Track type concrete distributing device for tunnel secondary lining trolley

By designing the central pump tube rotation system and the telescopic casing system on the tunnel's secondary lining trolley, combined with the hydraulic system, non-destructive concrete pouring and efficient cleaning of the pump tubes are achieved, which solves the existing technology problems of large equipment maintenance and difficult cleaning. problems, improving construction efficiency and reducing costs.

CN221879413UActive Publication Date: 2024-10-22LUOYANG SANTIE ENGINEERING TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420635243.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2024-10-22
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

In the construction of underground projects such as tunnels and subways, the use of double-lined trolley concrete pump pipes results in heavy equipment maintenance, shortened service life, and difficulty in cleaning, affecting construction efficiency and costs.

Method used

A tunnel double-lining trolley track-type concrete distribution device is designed, which uses a central pump tube rotation system and a telescopic casing system to achieve non-destructive pouring and cleaning of concrete. It is combined with a hydraulic system to clean the pump tubes, reducing the difficulty and workload of cleaning. .

Benefits of technology

It reduces equipment maintenance and usage costs, improves construction efficiency, avoids clogging of pump tubes, and significantly reduces cleaning workload and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221879413U_ABST
    Figure CN221879413U_ABST
Patent Text Reader

Abstract

The utility model discloses a tunnel secondary lining trolley track type concrete distributing device which comprises a walking system, the walking system is arranged on the upper surface of a secondary lining trolley and walks in the length direction of the secondary lining trolley, feeding port pump pipes are symmetrically distributed on the two sides of the secondary lining trolley, the walking system is located between the feeding port pump pipes on the two sides, and the walking system is arranged on the upper surface of the secondary lining trolley and walks in the length direction of the secondary lining trolley. The central pump pipe rotating system is arranged at the upper end of the walking system, can rotate and is used for orderly pouring concrete conveyed by a concrete conveying pump into the feed port pump pipes on the two sides by changing the conveying direction; the telescopic sleeve system is connected with one end of the central pump pipe rotating system to realize communication with the feed inlet pump pipes on the two sides; the cleaning system is arranged at the upper end of the central pump pipe rotating system and used for cleaning the interior of the poured feed inlet pump pipe, the tunnel secondary lining trolley rail type concrete distributing device can clean the poured concrete pump pipe without damaging the concrete pump pipe, the maintenance cost is saved, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of tunnel construction, in particular to a track-type concrete placing device for a tunnel secondary lining trolley. Background Art

[0002] In the construction of underground projects such as tunnels and subways, secondary lining trolleys are used for secondary concrete lining. In order to ensure the construction quality, avoid the segregation of concrete, and avoid the appearance of honeycomb, interlayer, cracks, etc., dozens of pouring windows are set on the secondary lining trolley, and concrete is poured one window at a time from bottom to top, layer by layer, and section by section. This construction method makes the workload of moving and installing the concrete pump pipe of each window very large in each cycle of concrete lining construction, resulting in low construction efficiency and high labor intensity for workers.

[0003] In addition, after the concrete pouring near each pouring window of the formwork trolley is completed, the cleaning of the concrete in each pump pipe is very troublesome and the workload is large. At present, there are some similar products on the market, but they have the following two problems:

[0004] (1) Using the concrete pump pipe as a rotating shaft increases the maintenance of the equipment and even shortens the life of the equipment. We know that concrete has a strong wear effect on the pump pipe. When the pump pipe wall is worn thin or broken, the concrete placing machine cannot work normally; (2) There is no concrete pump pipe cleaning mechanism installed, so the concrete in the pump pipe cannot be cleaned in time, and the subsequent cleaning workload is large, and even the concrete pump pipe is wasted. Summary of the invention

[0005] The technical problem to be solved by the utility model is to overcome the existing defects and provide a tunnel secondary lining trolley track type concrete distribution device, which can clean the concrete pump pipe after pouring without damaging the concrete pump pipe, and can effectively solve the problems in the background technology.

