Processing equipment for green porous building materials

By introducing processing support steel mesh, guide plates, dust accumulation boxes and gas purification systems into porous building materials processing equipment, the problem of dust and harmful gas pollution is solved, centralized dust processing and gas purification are realized, and the efficiency of the equipment is improved. service life and safety of the working environment.

CN221892304UInactive Publication Date: 2024-10-25GANSU JINANG BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420451739.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-08
Publication Date
2024-10-25
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Existing porous building material processing equipment has problems such as jamming, dust pollution, noise pollution and harmful gas emissions during the crushing and calcining process, which affects the life of the equipment and the health of workers.

Method used

A green porous building materials processing equipment is designed, which uses processing support steel mesh, guide plate, dust accumulation box, gas purification body, air guide pipe and exhaust port. Dust is collected through the dust accumulation box, and harmful substances are purified using oxidants such as hydrogen peroxide. gas, generating harmless gas for discharge and reducing environmental pollution.

Benefits of technology

Effectively collects and processes dust, purifies harmful gases, improves the service life of equipment and the safety of the working environment, and reduces noise pollution and environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221892304U_ABST
    Figure CN221892304U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of porous building material processing, in particular to green porous building material processing equipment. According to the technical scheme, the porous building material processing device comprises a porous building material processing main body, processing supporting steel wire meshes and a reserved cavity, the processing supporting steel wire meshes are evenly and fixedly installed in the porous building material processing main body, the reserved cavity is formed in the bottom of the interior of the porous building material processing main body, and guide plates are fixedly installed on the two sides of the top of the inner wall of the reserved cavity. Through the arrangement of the processing supporting steel wire mesh, the flow guide plate and the dust accumulation box, a worker puts porous brick building materials into the top of the processing supporting steel wire mesh to be subjected to calcination, heating and shaping processing, and dust generated in the heating and shaping processing process downwards falls to the top of the flow guide plate through the processing supporting steel wire mesh; and then the dust slides into the dust accumulation box to be collected, workers can conveniently treat the dust generated in the machining process in a centralized mode, and the situation that the dust affects machining operation in the next machining process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of porous building material processing, in particular to a processing device for green porous building materials. Background Art

[0002] With the development of the construction industry, porous building materials have been widely used in the construction industry due to their excellent properties, such as good thermal insulation, sound insulation, light weight, etc., among which porous bricks are widely used. Among them, the "a building material processing equipment for building material processing" disclosed by the authorization number "CN218981878U" has solved the problem of metal recovery after crushing. However, during the crushing process, the presence of metal substances in the construction waste will cause the two crushing rollers to get stuck and damaged, reducing the service life of the device. The device does not have a dust removal mechanism. During the operation of the device, a large amount of dust will be generated. If it is not processed, the dust will be inhaled by the staff, endangering the health of the staff. The safety is not high. The device has no noise reduction function. During the operation of the device, the crushing roller will generate a lot of noise when crushing the construction waste, causing noise pollution and endangering the health of the users. After further retrieval, it was found that the authorization number "CN216442 680U" disclosed in the "a processing equipment for cutting lightweight building materials", through a specific technical structure setting, effectively solves the problem that the local torque of the plate may be caused by the cutting resistance, resulting in uneven cutting. In common cutting operations, a large amount of debris is often generated. Such debris is dispersed in the operating space and enters the internal connection of the machine, causing wear of the machine and reducing the service life of the machine. It will also enter the respiratory tract of the operator and even cause great harm to the health of the operator. It will also affect the surrounding environment and bring great inconvenience to the user. Technical disadvantages, but in actual use, a processing equipment for a green porous building material with a similar structure still has many defects, such as: the existing porous red bricks will generate a large amount of dust during the calcination process and accumulate in the calcination equipment, which is not convenient for the staff to clean up in a centralized manner, and the harmful gases generated during the calcination process will pollute the environment after being discharged, so it is necessary to design a processing equipment for green porous building materials. Utility Model Content

[0003] The purpose of the utility model is to provide a processing device for green porous building materials to solve the problems raised in the above background technology.

