Overbreak reinforcing structure for palisade crane beam of underground powerhouse of pumped storage power station
By using technical means such as mortar anchors, prestressed anchors and backfill concrete in the rock wall crane beams of the underground powerhouse of the pumped storage power station, different types of over-excavation deviations are reinforced and reinforced, and the problem caused by over-excavation of the rock wall crane beams is solved. solve the problem of structural instability and improve the stability and progress of the project.
Patent Information
- Application Number
- CN202323385125.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-12
AI Technical Summary
Due to unfavorable geological conditions and the inability to accurately control the blasting charge during the excavation process of the rock wall crane beam of the underground powerhouse of the pumped storage power station, over-excavation occurred to varying degrees, affecting the stability of the crane beam structure and the progress of the project.
Using supporting structures such as mortar anchors and prestressed anchors, combined with backfill concrete and additional steel bars, A-type, B-type, and C-type reinforcement structures were designed to classify different types of overexcavation deviations to strengthen the rock wall. Crane beam support and stability.
It effectively solves the adverse impact of over-excavation of the crane beam on the rock wall on the structure, improves the stability and progress of the project, and ensures the load-bearing capacity of the crane beam and the installation and maintenance conditions of the hydro-generator unit.
Smart Images

Figure CN221878202U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of rock wall crane beams for underground powerhouses in pumped storage power stations, in particular to an over-excavation reinforcement structure for rock wall crane beams for underground powerhouses in pumped storage power stations. Background Art
[0002] In order to reduce the span of underground powerhouse caverns and shorten the construction period, underground powerhouses of pumped-storage power stations mostly adopt rock wall crane beam structures. The rock wall crane beam bears all the loads of the main bridge crane operation, and the main bridge crane is responsible for the installation and maintenance of the most core hydro-generator set in the underground powerhouse. Therefore, the role of the rock wall crane beam in the entire underground powerhouse is extremely critical. The excavation and forming of the rock wall crane beam have high requirements. During the excavation process, due to unfavorable geological conditions and the inability to accurately control the amount of blasting charges, there is varying degrees of over-excavation in the excavation of the rock wall crane beam, which affects the rock wall crane beam structure. Utility Model Content
[0003] The purpose of the utility model is to provide an over-excavation reinforcement structure for the rock wall crane beam of an underground powerhouse in a pumped storage power station in response to the above-mentioned problems.
[0004] To this end, the above-mentioned purpose of the utility model is achieved through the following technical solutions:
[0005] A pumped-storage power station underground powerhouse rock wall crane beam over-excavation reinforcement structure, the pumped-storage power station underground powerhouse rock wall crane beam over-excavation reinforcement structure comprises: mortar anchor rod A, mortar anchor rod B and mortar anchor rod C, the mortar anchor rod A and mortar anchor rod B are arranged above the pumped-storage power station underground powerhouse rock wall crane beam to penetrate into the side wall, the mortar anchor rod C is arranged below the pumped-storage power station underground powerhouse rock wall crane beam to penetrate into the side wall; supporting mortar anchor rods are arranged between the pumped-storage power station underground powerhouse rock wall crane beam and the side wall;
[0006] The feature is that backfill concrete is provided at the over-excavated part of the rock wall crane beam of the underground powerhouse of the pumped storage power station, and additional steel bars are provided at the wider position of the backfill concrete.
[0007] While adopting the above technical solutions, the present invention can also adopt or combine the following technical solutions:
[0008] As a preferred technical solution of the utility model: supporting prestressed anchor rods or supporting mortar anchor rods are arranged between the backfill concrete of the over-excavated part and the side wall.
[0009] As an optimal technical solution of the utility model: a mortar anchor rod D is arranged below the mortar anchor rod A and the mortar anchor rod B, and the mortar anchor rod D is arranged above the rock wall crane beam of the underground powerhouse of the pumped storage power station to penetrate into the side wall.
[0010] As a preferred technical solution of the utility model: a wall-attached concrete wall is additionally provided at the lower part of the rock wall crane beam of the underground powerhouse of the pumped-storage power station, and a plurality of rows of prestressed anchor rods are arranged between the wall-attached concrete wall and the side wall.
[0011] As a preferred technical solution of the utility model: a prestressed anchor rod guide tube is arranged outside the end of the prestressed anchor rod located in the attached concrete wall.
[0012] As a preferred technical solution of the utility model: additional steel bars are arranged on the attached concrete wall.