[0006] To achieve the above purpose, the utility model provides the following technical solutions: a tunnel secondary lining trolley track type concrete placing device, comprising a secondary lining trolley and a walking system, the walking system is arranged at the upper end of the secondary lining trolley and travels along its length direction, the two sides of the secondary lining trolley are symmetrically distributed with feed inlet pump pipes, the walking system is located between the feed inlet pump pipes on both sides, and also includes:

[0007] The central pump pipe rotation system is arranged at the upper end of the walking system and can rotate itself to change the delivery direction of the concrete delivered by the concrete delivery pump and pour it into the inlet pump pipes on both sides in an orderly manner;

[0008] The telescopic sleeve system is connected to one end of the central pump pipe rotating system to achieve communication with the pump pipes at the feed inlets on both sides;

[0009] The cleaning system is arranged at the upper end of the central pump pipe rotating system and is used for cleaning the inside of the inlet pump pipe after pouring.

[0010] As a preferred technical solution of the utility model, the travel system includes tracks, a chassis, a rack, a connecting rod, a gear, a travel wheel and a hydraulic motor. The track is symmetrically arranged on the body surface of the second lining trolley, the chassis is arranged above the track, the travel wheel is arranged at the lower end of the chassis and rolls along the track, the connecting rod is fixed between the two tracks, a rack is arranged at the upper end of the connecting rod, the hydraulic motor is fixed at the lower end of the chassis, the gear is fixed at the output end of the hydraulic motor, and the gear is meshed with the rack.

[0011] As an optimal technical solution of the utility model, the central pump pipe rotation system includes a rotating shaft pipe, a hydraulic slewing bearing and a central pump pipe, the two ends of the central pump pipe are respectively connected with an inlet bend pipe and a discharge bend pipe, the inlet bend pipe is connected to the concrete feed hose, and central pump pipe support seats are symmetrically arranged at both ends of the outer side surface of the central pump pipe, the central pump pipe is rotatable in the central pump pipe support seat, the lower end of the central pump pipe support seat is connected to the chassis, the rotating shaft pipe is sleeved on the outer side surface of the central pump pipe and the two are coaxial, three rotating shaft pipe support seats are arranged on the outer side surface of the rotating shaft pipe, the rotating shaft pipe is rotatable in the rotating shaft pipe support seat, the lower end of the rotating shaft pipe support seat is connected to the chassis, the rotating shaft pipe support seat located in the middle position is connected to the hydraulic slewing bearing, and the hydraulic slewing bearing is sleeved on the outer side surface of the rotating shaft pipe.

[0012] As an optimal technical solution of the utility model, the cleaning system includes a hydraulic cylinder support, a cleaning hydraulic cylinder, a base, a cleaning joint pipe, an air and water inlet pipe, a cleaning pipe joint A, a cleaning hose and a cleaning pipe joint B. The hydraulic cylinder support is fixed to the outer side of the rotating shaft tube, the cleaning hydraulic cylinder is installed at the upper end of the hydraulic cylinder support, the base is fixed on the piston rod of the cleaning hydraulic cylinder, the cleaning joint pipe is fixed to the upper end of the base, there is a circular hole in the center of the upper flange of the cleaning joint pipe, one end of the air and water inlet pipe is fixed at the circular hole of the upper flange of the cleaning joint pipe, the cleaning pipe joint A is connected to the cleaning joint pipe through a pipe clamp, and the cleaning pipe joint A is connected to the cleaning pipe joint B through a cleaning hose.

[0013] As a preferred technical solution of the utility model, a through hole is arranged at the upper end of the hydraulic cylinder support, and a positioning rod is arranged at the lower end of the base, and the positioning rod passes through the through hole.

