Vibrating pile clamping hammer construction device for PHS square pile

By designing a vibrating pile clamping hammer construction device for PHS square piles, the steel sleeve and hydraulic cylinder are used to clamp the square piles, and then the vibrating hammer machine is used for construction, which solves the problem of the hammer pile machine occupying a large area, long use time and Remove pile problems, improve construction efficiency and reduce costs.

CN221895776UActive Publication Date: 2024-10-25CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323666336.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-31
Publication Date
2024-10-25
Estimated Expiration
2033-12-31

AI Technical Summary

Technical Problem

In the existing guide hole pile planting technology, the hammer pile driver occupies a large area, takes a long time to use, and is prone to problems such as hammer loss, pile deviation, and pile head damage.

Method used

Design a vibrating pile clamping hammer construction device for PHS square piles, including a steel sleeve, a hydraulic cylinder, a triangular connecting plate and a movable plate. The hydraulic cylinder drives the movable plate to clamp the square pile in the steel sleeve, using vibration The hammer machine is used for construction, which reduces the use time and floor space of the hammer pile machine.

Benefits of technology

It improves construction efficiency, avoids the phenomenon of pile detachment, simplifies construction operations, and reduces construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221895776U_ABST
    Figure CN221895776U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of square pile construction, and provides a vibration pile clamping hammer construction device for a PHS square pile, which comprises a steel sleeve, a hydraulic cylinder is arranged at the top of the steel sleeve, and a triangular connecting plate connected with the output end of the hydraulic cylinder is arranged on one side of the upper portion of the steel sleeve. A movable plate capable of clamping the square pile is arranged on one side of the upper portion of the steel sleeve and located at the position of the triangular connecting plate. A steel sleeve and a hammer head of a vibratory hammer machine are replaced, a construction device can be operated through the vibratory hammer machine, during construction, a square pile is sleeved with the steel sleeve, the hydraulic cylinder receives force, the triangular connecting plate drives the movable plate to enable the square pile to be tightly attached to the steel sleeve, the square pile is stably arranged in the steel sleeve, and then the square pile can be stably clamped, hoisted and pressed into a pile hole. A large amount of time for erecting and moving a pile hammering machine is omitted, the pile can be stably clamped in the steel sleeve, pile disengaging is avoided, the lifting, fixing and pile sinking functions are integrated, the construction operation is simpler, the construction efficiency is higher, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of square pile construction, in particular to a vibration pile clamping hammer construction device for PHS square piles. Background Art

[0002] When prestressed pipe piles encounter complex geological conditions such as gravel, strongly or moderately weathered rock formations, and groundwater, the construction technology of rotary drilling and then implanting pipe piles will be adopted. This technology uses a rotary drilling rig to pre-drill holes, pours in an appropriate amount of concrete, and then uses a hammer pile driver to drive the pipe piles into the pile holes. This technology can effectively improve the construction quality and is suitable for the construction of precast piles in various complex geological conditions.

[0003] In the existing hole-driving pile-planting technology, prefabricated piles are constructed using a pile hammer, which occupies a large area and takes a long time to set up and move. In addition, the use of a pile hammer is prone to hammer loss, pile displacement, and pile head damage. In view of the above-mentioned related problems, the purpose of this application is to design a pile-planting mechanical equipment specifically for hole-driving pile construction. Utility Model Content

[0004] The utility model aims to provide a vibrating pile-clamping hammer construction device for PHS square piles, so as to solve the problems raised in the above-mentioned background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A vibrating pile-clamping hammer construction device for PHS square piles comprises a steel sleeve, a hydraulic cylinder is arranged on the top of the steel sleeve, a triangular connecting plate connected to the output end of the hydraulic cylinder is arranged on one side of the upper part of the steel sleeve, and a movable plate capable of clamping the square pile is arranged at the position of the triangular connecting plate on one side of the upper part of the steel sleeve.

[0007] As a preferred solution of the vibration pile clamp hammer construction device for PHS square piles described in the utility model, a movable groove is opened on one side of the upper part of the steel sleeve, the movable plate is located in the movable groove, and sliding rods are installed inside the movable groove on the front and rear sides of the steel sleeve, the movable plate moves back and forth on the sliding rod, and a reset spring is sleeved on the outer side of the sliding rod between the movable plate and the movable groove.

[0008] As a preferred solution of the vibration pile-clamping hammer construction device for PHS square piles described in the utility model, a limiting column is provided at the end of the sliding rod.

[0009] As a preferred solution of the vibration pile-clamping hammer construction device for PHS square piles described in the utility model, the number of the sliding rods and the return springs are both four, which are respectively arranged on the front and rear sides of the moving groove.

[0010] As a preferred solution of the vibration pile-clamping hammer construction device for PHS square piles described in the utility model, the triangular connecting plate is installed with a reinforcement plate.

[0011] As a preferred solution of the vibration pile-clamping hammer construction device for PHS square piles described in the utility model, a weight-reducing opening is provided on one side of the bottom of the steel sleeve.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] By replacing the steel sleeve with the hammer head of the vibratory hammer, the construction device can be operated by the vibratory hammer. During construction, the square pile is inserted into the steel sleeve, and then the hydraulic cylinder is used to apply force to drive the movable plate through the triangular connecting plate to make the square pile and the steel sleeve close together and stably placed in the steel sleeve. The square pile can be clamped and lifted, and pressed into the pile hole, which saves a lot of time in setting up and moving the hammer pile machine, and the pile can be stably clamped in the steel sleeve to avoid falling off. This application integrates the multiple kinetic energy of lifting, fixing and pile sinking into one, and the construction operation is simpler, the construction efficiency is higher, and the construction cost is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic structural diagram of a vibrating pile-clamping hammer construction device for PHS square piles according to the utility model;

