Intelligent environment-friendly energy-saving cremation machine system
By adopting double sealing structure, multi-hole design and urea injection technology in the cremator, the problems of uneven temperature, poor sealing, high energy consumption and pollutant emission of the cremator are solved, and an efficient and environmentally friendly cremation process is achieved.
Patent Information
- Application Number
- CN202420136554.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-01-19
AI Technical Summary
Existing cremators have problems such as uneven temperature field in the main combustion chamber, poor sealing effect, high energy consumption, insufficient automatic control of pressure and temperature, high nitrogen oxide content in flue gas, and insufficient flue gas residence time in the secondary combustion chamber.
An intelligent, environmentally friendly and energy-saving cremator system is designed, which adopts a double-sealing structure of the kang bed support edge and a temperature-resistant sealing curtain, adds side-wind and top-wind combustion-supporting air holes, sets high-pressure air holes and a preheater, and optimizes the structure of the secondary combustion chamber. , using a urea spray gun to carry out SNCR denitration reaction, and realizing automatic control through measurement and control instruments.
It improves the sealing and incineration efficiency of the main combustion chamber, reduces energy consumption, ensures full combustion of flue gas and reduction of pollutants, reduces the overall size of the cremator, and achieves stable performance and cost savings.
Smart Images

Figure CN221881466U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of cremation equipment, and in particular relates to an intelligent, environmentally friendly and energy-saving crematorium system. Background Art
[0002] A cremator is a device used to cremate remains. Traditional cremators consist of a primary combustion chamber and a secondary combustion chamber, housed within a steel structure. The combustion chambers are primarily constructed of refractory bricks of varying shapes, with the secondary combustion chambers located below, above, or to the side of the primary chamber. With the aging population in my country and the increasing cremation rate, the number of cremation services performed by cremators in funeral homes is increasing, and the market demand for cremators in my country is expected to continue to grow.
[0003] The main foreign crematorium manufacturers include Facultatieve Technology (UK), DFWEurope (Netherlands), Vezzani (Italy), and B&L Cremation System (USA). Based on the performance analysis of cremators from various countries, the length, width, and height of the main combustion chamber of foreign cremators are generally in the range of 2400-2600mm, 900-1200mm, and 800-1000mm, respectively. The volume of the main combustion chamber is approximately 2-3m 3 The volumetric heat load and cross-sectional heat load of the main combustion chamber are 70-170kW / m 3 and 150~400kW / m 2 Domestic crematorium manufacturers mainly include Fushouyuan Environmental Protection Machinery Manufacturing Co., Ltd. and Weihai Hangtai Environmental Protection Equipment Co., Ltd. Compared with the performance parameters of foreign crematoriums, domestic crematoriums are generally smaller in size and have a relatively higher heat load. This is mainly due to the generally shorter cremation time of domestic crematoriums. By increasing the combustion heat load and combustion heat intensity of the furnace, the body's incineration rate can be accelerated and the cremation time can be shortened.
[0004] However, there are still many common problems in the operation of existing cremators. For example, the temperature field in the main combustion chamber is uneven, which leads to high energy consumption during the cremation process; the sealing effect of the main combustion chamber is poor; the secondary combustion chamber is generally small, and the flue gas residence time is insufficient, making it difficult to ensure that dioxins and carbon monoxide emissions meet the standards. However, in order to ensure the residence time in the secondary combustion chamber, the overall size of the crematorium is often greatly increased; and the pressure and temperature in the furnace are not under automatic control.
[0005] Therefore, it is urgent to carry out the research and development of intelligent and environmentally friendly crematorium projects and develop new crematorium equipment that integrates intelligence, environmental protection, economy, efficiency and safety. Utility Model Content
[0006] The purpose of this utility model is to overcome the deficiencies in the prior art and provide an intelligent, environmentally friendly and energy-saving cremator system and cremation method thereof, which integrates intelligence, environmental protection, economy, high efficiency and safety, and has the advantages of simplicity and reliability, stable performance, low investment, operating costs and energy consumption.
[0007] The technical solutions provided by this utility model are as follows:
[0008] An intelligent, environmentally friendly, and energy-saving cremator system includes a crematorium, and an air supply system and a fuel supply system provided in conjunction with the crematorium, wherein:
[0009] The crematorium comprises a main combustion chamber and a secondary combustion chamber arranged in a left-right structure and connected as a whole, the main combustion chamber comprising a furnace, a furnace door arranged on the front wall of the furnace, and a burner a arranged on the rear wall of the furnace, a plurality of top wind combustion-supporting air holes a are provided on the top of the furnace, and a plurality of side wind combustion-supporting air holes are provided on the left and right side walls; a kang bed support edge is provided inwardly at the bottom edge of the furnace, and a transportable kang bed is placed on the top;
[0010] The secondary combustion chamber includes a mixing chamber, a combustion chamber and a tail combustion section that are connected in sequence. A number of flue gas channels are opened on the connecting wall of the mixing chamber and the main combustion chamber, which are used to connect the main combustion chamber and the secondary combustion chamber. A number of top wind combustion holes b are provided on the top of the mixing chamber; the combustion chamber is located below the mixing chamber, and a burner b is provided on the rear wall of the combustion chamber; the tail combustion section is located on the front side of the mixing chamber and the combustion chamber, and includes a tail combustion front section and a tail combustion rear section. The outlet end of the tail combustion rear section is the smoke exhaust port of the crematorium, and the wall of the tail combustion rear section is provided with a burner c.
[0011] The air supply system includes a burner fan and a combustion-supporting fan. The burner fan is connected to the burner a, burner b, and burner c respectively through the burner air bag and several burner air supply pipelines in sequence to provide the required air for burner combustion; the combustion-supporting fan is connected to the top wind combustion-supporting air hole a, top wind combustion-supporting air hole b, and side wind combustion-supporting air hole respectively through the combustion-supporting air bag and several combustion-supporting air supply pipelines to provide combustion-supporting air to the main combustion chamber and the secondary combustion chamber.
[0012] The fuel supply system includes a main fuel / gas pipeline, and branch fuel / gas pipelines connected to the main fuel / gas pipeline and respectively connected to the burner a, burner b, and burner c. Each branch fuel / gas pipeline is provided in parallel with a burner ignition fuel / gas pipeline connected to the burner a, burner b, and burner c.
[0013] The present invention is further configured such that the crematorium system further includes a kang bed transfer system, a cooling system, and a monitoring system that are matched with the crematorium, wherein:
[0014] The kang bed transfer system includes a track and a traveling trolley moving along the track, as well as a servo motor and a lifting, forward and backward mechanism for driving and controlling the movement of the traveling trolley.
[0015] The cooling system includes a manipulator, an air collecting hood arranged on the kang bed, and a filter and a cooling fan which are sequentially connected to the air collecting hood.
[0016] The monitoring system includes transfer vehicle monitoring, furnace door monitoring, remains cooling monitoring, exhaust gas emission chimney monitoring, and furnace monitoring arranged in the main combustion chamber furnace. The furnace monitoring is preferably a retractable TV monitoring lens, which is arranged on the rear wall of the main combustion chamber furnace.
[0017] The utility model is further configured such that the length of the main combustion chamber furnace is 2.0 to 2.5 m, the width is 0.7 to 0.9 m, the height is 0.9 to 1.2 m, and the volume is 1.26 to 2.7 m. 3 The burner power range is 211~515KW, and the volume load is about 167.5~190.7KW / m 3 .
