Complete set of system for treating cracking of concrete spray layer of top arch of underground powerhouse
Through the complete system of trolleys and array-type anchors to separate the active protection net, the problem of low efficiency and safety risks in the cracking treatment of the shotcrete layer on the roof arch of the underground factory has been solved, and efficient and safe shotcrete layer processing and real-time monitoring have been achieved, ensuring that Construction safety and overall image.
Patent Information
- Application Number
- CN202420027527.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-05
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-05
AI Technical Summary
The shotcrete layer on the roof arch of the underground factory is prone to cracking during the excavation process. The existing treatment methods are inefficient, have high safety risks and cannot be monitored in real time, which affects construction safety and the overall image.
A complete system of trolleys, array anchors and active protection nets is used. The active protection nets are divided by anchors to form multiple units. The trolleys are used to regularly inspect and clean the shotcrete layer to ensure safety and monitor the status of the crown arch in real time.
It improves the safety and efficiency of the roof arch shotcrete layer cracking treatment, avoids secondary treatment, and grasps the safety status of the underground factory roof arch in real time, providing a basis for dynamic design and construction.
Smart Images

Figure CN221878952U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of water conservancy and hydropower, and in particular to a complete system for treating cracks in a concrete spray layer of an underground plant top arch. Background Art
[0002] The underground powerhouse of a hydropower station has a large span and a high excavation height. Under complex geological conditions or high ground stress conditions, after the cavern is excavated, the stress of the arch surrounding rock will be adjusted. As the powerhouse continues to be excavated, the stress concentration degree and range of the powerhouse arch gradually increase, and the stress redistribution causes the surrounding rock to deform. Moreover, the stress concentration and surrounding rock deformation are time-sensitive and continue to develop for a long time. The surrounding rock deformation of the powerhouse arch will cause the sprayed concrete layer to crack and fall off, endangering the safety of personnel and equipment under the powerhouse.
[0003] Due to the high excavation height of the underground factory building, it is difficult to deal with the problem of cracking of the top arch spray layer after the factory building is excavated to the lower part. The commonly used treatment measures are: 1) Use a car crane to inspect and deal with the cracking of the top arch spray layer, but this method is too inefficient and has a high safety risk, and it is difficult to deal with large-area cracked spray layers; 2) Pull a passive protection net at the position of the rock anchor beam, but this method cannot deal with the spray layer that has cracked but not fallen off, and cannot check the safety status of the top arch. It also interferes with the construction of the factory building, has poor aesthetics, and affects the overall image of the factory building. Utility Model Content
[0004] The main purpose of the utility model is to provide a complete system for treating cracks in the concrete spraying layer of an underground factory building top arch, in the hope of effectively solving the problems in the background technology.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A complete system for treating cracks in a concrete spray layer of an underground powerhouse top arch, the complete system comprising a trolley, an array of anchor rods on the top arch of the underground powerhouse, and an active protection net;
[0007] The top arch is provided with a sprayed concrete layer and anchor rods, an active protection net is provided under the top arch, and the active protection net is fixed to the ends of the anchor rods in the top arch so that the array-type anchor rods divide the entire active protection net to form a plurality of active protection net units;
[0008] Tracks are laid on the side walls of the underground factory building, and a trolley is set up between the two side tracks. The trolley is used to regularly check the cracks of the sprayed concrete layer of the top arch, to clean the warping of the sprayed concrete layer of the top arch, or to clean up the concrete blocks in the active protection net.
[0009] While adopting the above technical solutions, the present invention can also adopt or combine the following technical solutions:
[0010] As a preferred technical solution of the utility model: the active protection net is provided with a double-layer net, which is an inner steel wire rope net and an outer steel wire grille, and the outer steel wire grille is fixed to the end of the anchor rod by bolts.
[0011] As a preferred technical solution of the present utility model: guardrails are arranged around the trolley.