[0013] The utility model provides an over-excavation reinforcement structure for rock wall crane beams in underground powerhouses of pumped-storage power stations, comprising: mortar anchor rods A, mortar anchor rods B and mortar anchor rods C, wherein the mortar anchor rods A and mortar anchor rods B are arranged above the rock wall crane beams in underground powerhouses of pumped-storage power stations to penetrate into the side walls, and the mortar anchor rods C are arranged below the rock wall crane beams in underground powerhouses of pumped-storage power stations to penetrate into the side walls; supporting mortar anchor rods are arranged between the rock wall crane beams in underground powerhouses of pumped-storage power stations and the side walls; backfill concrete is arranged in the over-excavation part of the rock wall crane beams in underground powerhouses of pumped-storage power stations, and additional steel bars are arranged in the wider position of the backfill concrete. The over-excavation reinforcement structure for rock wall crane beams in underground powerhouses of pumped-storage power stations provided by the utility model can effectively solve the adverse effects of over-excavation of rock wall crane beams in underground powerhouses on the rock wall crane beam structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 This is a typical schematic diagram of the A-type reinforcement structure in the embodiment of the utility model;
[0015] Figure 2 This is a typical schematic diagram of a B-type reinforcement structure in an embodiment of the utility model;
[0016] Figure 3 This is a typical schematic diagram of a C-type reinforcement structure in an embodiment of the utility model;
[0017] In the figure: 11. Backfill concrete for over-excavation part of type A reinforcement structure; 12. Additional steel bars for type A reinforcement structure; 21. D anchor rod for type B reinforcement structure; 22. Backfill concrete for type B reinforcement structure; 23. Additional steel bars for type B reinforcement structure; 31. D anchor rod for type C reinforcement structure; 32. Attached concrete wall of type C reinforcement structure; 33. Prestressed anchor rod for type C reinforcement structure; 34. Prestressed anchor rod guide tube for type C reinforcement structure; 35. Backfill concrete for type C reinforcement structure; 36. Additional steel bars for type C reinforcement structure; 4. Concrete for rock wall crane beam. DETAILED DESCRIPTION
[0018] The utility model is further described below in conjunction with the accompanying drawings and specific implementation methods.
[0019] like Figure 1 As shown, an over-excavation reinforcement structure of a crane beam on a rock wall of an underground powerhouse of a pumped-storage power station comprises: a mortar anchor rod A, a mortar anchor rod B and a mortar anchor rod C. The mortar anchor rod A and the mortar anchor rod B are arranged above the crane beam on the rock wall of an underground powerhouse of the pumped-storage power station to penetrate into the side wall, and the mortar anchor rod C is arranged below the crane beam on the rock wall of an underground powerhouse of the pumped-storage power station to penetrate into the side wall;
[0020] like Figure 1-3 As shown, supporting mortar anchor rods are arranged between the crane beam and the side wall of the rock wall of the underground powerhouse of the pumped storage power station;
[0021] Backfill concrete 11 / 22 / 35 is set in the over-excavation part of the rock wall crane beam of the underground powerhouse of the pumped-storage power station, and additional steel bars 12 / 23 / 36 are set in the wider position of the backfill concrete 11 / 22 / 35.
[0022] like Figure 1-3 As shown, supporting prestressed anchor rods or supporting mortar anchor rods are arranged between the backfill concrete of the over-excavated part and the side wall.
[0023] like Figure 2-3 As shown, in the B-type reinforcement structure and the C-type reinforcement structure, mortar anchor rods D21 / 31 are arranged below the mortar anchor rods A and B, and the mortar anchor rods D21 / 31 are arranged above the rock wall crane beam of the underground powerhouse of the pumped storage power station to penetrate into the side wall.
[0024] like Figure 3 As shown, in the C-type reinforcement structure, a wall-attached concrete wall 32 is added to the lower part of the rock wall crane beam of the underground powerhouse of the pumped storage power station, and multiple rows of prestressed anchor rods 33 are arranged between the wall-attached concrete wall 32 and the side wall.
[0025] A prestressed anchor rod guide tube 34 is arranged outside the end of the prestressed anchor rod 33 located at the attached concrete wall 32 .
[0026] Additional reinforcement bars 36 are provided on the attached concrete wall 32 .
[0027] Specifically, the over-excavation reinforcement structure of the rock wall crane beam of the underground powerhouse of the pumped storage power station is realized by the following methods:
[0028] like Figure 1-3 As shown in the figure, by classifying the deviation between the excavation shape and the design caused by the over-excavation of the rock wall crane beam, different reinforcement structures are adopted for different types, which are divided into type A reinforcement structure, type B reinforcement structure, and type C reinforcement structure, corresponding to Figure 1 , Figure 2 as well as Figure 3 .
[0029] Before implementing the reinforcement structure, the concrete sprayed layer on the rock wall within the range of the rock wall crane beam and its attached wall concrete should be chiseled out and cleaned to the surrounding rock.
[0030] When the over-excavation above the inflection point on the wall seat slope is >20cm, but the over-excavation of the wall seat is small, the wall seat angle forming deviation is within 3°, and the over-excavation at and below the lower inflection point of the wall seat slope is <20cm, a type A reinforcement structure is adopted: the over-excavation part of the rock wall crane beam range is backfilled with concrete of the same grade as the rock wall crane beam 11, and additional steel bars 12 are added to the over-excavation part above the upper inflection point. The concrete backfill 11 needs to be poured at the same time as the rock wall crane beam concrete 4.