[0018] The utility model is further configured such that the furnace door is connected to the front wall of the main combustion chamber furnace by a hinge, and a sealing ring is provided on the inside of the furnace door, preferably a graphite packing sealing ring; a steel furnace door frame is installed on the outside of the front wall of the main combustion chamber furnace, and the furnace door is also hoisted on the steel furnace door frame, which is beneficial to improve the stability of the device and facilitates operation.
[0019] The present invention is further configured as follows: the kang bed support edge is preferably arranged at the left and right side walls and rear wall edges of the bottom of the main combustion chamber furnace; the upper surface of the kang bed support edge is provided with a sealing gasket, preferably a graphite packing sealing gasket, and when the kang bed is dropped onto the kang bed support edge through transportation, the sealing gasket is pressed and sealed by its own gravity; a sand seal steel groove is welded on the inner side of the kang bed support edge, and fine sand is arranged in the sand seal steel groove. A sand knife corresponding to the position of the sand seal steel groove is installed at the bottom of the kang bed, and the sand knife is inserted into the sand seal steel groove to form a sand seal, which plays a role of secondary sealing, improves the sealing of the bottom of the main combustion chamber furnace, and ensures that the incineration flue gas does not leak out. It can solve the problems of poor sealing effect of the main combustion chamber of the existing crematorium, air leakage and ash leakage of the kang bed, ensure the furnace temperature, reduce energy consumption, and improve the operating environment.
[0020] Furthermore, a heat-resistant sealing curtain is provided under the furnace of the main combustion chamber. When the cremation is completed and the kang bed is transferred out of the main combustion chamber, in order to save energy, the heat-resistant sealing curtain is used to seal the space left at the bottom of the furnace after the kang bed is moved out.
[0021] The utility model is further configured such that the burner a is disposed at the lower portion of the rear wall of the primary combustion chamber and is inserted downwardly into the rear wall at an angle of 15° to 25° from the horizontal, with the specific insertion angle being adjustable to facilitate sufficient combustion in the primary combustion chamber. The burner b is disposed at the lower portion of the rear wall of the secondary combustion chamber and is inserted horizontally into the combustion chamber to re-burn the incineration flue gas, thereby eliminating smoke and reducing the generation of CO and organic pollutants (VOCs).
[0022] The present invention is further configured such that the cross-section of the tail combustion section of the secondary combustion chamber is circular or square, the front section of the tail combustion is a structure of low-carbide silicon low-porosity clay brickwork with external insulation, and the rear section of the tail combustion is a structure of stainless steel internal insulation, that is, the rear section of the tail combustion with the burner c is arranged in the outlet flue part of the crematorium, ensuring that the residence time of the flue gas in the secondary combustion chamber is not less than 2s, reducing the generation of the incineration pollutants dioxins and organic pollutants VOCs while significantly reducing the overall size of the crematorium, reducing the occupied space, and the structure is more flexible and convenient for arrangement.
[0023] The utility model is further configured such that a urea spray gun is provided on the wall of the air mixing chamber of the secondary combustion chamber, the urea spray gun is connected to a urea solution pipeline and an air compressor, the urea solution is atomized by compressed air and then sprayed into the air mixing chamber through the urea spray gun, the suitable temperature field of the high-temperature flue gas in the secondary combustion chamber is utilized to pyrolyze the urea solution to produce ammonia to inhibit the formation of dioxins, and at the same time, the SNCR denitrification reaction is carried out to reduce the content of nitrogen oxides in the flue gas at the outlet of the crematorium.
[0024] The present invention is further configured such that the side wind combustion-supporting air holes provided in the furnace of the main combustion chamber are preferably arranged in two rows, one above the other, and symmetrically arranged on the left and right side walls, with 5 to 20 holes provided in each row, and the aperture range of each side wind combustion-supporting air hole is 6 to 10 mm, all of which are downwardly directed at an angle of 10° to 30° to the horizontal direction, so as to deliver the combustion-supporting air from the left and right side walls into the furnace of the main combustion chamber 1. The top wind combustion-supporting air holes a and top wind combustion-supporting air holes b are preferably arranged in a row, with a number of 5 to 20 holes, and the aperture range of each top wind combustion-supporting air hole a and top wind combustion-supporting air hole b is 15 to 35 mm, so as to deliver the combustion-supporting air from the top into the furnace of the main combustion chamber and the mixed air chamber of the secondary combustion chamber.
[0025] Furthermore, a number of high-pressure air holes are provided on the top of the main combustion chamber furnace, which are connected to the air compressor through a high-pressure air pipe. In the later stage of cremation, the air compressor provides high-pressure air to the furnace, and performs high-pressure incineration on the parts that are difficult to incinerate, so as to improve the incineration efficiency and reduce energy consumption.
[0026] The present invention is further configured such that the air supply system also includes a top wind preheater a and a top wind preheater b arranged on the outer wall of the flue of the tail combustion section of the secondary combustion chamber, both ends of which are connected to the combustion air bag and the top wind combustion air hole a and the top wind combustion air hole b through air supply pipelines, and are used to utilize the radiation heat of the high-temperature flue gas in the tail combustion section of the secondary combustion chamber to preheat the combustion air and distribute it through the air supply pipeline, and then send it into the main combustion chamber and the secondary combustion chamber through each top wind combustion air hole.
[0027] Furthermore, the air supply system also includes a side wind preheater arranged on the top and outer side wall of the main combustion chamber, and its two ends are respectively connected to the combustion air bag and the side wind combustion air holes through air supply pipelines, and is used to utilize the radiation heat of the top wall and side wall of the main combustion chamber to preheat the combustion air and distribute it through the air supply pipeline, and then send it into the main combustion chamber through each side wind combustion air hole.
[0028] Preferably, two groups of side wind preheaters are provided, one group corresponding to the side wind combustion-supporting air holes on the outer wall of the crematorium, and the other group corresponding to the side wind combustion-supporting air holes buried in the inner wall connecting the main combustion chamber and the secondary combustion chamber, providing preheated combustion-supporting air to the main combustion chamber through the left and right sides.
[0029] The present invention is further configured such that the crematorium system is further provided with a number of measuring and controlling instruments for monitoring and regulating parameters such as temperature, pressure, and oxygen content during the cremation process, wherein:
[0030] An oxygen content analyzer a and a thermocouple a are installed at the top of the flue gas passage. These are inserted into the connecting passage from the primary combustion chamber to the secondary combustion chamber. These analyzers are used to measure the oxygen content and flue gas temperature in the primary combustion chamber. These analyzers automatically adjust the amount of fuel required by the burner a and the amount of combustion-supporting air in the primary combustion chamber through an interlocking mechanism. Preferably, two thermocouples a are provided.
[0031] An oxygen content analyzer b and a thermocouple b are provided on the front wall of the tail combustion section of the secondary combustion chamber, which are horizontally inserted into the chamber of the tail combustion section to measure the oxygen content and flue gas temperature of the combustion flue gas in the secondary combustion chamber, and automatically adjust and control the amount of fuel required for burners b and burner c and the amount of combustion-supporting air in the secondary combustion chamber through interlocking.
[0032] A pressure gauge is set on the rear wall of the main combustion chamber furnace to measure the pressure in the main combustion chamber. The frequency of the variable frequency induced draft fan connected to the smoke exhaust port of the crematorium is interlocked to ensure that the pressure in the crematorium is controlled at a slightly negative pressure working condition of -30 to -10Pa to prevent smoke leakage from the crematorium and ensure that all smoke is sent to the exhaust gas treatment system for treatment.