[0014] As a preferred technical solution of the utility model, the telescopic sleeve system includes a telescopic inner tube, a telescopic outer tube and a telescopic hydraulic cylinder, one end of the telescopic inner tube is connected to the discharge port elbow through a pipe clamp, the telescopic outer tube is slidably connected to the outer side surface of the telescopic inner tube, one side of the hydraulic cylinder support is sleeved on the outer side surface of the telescopic inner tube, the fixed end of the telescopic hydraulic cylinder is connected to the hydraulic cylinder support, and the telescopic end of the telescopic hydraulic cylinder is connected to the outer side surface of the telescopic outer tube.

[0015] Compared with the prior art, the beneficial effects of the utility model are as follows: the track-type concrete placing device for the second lining trolley of the tunnel is reasonably designed and compact in structure, and a pipe sleeve structure in which a central pump pipe and a rotating shaft pipe cooperate is used to realize the pouring operation of concrete, thereby reducing the use cost and maintenance workload and improving the construction efficiency; at the same time, a cleaning system is installed, thereby reducing the difficulty and workload of cleaning the pump pipe, avoiding the possibility of the pump pipe being blocked by concrete and reducing the cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the structure of the utility model;

[0017] Figure 2 for Figure 1 Left view of

[0018] Figure 3 Schematic diagram of the status of pouring concrete for the left window of the tunnel secondary lining trolley.

[0019] In the figure: 1 second lining trolley, 2 walking system, 21 track, 22 chassis, 23 rack, 24 connecting rod, 25 gear, 26 walking wheel, 27 hydraulic motor, 3 feed inlet pump pipe, 4 center pump pipe rotation system, 41 center pump pipe support seat, 42 shaft pipe support seat, 43 shaft pipe, 44 hydraulic slewing bearing, 45 center pump pipe, 46 feed inlet elbow, 47 discharge outlet elbow, 5 cleaning system, 51 hydraulic cylinder support, 52 cleaning hydraulic cylinder, 53 base, 54 cleaning joint pipe, 55 air and water inlet pipe, 56 cleaning pipe joint A, 57 cleaning hose, 58 cleaning pipe joint B, 59 positioning rod, 6 telescopic sleeve system, 61 telescopic inner pipe, 62 telescopic outer pipe, 63 telescopic hydraulic cylinder. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments (for the convenience of description and understanding, the following is a schematic diagram of the present invention). Figure 1 Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0021] See also Figure 1-3 The utility model provides a technical solution: a tunnel secondary lining trolley track type concrete placing device, comprising a secondary lining trolley 1 and a walking system 2, the walking system 2 is arranged at the upper end of the secondary lining trolley 1, and travels along its length direction, the two sides of the secondary lining trolley 1 are symmetrically distributed with feed inlet pump pipes 3, the walking system 2 is located between the feed inlet pump pipes 3 on both sides, the walking system 2 comprises a track 21, a chassis 22, a rack 23, a connecting rod 24, a gear 25, a walking wheel 26 and a hydraulic motor 27, the track 21 is symmetrically arranged on the body of the secondary lining trolley 1 The chassis 22 is arranged above the track 21, the travel wheel 26 is arranged at the lower end of the chassis 22 and rolls along the track 21, the connecting rod 24 is fixed between the two tracks 21, the upper end of the connecting rod 24 is provided with a rack 23, the hydraulic motor 27 is fixed at the lower end of the chassis 22, the gear 25 is fixed at the output end of the hydraulic motor 27, the gear 25 is meshed with the rack 23, the gear 25 is driven by the hydraulic motor 27 to move on the rack 23, and the travel wheel 26 rolls on the track 21, thereby driving the casting system to move;

