrete layer (2), a notch (22) is provided on the second concrete layer (2), and a convex block (23) matching with the notch (22) is arranged on the support frame (21).