[0015] Figure 2 This is a cross-sectional view of a vibrating pile-clamping hammer construction device for PHS square piles according to the utility model;

[0016] Figure 3 It is a side view of a vibrating pile-clamping hammer construction device for PHS square piles according to the utility model;

[0017] In the figure: 100, steel sleeve; 200, hydraulic cylinder; 300, triangular connecting plate; 400, movable plate; 401, moving groove; 402, sliding rod; 403, return spring. DETAILED DESCRIPTION

[0018] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0019] Obviously, many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0020] See also Figure 1-3The utility model provides a vibrating pile-clamping hammer construction device for PHS square piles: it includes a steel sleeve 100, which can be processed and manufactured according to the size of the prefabricated piles. A hydraulic cylinder 200 is arranged on the top of the steel sleeve 100, and a triangular connecting plate 300 connected to the output end of the hydraulic cylinder 200 is arranged on one side of the upper part of the steel sleeve 100. A movable plate 400 for clamping the square pile is arranged at the position of the triangular connecting plate 300 on one side of the upper part of the steel sleeve 100.

[0021] When in use, the steel sleeve 100 is replaced with the hammer head of the vibratory hammer, and the construction device can be operated by the vibratory hammer. During construction, the square pile is inserted into the steel sleeve 100, and then the hydraulic cylinder 200 is used to generate force to drive the movable plate 400 through the triangular connecting plate 300 to make the square pile and the steel sleeve 100 close together and stably placed in the steel sleeve 100. The square pile can be clamped and lifted, and pressed into the pile hole, which saves a lot of time for setting up and moving the hammer pile driver, and the pile can be stably clamped in the steel sleeve 100 to avoid falling off. The application integrates the kinetic energy of lifting, fixing, and pile sinking into one, and the construction operation is simpler, the construction efficiency is higher, and the construction cost is reduced.

[0022] Preferably, a movable groove 401 is opened on one side of the upper part of the steel sleeve 100, and the movable plate 400 is located in the movable groove 401. Slide rods 402 are installed inside the movable groove 401 on the front and rear sides of the steel sleeve 100. The movable plate 400 moves back and forth on the slide rod 402, and a return spring 403 is sleeved on the outer side of the slide rod 402 between the movable plate 400 and the movable groove 401.

[0023] When in use, the movable plate 400 moves on the movable groove 401 when squeezed, slides on the upper limit position of the slide rod 402 and squeezes the return spring 403. When no longer squeezed, the elastic return of the return spring 403 drives the movable plate 400 to return to its original position.

[0024] Preferably, a limiting column is provided at the end of the sliding rod 402 to facilitate limiting the movable plate 400.

[0025] Preferably, the number of the sliding rods 402 and the number of the return springs 403 are four, which are respectively arranged on the front and rear sides of the moving slot 401 for easy use.

[0026] Preferably, the triangular connecting plate 300 is installed with a reinforcing plate to increase the strength of the triangular connecting plate 300 .

[0027] Preferably, a weight-reducing opening is provided on one side of the bottom of the steel sleeve 100 to facilitate weight reduction.

[0028] Working principle: Replace the steel sleeve 100 with the hammer head of the vibrating hammer, and the construction device can be operated by the vibrating hammer. During construction, the square pile is inserted into the steel sleeve 100, and then the hydraulic cylinder 200 is used to squeeze the movable plate 400 through the triangular connecting plate 300. When the movable plate 400 is squeezed, it moves on the movable groove 401, slides on the upper limit position of the slide rod 402 and squeezes the reset spring 403, so that the square pile is tightly attached to the steel sleeve 100 and stably placed in the steel sleeve 100, so that the square pile can be clamped and lifted, and pressed into the pile hole.

[0029] It will be appreciated that in the development of any actual implementation, as in any engineering or design project, numerous implementation-specific decisions may be made. Such a development effort may be complex and time-consuming, but will be a routine task of design, fabrication, and production for those of ordinary skill having the benefit of this disclosure without undue experimentation.

[0030] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.

Claims

1. A vibrating pile hammer construction device for PHS square piles, It is characterized in that The invention comprises a steel sleeve (100), wherein a hydraulic cylinder (200) is provided on the top of the steel sleeve (100), a triangular connecting plate (300) connected to the output end of the hydraulic cylinder (200) is provided on one side of the upper part of the steel sleeve (100), and a movable plate (400) capable of clamping square piles is provided on one side of the upper part of the steel sleeve (100) at the position of the triangular connecting plate (300).

2. A vibrating pile-clamping hammer construction device for PHS square piles according to claim 1, Features: A movable groove (401) is provided on one side of the upper part of the steel sleeve (100), and the movable plate (400) is located in the movable groove (401). Slide rods (402) are installed inside the movable groove (401) on the front and rear sides of the steel sleeve (100), and the movable plate (400) moves back and forth on the slide rods (402). A return spring (403) is sleeved on the outer side of the slide rod (402) and is located between the movable plate (400) and the movable groove (401).

3. A vibrating pile-clamping hammer construction device for PHS square piles according to claim 2, Features: A limiting column is provided at the end of the sliding rod (402).

4. A vibrating pile-clamping hammer construction device for PHS square piles according to claim 2, Features: The number of the sliding rods (402) and the number of the return springs (403) are both four, and they are respectively arranged on the front and rear sides of the moving groove (401).

5. A vibrating pile-clamping hammer construction device for PHS square piles according to claim 1, Features: The triangular connecting plate (300) is provided with a reinforcing plate.

6. A vibrating pile-clamping hammer construction device for PHS square piles according to claim 1 or 2, Features: A weight-reducing opening is provided on one side of the bottom of the steel sleeve (100).