[0022] The central pump pipe rotation system 4 includes a rotating shaft pipe 43, a hydraulic slewing bearing 44 and a central pump pipe 45. The two ends of the central pump pipe 45 are respectively connected with an inlet elbow 46 and an outlet elbow 47. The inlet elbow 46 is connected to the concrete feed hose. The two ends of the outer side of the central pump pipe 45 are symmetrically provided with a central pump pipe support seat 41. The central pump pipe 45 can rotate in the central pump pipe support seat 41. The lower end of the central pump pipe support seat 41 is connected to the chassis 22. The rotating shaft pipe 43 is sleeved on the outer side of the central pump pipe 45 and the two are coaxial. The rotating shaft pipe The outer side of 43 is provided with three rotating shaft tube support seats 42, the rotating shaft tube 43 can rotate in the rotating shaft tube support seat 42, the lower end of the rotating shaft tube support seat 42 is connected to the chassis 22, and the rotating shaft tube support seat 42 located in the middle position is connected to the hydraulic slewing support 44, and the hydraulic slewing support 44 is sleeved on the outer side of the rotating shaft tube 43. Under the rotation of the hydraulic slewing support 44, the central pump pipe 45 and the rotating shaft tube 43 are driven to rotate at the same time, and the concrete delivered by the concrete delivery pump is orderly poured into the inlet pump pipe 3 on both sides by changing the delivery direction;

[0023] The cleaning system 5 comprises a hydraulic cylinder support 51, a cleaning hydraulic cylinder 52, a base 53, a cleaning joint pipe 54, an air-water inlet pipe 55, a cleaning pipe joint A56, a cleaning hose 57 and a cleaning pipe joint B58. The hydraulic cylinder support 51 is fixed to the outer side surface of the rotating shaft tube 43, the cleaning hydraulic cylinder 52 is installed on the upper end of the hydraulic cylinder support 51, the base 53 is fixed on the piston rod of the cleaning hydraulic cylinder 52, the cleaning joint pipe 54 is fixed to the upper end of the base 53, a circular hole is provided at the center of the upper flange of the cleaning joint pipe 54, one end of the air-water inlet pipe 55 is fixed at the circular hole of the upper flange of the cleaning joint pipe 54, the cleaning pipe joint A56 is connected to the cleaning joint pipe 54 through a pipe clamp, the cleaning pipe joint A56 is connected to the cleaning pipe joint B58 through a cleaning hose 57, and a mixture of compressed air and water is sent through the air-water inlet pipe 55 to clean the inside of the poured feed inlet pump pipe 3;

[0024] The telescopic sleeve system 6 includes a telescopic inner tube 61, a telescopic outer tube 62 and a telescopic hydraulic cylinder 63. One end of the telescopic inner tube 61 is connected to the discharge port elbow 47 through a pipe clamp, the telescopic outer tube 62 is slidably connected to the outer side surface of the telescopic inner tube 61, one side of the hydraulic cylinder support 51 is sleeved on the outer side surface of the telescopic inner tube 61, the fixed end of the telescopic hydraulic cylinder 63 is connected to the hydraulic cylinder support 51, and the telescopic end of the telescopic hydraulic cylinder 63 is connected to the outer side surface of the telescopic outer tube 62. Under the action of the telescopic hydraulic cylinder 63, the telescopic outer tube 62 is driven to extend and connect to the feed port pump pipe 3. A pipe clamp is sleeved between the telescopic outer tube 62 and the feed port pump pipe 3 to prevent leakage.

[0025] Furthermore, a through hole is provided at the upper end of the hydraulic cylinder support 51 , and a positioning rod 59 is provided at the lower end of the base 53 . The positioning rod 59 passes through the through hole. The linearity of movement of the cleaning joint pipe 54 is ensured by providing the positioning rod 59 .