[0033] Furthermore, an observation door is provided between the main combustion chamber door and the lower portion of the furnace rear wall. The observation door is provided with an observation hole for manually observing the flame and combustion conditions during incineration. For remote operation, the incineration conditions in the main combustion chamber furnace can be observed in conjunction with the furnace monitoring.
[0034] The present invention further provides that the main body of the crematorium is constructed of low-carbon silicon, low-porosity clay bricks combined with castables. The exterior walls and roof of the crematorium are insulated with aluminum silicate insulation, with a thickness of 50 to 150 mm. The door frame, arch, arch and floor of the air mixing chamber, side wind combustion-supporting air holes, mounting holes for the urea spray gun, mounting holes for burners a, b, and c, and observation holes are all paved with castables. The flue gas duct and kang bed support edge are constructed of mullite castables, which are characterized by high temperature resistance, corrosion resistance, and high strength, and are suitable for temperatures up to 1680°C.
[0035] Compared with the prior art, the beneficial effects of the present invention are:
[0036] (1) The utility model solves the main problems of current cremators, namely, uneven temperature field in the main combustion chamber, poor sealing effect, high energy consumption, insufficient automatic control of pressure and temperature, high nitrogen oxides in the flue gas, and insufficient residence time of the flue gas in the secondary combustion chamber. The intelligent, environmentally friendly and energy-saving cremator system is simple and reliable, with stable performance and low investment, operation cost and energy consumption.
[0037] (2) The kang bed of the main combustion chamber of the utility model adopts a double sealing structure, which is sealed by a sealing gasket and a sand sealing method. A sand sealing groove is set in the main combustion chamber. The sand sealing increases the sealing of the main combustion chamber, thereby solving the problems of poor sealing effect of the main combustion chamber of the existing crematorium and air leakage and ash leakage of the kang bed. It ensures the furnace temperature, reduces energy consumption, and improves the operating environment. In addition, the heat-resistant sealing curtain set under the kang bed can seal the space left by the kang bed after it is moved out of the main combustion chamber, further saving energy.
[0038] (3) The utility model sets a plurality of side wind combustion-supporting air holes which are symmetrical on the left and right sides on the furnace of the main combustion chamber, and sets a plurality of top wind combustion-supporting air holes on the top of the furnaces of the main combustion chamber and the secondary combustion chamber, thereby increasing the opening density of the combustion-supporting air and reducing the diameter of the combustion-supporting air hole, which is beneficial to the air volume distribution in the main combustion chamber and the uniform distribution of the flue gas flow field, increasing the residence time of the flue gas in the main combustion chamber, ensuring the incineration effect, and being beneficial to the mixed air in the secondary combustion chamber, so that the furnace air is evenly distributed, ensuring sufficient incineration and further reducing the amount of incineration pollutants generated.
[0039] Moreover, the utility model sets a number of high-pressure air holes on the top wall of the main combustion chamber, which introduce high-pressure air into the main combustion chamber furnace in the later stage of incineration, and perform high-pressure decomposition on the parts that are difficult to incinerate, so as to improve the incineration efficiency and reduce energy consumption.
[0040] (4) The top wind and side wind preheaters provided in the present invention preheat the combustion air entering the main combustion chamber and the secondary combustion chamber in advance, and use the radiant heat from the furnace incineration and the radiant heat from the high-temperature flue gas to preheat the combustion air, thereby reducing the impact of cold air on the furnace temperature and reducing energy consumption.
[0041] (5) The utility model optimizes the structure of the secondary combustion chamber, sets the secondary combustion chamber into a segmented furnace structure, sets an air mixing chamber, and sets the combustion chamber and the tail combustion section in segments. The air mixing chamber fully mixes the flue gas from the main combustion chamber with the combustion-supporting top wind, and at the same time separates the large particles of dust generated by the incineration of the funerary objects. When the furnace is shut down, the dust can be removed through the ash cleaning port at the bottom of the air mixing chamber; the combustion chamber and the tail combustion section are set in segments, which optimizes the flue gas passage, ensures that the flue gas residence time is not less than 2s, and makes the layout of the secondary combustion chamber flexible, thereby reducing the overall size of the crematorium and reducing the space occupied.
[0042] (6) The utility model sets a urea spray gun in the air mixing chamber of the second combustion chamber. The compressed air atomizes the urea solution and then sprays it into the air mixing chamber through the urea spray gun. The suitable temperature field of the high-temperature flue gas in the second combustion chamber is used to thermally decompose the urea solution to generate ammonia to inhibit the formation of dioxins. At the same time, the SNCR denitrification reaction is carried out to reduce the content of nitrogen oxides in the flue gas at the outlet of the crematorium.
[0043] (7) The utility model adopts a high-efficiency oxygen-controlled combustion technology. An oxygen content analyzer a and a thermocouple a are arranged at the top of the connecting channel between the main combustion chamber and the secondary combustion chamber. By measuring the oxygen content and flue gas temperature of the incineration flue gas in the main combustion chamber, the amount of fuel required for the burner and the amount of combustion-supporting air in the main combustion chamber are automatically adjusted to control the oxygen content in the furnace of the main combustion chamber to be 4% to 14%, preferably within 4% to 6%, and the temperature is controlled within 850 to 1000°C, thereby ensuring the incineration effect while achieving the purpose of energy saving.
[0044] An oxygen content analyzer b and a thermocouple b are installed in the tail combustion section of the secondary combustion chamber. By measuring the oxygen content and flue gas temperature of the secondary combustion chamber, the amount of fuel required by the burner and the amount of combustion-supporting air in the secondary combustion chamber are automatically adjusted and controlled. This allows the secondary combustion chamber to fully burn the unburned flue gas in the main combustion chamber, eliminate smoke, and reduce the generation of CO and organic pollutants (VOCs). This can prevent the secondary combustion chamber from having too much air and ensure the temperature of the secondary combustion chamber. The oxygen content in the secondary combustion chamber is controlled to be within 4% to 14%, preferably within 4% to 6%, and the temperature is controlled to be no less than 850°C.
[0045] (8) The utility model optimizes the structure and shape design of the crematorium, and sets a remote pressure gauge on the rear wall of the main combustion chamber. By measuring the pressure of the main combustion chamber, it is interlocked with the frequency of the variable frequency induced draft fan to ensure that the pressure in the furnace is controlled at a micro-negative pressure working condition of -30 to -10Pa, preventing the smoke leakage of the crematorium and ensuring that all smoke is sent to the exhaust gas treatment system for treatment.
