Large-span steel bar truss floor support plate hoisting shaping bracket
By designing standardized brackets, including structures such as protective hangers and clamp rotating shafts, the problems of deformation and slippage during the hoisting of large-span steel truss floor decks were solved, and the construction quality and stability were improved.
Patent Information
- Application Number
- CN202323552213.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2033-12-25
AI Technical Summary
The large-span steel truss floor decking has problems such as edge warping and deflection during the hoisting process, which affects the construction quality, and there is great uncertainty in traditional construction methods.
A stereotyped bracket including floor decking, protective hangers, hoisting stiffening rings, hanger beams and side baffles is designed. Through the structure of the clamp shaft, side baffles, movable support square steel and counterweight boom, , to ensure the stability and protection of the floor deck during the hoisting process.
It effectively prevents the slippage and deformation of the floor decking, ensures the stability and quality during the hoisting process, and is suitable for the construction of floor decking slabs of various specifications.
Smart Images

Figure CN221878885U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of floor decking hoisting construction, and in particular to a standardized bracket for hoisting large-span steel truss floor decking. Background Art
[0002] With the development of steel frame structure construction, steel truss floor slabs are increasingly being chosen due to their advantages of fast construction speed, high overall rigidity, and good seismic performance. Consequently, the safety requirements for truss slabs are also becoming increasingly stringent. However, due to the presence of high-altitude and edge-prone work during construction, as well as factors such as slab load-bearing capacity and finished product quality leading to concrete leakage and slab deformation, steel frame structure construction faces various safety and quality issues.
[0003] In traditional construction methods, there are significant uncertainties during the transportation and hoisting of large-span steel truss floor slabs. If warping or bending occurs during hoisting, it will affect the construction quality of the entire project. Therefore, relevant reinforcement measures can be taken during hoisting to prevent deformation and damage to the truss slabs.
[0004] In view of this, and in response to a series of problems existing in the current hoisting operation of large-span steel truss floor decks, there is an urgent need to invent a simple and effective standardized bracket for hoisting large-span steel truss floor decks, so as to improve the construction quality of large-span steel truss floor decks. Utility Model Content
[0005] The purpose of this utility model is to overcome the shortcomings of the existing technology and provide a standardized support for hoisting large-span steel truss floor slabs.
[0006] This standardized support frame for hoisting large-span steel truss floor decking includes a floor decking, a protective hanger, a hoisting stiffening ring, a hanger beam, and side baffles. The protective hanger includes a hanger beam and a hanger longitudinal beam. A hoisting lug is provided at the upper end of the hanger beam, and a hoisting stiffening ring is provided on the hoisting lug. A hoisting rope is provided inside the hoisting stiffening ring. Two clamping shaft supports are provided in the middle of the hanger beam, and a clamping shaft is provided between the two clamping shaft supports. A floor decking clamp is provided on the clamping shaft. The floor decking clamp rotates self-lockingly through the clamping shaft to press the floor decking above it and prevent it from shifting in the air.
[0007] Preferably, the protective hanger has a square steel limiting plate and a fixed channel steel on its longitudinal beam. The fixed channel steel has a left side baffle and a right side baffle on both sides. A side baffle is installed in both the left and right side baffles. A side baffle sliding block is provided on both sides of the side baffle. The two side baffle sliding blocks slide in the left and right side baffles respectively. A side baffle is provided at each end of the fixed channel steel. The floor deck is placed between the side baffles.
[0008] Preferably, the square steel limiting plate is parallel to the fixed channel steel, and a movable supporting square steel is provided inside the square steel limiting plate. The square steel limiting plate and the movable supporting square steel are fixed by bolts, and the floor deck is placed on the movable supporting square steel.
[0009] Preferably, the protective hanger has counterweight rods at the four corners of the bottom of the longitudinal beam of the hanger, and counterweight blocks are provided on the counterweight rods.
[0010] Preferably, the hanger beams and hanger longitudinal beams are connected to form a rectangular structure. The hanger beams on both sides of the rectangular structure are equipped with floor decking clamps, and the two floor decking clamps press on the two ends of the floor decking respectively.
[0011] The beneficial effects of this utility model are:
[0012] 1) Standardized brackets are used for hoisting large-span steel truss floor decks. The floor decks are placed inside the brackets during hoisting, so that the four corners and all sides of the floor decks can be effectively protected. The floor deck clamps press down on both ends of the floor decks to prevent them from slipping, thereby preventing the truss plates from being deformed or damaged.
[0013] 2) The standardized bracket is equipped with side baffles and movable support square steel. The spacing of the side baffles is adjustable and can be used for hoisting construction of floor decking of various specifications.
[0014] 3) The standardized bracket is equipped with floor deck clamps at the ends and counterweight rods at the four bottom corners for installing balance counterweights, ensuring that the floor deck is in a stable state during hoisting and guaranteeing the quality of floor deck hoisting construction. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural schematic diagram of the standardized bracket for hoisting large-span steel truss floor decking of this utility model;
[0016] Figure 2 It is a standardized bracket elevation drawing;
[0017] Figure 3 This is a three-dimensional schematic diagram of a standardized bracket;
[0018] Figure 4 This is an elevation view of the floor decking hoisting process;
[0019] The components include: 1. Floor decking; 2. Protective hanger; 3. Lifting stiffening ring; 4. Hanger beam; 5. Clamp pivot support; 6. Clamp pivot; 7. Counterweight block; 8. Counterweight block rod; 9. Hanger longitudinal beam; 10. Lifting lug; 11. Floor decking clamp; 12. Lifting rope; 13. Movable support square steel; 14. Square steel limit plate; 15. Right slide groove of side baffle; 16. Side baffle; 17. Fixed channel steel; 18. Left slide groove of side baffle; 19. Side baffle sliding block. DETAILED DESCRIPTION
[0020] The present invention will be further described below with reference to embodiments. The description of the embodiments below is only for the purpose of helping to understand the present invention. It should be noted that, for those skilled in the art, several modifications can be made to the present invention without departing from the principle of the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.