[0026] When in use: check and connect the circuit control system, start the hydraulic system, operate the control valve of the hydraulic motor 27, the gear 25 on the output shaft of the hydraulic motor 27 meshes with the rack 23, drives the entire concrete placing boom to move to one end of the track 21, and connects the concrete delivery pump pipe between the concrete pump and the concrete placing boom;

[0027] Operate the control valve of the hydraulic slewing bearing 44 to rotate the central pump pipe rotating system 4 and the telescopic sleeve system 6 to the left to a horizontal position, operate the control valve of the hydraulic motor 27 to move the entire material placing machine forward or backward, ensure that the axis of the telescopic outer tube 62 and the first feed inlet pump pipe 3 on the left are coaxial, operate the control valves of the two telescopic hydraulic cylinders 63 to extend the piston rods of the two telescopic hydraulic cylinders 63 synchronously, push the telescopic outer tube 62 to move to the left, until the telescopic outer tube 62 contacts the first feed inlet pump pipe 3 on the left, and then use a pipe clamp to firmly connect the telescopic outer tube 62 and the first feed inlet pump pipe 3 on the left;

[0028] Start the concrete delivery pump and begin to pump concrete to the first pouring window on the left until the amount of concrete required for this window is reached, then stop the concrete pumping operation, remove the connecting pipe clamp between the left feed inlet pump pipe 3 and the telescopic outer pipe 62, operate the control valves of the two telescopic hydraulic cylinders 63, retract the two piston rods, drive the telescopic outer pipe 62 to retract, start the control valve of the hydraulic slewing bearing 44, rotate the central pump pipe rotation system 4 and the telescopic sleeve system 6 to the right, until the telescopic sleeve system 6 rotates 180° to a horizontal position, operate the control valve of the hydraulic motor 27, and make the entire The concrete placing machine moves forward or backward, ensuring that the axis of the telescopic outer tube 62 and the first feed inlet pump pipe 3 on the right are coaxial, and operating the control valves of the two telescopic hydraulic cylinders 63 to make the piston rods of the two telescopic hydraulic cylinders 63 extend synchronously, pushing the telescopic outer tube 62 to the right until the telescopic outer tube 62 contacts the first feed inlet pump pipe 3 on the right, and then firmly connecting the telescopic outer tube 62 and the first feed inlet pump pipe 3 on the right with a pipe clamp, starting the concrete delivery pump, and starting to pump concrete to the first pouring window on the right, until the amount of concrete required for this window is reached, then stopping the concrete delivery pump operation.

[0029] While pumping concrete to the right pouring window, connect the cleaning pipe joint B58 and the first feed inlet pump pipe 3 on the left with a pipe clamp, and start to feed a mixture of compressed air and water through the air-water inlet pipe 55 to clean the concrete pump pipe of the first pouring window on the left. Repeat the above operation, alternately pouring concrete and cleaning the pump pipes of the pouring windows on the left and right sides, until the concrete on both sides of the second lining trolley is completely poured.

[0030] The utility model adopts a set structure of a central pump pipe 45 and a rotating shaft pipe 43, which reduces the use cost and maintenance workload; the installation of a cleaning system 5 reduces the difficulty and workload of cleaning the pump pipe, avoids the possibility of the pump pipe being blocked by concrete, reduces costs, and improves construction efficiency.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A tunnel secondary lining trolley track type concrete placing device, comprising a walking system (2), the walking system (2) being arranged at the upper end of the secondary lining trolley (1) and moving along the length direction thereof, the secondary lining trolley (1) being symmetrically provided with feed inlet pump pipes (3) on both sides, the walking system (2) being located between the feed inlet pump pipes (3) on both sides, Features: Also includes: The central pump pipe rotating system (4) is arranged at the upper end of the walking system (2) and can rotate itself, and is used to change the conveying direction of the concrete delivered by the concrete delivery pump and pour it into the inlet pump pipes (3) on both sides in an orderly manner; The telescopic sleeve system (6) is connected to one end of the central pump pipe rotating system (4) to achieve communication with the feed inlet pump pipes (3) on both sides; The cleaning system (5) is arranged at the upper end of the central pump pipe rotating system (4) and is used to clean the inside of the inlet pump pipe (3) after casting.

