Protective device for hydraulic engineering construction site
By introducing a protective storage support device into the water conservancy project construction site protection device, and using the expansion storage component and the positioning component to realize the adjustable length and stable installation of the protective prompt net, the problems of inconvenient expansion and length adjustment of the existing device are solved, and the efficiency is improved. The practicality and convenience of the device.
Patent Information
- Application Number
- CN202420295748.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-18
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-18
AI Technical Summary
The existing protection devices at construction sites of water conservancy projects cannot be retracted, are inconvenient to carry, waste space, and are difficult to adjust the length of the guardrail, making installation difficult.
A device including a protective prompt net and a protective storage support device is designed. The adjustable length and convenient installation of the protective prompt net are realized by unfolding the storage component and the positioning component. The retraction and expansion of the protective prompt net are realized through the drive motor and roller group, and the positioning component rotates through the thread. The drill rod and the drilling screw position the drill rod into a locked position.
It realizes various length adjustments and stable installation of the protective prompt net, enhances the practicality and convenience of the device, and is suitable for protection work at different water conservancy project construction sites.
Smart Images

Figure CN221879061U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction site protection, in particular to a water conservancy engineering construction site protection device. Background Art
[0002] Water conservancy project construction is a discipline that studies the construction methods and management methods of water conservancy project construction. It is an important knowledge in water conservancy engineering majors, including diversion and interception project construction, blasting project construction, foundation treatment and foundation engineering construction.
[0003] The existing patent (public number: CN201920632411.0) discloses a construction protection device for a building project, including a column A and a column B arranged in parallel, the four sides of the column A are respectively provided with a wedge-shaped groove, and a protective plate A is installed at the connection between the column A and the column B, the two sides of the protective plate A are provided with a wedge-shaped strip, and the top of the protective plate A is provided with a placement groove, and the front side of the protective plate A is provided with a first slide groove. The utility model has a scientific and reasonable structure and is easy to operate. In the process of implementing this solution, the inventor found that the following problems exist in the prior art, which have not been well solved: the device cannot be retracted and extended when in use, which is not convenient to carry, and it causes a waste of space when not in use, and the device cannot easily adjust the length of the guardrail when working in different construction scenes, and there is a problem of difficulty in installation.
[0004] Therefore, those skilled in the art provide a water conservancy project construction site protection device to solve the problems raised in the above background technology. Utility Model Content
[0005] The purpose of the utility model is to provide a water conservancy project construction site protection device to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] A water conservancy project construction site protection device includes a protection warning net, with protection storage support devices installed at both ends of the protection warning net. The protection storage support device includes: an unfolding and storing component and a positioning component, and the inner side of the positioning component is installed on the outer side of the lower end of the unfolding and storing component.
[0008] As a further solution of the utility model, the unfolding and storing assembly includes: a first retractable cover shell, a second retractable cover shell, a first retracting shaft, a second retracting shaft and a first movable roller group, the upper end of the first movable roller group is installed on the lower end of the first retractable cover shell, the lower end of the second retractable cover shell is installed with the second movable roller group, the lower end of the first retracting shaft is installed with a first drive motor, the lower end of the second retracting shaft is installed with a second drive motor, the lower end of the second drive motor is installed at the lower end inside the second retractable cover shell, and the lower end of the first drive motor is fixedly installed at the lower end inside the first retractable cover shell.
[0009] As a further solution of the utility model, the positioning assembly includes: a rotating block, a threaded rotating rod, a fixed block and a threaded rotating groove, the threaded rotating groove is opened at the upper and lower ends of the fixed block, the upper end of the threaded rotating rod is fixedly installed at the lower end of the rotating block, the lower end of the threaded rotating rod is installed with a ground-drilling spiral positioning drill rod, and the threaded rotating rod is movably installed in the threaded rotating groove.
[0010] As a further solution of the utility model, the positioning assembly is provided with two groups, and the inner sides of the two groups of fixing blocks are respectively installed on the outer sides of the lower ends of the first retractable cover shell and the second retractable cover shell.
[0011] As a further solution of the utility model, the upper end of the second winding shaft can be rotatably mounted on the upper end of the second retractable cover shell, and the upper end of the first winding shaft can be rotatably mounted on the upper end of the first retractable cover shell.
[0012] As a further solution of the utility model, a net outlet is opened on the inner side of the first retractable cover shell, and the net outlet is opened in two groups. The other group of net outlets is opened on the inner side of the second retractable cover shell, and the two ends of the protective warning net are respectively installed on the outer walls of the first winding shaft and the second winding shaft.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] By arranging a protective storage support device, after the protective reminder net is rolled up, the first retractable cover shell and the second retractable cover shell are completed and can be used for subsequent storage work. The device retracts the protective reminder net by unfolding the protective reminder net, thereby realizing the unfolding and installation of the protective reminder net, which effectively enhances the practicality of the entire device. The protective reminder net can be retracted into a variety of different lengths, and the length of the protective reminder net can be adjusted to be suitable for protective work on a variety of different water conservancy project construction sites. The unfolding storage component is simply assembled through two sets of positioning components for positioning and locking work, which not only enhances the stability of the entire device, but also further enhances the convenience of use of the entire device. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1It is a schematic diagram of the overall structure of a protective device for a water conservancy project construction site;
[0016] Figure 2 A schematic diagram of the structure of a protective storage support device for a water conservancy project construction site protective device;
[0017] Figure 3 A schematic diagram of the structure of an unfolding and storing component of a water conservancy project construction site protection device;
[0018] Figure 4 The present invention is a schematic diagram of the structure of a positioning component of a protective device for a water conservancy project construction site.