[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a green porous building material processing equipment, including a porous building material processing body, a processing support steel wire mesh and a reserved cavity, the interior of the porous building material processing body is evenly fixedly installed with a processing support steel wire mesh, the bottom of the porous building material processing body is provided with a reserved cavity, guide plates are fixedly installed on both sides of the top of the inner wall of the reserved cavity, a dust accumulation box is movably installed inside the reserved cavity, and the dust accumulation box is located between the guide plates, a gas purification body is fixedly installed on the top of the porous building material processing body, a partition is fixedly installed on one side of the gas purification body, an air guide pipe is fixedly installed on the top of the porous building material processing body through the gas purification body and the partition, and an exhaust port is provided on the top of the gas purification body.

[0005] The staff puts the porous brick building materials on the top of the processing support steel wire mesh for calcination, heating and shaping, and then adds the purifier to the inside of the gas purification body, which is blocked by a partition. The dust generated during the heating and shaping process falls down through the processing support steel wire mesh to the top of the guide plate, and then slides to the inside of the dust accumulation box for collection, so that the staff can concentrate on processing the dust generated during the processing to avoid dust affecting the processing operation during the next processing. The purifier is an oxidant such as hydrogen peroxide, and then the harmful gas generated in the porous building material processing body is introduced into the purifier through the air duct, and then reacts with harmful substances such as sulfides and organic matter in the harmful gas to form a precipitate, and then the harmless gas is discharged through the exhaust port to avoid pollution to the environment.

[0006] Preferably, a sealing door is rotatably mounted at the front end of the porous building material processing body, and a door handle is fixedly mounted at the front end of the sealing door. The staff can open the sealing door by holding the door handle, and then add the porous red brick building material into the interior of the porous building material processing body for heating and shaping, which is convenient for the staff to operate.

[0007] Preferably, a control panel is fixedly installed on one side of the front end of the sealing door, and an exhaust pipe is fixedly installed through the exhaust port on the top of the gas purification body. The exhaust pipe is convenient for gathering and discharging harmless gases, and the control panel is convenient for controlling the switch of the device.

[0008] Preferably, a calcining device body is fixedly installed at the bottom of the porous building material processing body, an air supply pipe is fixedly installed through the front end of the calcining device body, and a blower is fixedly connected to the front end of the air supply pipe. The calcined material is calcined inside the calcining device body, thereby raising the internal temperature of the porous building material processing body, and the blower blows air into the inside of the calcining device body through the air supply pipe, so that the calcining temperature is conveniently raised to a higher level, thereby facilitating the porous building material processing body to heat and shape the porous red bricks at a suitable temperature.

[0009] Preferably, heat pipes are fixedly installed on both sides of the top of the calcining equipment body, and the heat pipes are connected to the porous building material processing body. The heat generated inside the calcining equipment body is discharged into the porous building material processing body through the heat pipes, which facilitates the transmission of the calcining temperature and prevents the dust generated by the calcination from entering the porous building material processing body and causing pollution to the porous red brick building materials.

[0010] Preferably, a feed inlet is provided on one side of the calcining equipment body, and a sealing cover is movably installed inside the feed inlet. The calcining material can be conveniently added into the interior of the calcining equipment body through the feed inlet, and the feed inlet is sealed by the sealing cover, which is convenient for the staff to operate.

[0011] Preferably, the bottom of the porous building material processing body is fixedly installed with support legs, and the number of the support legs is four groups. The porous building material processing body is supported by the support legs, so that the porous building material processing body can be placed on a horizontal plane more stably for processing.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. By setting up a processing support steel wire mesh, a guide plate and a dust accumulation box, the staff puts the porous brick building materials on the top of the processing support steel wire mesh for calcination, heating and shaping. The dust generated during the heating and shaping process falls down through the processing support steel wire mesh to the top of the guide plate, and then slides into the dust accumulation box for collection, which is convenient for the staff to concentrate on processing the dust generated during the processing and avoid dust affecting the processing operation during the next processing.