[0046] (9) The utility model installs automatic control instruments such as pressure gauges, temperature meters, oxygen content analyzers, and television monitoring systems at key positions of the crematorium, which can realize intelligent, automated, and remote control operation, and digitize different stages of cremation, greatly reducing the workload of cremation operators and improving their working environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] Figure 1 This is a process flow chart of the intelligent, environmentally friendly and energy-saving cremator system of the utility model;
[0048] Figure 2 This is a schematic diagram of the three-dimensional structure of the crematorium of the present utility model;
[0049] Figure 3 This is a top view of the crematorium of the present invention;
[0050] Figure 4 for Figure 3 Cross-section of the middle AA section;
[0051] Figure 5 for Figure 3 Cross-section of the middle BB section;
[0052] Among them: 1. Main combustion chamber; 101. Furnace; 102. Furnace door; 103. Kang bed; 104. Sand-sealed steel trough; 105. Sealing gasket; 106. Heat-resistant sealing curtain; 107. Burner a; 108. Flue gas duct; 109. Side wind combustion-supporting air hole; 110. Top wind combustion-supporting air hole a; 111. Observation door; 112. Furnace monitoring; 113. Pressure gauge; 114. Thermocouple a; 115. Oxygen content analyzer a; 116. High-pressure air hole; 117. Kang bed support edge; 118. Sand knife;
[0053] 2. Secondary combustion chamber; 201. Air mixing chamber; 202. Combustion chamber; 203. Tail combustion section; 203a. Tail combustion front section; 203b. Tail combustion rear section; 204. Burner b; 205. Top wind combustion air hole b; 206. Urea spray gun; 207. Oxygen content analyzer b; 208. Thermocouple b; 209. Burner c;
[0054] 3a, burner fan; 3b, combustion-supporting fan; 30a, burner air bag; 30b, combustion-supporting air bag; 301, main burner air regulating valve; 302, secondary burner air regulating valve b; 303, secondary burner air regulating valve c; 304a, main burner side air regulating valve a; 304b, main burner side air regulating valve b; 305, main burner top air regulating valve; 306, secondary burner top air regulating valve; 307, side air preheater; 308, top air preheater a. 309, top air preheater b; 310, air compressor; 320, main fuel / gas line solenoid valve; 321, main fuel / gas line solenoid valve; 322, main burner ignition fuel / gas line solenoid valve; 323, secondary fuel / gas line solenoid valve b; 324, secondary burner ignition fuel / gas line solenoid valve b; 325, secondary fuel / gas line solenoid valve c; 326, secondary burner ignition fuel / gas line solenoid valve c;
[0055] 401, track; 402, traveling trolley;
[0056] 501. Robot; 502. Air collecting hood; 503. Cooling fan; 504. Filter. DETAILED DESCRIPTION
[0057] The technical solutions of the present invention are described clearly and completely below with reference to specific embodiments. It should be understood that the embodiments described are only a portion of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work are within the scope of the present invention. Unless otherwise defined, all professional and scientific terms used herein have the same meanings as those familiar to those skilled in the art.
[0058] The utility model provides an intelligent environmental protection and energy-saving cremator system, such as Figure 1-5 As shown, the crematorium system includes a crematorium, an air supply system, and a fuel supply system, wherein:
[0059] The crematorium includes a main combustion chamber 1 and a secondary combustion chamber 2, which are arranged in a left-right structure and connected as a whole; the main combustion chamber 1 includes a furnace 101, a furnace door 102 arranged on the front wall of the furnace, and a burner a 107 arranged on the rear wall of the furnace; the top of the furnace 101 is provided with a plurality of top wind combustion-supporting air holes a 110, and the left and right side walls are provided with a plurality of side wind combustion-supporting air holes 109; a plurality of flue gas channels 108 are opened on the wall connecting the furnace 101 and the secondary combustion chamber 2, for connecting the main combustion chamber 1 and the secondary combustion chamber 2; a kang bed support edge 117 is provided inwardly at the bottom edge of the furnace 101, and a movable and transportable kang bed 103 is placed above;
[0060] The secondary combustion chamber 2 includes a mixing chamber 201, a combustion chamber 202 and a tail combustion section 203 that are connected in sequence. The mixing chamber 201 is connected to the main combustion chamber 1 through the flue gas channel 108. The top of the mixing chamber 201 is provided with a number of top wind combustion-supporting air holes b205; the mixing chamber 201 and the combustion chamber 202 are arranged in an upper and lower structure, and the combustion chamber 202 is located below the mixing chamber 201. They are separated by the bottom plate of the mixing chamber 201 and are connected to the side of the rear wall of the secondary combustion chamber 2. The rear wall of the combustion chamber 202 is provided with a burner b204; the tail combustion section 203 is located on the front side of the mixing chamber 201 and the combustion chamber 202, and includes a tail combustion front section 203a and a tail combustion rear section 203b. The outlet end of the tail combustion rear section 203b is the smoke exhaust port of the crematorium, and the wall of the tail combustion rear section 203b is provided with a burner c 209.
[0061] The air supply system includes a burner fan 3a and a combustion-supporting fan 3b, and the burner fan 3a and the combustion-supporting fan 3b are respectively connected to the burner air bag 30a and the combustion-supporting air bag 30b, and the burner air bag 30a is respectively connected to the burner a 107, burner b 204, and burner c 209 through a number of burner air supply pipelines to provide the required air for burner combustion; the combustion-supporting air bag 30b is respectively connected to the top wind combustion-supporting air hole a 110, the top wind combustion-supporting air hole b 205, and the side wind combustion-supporting air hole 109 through a number of combustion-supporting air supply pipelines to provide combustion-supporting air for the main combustion chamber 1 and the secondary combustion chamber 2.
[0062] The fuel supply system includes a main fuel / gas pipeline, and branch fuel / gas pipelines connected to the main fuel / gas pipeline and respectively connected to the burner a 107, burner b 204, and burner c 209. Each branch fuel / gas pipeline is provided in parallel with a burner ignition fuel / gas pipeline connected to the burner a 107, burner b 204, and burner c 209.
[0063] Figure 1 The structure of the crematorium is only for reference. Figure 2-5 The following shall prevail.
[0064] The crematorium system also includes a bed transfer system, a cooling system, and a monitoring system, wherein:
[0065] The kang bed transfer system includes a track 401 and a walking trolley 402 that moves along the track 401. Before and after cremation, the walking trolley 402 controls the movement and transfer of the kang bed 103 through the control of a servo motor and the drive of a lifting, forward and backward mechanism (not shown in the figure). Before incineration, the kang bed 103 is transported into the furnace 101 of the main combustion chamber 1 and falls on the kang bed support edge 117. After incineration, the kang bed 103 is moved out. The kang bed transfer system can adopt existing technical content.
[0066] The cooling system is used to cool the kang bed 103 and the remains after incineration, and includes a manipulator 501, an air collecting hood 502 arranged on the kang bed 103, and a filter 504 and a cooling fan 503 connected to the air collecting hood 502 in sequence. The air collecting hood 502 is also provided with a cooling air inlet (not shown in the figure), which is used to input cooling air to cool the kang bed 103 and the remains, and then filter through the filter 504 and discharge it by the cooling fan 503; the cooling system can adopt existing technical content.
[0067] The monitoring system includes transfer vehicle monitoring, furnace door monitoring, remains cooling monitoring, exhaust gas emission chimney monitoring, and furnace monitoring 112 arranged in the furnace 101 of the main combustion chamber 1. The furnace monitoring 112 is preferably a retractable TV monitoring lens, which is arranged on the rear wall of the furnace 101 of the main combustion chamber 1.
[0068] Furthermore, the length of the furnace 101 of the main combustion chamber 1 is 2.0 to 2.5 m, the width is 0.7 to 0.9 m, the height is 0.9 to 1.2 m, and the volume is 1.26 to 2.7 m 3 The burner power range is 211~515KW, and the volume load is about 167.5~190.7KW / m 3 .
[0069] Furthermore, the furnace door 102 is connected to the front wall of the furnace 101 of the main combustion chamber 1 through a hinge, and a sealing ring (not shown in the figure) is provided on the inner side of the furnace door 102, preferably a graphite packing sealing ring, which is used for sealing the front wall side of the furnace 101 after the furnace door 102 is closed; a steel furnace door frame (not shown in the figure) is installed on the outer side of the front wall of the furnace 101 of the main combustion chamber 1, and the furnace door 101 is also hoisted on the steel furnace door frame, which is beneficial to improve the stability of the device and facilitate operation.