[0019] In the figure: 1. protection warning net; 2. protection storage support device; 21. unfolding storage assembly; 211. first retractable cover shell; 212. first movable roller group; 213. first drive motor; 214. first winding shaft; 215. net outlet; 216. second retractable cover shell; 217. second winding shaft; 218. second drive motor; 219. second movable roller group; 22. positioning assembly; 221. threaded rotating rod; 222. rotating block; 223. fixed block; 224. threaded rotating groove; 225. ground drilling spiral positioning drill rod. DETAILED DESCRIPTION
[0020] See also Figures 1-2 In an embodiment of the utility model, a water conservancy project construction site protection device includes a protection reminder net 1, and protection storage support devices 2 are installed at both ends of the protection reminder net 1. The protection storage support device 2 includes: an unfolding storage component 21 and a positioning component 22. The inner side of the positioning component 22 is installed on the outer side of the lower end of the unfolding storage component 21.
[0021] like Figure 3As shown, the unfolding and storing assembly 21 includes: a first retractable housing 211, a second retractable housing 216, a first reel 214, a second reel 217 and a first movable roller group 212, the upper end of the first movable roller group 212 is mounted on the lower end of the first retractable housing 211, the lower end of the second retractable housing 216 is mounted with a second movable roller group 219, the lower end of the first retractable housing 214 is mounted with a first drive motor 213, the lower end of the second retractable housing 217 is mounted with a second drive motor 218, and the lower end of the second drive motor 218 is mounted on the second retractable housing 216. At the lower end of the interior, the lower end of the first driving motor 213 is fixedly mounted on the lower end of the interior of the first retractable cover shell 211, the upper end of the second retracting shaft 217 is rotatably mounted on the upper end of the interior of the second retractable cover shell 216, the upper end of the first retracting shaft 214 is rotatably mounted on the upper end of the interior of the first retractable cover shell 211, a net outlet 215 is opened on the inner side of the first retractable cover shell 211, two groups of net outlets 215 are opened, and the other group of net outlets 215 is opened on the inner side of the second retractable cover shell 216, and the two ends of the protective reminder net 1 are respectively mounted on the outer walls of the first retracting shaft 214 and the second retracting shaft 217.
[0022] like Figure 4As shown, the positioning assembly 22 includes: a rotating block 222, a threaded rotating rod 221, a fixed block 223 and a threaded rotating groove 224, the threaded rotating groove 224 is provided at the upper and lower ends of the fixed block 223, the upper end of the threaded rotating rod 221 is fixedly mounted on the lower end of the rotating block 222, the lower end of the threaded rotating rod 221 is mounted with a ground-drilling spiral positioning drill rod 225, the threaded rotating rod 221 is movably mounted in the threaded rotating groove 224, the positioning assembly 22 is provided with two groups, and the inner sides of the two groups of fixed blocks 223 are respectively mounted on the outer sides of the lower ends of the first retractable cover shell 211 and the second retractable cover shell 216; the device uses the first driving motor 213 to start first, and the first driving motor 213 drives the upper The first reel 214 installed at the end rotates to release the protective reminder net 1, and the protective reminder net 1 is extended to pull the second retractable cover shell 216, and the second retractable cover shell 216 is moved to the position where the other end needs to be placed. After the unwinding length of the protective reminder net 1 reaches the protective length required on site, the first drive motor 213 is turned off, and the first retractable cover shell 211 and the second retractable cover shell 216 are placed in fixed positions in sequence. The staff rotates the rotating block 222, and the rotating block 222 rotates to drive the threaded rotating rod 221 installed at the lower end to move up and down in the threaded rotating groove 224. After the threaded rotating rod 221 moves down in the threaded rotating groove 224, it drives the ground drilling spiral positioning drill rod 225 installed at the lower end. The ground-drilling spiral positioning drill rod 225 moves downward and drills into the ground, and can be locked with the ground after it moves downward and drills into the ground, so as to avoid the problem of displacement of the first retractable cover shell 211 and the second retractable cover shell 216 during use, and the component is easy to operate and can be disassembled by reverse rotation after use. After the ground-drilling spiral positioning drill rod 225 is moved out of the ground, the protection prompt net 1 can be stored. When the protection prompt net 1 needs to be stored, the second drive motor 218 can be started. After the second drive motor 218 is started, it drives the second winding shaft 217 at the upper end to rotate. After the second winding shaft 217 rotates, the protection prompt net 1 installed on the outer wall can be rotated and reeled. After the protective warning net 1 is rolled up, the first retractable cover shell 211 and the second retractable cover shell 216 are completed and can be used for subsequent storage work. The device retracts the protective warning net 1 by unfolding the protective warning net 1, thereby realizing the unfolding and installation of the protective warning net 1, which effectively enhances the practicability of the entire device. The protective warning net 1 can be retracted into a variety of different lengths, and the length of the protective warning net 1 can be adjusted to be suitable for protection work on a variety of different water conservancy project construction sites. The unfolding storage component 21 is simply assembled through two groups of positioning components 22 for positioning and locking work, which not only enhances the stability of the entire device, but also further enhances the convenience of use of the entire device.