2. A tunnel secondary lining trolley track type concrete placing device according to claim 1, Features: The travel system (2) comprises a track (21), a chassis (22), a rack (23), a connecting rod (24), a gear (25), a travel wheel (26) and a hydraulic motor (27); the track (21) is symmetrically arranged on the body surface of the second lining trolley (1); the chassis (22) is arranged above the track (21); the travel wheel (26) is arranged at the lower end of the chassis (22) and rolls along the track (21); the connecting rod (24) is fixed between the two tracks (21); the upper end of the connecting rod (24) is provided with a rack (23); the hydraulic motor (27) is fixed at the lower end of the chassis (22); the gear (25) is fixed at the output end of the hydraulic motor (27); and the gear (25) is meshed with the rack (23).

3. A tunnel secondary lining trolley track type concrete placing device according to claim 2, Features: The central pump pipe rotation system (4) comprises a rotating shaft pipe (43), a hydraulic slewing bearing (44) and a central pump pipe (45). The two ends of the central pump pipe (45) are respectively connected to an inlet elbow pipe (46) and an outlet elbow pipe (47). The inlet elbow pipe (46) is connected to a concrete feed hose. Central pump pipe support seats (41) are symmetrically arranged at both ends of the outer side surface of the central pump pipe (45). The central pump pipe (45) is rotatable in the central pump pipe support seat (41). The lower end of the central pump pipe support seat (41) is The end is connected to the chassis (22), the rotating shaft tube (43) is sleeved on the outer side of the central pump tube (45) and the two are coaxial, the outer side of the rotating shaft tube (43) is provided with three rotating shaft tube support seats (42), the rotating shaft tube (43) is rotatable in the rotating shaft tube support seat (42), the lower end of the rotating shaft tube support seat (42) is connected to the chassis (22), the rotating shaft tube support seat (42) located in the middle position is connected to the hydraulic slewing bearing (44), and the hydraulic slewing bearing (44) is sleeved on the outer side of the rotating shaft tube (43).

4. A tunnel secondary lining trolley track type concrete placing device according to claim 3, Features: The cleaning system (5) comprises a hydraulic cylinder support (51), a cleaning hydraulic cylinder (52), a base (53), a cleaning joint pipe (54), an air and water inlet pipe (55), a cleaning pipe joint A (56), a cleaning hose (57) and a cleaning pipe joint B (58). The hydraulic cylinder support (51) is fixed to the outer side surface of the rotating shaft tube (43), the cleaning hydraulic cylinder (52) is installed on the upper end of the hydraulic cylinder support (51), the base (53) is fixed on the piston rod of the cleaning hydraulic cylinder (52), the cleaning joint pipe (54) is fixed to the upper end of the base (53), a circular hole is provided at the center of the upper flange of the cleaning joint pipe (54), one end of the air and water inlet pipe (55) is fixed to the circular hole of the upper flange of the cleaning joint pipe (54), the cleaning pipe joint A (56) is connected to the cleaning joint pipe (54) through a pipe clamp, and the cleaning pipe joint A (56) is connected to the cleaning pipe joint B (58) through a cleaning hose (57).

5. A tunnel secondary lining trolley track type concrete placing device according to claim 4, Features: The upper end of the hydraulic cylinder support (51) is provided with a through hole, and the lower end of the base (53) is provided with a positioning rod (59), and the positioning rod (59) passes through the through hole.

6. A track-type concrete placing device for a tunnel secondary lining trolley according to claim 4, Features: The telescopic sleeve system (6) comprises a telescopic inner tube (61), a telescopic outer tube (62) and a telescopic hydraulic cylinder (63); one end of the telescopic inner tube (61) is connected to the discharge port elbow (47) through a pipe clamp; the telescopic outer tube (62) is slidably connected to the outer side surface of the telescopic inner tube (61); one side of the hydraulic cylinder support (51) is sleeved on the outer side surface of the telescopic inner tube (61); the fixed end of the telescopic hydraulic cylinder (63) is connected to the hydraulic cylinder support (51); and the telescopic end of the telescopic hydraulic cylinder (63) is connected to the outer side surface of the telescopic outer tube (62).