[0014] 2. By setting up a gas purification body, an air duct and an exhaust port, the staff adds the purifier into the interior of the gas purification body and blocks it with a partition. The purifier is an oxidant such as hydrogen peroxide. Then the harmful gas generated in the porous building material processing body is introduced into the purifier through the air duct, and then reacts with harmful substances such as sulfides and organic matter in the harmful gas to generate precipitates, and then the harmless gas is discharged through the exhaust port to avoid pollution to the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a front view structural schematic diagram of the utility model;

[0016] Figure 2 It is a side view structural schematic diagram of the utility model;

[0017] Figure 3 This is a schematic diagram of the front cross-sectional structure of the porous building material processing body of the utility model;

[0018] Figure 4 This is a schematic diagram of the side view structure of the main body of the calcining equipment of the utility model;

[0019] Figure 5 It is a schematic diagram of the front cross-sectional structure of the main body of the calcining equipment of the present utility model.

[0020] In the figure: 1. Porous building material processing body; 101. Processing support wire mesh; 102. Reserved cavity; 103. Guide plate; 104. Dust accumulation box; 105. Gas purification body; 106. Partition; 107. Air duct; 108. Exhaust port; 109. Exhaust pipe; 2. Sealed door; 201. Door handle; 202. Control panel; 3. Calcination equipment body; 301. Blower; 302. Air duct; 303. Heat conduction pipe; 304. Feed inlet; 305. Sealed cover; 4. Support legs. DETAILED DESCRIPTION

[0021] The technical solution of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0022] Embodiment 1

[0023] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, the utility model proposes a green porous building material processing equipment, including a porous building material processing body 1, a processing support steel wire mesh 101 and a reserved cavity 102, the porous building material processing body 1 is evenly fixedly installed with a processing support steel wire mesh 101, the bottom of the porous building material processing body 1 is provided with a reserved cavity 102, guide plates 103 are fixedly installed on both sides of the top of the inner wall of the reserved cavity 102, a dust accumulation box 104 is movably installed inside the reserved cavity 102, and the dust accumulation box 104 is located between the guide plates 103, a gas purification body 105 is fixedly installed on the top of the porous building material processing body 1, a partition 106 is fixedly installed on one side of the gas purification body 105, and an air guide pipe 107 is fixedly installed on the top of the porous building material processing body 1 through the gas purification body 105 and the partition 106;

[0024] An exhaust port 108 is provided at the top of the gas purification body 105, a sealing door 2 is rotatably installed at the front end of the porous building material processing body 1, a door handle 201 is fixedly installed at the front end of the sealing door 2, a control panel 202 is fixedly installed on one side of the front end of the sealing door 2, an exhaust pipe 109 is fixedly installed through the exhaust port 108 at the top of the gas purification body 105, a calcining equipment body 3 is fixedly installed at the bottom of the porous building material processing body 1, an air supply pipe 302 is fixedly installed through the front end of the calcining equipment body 3, and a blower 301 is fixedly connected to the front end of the air supply pipe 302.

[0025] The working principle of a green porous building material processing equipment based on Example 1 is as follows: first, the staff opens the sealed door 2 by holding the door handle 201, and then puts the porous brick building material into the top of the processing support wire mesh 101 for calcination, heating and shaping processing, and then adds the purifier into the interior of the gas purification body 105, and the calcined material is calcined inside the calcination equipment body 3, so as to increase the internal temperature of the porous building material processing body 1, and turn on the blower 301 through the control panel 202, and the blower 301 blows air to the inside of the calcination equipment body 3 through the air supply pipe 302, so that the calcination temperature is conveniently increased to a higher level, so as to facilitate the porous building material processing body 1 to heat and shape the porous red bricks at a suitable temperature;

[0026] The dust is blocked by the partition 106, and the dust generated during the heating and shaping process falls down on the top of the guide plate 103 through the processing support wire mesh 101, and then slides into the dust accumulation box 104 for collection, so that the staff can concentrate on processing the dust generated during the processing to avoid the dust affecting the processing operation during the next processing. The purifier is an oxidant such as hydrogen peroxide, and then the harmful gas generated in the porous building material processing body 1 is introduced into the purifier through the air guide pipe 107, and then reacts with harmful substances such as sulfides and organic matter in the harmful gas to generate precipitates, and then the harmless gas is discharged through the exhaust pipe 109 to avoid pollution to the environment.