[0023] The working principle of the utility model is as follows: the device starts the first driving motor 213 first, and after the first driving motor 213 is driven, the first winding shaft 214 installed at the upper end rotates to loosen the protective reminder net 1, and the protective reminder net 1 is extended to pull the second retractable cover shell 216, and the second retractable cover shell 216 is moved to the position where the other end needs to be placed. After the unwinding length of the protective reminder net 1 reaches the protective length required for use on site, the first driving motor 213 is turned off, and the first retractable cover shell 211 and the second retractable cover shell 216 are placed in fixed positions in sequence, and the staff rotates the rotating block 222, and the rotating block 222 rotates to drive the threaded rotating rod 221 installed at the lower end to move up and down in the threaded rotating groove 224, and the threaded rotating rod 221 moves down in the threaded rotating groove 224 and drives the ground drilling spiral positioning drill rod 225 installed at the lower end to move down. The drill is moved into the underground, and the ground-drilling spiral positioning drill rod 225 moves down and drills into the underground, and can be locked with the ground to avoid the problem of displacement of the first retractable cover shell 211 and the second retractable cover shell 216 during use. The component is easy to operate and can be disassembled by reverse rotation after use. After the ground-drilling spiral positioning drill rod 225 is moved out of the underground, the protection reminder net 1 can be stored. When the protection reminder net 1 needs to be stored, the second drive motor 218 can be started. After the second drive motor 218 is started, it drives the second winding shaft 217 at the upper end to rotate. After the second winding shaft 217 rotates, the protection reminder net 1 installed on the outer wall can be rotated and retracted. After the protection reminder net 1 is retracted, the first retractable cover shell 211 and the second retractable cover shell 216 are completed and can be used for subsequent storage.
[0024] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water conservancy project construction site protection device, comprising a protection warning net (1), Features: The protective reminder net (1) is provided with protective storage support devices (2) at both ends, and the protective storage support device (2) comprises: an unfolding and storing component (21) and a positioning component (22), wherein the inner side of the positioning component (22) is mounted on the outer side of the lower end of the unfolding and storing component (21); The unfolding and storing assembly (21) comprises: a first retractable cover shell (211), a second retractable cover shell (216), a first retracting shaft (214), a second retracting shaft (217) and a first movable roller group (212); the upper end of the first movable roller group (212) is mounted on the lower end of the first retractable cover shell (211); the lower end of the second retractable cover shell (216) is mounted with a second movable roller group (219); the lower end of the first retractable shaft (214) is mounted with a first driving motor (213); the lower end of the second retractable shaft (217) is mounted with a second driving motor (218); the lower end of the second driving motor (218) is mounted at the lower end inside the second retractable cover shell (216); and the lower end of the first driving motor (213) is fixedly mounted at the lower end inside the first retractable cover shell (211).
2. A water conservancy project construction site protection device according to claim 1, It is characterized in that The positioning assembly (22) comprises: a rotating block (222), a threaded rotating rod (221), a fixed block (223) and a threaded rotating groove (224); the threaded rotating groove (224) is provided at the upper and lower ends of the fixed block (223); the upper end of the threaded rotating rod (221) is fixedly mounted on the lower end of the rotating block (222); a ground-boring spiral positioning drill rod (225) is mounted on the lower end of the threaded rotating rod (221); and the threaded rotating rod (221) is movably mounted in the threaded rotating groove (224).
3. A water conservancy project construction site protection device according to claim 2, It is characterized in that The positioning assembly (22) is provided with two groups, and the inner sides of the two groups of fixing blocks (223) are respectively mounted on the outer sides of the lower ends of the first retractable cover shell (211) and the second retractable cover shell (216).
4. A water conservancy project construction site protection device according to claim 2, It is characterized in that The upper end of the second winding shaft (217) is rotatably mounted on the upper end inside the second retractable cover shell (216), and the upper end of the first winding shaft (214) is rotatably mounted on the upper end inside the first retractable cover shell (211).
5. A water conservancy project construction site protection device according to claim 2, It is characterized in that A net outlet (215) is provided on the inner side of the first retractable cover shell (211), and two groups of net outlets (215) are provided, with the other group of net outlets (215) being provided on the inner side of the second retractable cover shell (216), and the two ends of the protective warning net (1) are respectively mounted on the outer walls of the first reeling shaft (214) and the second reeling shaft (217).