[0012] The utility model provides a complete set of system for treating cracks in the concrete spray layer of the top arch of an underground plant, which has the following beneficial effects: for treating cracks and falling pieces in the spray layer of the top arch of an underground plant, an active protection net is hung as soon as possible by using the exposed anchor rods of the top arch, and the whole active protection net is divided into multiple active protection net units by array-type anchor rods to prevent the falling spray layer from falling into the lower part of the plant, thereby ensuring the safety of the personnel and equipment in the lower part. In addition, after the falling spray layer appears in the formed active protection net unit, the active protection net unit with the falling spray layer can be cut off, the falling spray layer can be taken out, and then the active protection net unit can be re-sewn into a complete state; the cracked spray layer of the plant top arch is cleared by using a trolley, and the falling concrete pieces in the active protection net are cleaned; and the safety status of the top arch is regularly checked. The method is safe and reliable for treating the cracking problem of the top arch spray layer, has high efficiency, does not interfere with the construction, does not affect the overall image of the plant, does not require secondary treatment in the later stage, can grasp the safety status of the underground plant top arch in real time, and provides a basis for the dynamic design of the plant excavation support and the lower construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is the overall structural diagram of a complete system for treating cracks in the top arch concrete spraying layer of an underground plant provided by the utility model;
[0014] Figure 2 for Figure 1 A magnified image of area A;
[0015] Figure 3 It is a schematic diagram of the connection relationship between the active protection net and the anchor rod;
[0016] In the figure: 1-underground plant; 2-top arch; 3-anchor rod; 4-trolley; 5-track; 6-guardrail; 7-sprayed concrete layer; 8-active protection net; 81-wire rope net; 82-wire grille; 9-bolt. DETAILED DESCRIPTION
[0017] The utility model is further described in detail with reference to the accompanying drawings and specific embodiments.
[0018] like Figure 1-3As shown, a complete system for treating cracks in the concrete spraying layer of the top arch of an underground powerhouse includes a trolley 4, an array of anchor rods 3 on the top arch 2 of an underground powerhouse 1, and an active protection net 8;
[0019] The top arch 2 is provided with a sprayed concrete layer 7 and anchor rods 3, an active protection net 8 is provided below the top arch 2, and the active protection net 8 is fixed to the ends of the anchor rods 3 in the top arch 2 so that the arrayed anchor rods 3 divide the entire active protection net 8 to form a plurality of active protection net 8 units;
[0020] Tracks 5 are laid on the side walls of the underground factory building 1, and a trolley 4 is set up between the two side tracks 5. The trolley 4 is used to regularly check the cracks of the sprayed concrete layer 7 of the top arch 2 or to clean the sprayed concrete layer 7 of the top arch 2 or to clean the concrete blocks in the active protection net 8.
[0021] The active protection net 8 is provided with a double layer net, which is an inner layer steel wire rope net 81 and an outer layer steel wire grid 82. Figure 3 As shown, the outer steel wire grating 82 is formed as a skeleton to support each active protection net 8 unit upward, and the outer steel wire grating 82 is fixed to the end of the anchor rod 3 by bolts 9. The spacing between the steel wires of the inner steel wire rope net 81 should be small enough to prevent the falling spray layer from falling into the factory building through the gap, and the outer steel wire grating 82 should have sufficient strength to prevent the falling spray layer from being too heavy and destroying the active protection net 8.
[0022] Guardrails 6 are provided around the trolley 4 .
[0023] The following are specific embodiments of the present invention:
[0024] like Figure 1-3 As shown, a complete system for treating cracks in the concrete spraying layer of the top arch of an underground powerhouse includes a trolley 4, an array of anchor rods 3 and an active protective net 8 on the top arch 2 of the underground powerhouse 1. The top arch 2 is supported by a spraying layer 7 after excavation. The spraying layer 7 has different thicknesses according to the specific conditions of the project. It can be sprayed to the designed thickness in one go, or it can be sprayed initially, with a steel mesh hung, and then sprayed again. Under complex geological conditions or high ground stress conditions, the stress of the top arch 2 is constantly adjusted during the continuous excavation of the underground powerhouse 1, resulting in cracks in the spraying layer. The cracking of the spraying layer will have an adverse effect on the stability of the surrounding rock of the top arch, and the cracking and falling of the spraying layer will cause great safety hazards to the personnel and equipment below.