[0070] Furthermore, the kang bed support edge 117 is preferably arranged at the left and right side walls and rear wall edges of the bottom of the furnace 101 of the main combustion chamber 1; the upper surface of the kang bed support edge 117 is provided with a sealing gasket 105, preferably a graphite packing sealing gasket. When the kang bed 103 is transferred and dropped onto the kang bed support edge 117, the sealing gasket 105 is pressed and sealed by its own gravity; a sand seal steel groove 104 is welded on the inner side of the kang bed support edge 117, and fine sand is arranged in the sand seal steel groove 104. A sand knife 118 corresponding to the position of the sand seal steel groove 104 is installed at the bottom of the kang bed 103. The sand knife 118 is inserted into the sand seal steel groove 104 to form a sand seal, which plays a role of secondary sealing, improves the sealing of the bottom of the main combustion chamber furnace, and ensures that the incineration flue gas does not leak out. It can solve the problems of poor sealing effect of the main combustion chamber of the existing crematorium, air leakage and ash leakage of the kang bed, ensure the furnace temperature, reduce energy consumption, and improve the operating environment.
[0071] Furthermore, a heat-resistant sealing curtain 106 is provided under the furnace 101 of the main combustion chamber 1. When the cremation is completed and the kang bed 103 is transferred out of the main combustion chamber 1, in order to save energy, the heat-resistant sealing curtain 106 is used to seal the space left at the bottom of the furnace after the kang bed 103 is moved out.
[0072] Furthermore, the burner a 107 is positioned at the lower portion of the rear wall of the furnace 101 of the main combustion chamber 1 and inserted downwardly into the rear wall at an angle of 15° to 25° from the horizontal. The specific insertion angle is adjustable to facilitate sufficient combustion within the main combustion chamber. The burner b 204 is positioned at the lower portion of the rear wall of the combustion chamber 202 and inserted horizontally into the combustion chamber 202 to reburn the incineration flue gas, thereby eliminating smoke and reducing the production of CO and organic pollutants (VOCs).
[0073] Furthermore, the cross-section of the tail combustion section 203 of the secondary combustion chamber 2 is circular or square, the tail combustion front section 203a is a structure of low-carbide silicon low-porosity clay bricks with external insulation, and the tail combustion rear section 203b is a structure of stainless steel internal insulation, that is, the utility model arranges the tail combustion rear section 203b with the burner c 209 in the outlet flue part of the crematorium, ensuring that the residence time of the flue gas in the secondary combustion chamber 2 is not less than 2s, reducing the generation of the incineration pollutants dioxins and organic pollutants VOCs while significantly reducing the overall size of the crematorium, reducing the occupied space, and the structure is more flexible and easy to arrange.
[0074] Furthermore, a urea spray gun 206 is provided on the wall of the air mixing chamber 201. The urea spray gun 206 is connected to the urea solution pipeline and the air compressor 310. The urea solution is atomized by compressed air and then sprayed into the air mixing chamber 201 through the urea spray gun 206. The suitable temperature field of the high-temperature flue gas in the secondary combustion chamber 2 is utilized to pyrolyze the urea solution to produce ammonia to inhibit the formation of dioxins. At the same time, the SNCR denitrification reaction is carried out to reduce the content of nitrogen oxides in the flue gas at the outlet of the crematorium.
[0075] Furthermore, the side wind combustion-supporting air holes 109 provided in the furnace 101 of the main combustion chamber 1 are preferably arranged in two rows, one above the other, and symmetrically arranged on the left and right side walls, with 5 to 20 holes provided in each row, and the aperture of each side wind combustion-supporting air hole 109 is in the range of 6 to 10 mm, and all are downwardly directed at an angle of 10° to 30° to the horizontal direction, so as to deliver the combustion-supporting air from the left and right side walls into the furnace 101 of the main combustion chamber 1. The top wind combustion-supporting air holes a 110 and top wind combustion-supporting air holes b 205 are preferably arranged in a row, with a number of 5 to 20 holes, and the aperture of each top wind combustion-supporting air hole a 110 and top wind combustion-supporting air hole b 205 is in the range of 15 to 35 mm, so as to deliver the combustion-supporting air from the top into the furnace 101 of the main combustion chamber 1 and the air mixing chamber 201 of the secondary combustion chamber 2. The setting of the above-mentioned combustion-supporting air holes is beneficial to the air volume distribution in the main combustion chamber 1 and the mixed air in the secondary combustion chamber 2, so that the furnace air is evenly distributed. While optimizing the incineration temperature field, it ensures sufficient incineration and can further reduce the amount of incineration pollutants generated.
[0076] Furthermore, a plurality of high-pressure air holes 116 are provided on the top of the furnace 101 of the main combustion chamber 1, which are connected to the air compressor 310 through a high-pressure air pipe. In the later stage of cremation, the air compressor 310 provides high-pressure air to the furnace 101, and performs high-pressure incineration on the parts that are difficult to incinerate, so as to improve the incineration efficiency and reduce energy consumption.
[0077] Furthermore, the air supply system also includes a top wind preheater a 308 and a top wind preheater b 309, which are arranged on the outer wall of the flue of the tail combustion section 203 of the secondary combustion chamber 2, and the two ends thereof are respectively connected to the combustion-supporting air bag 30b and the top wind combustion-supporting air hole a 110 and the top wind combustion-supporting air hole b 205 through an air supply pipeline, and are used to utilize the radiation heat of the high-temperature flue gas flue in the tail combustion section 203 of the secondary combustion chamber 2 to preheat the combustion-supporting air and distribute it through the air supply pipeline, and then send it into the main combustion chamber and the secondary combustion chamber through each top wind combustion-supporting air hole.
[0078] Furthermore, the air supply system also includes a side wind preheater 307, which is arranged on the furnace roof and outer side wall of the main combustion chamber 1, and its two ends are respectively connected to the combustion air bag 30b and the side wind combustion air hole 109 through the air supply pipeline, and is used to use the radiation heat of the furnace roof and side wall of the main combustion chamber 1 to preheat the combustion air, and after being distributed by the air supply pipeline, it is sent into the main combustion chamber through each side wind combustion air hole. Preferably, two groups of side wind preheaters 307a and 307b are provided, one group corresponding to the side wind combustion air hole 109 on the outer side wall of the crematorium, and the other group corresponding to the side wind combustion air hole 109 embedded in the inner wall connecting the main combustion chamber 1 and the secondary combustion chamber 2, providing preheated combustion air to the main combustion chamber 1 through the left and right sides.
[0079] Furthermore, the crematorium system is also equipped with several measuring and controlling instruments for monitoring and regulating parameters such as temperature, pressure, and oxygen content during the cremation process, including:
[0080] An oxygen content analyzer a 115 and a thermocouple a 114 are installed at the top of the flue gas duct 108. These are inserted into the communication channel between the primary combustion chamber 1 and the secondary combustion chamber 2. These analyzers are used to measure the oxygen content and flue gas temperature in the primary combustion chamber 1. These analyzers, through interlocking mechanisms, automatically adjust the amount of fuel required by the burner a 107 and the amount of combustion-supporting air in the primary combustion chamber 1. Preferably, two thermocouples a 114 are provided.
[0081] An oxygen content analyzer b 207 and a thermocouple b 208 are provided on the front wall of the tail combustion section 203 of the secondary combustion chamber 2, which are horizontally inserted into the chamber of the tail combustion section 203 to measure the oxygen content and flue gas temperature of the combustion flue gas in the secondary combustion chamber 2, and automatically adjust and control the amount of fuel required by the burner b 204 and the burner c 209 and the amount of combustion-supporting air in the secondary combustion chamber 2 through interlocking.