[0031] When the over-excavation above the inflection point on the wall seat slope is less than 20cm, but the wall seat is partially over-excavated, the local forming deviation of the wall seat angle exceeds 3°, and the over-excavation at and below the lower inflection point of the wall seat slope is greater than 20cm, a type B reinforcement structure is adopted: a row of D anchor rods 21 is added under the A and B anchor rods, the over-excavation part of the rock wall crane beam range is backfilled 22 with concrete of the same grade as the rock wall crane beam, and additional steel bars 23 are added to the over-excavation part at and below the lower inflection point. The concrete backfill 22 needs to be poured simultaneously with the rock wall crane beam concrete 4.
[0032] When the over-excavation above the inflection point on the wall seat slope is less than 20cm, the wall seat part is over-excavated in a large area, the large-area forming deviation of the wall seat angle exceeds 3°, and the over-excavation at and below the inflection point of the wall seat slope is greater than 20cm, a C-type reinforcement structure is adopted: add a row of D anchor rods 31 under the A and B anchor rods, add a 3m high wall-attached concrete wall 32 under the rock wall crane beam, and add 3 rows of ordinary prestressed anchor rods T = 120kN, L = 9m@1.5m, up-tilt 15°, prestressed anchor guide tube 34 should be embedded before pouring the attached concrete wall 32. The over-excavation area of the rock wall crane beam range is backfilled with the same grade concrete as the rock wall crane beam 35, and additional steel bars 36 are added to the over-excavation area at the lower turning point and below. The attached concrete wall 32 and concrete backfill 35 need to be poured at the same time as the rock wall crane beam concrete 4.
[0033] For areas where the over-excavation of the rock wall crane beam is less than 20cm, the rock wall crane beam area needs to be backfilled with concrete of the same grade as the rock wall crane beam, and the concrete backfill needs to be poured at the same time as the rock wall crane beam concrete.
[0034] If the over-excavation of the side wall above the inflection point on the slope of the wall seat in the B-type and C-type reinforcement treatment sections is greater than 20cm, the A-type reinforcement treatment should be adopted, and additional steel bars should be added to the over-excavation part above the upper inflection point.
[0035] The side formwork can be removed only after the rock wall crane beam and reinforced structural concrete have reached 75% of the design strength, and the load-bearing bottom formwork can be removed only after reaching 100% of the design strength and the prestressed anchor rods have been tensioned.
[0036] The above-mentioned specific implementation cases are used to explain the present invention and are only preferred embodiments of the present invention, rather than limiting the present invention. Any modifications, equivalent substitutions, improvements, etc. made to the present invention within the spirit of the present invention and the protection scope of the claims shall fall within the protection scope of the present invention.
Claims
1. A pumped-storage power station underground powerhouse rock wall crane beam over-excavation reinforcement structure, the pumped-storage power station underground powerhouse rock wall crane beam over-excavation reinforcement structure comprising: Mortar anchor rod A, mortar anchor rod B and mortar anchor rod C, the mortar anchor rod A and mortar anchor rod B are arranged above the rock wall crane beam of the underground powerhouse of the pumped-storage power station to penetrate into the side wall, and the mortar anchor rod C is arranged below the rock wall crane beam of the underground powerhouse of the pumped-storage power station to penetrate into the side wall; supporting mortar anchor rods are arranged between the rock wall crane beam and the side wall of the underground powerhouse of the pumped-storage power station; The feature is that backfill concrete is provided at the over-excavated part of the rock wall crane beam of the underground powerhouse of the pumped storage power station, and additional steel bars are provided at the wider position of the backfill concrete.
2. The over-excavation reinforcement structure of the rock wall crane beam of the underground powerhouse of the pumped storage power station according to claim 1 is characterized by: A supporting prestressed anchor rod or a supporting mortar anchor rod is arranged between the backfill concrete of the over-excavated part and the side wall.
3. The over-excavation reinforcement structure of the rock wall crane beam of the underground powerhouse of the pumped storage power station according to claim 1 is characterized by: A mortar anchor rod D is arranged below the mortar anchor rod A and the mortar anchor rod B. The mortar anchor rod D is arranged above the rock wall crane beam of the underground powerhouse of the pumped storage power station to penetrate into the side wall.
4. The over-excavation reinforcement structure of the rock wall crane beam of the underground powerhouse of the pumped storage power station according to claim 1 is characterized by: A wall-attached concrete wall is additionally arranged at the lower part of the rock wall crane beam of the underground powerhouse of the pumped-storage power station, and a plurality of rows of prestressed anchor rods are arranged between the wall-attached concrete wall and the side wall.
5. The over-excavation reinforcement structure for the rock wall crane beam of the underground powerhouse of the pumped storage power station according to claim 4 is characterized by: A prestressed anchor rod guide tube is arranged outside the end of the prestressed anchor rod located in the attached concrete wall.
6. The over-excavation reinforcement structure of the rock wall crane beam of the underground powerhouse of the pumped storage power station according to claim 4 is characterized by: Additional steel bars are arranged on the attached concrete wall.
Citation Information
Cited By
Anchor rod structure of semi-underground powerhouse
CN224514272U