[0021] As one example, such as Figures 1 to 4 As shown, this standardized support for hoisting large-span steel truss floor decking includes a floor decking 1, a protective hanger 2, a hoisting stiffening ring 3, a hanger beam 4, and a side baffle 16. The protective hanger 2 includes a hanger beam 4 and a hanger longitudinal beam 9. A hoisting lug 10 is provided at the upper end of the hanger beam 4, and a hoisting stiffening ring 3 is provided on the hoisting lug 10. A hoisting rope 12 is provided inside the hoisting stiffening ring 3. Two clamping shaft supports 5 are provided in the middle of the hanger beam 4, and a clamping shaft 6 is provided between the two clamping shaft supports 5. A floor decking clamp 11 is provided on the clamping shaft 6. The floor decking clamp 11 rotates by self-locking through the clamping shaft 6 and is used to press on the floor decking 1 to prevent it from shifting in the air.
[0022] The protective hanger 2 has a square steel limiting plate 14 and a fixed channel steel 17 on its longitudinal beam 9. The fixed channel steel 17 has a left side baffle slide groove 18 and a right side baffle slide groove 15 on both sides. A side baffle 16 is installed in both the left and right side baffle slide grooves 18 and 15. Side baffle sliding blocks 19 are provided on both sides of each side baffle 16, sliding within the left and right side baffle slide grooves 18 and 15 respectively. A side baffle 16 is located at each end of the fixed channel steel 17, and the floor deck 1 is placed between the side baffles 16. The spacing of the side baffles 16 is adjustable, allowing for the hoisting and installation of floor deck 1 of various specifications.
[0023] The square steel limiting plate 14 is parallel to the fixed channel steel 17. A movable support square steel 13 is provided inside the square steel limiting plate 14. The square steel limiting plate 14 and the movable support square steel 13 are fixed by bolts. The floor deck 1 is placed on the movable support square steel 13.
[0024] The protective hanger 2 has counterweight rods 8 at the four corners of the bottom of the longitudinal beam 9. The counterweight rods 8 are equipped with balance counterweights 7, which ensures that the floor deck 1 is in a stable state during the hoisting process and ensures the quality of the hoisting construction of the floor deck 1.
[0025] The hanger beam 4 and the hanger longitudinal beam 9 are connected to form a rectangular structure. The hanger beam 4 on both sides of the rectangular structure is equipped with floor deck clamps 11, and the two floor deck clamps 11 press on the two ends of the floor deck 1 respectively.
[0026] When the floor deck 1 is hoisted, it is placed inside the protective hanger 2 so that the four corners and all sides of the floor deck 1 can be effectively protected. The floor deck clamp 11 presses down on both ends of the floor deck 1 to prevent it from slipping, thereby preventing the truss plate from being deformed or damaged.
Claims
1. A standardized bracket for hoisting large-span steel truss floor decks, characterized in that: It includes a floor decking plate, a protective hanger, a lifting stiffening ring, a hanger beam and a side baffle; the protective hanger includes a hanger beam and a hanger longitudinal beam, a lifting ear plate is arranged on the upper end of the hanger beam, a lifting stiffening ring is arranged on the lifting ear plate, a lifting rope is arranged in the lifting stiffening ring, two clamp rotating shaft supports are arranged in the middle of the hanger beam, a clamp rotating shaft is arranged between the two clamp rotating shaft supports, a floor decking plate clamp is arranged on the clamp rotating shaft, the floor decking plate clamp is rotated by self-locking through the clamp rotating shaft, and is used to press on the top of the floor decking plate to prevent it from shifting in the air.
2. The large-span steel bar truss floor deck hoisting and shaping bracket according to claim 1 is characterized in that: A square steel limit plate and a fixed channel steel are arranged on the longitudinal beam of the protective hanger, a left side baffle plate slide groove and a right side baffle plate slide groove are arranged on both sides of the fixed channel steel, side baffles are arranged in the left side baffle plate slide groove and the right side baffle plate slide groove, side baffles are arranged on both sides of the side baffles, side baffle plate sliding blocks are respectively arranged, the two side baffle plate sliding blocks slide in the left side baffle plate slide groove and the right side baffle plate slide groove respectively, a side baffle plate is respectively arranged at both ends of the fixed channel steel, and the floor decking plate is placed between the side baffles.
3. The large-span steel bar truss floor deck hoisting and shaping bracket according to claim 2 is characterized in that: The square steel limit plate is parallel to the fixed channel steel, and a movable supporting square steel is arranged inside the square steel limit plate. The square steel limit plate and the movable supporting square steel are fixed by bolts, and the floor deck is placed on the movable supporting square steel.
4. The large-span steel bar truss floor deck hoisting and shaping bracket according to claim 1 is characterized in that: Counterweight hangers are respectively arranged at four corners of the bottom of the hanger longitudinal beam of the protection hanger, and a balancing counterweight is arranged on the counterweight hanger.
5. The large-span steel bar truss floor deck hoisting and shaping bracket according to claim 1 is characterized in that: The hanger crossbeam and the hanger longitudinal beam are connected to form a rectangular structure. The hanger crossbeams on both sides of the rectangular structure are provided with floor deck clamps, and the two floor deck clamps are respectively pressed on the two ends of the floor deck.