[0082] A pressure gauge 113 is provided on the rear wall of the furnace 101 of the main combustion chamber 1 for measuring the pressure in the main combustion chamber 1. The pressure in the crematorium is controlled at a slightly negative pressure working condition of -30 to -10 Pa by frequency interlocking with the variable frequency induced draft fan connected to the smoke exhaust port of the crematorium, thereby preventing smoke leakage from the crematorium and ensuring that all smoke is sent to the exhaust gas treatment system for treatment.
[0083] Furthermore, an observation door 111 is provided between the main combustion chamber 1 door 102 and the lower portion of the rear wall of the furnace 101. The observation door 111 is provided with an observation hole (not shown) for manually observing the flame and combustion during incineration. For remote operation, the incineration status within the main combustion chamber 1 furnace 101 can be observed in conjunction with the in-furnace monitoring system 112.
[0084] Furthermore, the main body of the crematorium is constructed of low-carbon silicon, low-porosity clay bricks combined with castables. The exterior walls and roof of the crematorium are insulated with aluminum silicate insulation, with a thickness of 50 to 150 mm. The door frame, arch, arch and floor of the air mixing chamber 201, side wind combustion-supporting air holes 109, mounting holes for the urea spray gun 206, burners a 107, b 204, and c 209, as well as the observation hole, are all paved with castables. The flue gas duct 108 and the kang bed support edge 117 are constructed of mullite castables, which are characterized by high temperature resistance, corrosion resistance, and high strength, and are suitable for temperatures up to 1680°C.
[0085] The cremation method using the intelligent, environmentally friendly and energy-saving cremator system in the present invention comprises the following steps:
[0086] (1) Place the body on the kang bed 103 and transfer it to the furnace 101 of the main combustion chamber 1, and close the furnace door 102;
[0087] (2) Ignite the burners in the main combustion chamber 1 and the secondary combustion chamber 2 in sequence, and observe the combustion conditions in the crematorium;
[0088] (3) Using the measurement and control instruments installed in the main combustion chamber 1 and the secondary combustion chamber 2 to monitor and control the temperature, oxygen content and pressure in the crematorium;
[0089] (4) After the cremation is completed, the crematorium system is turned off and the kang bed 103 is removed.
[0090] Specifically, the step (1) includes the following steps:
[0091] The body is placed on the kang bed 103. The trolley 402 of the kang bed transfer system, under the control of a servo motor, transports it into the furnace 101 of the main combustion chamber 1 and onto the kang bed support rim 117. The trolley 402 then withdraws. The kang bed 103, relying on its own gravity, compresses and seals the gasket 105 on the upper surface of the kang bed support rim 117. Simultaneously, the sand cutter 118 at the bottom of the kang bed 103 inserts into the sand seal steel groove 104, forming a secondary seal to prevent incineration fumes from leaking. After the body is placed in the furnace 101 of the main combustion chamber 1, the crematorium door 102 is closed.
[0092] The step (2) comprises the following steps:
[0093] The burner blower 3a and combustion-supporting blower 3b are started, and the main ignition sequence control program is initiated. The main fuel / gas line solenoid valve 320 on the main fuel / gas line, the main burner ignition fuel / gas line solenoid valve 322 on the burner ignition fuel / gas line connected to burner a 107, and the main burner air regulating valve 301 on the burner air supply line are jointly opened. The ignition transformer associated with burner a 107 in the main combustion chamber is ignited. When the flame detector in main combustion chamber 1 detects an ignition signal, the main fuel / gas line solenoid valve 321 on the branch fuel / gas line connected to burner a 107 is opened. After a delay of 3-4 seconds, the main burner ignition fuel / gas line solenoid valve 322 is closed, and the ignition transformer of burner a 107 is extinguished. The combustion status is observed through the observation door 111 provided in main combustion chamber 1 and the furnace monitoring system 112.
[0094] Then start the second combustion ignition sequence control program, and link to open the two burner ignition fuel / gas pipelines connected to the second combustion chamber burner b204 and burner c209, and the two burner air regulating valves b302 and c303 on the burner air supply pipeline; the ignition transformer matching the burner b204 and burner c209 is ignited. When the flame detector of the second combustion chamber 2 detects the ignition signal, the two fuel / gas pipeline solenoid valves b323 and c325 on the fuel / gas distribution pipeline connected to the burner b204 and burner c209 are opened, and after a delay of 3 to 4 seconds, the two burner ignition fuel / gas pipeline solenoid valves b324 and c326 are closed, and the ignition transformers of burners b204 and burner c209 are extinguished.
[0095] The step (3) includes monitoring and regulating the temperature in the main combustion chamber 1 of the crematorium furnace, monitoring and regulating the oxygen content in the main combustion chamber 1, monitoring and regulating the pressure in the main combustion chamber 1, monitoring and regulating the temperature in the secondary combustion chamber 2, and monitoring and regulating the oxygen content in the secondary combustion chamber 2. The control process of each parameter is as follows:
[0096] (1) Main combustion chamber temperature:
[0097] The combustion temperature of the furnace 101 of the main combustion chamber 1 is generally between 850°C and 1000°C. The flue gas temperature within the main combustion chamber is measured by a thermocouple a 114 installed in the flue gas passage 108 from the main combustion chamber to the secondary combustion chamber. The opening of the main burner air control valve 301 is automatically adjusted based on the temperature. When two thermocouples a 114 are provided, the average value of the data measured by the two thermocouples is used as a reference for adjustment. The opening of the main burner air control valve 301 causes the pressure of the burner air supply line connected to the main combustion chamber 1 to change. The pressure change is sensed by a pressure-inducing pipe (not shown) connected to the burner air supply line, which in turn adjusts the opening of the main fuel / gas line solenoid valve 321, adjusting the fuel / gas volume and thus regulating the temperature within the main combustion chamber 1.
[0098] Specifically, when the temperature measured by the thermocouple a 114 is less than 850°C, the opening of the main burner air regulating valve 301 is adjusted to 100%; when the temperature measured by the thermocouple a 114 is displayed as 850-900°C, the opening of the main burner air regulating valve 301 is adjusted to 70%-80%, preferably 75%; when the temperature measured by the thermocouple a 114 is greater than 900°C, the opening of the main burner air regulating valve 301 is adjusted accordingly according to the change in temperature, the opening is reduced accordingly when the temperature rises, and the opening is increased accordingly when the temperature decreases. Specifically, for every 10°C change in temperature, the opening of the main burner air regulating valve 301 is adjusted accordingly by ±(5%-15%), preferably ±10%.
[0099] (2) Oxygen content in the main combustion chamber:
[0100] To ensure sufficient combustion and incineration, the oxygen content in the main combustion chamber 1 is controlled to be 4% to 14%, and can be controlled to be within the range of 8% to 14%, or can be controlled to be within the range of 4% to 6%. The oxygen content of the flue gas in the main combustion chamber is monitored by an oxygen content analyzer a 115 arranged on the flue gas channel 108 from the main combustion chamber to the secondary combustion chamber, and the top wind air intake and side wind air intake of the top wind combustion-supporting air hole a 110 and the side wind combustion-supporting air hole 109 are adjusted.