[0027] Embodiment 2

[0028] like Figure 1 , Figure 4 and Figure 5 As shown, the utility model proposes a green porous building material processing equipment. Compared with the first embodiment, this embodiment also includes: heat pipes 303 are fixedly installed on both sides of the top of the calcining equipment body 3, the heat pipes 303 are connected to the porous building material processing body 1, a feed port 304 is opened on one side of the calcining equipment body 3, a sealing cover 305 is movably installed inside the feed port 304, and support legs 4 are fixedly installed on the bottom of the porous building material processing body 1, and the number of support legs 4 is four groups.

[0029] In this embodiment, Figure 1 As shown, the porous building material processing body 1 is supported by the support legs 4, so that the porous building material processing body 1 can be placed on a horizontal plane more stably for processing. Figure 4 As shown, the heat generated inside the calcining equipment body 3 is discharged into the interior of the porous building material processing body 1 through the heat pipe 303, which facilitates the transmission of the calcining temperature and prevents the dust generated by the calcination from entering the interior of the porous building material processing body 1 and causing pollution to the porous red brick building materials. Figure 5As shown, the calcined material can be conveniently added into the interior of the calcining equipment body 3 through the feed port 304, and the feed port 304 is sealed by the sealing cover 305 to facilitate the operation of the staff.

[0030] The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solution of the present invention and the relevant inspiration of the above-mentioned embodiments, those skilled in the art can make various alternative improvements and combinations to the above-mentioned specific embodiments.

Claims

1. A green porous building material processing device, comprising a porous building material processing body (1), a processing support steel wire mesh (101) and a reserved cavity (102), characterized in that: A processing support steel wire mesh (101) is evenly fixedly installed inside the porous building material processing body (1), a reserved cavity (102) is provided at the bottom inside the porous building material processing body (1), guide plates (103) are fixedly installed on both sides of the top of the inner wall of the reserved cavity (102), a dust accumulation box (104) is movably installed inside the reserved cavity (102), and the dust accumulation box (104) is located between the guide plates (103), a gas purification body (105) is fixedly installed on the top of the porous building material processing body (1), a partition plate (106) is fixedly installed on one side inside the gas purification body (105), an air guide pipe (107) is fixedly installed on the top of the porous building material processing body (1) through the gas purification body (105) and the partition plate (106), and an exhaust port (108) is provided on the top of the gas purification body (105).

2. The processing equipment of a green porous building material according to claim 1, characterized in that: A sealing door (2) is rotatably mounted on the front end of the porous building material processing body (1), and a door handle (201) is fixedly mounted on the front end of the sealing door (2).

3. The processing equipment of a green porous building material according to claim 2 is characterized in that: A control panel (202) is fixedly mounted on one side of the front end of the sealing door (2), and an exhaust pipe (109) is fixedly mounted on the top of the gas purification body (105) through the exhaust port (108).

4. The processing equipment of a green porous building material according to claim 1, characterized in that: A calcining equipment body (3) is fixedly installed at the bottom of the porous building material processing body (1), an air supply pipe (302) is fixedly installed through the front end of the calcining equipment body (3), and a blower (301) is fixedly connected to the front end of the air supply pipe (302).

5. The processing equipment of a green porous building material according to claim 4 is characterized in that: Heat conducting pipes (303) are fixedly installed through both sides of the top of the calcining equipment body (3), and the heat conducting pipes (303) are connected through the porous building material processing body (1).

6. The processing equipment of a green porous building material according to claim 4, characterized in that: A material inlet (304) is provided on one side of the calcining equipment body (3), and a sealing cover (305) is movably installed inside the material inlet (304).

7. The processing equipment of a green porous building material according to claim 1, characterized in that: Support legs (4) are fixedly mounted on the bottom of the porous building material processing body (1), and the number of the support legs (4) is four groups.