Precast beam joint connecting structure for hole plugging
By using double-sided welding technology of embedded steel plates and prefabricated beam top steel bars during the construction of subway stations, a consolidated end is formed, which solves the problem that the prefabricated beam end is difficult to withstand large loads in the existing technology, and achieves shortening of the construction period and Increase in load.
Patent Information
- Application Number
- CN202420369471.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-28
AI Technical Summary
During the construction of subway stations, the reservation of temporary holes led to the extension of the construction period. The end connections of existing precast beams were difficult to meet the high load requirements, especially the articulated reinforcements were insufficient and could not effectively bear larger loads.
A precast beam joint connection structure including corbels, precast beam body, embedded steel plate, precast beam top steel bar, micro-expanded concrete, cement slurry and sealing glue is used to form a solid structure through double-sided welding of the embedded steel plate and the precast beam top steel bar. Knot ends to increase load carrying capacity.
Through double-sided welding, the ends of the prefabricated beams are transformed into consolidated ends, which can withstand greater loads, significantly save construction time, and meet construction needs.
Smart Images

Figure CN221878389U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a prefabricated beam joint connection structure for hole sealing. Background Art
[0002] During the construction of subway station structures, temporary holes are usually reserved, such as shield hoisting holes, shield excavation holes, and excavation holes reserved during cover-and-cut construction. The usual practice is to pour reinforced concrete within the hole range after the station's two-end interval structure or station structure is fully constructed. This requires the erection of scaffolding from the bottom plate upwards. When the construction period is tight, it cannot meet the relevant construction period requirements. For example, when there are many subway floors, the construction period will be further extended and cannot be completed on time. At this time, using prefabricated structures to block the holes will greatly save construction time. Generally, the end connections of prefabricated panels or beams with smaller internal forces are mostly hinged, while the end connections of beams with larger forces within the hole range are difficult to meet the reinforcement requirements when hinged. It is necessary to consolidate the upper steel bars of the end so that the end steel bars bear the internal force, so that the prefabricated beams can withstand greater loads. Utility Model Content
[0003] The utility model aims at the deficiencies of the prior art and provides a prefabricated beam joint connection structure for hole plugging, so as to solve the problem that the hinged connection of the beam end with large force in the temporary hole plugging range cannot meet the structural force requirement.
[0004] In order to achieve the above utility model purpose, the utility model adopts the following technical solutions:
[0005] The utility model provides a hole-sealed prefabricated beam joint connection structure, comprising a corbel, a prefabricated beam body, an embedded steel plate, a first row of steel bars on the top of the prefabricated beam, a second row of steel bars on the top of the prefabricated beam, micro-expansion concrete, cement slurry, cement mortar and sealing glue;
[0006] in:
[0007] The embedded steel plate includes a top steel plate and a side steel plate, wherein the top steel plate is located on the upper surface of the cast-in-place structure, and the side steel plate is located on the side of the cast-in-place structure;
[0008] The cement mortar is laid on the top of the corbel, and the prefabricated beam body is placed on the top of the cement mortar;
[0009] The first row of steel bars on the top of the precast beam is welded to the top steel plate in the embedded steel plate, and the second row of steel bars on the top of the precast beam is welded to the side steel plate in the embedded steel plate;
[0010] The top end of the precast beam body is provided with a tongue and groove, and the width of the tongue and groove is 200 mm and the height is 250 mm. The tongue and groove is provided to facilitate the construction space for welding the second row of steel bars on the top of the precast beam and the side steel plate, and the micro-expansive concrete is filled in the tongue and groove;
[0011] There is a gap between the side of the prefabricated beam body and the cast-in-place structure, and the cement slurry is used to seal the gap.
[0012] Preferably, the diameters of the first row of steel bars at the top of the precast beam and the second row of steel bars at the top of the precast beam are the same, the width of the embedded steel plate is greater than 5 times the diameter of the steel bars of the first row of steel bars at the top of the precast beam, and the length of the embedded steel plate is greater than or equal to the width of the precast beam body.
[0013] Preferably, the surface of the embedded steel plate is coated with an anti-corrosion coating, and the top steel plate in the embedded steel plate has a sufficient thickness of the steel bar protection layer.
[0014] Preferably, the first row of steel bars at the top of the precast beam and the second row of steel bars at the top of the precast beam are both welded to the embedded steel plate on both sides, and the welding length is greater than or equal to 5 times the steel bar diameter of the first row of steel bars at the top of the precast beam.
[0015] Compared with the prior art, one or more of the above technical solutions have the following beneficial effects:
[0016] By performing double-sided welding between the top steel bars of the precast beam and the embedded steel plate in the existing structure, the end of the precast beam becomes a consolidated end, so that the end of the precast beam bears part of the internal force, allowing the precast beam to withstand a larger load. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.