[0101] Specifically, after the burner in the main combustion chamber 1 is ignited, the main combustion top air regulating valve 305 and the main combustion side air regulating valves a 304a and b 304b on the combustion air supply pipeline connected to the top air combustion air hole a 110 and the side air combustion air hole 109 are opened to 0%. The opening is adjusted to 10% 3 to 5 minutes after the cremation begins, preferably after 3 minutes. Thereafter, the opening is increased by 5% every 3 to 5 minutes, preferably every 3 minutes. The opening of the main combustion top air regulating valve 305 and the main combustion side air regulating valves a 304a and b 304b gradually increases.
[0102] When the displayed value of the oxygen content analyzer a 115 is 8% to 10%, preferably 9%, the opening of the main combustion top air regulating valve 305 and the main combustion side air regulating valves a 304a and b 304b are adjusted according to the displayed value of the oxygen content analyzer a 115, thereby controlling the oxygen content in the main combustion chamber 1. When the oxygen content increases or decreases by 1%, the opening is correspondingly reduced or increased by 3% to 10%, preferably 5%, so that the oxygen content in the main combustion chamber 1 can be controlled between 8% and 14%. Alternatively,
[0103] When the displayed value of the oxygen content analyzer a 115 is 4% to 6%, preferably 5%, the opening of the main combustion top wind regulating valve 305 and the main combustion side wind regulating valves a 304a, b 304b are adjusted according to the displayed value of the oxygen content analyzer a 115, so as to control the oxygen content in the main combustion chamber 1. When the oxygen content increases or decreases by 1%, the opening is correspondingly reduced or increased by 3% to 10%, preferably 5%, so that the oxygen content in the main combustion chamber 1 can be controlled between 4% and 6%.
[0104] (3) Main combustion chamber pressure:
[0105] The pressure in the furnace 101 of the main combustion chamber 1 is controlled to be under a slightly negative pressure condition of -50 to -10Pa, preferably in the range of -30 to -10Pa, to prevent smoke leakage from the crematorium, while ensuring that all smoke is sent to the subsequent exhaust gas treatment system for treatment. The pressure in the furnace 101 of the main combustion chamber 1 is monitored by the pressure gauge 113 of the main combustion chamber 1, and is interlocked with the frequency of the variable frequency induced draft fan, and proportionally adjusted with its frequency. When the pressure measured by the pressure gauge 113 is greater than -10Pa, the frequency converter frequency of the induced draft fan is increased; when the measured pressure is less than -30Pa, the frequency converter frequency of the induced draft fan is reduced; when the measured pressure is within the range of -30 to -10Pa, the frequency converter frequency of the induced draft fan returns to normal.
[0106] (4) Second combustion chamber temperature:
[0107] The flue gas temperature within secondary combustion chamber 2 is measured by thermocouple b208, and the openings of the two burner air control valves b302 and c303 are automatically adjusted based on the temperature. The openings of the two burner air control valves b302 and c303 cause the pressure in the burner air supply line connected to secondary combustion chamber 2 to change. This pressure change is sensed by a pressure-inducing pipe (not shown) connected to the burner air supply line, which in turn adjusts the openings of the two fuel / gas line solenoid valves b323 and c325, adjusting the fuel / gas flow and, therefore, the temperature within secondary combustion chamber 2.
[0108] Specifically, when the temperature measured by the thermocouple b208 is less than 900°C, the openings of the two burner air regulating valves b302 and c303 are adjusted to 100%; when the temperature measured by the thermocouple b208 is 900°C, the openings of the two burner air regulating valves b302 and c303 are adjusted to 70% to 80%, preferably 75%; when the temperature measured by the thermocouple b208 is greater than 900°C, the openings of the two burner air regulating valves b302 and c303 are adjusted accordingly according to the change in temperature. When the temperature rises, the openings are reduced accordingly, and when the temperature drops, the openings are increased accordingly. Specifically, for every 10°C change in temperature, the openings of the two burner air regulating valves b302 and c303 are adjusted by ±(5% to 15%), preferably ±10%; and when the thermocouple b208 is When the temperature measured at 208 is greater than 900°C and then drops to 900°C or less than 900°C, it is adjusted in the same manner as when the temperature is greater than 900°C.
[0109] (5) Oxygen content in the secondary combustion chamber:
[0110] The oxygen content in the secondary combustion chamber 2 is controlled to be between 4% and 14%, and can be controlled within the range of 9% to 14%, or can be controlled within the range of 4% to 6%. A control method 1 can be used: adjusting the top wind airflow of the top wind combustion-supporting air hole b 205 according to the cremation time; or a control method 2 can be used: monitoring the oxygen content of the flue gas in the secondary combustion chamber 2 through an oxygen content analyzer b 207 installed in the secondary combustion chamber 2, and adjusting the top wind airflow of the top wind combustion-supporting air hole b 205 according to the oxygen content.
[0111] Control method 1: After the burner in the secondary combustion chamber 2 is ignited, the opening of the secondary combustion top air regulating valve 306 on the combustion air supply line connected to the top air combustion air hole b 205 is 0%; the opening is adjusted to 50% within 0 to 7 minutes of the cremation time; the opening is adjusted to 45% within 7 to 18 minutes of the cremation time; the opening is adjusted to 40% within 18 to 30 minutes of the cremation time; the opening is adjusted to 35% within 30 to 50 minutes of the cremation time; the opening is adjusted to 30% within 50 to 60 minutes of the cremation time; and the opening is adjusted to 25% after 60 minutes of the cremation time. The opening of the secondary combustion top air regulating valve 306 is gradually reduced.
[0112] Control method 2: Based on the above control method 1, when the display value of the oxygen content analyzer b 207 is within the range of 9% to 11%, the opening of the secondary combustion chamber 2 top air regulating valve 306 is adjusted according to the display value of the oxygen content analyzer b 207, thereby controlling the oxygen content in the secondary combustion chamber 2; when the oxygen content is 9% to 11%, the opening of the secondary combustion chamber 2 top air regulating valve 306 remains constant; when the oxygen content is greater than 11%, the opening decreases by 3% to 10% for every 1% increase, preferably 5%; when the oxygen content is less than 9%, the opening increases by 3% to 10% for every 1% decrease, preferably 5%. In this way, the oxygen content in the secondary combustion chamber 2 can be controlled to be between 9% and 14%. Or,
[0113] Based on the above control method 1, when the displayed value of the oxygen content analyzer b 207 is within the range of 4% to 6%, the opening of the secondary combustion chamber top air regulating valve 306 is adjusted according to the displayed value of the oxygen content analyzer b 207, thereby controlling the oxygen content in the secondary combustion chamber 2. When the oxygen content is between 4% and 6%, the opening of the secondary combustion chamber top air regulating valve 306 remains constant. When the oxygen content is greater than 6%, the opening is reduced by 3% to 10%, preferably 5%, for every 1% increase in the oxygen content. When the oxygen content is less than 4%, the opening is increased by 3% to 10%, preferably 5%, for every 1% decrease in the oxygen content. Thus, the oxygen content in the secondary combustion chamber 2 can be controlled between 4% and 6%.
[0114] The step (4) comprises the following steps:
[0115] When the cremation is completed, the cremation end program is started, and the main fuel / gas pipeline solenoid valve 321 is closed in conjunction with the main fuel top wind regulating valve 305 and the main fuel side wind regulating valves a 304a and b 304b, and the main burner nozzle wind regulating valve 301 is closed; then the total fuel / gas pipeline solenoid valve 320 is closed in conjunction with the second fuel / gas pipeline solenoid valves b 323 and c 325, the second fuel top wind regulating valve 306 is closed, and the second burner nozzle wind regulating valves b 302 and c 303 are closed; the burner fan 3a and the combustion-supporting fan 3b are stopped, and the induced draft fan is stopped.