[0025] First, an active protective net 8 should be installed as soon as possible at the cracked part of the shotcrete layer 7 of the top arch 2 to hold the cracked and detached shotcrete layer of the top arch 2 to ensure the safety of the personnel and equipment below; a trolley 4 should be set up in the underground factory building to use the trolley 4 to clean the cracked shotcrete layer 7, clean the fallen concrete blocks in the active protective net 8, and regularly check the safety status of the top arch 2.
[0026] The active protection net 8 needs to be firmly connected to the exposed anchor rods 3 of the top arch 2 to transfer the load of the detached sprayed concrete layer 7 and the active protection net 8 to the surrounding rock. The coverage of the active protection net 8 should be determined after comprehensive analysis and consideration to prevent the sprayed layer from cracking in other areas of the top arch 2 during the continued excavation of the underground plant 1. After the sprayed layer detaches in several units of the active protection net 8, the active protection net 8 units with the detached sprayed layer can be cut off (it does not affect the other active protection net 8 units that have not detached the sprayed layer to continue to collect the detached sprayed layer), the detached sprayed layer is taken out, and then these cut active protection net 8 units are sewn back into a complete state.
[0027] The trolley 4 has a certain bearing capacity and can support the load of construction personnel and equipment. The trolley 4 is used to regularly check the cracking of the sprayed layer of the plant roof 2, clean the cracked concrete sprayed layer of the plant roof 2, and clean the concrete blocks in the active protection net 8. The trolley 4 can move freely along the axis of the plant to process different cracked and broken parts. The trolley 4 has a certain plane size to meet the construction requirements. A guardrail 6 needs to be set around the platform of the trolley 4 to prevent personnel and equipment from falling from the trolley.
[0028] The safety and stability of the top arch 2 can be checked regularly by using the trolley 4. The inspection can be carried out at regular intervals according to the progress of the project and the stability of the surrounding rock, so as to understand the safety status of the top arch 2 in real time and provide a reliable basis for the reinforcement of the top arch 2 and the excavation plan of the lower part.
[0029] The above-mentioned specific implementation methods are used to explain the present invention and are only preferred embodiments of the present invention, rather than limiting the present invention. Within the spirit of the present invention and the protection scope of the claims, any modifications, equivalent substitutions, improvements, etc. made to the present invention shall fall within the protection scope of the present invention.
Claims
1. A complete system for treating cracks in a concrete spray layer of an underground powerhouse top arch, the complete system comprising a trolley (4), an array of anchor rods (3) on a top arch (2) of an underground powerhouse (1), and an active protection net (8); The top arch (2) is provided with a sprayed concrete layer (7) and anchor rods (3), an active protection net (8) is provided below the top arch (2), and the active protection net (8) is fixed to the ends of the anchor rods (3) located inside the top arch (2) so that the arrayed anchor rods (3) divide the entire active protection net (8) to form a plurality of active protection net (8) units; Tracks (5) are laid on the side walls of the underground factory building (1), and a trolley (4) is set up between the two side tracks (5). The trolley (4) is used to regularly check the cracking of the sprayed concrete layer (7) of the top arch (2), to clean the warping of the sprayed concrete layer (7) of the top arch (2), or to clean the concrete blocks in the active protection net (8).
2. The complete system for treating cracks in the underground powerhouse arch concrete spraying layer according to claim 1 is characterized by: The active protection net (8) is provided with a double-layer net, which comprises an inner steel wire rope net (81) and an outer steel wire grille (82). The outer steel wire grille (82) is fixed to the end of the anchor rod (3) via bolts (9).
3. The complete system for treating cracks in the underground powerhouse arch concrete spraying layer according to claim 1 is characterized by: Guardrails (6) are arranged around the trolley (4).