[0018] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0019] Figure 1 It is a cross-sectional view of an embodiment of the utility model;
[0020] In the figure:
[0021] 1. Corbel; 2. Precast beam body; 3. Embedded steel plate; 4. Micro-expansive concrete; 5. Cement slurry; 6. Sealing glue; 7. The first row of steel bars at the top of the precast beam; 8. The second row of steel bars at the top of the precast beam; 9. Cement mortar. DETAILED DESCRIPTION
[0022] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0023] like Figure 1 As shown, the utility model discloses an embodiment of a hole-sealed precast beam joint connection method, comprising a corbel 1, a precast beam body 2, an embedded steel plate 3, a micro-expansion concrete 4, cement slurry 5, a sealing glue 6, a first row of steel bars 7 on the top of the precast beam, a second row of steel bars 8 on the top of the precast beam, and cement mortar 9;
[0024] Furthermore, the first row of steel bars 7 at the top of the precast beam and the second row of steel bars 8 at the top of the precast beam are connected to the embedded steel plate 3 embedded in the cast-in-place structure by double-sided welding, and the welding length is greater than or equal to 5 times the diameter of the steel bars.
[0025] Furthermore, the embedded steel plate 3 is composed of a top steel plate and a side steel plate.
[0026] Furthermore, the first row of steel bars 7 at the top of the precast beam is welded to the top steel plate, and the second row of steel bars 8 at the top of the precast beam is welded to the side steel plate.
[0027] Furthermore, the width of the embedded steel plate 3 should be greater than 5 times the diameter of the connected steel bar, and the length should be greater than or equal to the width of the prefabricated beam.
[0028] Furthermore, the surface of the embedded steel plate 3 is coated with anti-corrosion paint.
[0029] Furthermore, the embedded depth of the embedded steel plate 3 should meet the thickness of the protective layer of the welded steel bars.
[0030] Specifically, the whole working process is as follows:
[0031] When constructing the main structure of the station, the corbels 1 on both sides of the hole should be constructed at the same time, and steel plates 3 should be embedded in the cast-in-place structure, and the upper and lower surfaces of the embedded steel plates 3 should be painted with anti-corrosion materials. When using the precast beam body 2 to seal the temporary holes of the subway station, the side of the interface between the precast beam body 2 and the existing structure should be roughened first, and then 20mm thick cement mortar 9 should be laid on the top surface of the corbel 1, and then the precast beam body 2 should be hoisted in place, leaving a gap of less than 5-10mm between the precast beam body 2 and the cast-in-place structure, and then the first row of steel bars 7 and the second row of steel bars 8 on the top of the precast beam should be welded to the top and side of the embedded steel plate 3 respectively by double-sided welding, and the welding length should not be less than 5d; after all the steel bars are welded, cement slurry 5 is poured into the gap between the precast beam body 2 and the cast-in-place structure, and then micro-expansion concrete 4 is poured into the tongue and groove range of the top of the precast beam end, and after the micro-expansion concrete 4 solidifies, the gap between the precast beam body 2 and the corbel 1 is sealed with sealing glue 6.
[0032] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A prefabricated beam joint connection structure with hole sealing, It is characterized in that It comprises a corbel (1), a precast beam body (2), a pre-buried steel plate (3), a first row of steel bars (7) on the top of the precast beam, a second row of steel bars (8) on the top of the precast beam, slightly expansive concrete (4), cement paste (5), cement mortar (9) and a sealing adhesive (6); in: The embedded steel plate (3) comprises a top steel plate and a side steel plate, wherein the top steel plate is located on the upper surface of the cast-in-place structure, and the side steel plate is located on the side of the cast-in-place structure; The cement mortar (9) is laid on the top of the corbel (1), and the prefabricated beam body (2) is placed on the top of the cement mortar (9); The first row of steel bars (7) at the top of the precast beam is welded to the top steel plate in the embedded steel plate (3), and the second row of steel bars (8) at the top of the precast beam is welded to the side steel plate in the embedded steel plate (3); The top end of the prefabricated beam body (2) is provided with a tongue and groove, and the micro-expansive concrete (4) is filled in the tongue and groove; There is a gap between the side of the prefabricated beam body (2) and the cast-in-place structure, and the cement slurry (5) is used to close the gap.
2. The hole-sealing prefabricated beam joint connection structure according to claim 1, Features: The diameters of the first row of steel bars (7) at the top of the precast beam and the second row of steel bars (8) at the top of the precast beam are the same, the width of the embedded steel plate (3) is greater than 5 times the diameter of the first row of steel bars (7) at the top of the precast beam, and the length of the embedded steel plate (3) is greater than or equal to the width of the precast beam body (2).
3. The hole-sealing prefabricated beam joint connection structure according to claim 1, Features: The surface of the embedded steel plate (3) is coated with an anti-corrosion coating, and the top steel plate in the embedded steel plate (3) has a thickness of a steel bar protection layer.
4. The hole-sealing prefabricated beam joint connection structure according to claim 1, Features: The first row of steel bars (7) at the top of the precast beam and the second row of steel bars (8) at the top of the precast beam are both welded to the embedded steel plate (3) on both sides, and the welding length is greater than or equal to 5 times the diameter of the steel bars of the first row of steel bars (7) at the top of the precast beam.