[0116] After cremation, the furnace door 102 is opened and the kang bed 103 is removed. Further, when the kang bed 103 is removed from the main combustion chamber 1 hearth 101, in order to save energy, the heat-resistant sealing curtain 106 is used to seal the space left at the bottom of the hearth after the kang bed 103 is removed.
[0117] Furthermore, the cooling system is used to cool the kang bed 103 and the remains after incineration. The cooling air is input into the air collecting hood 502 to cool the kang bed 103 and the remains, and then filtered by the filter 504 and discharged by the cooling fan 503.
[0118] This application is described in detail for the purpose of enabling those skilled in the art to understand the contents of this application and implement them. This does not limit the scope of protection of this application. Any equivalent changes or modifications made according to the spirit of this application should be included in the scope of protection of this application.
Claims
1. An intelligent, environmentally friendly and energy-saving cremator system, characterized in that: It includes a crematorium, an air supply system, a fuel supply system, a bed transfer system, a cooling system and a monitoring system, among which: The crematorium comprises a main combustion chamber and a secondary combustion chamber which are arranged in a left-right structure and connected as a whole, the main combustion chamber comprises a furnace, a furnace door arranged on the front wall of the furnace and a burner a on the rear wall, a plurality of top wind combustion-supporting air holes a are arranged on the top of the furnace, and a plurality of side wind combustion-supporting air holes are arranged on the left and right side walls; a kang bed support edge is arranged inwardly on the bottom edge of the furnace, and a transportable kang bed is placed on the top; the secondary combustion chamber comprises a mixing chamber, a combustion chamber and a tail combustion section which are connected in sequence, a plurality of smoke passages are opened on the connecting wall surface of the mixing chamber and the main combustion chamber, a plurality of top wind combustion-supporting air holes b are arranged on the top of the mixing chamber; the combustion chamber is located below the mixing chamber, and a burner b is arranged on the rear wall; the tail combustion section is located on the front side of the mixing chamber and the combustion chamber, and comprises a tail combustion front section and a tail combustion rear section, a burner c is arranged on the wall surface of the tail combustion rear section, and the outlet end of the tail combustion rear section is the smoke exhaust port of the crematorium; The air supply system includes a burner fan and a combustion-supporting fan, wherein the burner fan is connected to the burner a, burner b, and burner c respectively through a burner air bag and a plurality of burner air supply pipelines; the combustion-supporting fan is connected to the top-wind combustion-supporting air hole a, top-wind combustion-supporting air hole b, and side-wind combustion-supporting air hole respectively through a combustion-supporting air bag and a plurality of combustion-supporting air supply pipelines; The fuel supply system includes a main fuel / gas pipeline, and branch fuel / gas pipelines connected to the main fuel / gas pipeline and respectively connected to the burner a, burner b, and burner c; each branch fuel / gas pipeline is arranged in parallel with a burner ignition fuel / gas pipeline connected to the burner a, burner b, and burner c.
2. The crematorium system according to claim 1, characterized in that: The kang bed transfer system includes a track and a trolley moving along the track, and a servo motor and a lifting, forward and backward mechanism for driving and controlling the movement of the trolley; The cooling system includes a manipulator, an air collecting hood arranged on the kang bed, and a filter and a cooling fan which are sequentially connected to the air collecting hood; The monitoring system includes transfer vehicle monitoring, furnace door monitoring, remains cooling monitoring, tail gas emission chimney monitoring, and furnace monitoring arranged in the main combustion chamber furnace.
3. The crematorium system according to claim 1, characterized in that: A sealing pad is provided on the upper surface of the supporting edge of the kang bed, which is used to compress the sealing pad to seal by utilizing the weight of the kang bed itself; A sand-sealed steel groove is welded on the inner side of the support edge of the kang bed, and fine sand is arranged in the sand-sealed steel groove. A sand knife corresponding to the position of the sand-sealed steel groove is installed at the bottom of the kang bed to form a sand seal to play a secondary sealing role.
4. The crematorium system according to claim 3, characterized in that: A temperature-resistant sealing curtain is arranged below the furnace of the main combustion chamber to seal the space left at the bottom of the furnace after the kang bed is removed.
5. The crematorium system according to claim 1, characterized in that: The burner a is arranged at the lower part of the rear wall of the main combustion chamber furnace and is inserted downward into the rear wall at an angle of 15° to 25° with the horizontal direction; The burner b is arranged at the lower part of the rear wall of the combustion chamber of the secondary combustion chamber and is inserted into the combustion chamber in a horizontal direction.
6. The crematorium system according to claim 1, characterized in that: A urea spray gun is provided on the wall of the air mixing chamber of the secondary combustion chamber. The urea spray gun is connected to the urea solution pipeline and the air compressor, and is used to use compressed air to atomize the urea solution and spray it into the air mixing chamber. The temperature field of the high-temperature flue gas in the secondary combustion chamber is utilized to pyrolyze the urea solution to produce ammonia to inhibit the formation of dioxins, and at the same time, the SNCR denitrification reaction is carried out.
7. The crematorium system according to claim 1, characterized in that: The side wind combustion-supporting air holes are arranged in two rows, one above the other, and are symmetrically arranged on the left and right side walls, with 5 to 20 holes arranged in each row, and the aperture of each side wind combustion-supporting air hole ranges from 6 to 10 mm, and are arranged downward at an angle of 10° to 30° to the horizontal direction; The top-wind combustion-supporting air holes a and the top-wind combustion-supporting air holes b are arranged in a row, with a number set to 5 to 20, and an aperture range of each top-wind combustion-supporting air hole a and the top-wind combustion-supporting air hole b is 15 to 35 mm.
8. The crematorium system according to claim 7, characterized in that: A plurality of high-pressure air holes are arranged on the top of the main combustion chamber furnace, which are connected to the air compressor through a high-pressure air pipe, and are used to provide high-pressure air in the furnace in the later stage of cremation and incineration of the parts that are difficult to incinerate.
9. The crematorium system according to claim 1, characterized in that: The air supply system includes a top wind preheater a and a top wind preheater b arranged on the outer wall of the flue of the tail combustion section of the secondary combustion chamber, and both ends of the top wind preheater a and a top wind preheater b are connected to the combustion air bag and the top wind combustion air hole a and the top wind combustion air hole b through air supply pipelines respectively; and The side wind preheater is arranged on the top and outer side wall of the main combustion chamber, and its two ends are connected to the combustion-supporting air bag and the side wind combustion-supporting air holes through air supply pipelines, and the side wind preheater is arranged in two groups, corresponding to the side wind combustion-supporting air holes arranged on the left and right sides of the main combustion chamber furnace.
10. The crematorium system according to claim 1, characterized in that: The top of the flue gas passage is provided with an oxygen content analyzer a and a thermocouple a, which are used to measure the oxygen content and flue gas temperature of the incineration flue gas in the main combustion chamber and to adjust the amount of fuel required by the burner a and the amount of combustion-supporting air in the main combustion chamber; The front wall of the tail combustion section of the secondary combustion chamber is provided with an oxygen content analyzer b and a thermocouple b, which are horizontally inserted into the chamber of the tail combustion section and are used to measure the oxygen content and flue gas temperature of the combustion flue gas in the secondary combustion chamber and adjust the amount of fuel required by the burners b and c and the amount of combustion-supporting air in the secondary combustion chamber; A pressure gauge is arranged on the rear wall of the main combustion chamber furnace to measure and control the pressure in the cremation furnace.
