Safety guardrail for building construction
By using a combined structure of connectors, slots, connecting rods, springs, lock tongues and fasteners in construction safety guardrails, rapid installation and disassembly is achieved, solving the problems of long installation time and inconvenient disassembly in the existing technology. , improve work efficiency and enhance the night warning effect.
Patent Information
- Application Number
- CN202420272619.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-04
AI Technical Summary
Existing building construction safety guardrails take a long time to install during splicing and are inconvenient to disassemble later. They lack the convenience of quick installation and disassembly.
It adopts a combined structure of connectors, slots, connecting rods, springs, lock tongues and fasteners, and realizes quick installation through the use of multiple sets of connecting shafts and lock tongues, and quick disassembly through the use of handles and covers. , and at the same time, a warning light is installed at the bottom of the connecting column to improve visibility at night.
It improves the installation speed and convenience of guardrails, simplifies the operation process, improves work efficiency, and enhances the warning effect at night.
Smart Images

Figure CN221879060U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of safety guardrails, and more specifically, particularly relates to a building construction safety guardrail. Background Art
[0002] During the construction process, protective fences are usually built around the building, mainly to separate the construction area from people’s normal living area, to prevent building materials from sliding and injuring construction workers, thereby enhancing construction safety.
[0003] In the prior art, construction safety guardrails are usually used in a splicing combination mode to facilitate disassembly, transportation and reuse. When splicing, the existing safety guardrails are generally combined by a connection mode of multiple sets of bolts and nuts on the connection side, which takes a long time to install and is not convenient for later disassembly. Therefore, in view of this, the existing structure and defects are studied and improved to provide a construction safety guardrail, in order to achieve a more practical purpose. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a construction safety guardrail, which is achieved by the following specific technical means:
[0005] A construction safety guardrail comprises a guardrail and a connecting column, wherein both ends of the left and right sides of the guardrail are provided with connecting heads, and the left and right sides of the connecting column are provided with two groups of slots matching the connecting heads; a connecting rod is vertically slidably installed inside the connecting column, and the connecting column is provided with chamber two and chamber three at the upper and lower ends close to the connecting rod respectively, and the connecting rod is horizontally provided with a connecting shaft on both sides close to chamber two and chamber three, and a locking tongue is installed at one end of the connecting shaft, and a locking groove that can be locked with the locking tongue is provided on the top side of the connecting head; the connecting rod is provided with a spring inside chamber two and chamber three, and the bottom end of the spring is set against the connecting shaft; the bottom end of the connecting column is provided with an operating cavity, and the bottom end of the connecting rod is arranged inside the operating cavity and is connected to a handle.
[0006] Furthermore, a mounting plate is mounted on the top of the connecting column via a fastener, and a through hole is provided on the top of the mounting plate for the connecting rod to pass through.
[0007] Furthermore, a warning light is fixedly mounted on the top of the mounting plate, and a cavity 1 for avoiding the connecting rod is provided on the bottom side of the warning light.
[0008] Furthermore, one end of the slot is connected to the second chamber and the third chamber respectively.
[0009] Furthermore, the bottom end of the connecting column is provided with an opening communicating with the operating cavity, and a cover plate is installed on the inner side of the opening.
[0010] Furthermore, a base is provided at the bottom end of the connecting column, and a plurality of through holes for installing fasteners are provided at the edge of the base.
[0011] Furthermore, a driving inclined surface is arranged on the bottom end of the locking tongue on the side facing the slot.
[0012] Compared with the prior art, the utility model has the following beneficial effects:
[0013] In the utility model, through the coordinated use of multiple groups of connecting shafts and multiple groups of locking tongues as well as connecting rods and springs, the guardrail can be quickly installed and stabilized, thereby improving the installation speed and convenience. At the same time, it is easy to disassemble after the construction is completed. This structure is simple to set up, improves work efficiency, and has high practicality.
[0014] The utility model provides a warning light to make the guardrail more conspicuous at night and provide a better warning effect; through the coordinated use of the connecting rod, the handle and the cover plate, the staff can manually lift the connecting rod through the handle, easily complete the disassembly, and facilitate work. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the structure of the guardrail and the connecting column of the utility model.
[0016] Figure 2 It is a schematic diagram of the slot structure of the connecting column of the utility model.
[0017] Figure 3 It is a schematic diagram of the cross-sectional structure of the utility model.
[0018] Figure 4 yes Figure 3 A magnified schematic diagram of area A in the middle.
[0019] Figure 5 yes Figure 3 Enlarged schematic diagram of area B in the middle.
[0020] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:
[0021] 1. Guardrail; 2. Connecting column; 3. Base; 4. Warning light; 5. Mounting plate; 6. Connecting rod; 7. Spring; 8. Connecting shaft; 9. Lock tongue; 10. Handle; 11. Chamber 1; 12. Chamber 2; 13. Chamber 3; 14. Cover plate. DETAILED DESCRIPTION
[0022] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0023] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] As attached Figure 1 To Attachment Figure 5 As shown:
[0026] The utility model provides a building construction safety guardrail, comprising a guardrail 1 and a connecting column 2, wherein both ends of the left and right sides of the guardrail 1 are provided with connecting heads, and the left and right sides of the connecting column 2 are provided with two groups of slots matching the connecting heads; a connecting rod 6 is vertically slidably installed inside the connecting column 2, and the connecting column 2 is respectively provided with a chamber 2 12 and a chamber 3 13 at the upper and lower ends close to the connecting rod 6, and the connecting rod 6 is horizontally provided with a connecting shaft 8 on both sides close to the chamber 2 12 and the chamber 3 13, and a locking tongue 9 is installed at one end of the connecting shaft 8, and a locking groove that can be locked with the locking tongue 9 is provided on the top side of the connecting head; the connecting rod 6 is provided with a spring 7 inside the chamber 2 12 and the chamber 3 13, and the bottom end of the spring 7 is arranged to abut against the connecting shaft 8; the bottom end of the connecting column 2 is provided with an operating cavity, and the bottom end of the connecting rod 6 is arranged inside the operating cavity and is connected with a handle 10.
[0027] The top end of the connecting column 2 is mounted with a mounting plate 5 via fasteners, and the top end of the mounting plate 5 is provided with a through hole for the connecting rod 6 to pass through.
[0028] The warning light 4 is fixedly mounted on the top of the mounting plate 5 , and a chamber 11 for avoiding the connecting rod 6 is provided on the bottom side of the warning light 4 .
[0029] One end of the slot is connected to the second chamber 12 and the third chamber 13 respectively, so that the connector of the guardrail 1 can be quickly clamped with the locking tongue 9 after being inserted.
[0030] The bottom end of the connecting column 2 is provided with an opening communicating with the operating cavity, and a cover plate 14 is installed on the inner side of the opening.
[0031] A base 3 is provided at the bottom end of the connecting column 2, and a plurality of through holes for installing fasteners are provided at the edge of the base 3.
[0032] Among them, the bottom end of the lock tongue 9 is provided with a driving bevel on the side facing the slot. Through the setting of the driving bevel, it is convenient to drive the lock tongue 9 upward by squeezing the driving bevel after the connecting head of the guardrail 1 is inserted, until the lock tongue 9 encounters the locking groove of the connecting head and pops out to perform quick connection and locking.
[0033] The working principle of this embodiment is as follows: first, when the guardrail 1 needs to be installed, the staff can align the connecting head of the guardrail 1 with the slot and squeeze it into the slot. When the lock tongue 9 is subjected to pressure, the lock tongue 9 drives the connecting shaft 8 to rise. At the same time, the connecting shaft 8 can drive the connecting rod 6 connected thereto to rise when it is lifted. During the lifting process, the connecting rod 6 will squeeze the spring 7. The connecting rod 6 drives multiple groups of connecting shafts 8 and lock tongues 9 to move upward in chambers 2 12 and 3 13 respectively. When the connecting head moves to a certain extent, the locking grooves at the top of the guardrail 1 are respectively engaged with the bottom ends of the lock tongues 9, and the spring 7 returns to its original state. , and fix the lock tongue 9 inside the groove, so that the installation is completed. This structure is simple to set up, easy to operate, and improves work efficiency. When the guardrail 1 needs to be disassembled, the cover plate 14 can be opened, and then the staff can lift the handle 10 to drive the connecting rod 6 to move upward. The upward movement of the connecting rod 6 can drive multiple groups of connecting shafts 8 and lock tongues 9 to run synchronously and disengage from the lock grooves on both sides of the guardrail 1, thereby completing rapid disassembly. This structure is convenient to use. Through the function of the warning light 4 at the top of the mounting plate 5, it can emit bright light at night and play a warning role, and the warning effect is better.
[0034] The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
Claims
1. A construction safety guardrail, comprising a guardrail (1) and a connecting column (2), Features: Both ends of the left and right sides of the guardrail (1) are provided with connectors, and both left and right sides of the connecting column (2) are provided with two groups of slots matching the connectors; a connecting rod (6) is vertically slidably mounted inside the connecting column (2), and the connecting column (2) is provided with chamber 2 (12) and chamber 3 (13) at the upper and lower ends close to the connecting rod (6), respectively; and the connecting rod (6) is horizontally provided with a connecting shaft ( 8), a locking tongue (9) is installed at one end of the connecting shaft (8), and a locking groove capable of locking with the locking tongue (9) is provided on the top side of the connecting head; the connecting rod (6) is provided with a spring (7) inside the second chamber (12) and the third chamber (13), and the bottom end of the spring (7) is arranged to abut against the connecting shaft (8); an operating cavity is provided at the bottom end of the connecting column (2), and the bottom end of the connecting rod (6) is arranged inside the operating cavity and is connected to a handle (10).
2. The construction safety guardrail as claimed in claim 1, Features: A mounting plate (5) is mounted on the top end of the connecting column (2) via a fastener, and a through hole is provided on the top end of the mounting plate (5) for the connecting rod (6) to pass through.
3. The construction safety guardrail as claimed in claim 2, Features: The warning light (4) is fixedly mounted on the top of the mounting plate (5), and a chamber (11) for avoiding the connecting rod (6) is provided on the bottom side of the warning light (4).
4. The construction safety guardrail as claimed in claim 1, Features: One end of the slot is connected to chamber two (12) and chamber three (13) respectively.
5. The construction safety guardrail as claimed in claim 1, Features: The bottom end of the connecting column (2) is provided with an opening communicating with the operating cavity, and a cover plate (14) is installed on the inner side of the opening.
6. The construction safety guardrail according to claim 1, Features: A base (3) is provided at the bottom end of the connecting column (2), and a plurality of groups of through holes for installing fasteners are provided at the edge of the base (3).